CN108914923A - A kind of reclaiming land around sea combination layering drainage method for processing foundation - Google Patents
A kind of reclaiming land around sea combination layering drainage method for processing foundation Download PDFInfo
- Publication number
- CN108914923A CN108914923A CN201810908704.7A CN201810908704A CN108914923A CN 108914923 A CN108914923 A CN 108914923A CN 201810908704 A CN201810908704 A CN 201810908704A CN 108914923 A CN108914923 A CN 108914923A
- Authority
- CN
- China
- Prior art keywords
- drainage
- whirl spraying
- foundation
- layering
- vacuum
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/10—Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
Abstract
The invention discloses a kind of reclaiming land around sea to combine layering drainage method for processing foundation, including serous fluid of dredger fill layer, blast layer, sand bedding, whirl spraying bar, virtual drainage channel, virtual drainage direction.Construction procedure is divided into:To wait fill out 1~1.5m of hydraulic fill sand thickness in place;Mud of the hydraulic reclamation with design height again;After standing for 2~March, surface layer bleeding is drained, prepares to vacuumize;Geotextiles are laid with, thickness 30~50cm sand bedding course is repaved, covers sealing film, vacuumize;Sealing film is opened, layering drainage processing is carried out.The present invention combines layering drainage method for processing foundation advantage to be that vertical drainage body penetrates through blast layer+serous fluid of dredger fill layer+three layers of sand bedding foundation structure, shortens foundation soil drainage distance, forms two-sided discharge structure;Layering drainage cuts foundation soil to form multiple horizontal direction drainage channels again, greatly speeds up foundation drainage rate, shortens the duration, reduces project cost.
Description
Technical field
The invention belongs to reclaiming land around sea technical fields, and in particular to a kind of reclaiming land around sea combination layering drainage basement process
Method.
Background technique
Reclaiming land around sea is the important means that coastal area solves construction land.Traditional reclaiming land around sea is generallyd use to banket skill
Art forms land-based area, and the barged-in fill soil property in hydraulic reclamation region is poor, and water content is high, and foundation bearing capacity is low, and sedimentation is not yet stable, therefore needs
Basement process is carried out to barged-in fill, commonly eating filled up ground processing method includes heavy-tamping method and vacuum method, heavy-tamping method
Of fine quality for clay and muddy ground first to select vacuum method suitable for sandy soil, conventional vacuum method is spread using surface layer
If layer of sand and plastic foil are vacuumized, water discharge time is relatively long, and basement process efficiency is lower.
Summary of the invention
In view of the above technical problems, the present invention provides a kind of reclaiming land around sea combination layering drainage method for processing foundation, adds
The fast foundation drainage time, increase basement process efficiency.
Technical solution is as follows:A kind of reclaiming land around sea combines layering drainage method for processing foundation, mainly includes:Serous fluid of dredger fill
Layer, blast layer, sand bedding, vacuum chimney filter, vacuum supervisor, woven cloth, sealing film, sealing ditch, vacuum pump, air compressor machine, whirl spraying are set
Standby vertical drainage body, whirl spraying bar, virtual drainage channel, virtual drainage direction.
Including following construction procedure:
(1) to wait fill out 1~1.5m of hydraulic fill sand thickness in place;
(2) mud of the hydraulic reclamation with design height again;
(3) after standing for 2~March, surface layer bleeding is drained, prepares to vacuumize;
(4) geotextiles are laid with, thickness 30~50cm sand bedding course is repaved, covers sealing film, vacuumize.
(5) sealing film is opened, layering drainage processing is carried out.
It is described to vacuumize as traditional vacuum method, including, sand bedding, vacuum chimney filter, vacuum supervisor, braiding
Cloth seals film, seals ditch, and vacuum pump waits equipment and materials.
The layering drainage is, provides high pressure gas using air compressor machine, is transmitted to whirl spraying equipment, and whirl spraying equipment is to soil
Whirl spraying bar is squeezed into vivo, pressure-air is rotated from whirl spraying bar bottom level to ejection with whirl spraying bar, and soil layer is made to cut to be formed
Horizontal direction drainage channel (virtual), then whirl spraying bar position is changed, whirl spraying is repeated, multiple horizontal channels (virtual) is formed.
Beneficial effects of the present invention are:Vertical drainage body penetrates through blast layer+serous fluid of dredger fill layer+three layers of sand bedding ground base junction
Structure shortens foundation soil drainage distance, forms two-sided discharge structure;Layering drainage again foundation soil is cut to be formed it is more
A horizontal direction drainage channel, greatly speeds up foundation drainage rate, shortens the duration, reduce project cost.
Detailed description of the invention
Fig. 1 is overall schematic of the invention
Fig. 2 is construction procedure (1) (2) schematic diagram of the invention
Fig. 3 is construction procedure (3) (4) schematic diagram of the invention
Fig. 4 is construction procedure (5) schematic diagram of the invention
Wherein 1 in figure:Serous fluid of dredger fill layer, 2:Blast layer, 3:Sand bedding, 4:Vacuum chimney filter, 5;Vacuum supervisor, 6:Braiding
Cloth, 7:Sealing film, 8:Sealing ditch, 9:Vacuum pump, 10:Air compressor machine, 11:Whirl spraying equipment, 12:Vertical drainage body, 13:Whirl spraying bar,
14:Virtual drainage channel, 15:Virtual drainage direction.
Specific embodiment
A specific embodiment of the invention is described with reference to the accompanying drawings and embodiments:
Embodiment 1
As shown in Figure 1, a kind of reclaiming land around sea of the invention combines layering drainage method for processing foundation, it mainly include hydraulic reclamation
Mud layer 1, blast layer 2, sand bedding 3, vacuum chimney filter 4, vacuum supervisor 5, woven cloth 6, sealing film 7, sealing ditch 8, vacuum pump 9,
Air compressor machine 10, whirl spraying equipment 11, vertical drainage body 12, whirl spraying bar 13, virtual drainage channel 14, virtual drainage direction 15.Construction
Steps are as follows:
(1) to wait fill out 1~1.5m of hydraulic fill sand thickness in place, as shown in Figure 2;
(2) again hydraulic reclamation with design height mud, as shown in Figure 2;
(3) after standing for 2~March, surface layer bleeding is drained, prepares to vacuumize;
(4) geotextiles are laid with, thickness 30~50cm sand bedding course is repaved, covers sealing film, vacuumize.
(5) sealing film is opened, layering drainage processing is carried out, the layering drainage is to be provided using air compressor machine 10
High pressure gas, is transmitted to whirl spraying equipment 11, and whirl spraying equipment 11 squeezes into whirl spraying bar 13 into the soil body, and pressure-air is from 13 bottom of whirl spraying bar
Portion's horizontal direction sprays, and rotates with whirl spraying bar, makes soil layer cut to form horizontal direction drainage channel (virtual), then change whirl spraying bar
Position repeats whirl spraying, forms multiple horizontal channels (virtual), as shown in Figure 4.
As shown in figure 3, construction procedure (3) (4) of the invention is conventional method vacuum method, including:(4) it is laid with
Geotextiles repave thickness 30~50cm sand bedding course, cover sealing film, vacuumize.It wherein further include 5, chimney filter of vacuum supervisor under film
It lays, and construction sideline seals digging for ditch, vacuum pump starts to vacuumize, and carries out basement process.
After (2) (3) (4) construction procedure in figure, vertical drainage body penetrates through blast layer+serous fluid of dredger fill layer+sand bedding three
Layer foundation structure, shortens foundation soil drainage distance, forms two-sided discharge structure;Layering drainage again cuts foundation soil
It cuts to form multiple horizontal direction drainage channels, greatly speeds up foundation drainage rate, shorten the duration, reduce project cost.
The preferred embodiment for the present invention is explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations
Mode within the knowledge of a person skilled in the art can also be without departing from the purpose of the present invention
It makes a variety of changes.Many other changes and remodeling can be made by not departing from the spirit and scope of the present invention.It should be appreciated that this hair
Bright to be not limited to specific embodiment, the scope of the present invention is defined by the following claims.
Claims (3)
1. a kind of reclaiming land around sea combines layering drainage method for processing foundation, which is characterized in that including serous fluid of dredger fill layer (1), blow
Layer of sand (2), sand bedding (3), vacuum chimney filter (4), vacuum are responsible for (5), and woven cloth (6) seals film (7), seal ditch (8), vacuum
It pumps (9), air compressor machine (10), whirl spraying equipment (11), vertical drainage body (12), whirl spraying bar (13), virtual drainage channel (14), virtually
Drainage direction (15);Including following construction procedure:
A. to wait fill out 1~1.5m of hydraulic fill sand thickness in place;
B. mud of the hydraulic reclamation with design height again;
C. after standing for 2~March, surface layer bleeding is drained, prepares to vacuumize;
D. geotextiles are laid with, thickness 30~50cm sand bedding course is repaved, covers sealing film, vacuumize;
E. sealing film is opened, layering drainage processing is carried out.
2. a kind of reclaiming land around sea according to claim 1 combines layering drainage method for processing foundation, which is characterized in that institute
That states vacuumizes as traditional vacuum method, including sand bedding (3), and vacuum chimney filter (4), vacuum is responsible for (5), woven cloth (6),
It seals film (7), seals ditch (8) and vacuum pump (9).
3. a kind of reclaiming land around sea according to claim 1 combines layering drainage method for processing foundation, which is characterized in that institute
The layering drainage stated is, provides high pressure gas using air compressor machine (10), is transmitted to whirl spraying equipment (11), whirl spraying equipment (11) to
It is squeezed into the soil body whirl spraying bar (13), pressure-air is rotated from whirl spraying bar (13) bottom level to ejection with whirl spraying bar (13),
Make soil layer cut to form horizontal direction drainage channel, then change whirl spraying bar position, repeats whirl spraying, form multiple horizontal channels.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810908704.7A CN108914923A (en) | 2018-08-10 | 2018-08-10 | A kind of reclaiming land around sea combination layering drainage method for processing foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810908704.7A CN108914923A (en) | 2018-08-10 | 2018-08-10 | A kind of reclaiming land around sea combination layering drainage method for processing foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108914923A true CN108914923A (en) | 2018-11-30 |
Family
ID=64404970
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810908704.7A Pending CN108914923A (en) | 2018-08-10 | 2018-08-10 | A kind of reclaiming land around sea combination layering drainage method for processing foundation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108914923A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109734273A (en) * | 2019-02-25 | 2019-05-10 | 吴慧明 | A kind of construction slurry large-scale treatment method |
CN110294584A (en) * | 2019-07-23 | 2019-10-01 | 中交上海航道勘察设计研究院有限公司 | A kind of device and method that mud dystopy is reinforced using self weight consolidation |
CN111705778A (en) * | 2020-06-20 | 2020-09-25 | 吴慧明 | Gas explosion equipment |
CN111705780A (en) * | 2020-06-20 | 2020-09-25 | 吴慧明 | Gas explosion device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101851914A (en) * | 2010-06-09 | 2010-10-06 | 天津大学 | Method for regulating and controlling ventilating transformation and quickly reinforcing dredger fill in vacuum |
CN102888835A (en) * | 2012-10-24 | 2013-01-23 | 天津大学 | Method for reinforcing dredger fill by sealing and vacuumizing secondary overlaid clay |
CN106677156A (en) * | 2016-12-27 | 2017-05-17 | 吴慧明 | Method for conducting disturbance treatment on soft soil foundation through aerosol |
-
2018
- 2018-08-10 CN CN201810908704.7A patent/CN108914923A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101851914A (en) * | 2010-06-09 | 2010-10-06 | 天津大学 | Method for regulating and controlling ventilating transformation and quickly reinforcing dredger fill in vacuum |
CN102888835A (en) * | 2012-10-24 | 2013-01-23 | 天津大学 | Method for reinforcing dredger fill by sealing and vacuumizing secondary overlaid clay |
CN106677156A (en) * | 2016-12-27 | 2017-05-17 | 吴慧明 | Method for conducting disturbance treatment on soft soil foundation through aerosol |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109734273A (en) * | 2019-02-25 | 2019-05-10 | 吴慧明 | A kind of construction slurry large-scale treatment method |
CN110294584A (en) * | 2019-07-23 | 2019-10-01 | 中交上海航道勘察设计研究院有限公司 | A kind of device and method that mud dystopy is reinforced using self weight consolidation |
CN110294584B (en) * | 2019-07-23 | 2024-02-02 | 中交上海航道勘察设计研究院有限公司 | Device and method for consolidating sludge in different positions by utilizing dead weight |
CN111705778A (en) * | 2020-06-20 | 2020-09-25 | 吴慧明 | Gas explosion equipment |
CN111705780A (en) * | 2020-06-20 | 2020-09-25 | 吴慧明 | Gas explosion device |
CN111705780B (en) * | 2020-06-20 | 2021-10-26 | 吴慧明 | Gas explosion device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108914923A (en) | A kind of reclaiming land around sea combination layering drainage method for processing foundation | |
CN102220757B (en) | Immediate processing method for drainage solidifying of super soft soil shallow surface space | |
CN107419717A (en) | It is pressurized compound vacuum pre-pressed soft soil foundation processing constructing device and technique | |
CN105064383B (en) | Pipe-inserting negative pressure air jet deep-well dewatering device | |
CN105453748B (en) | Stereo totally-closed greening vacuum alkali removing device and application method thereof | |
CN105359659B (en) | Wind-power vacuum alkali reduction apparatus for reclamation of saline and alkaline land and use method of apparatus | |
CN106677158B (en) | A kind of blowing-filling sludge superficial layer Quick uniform processing method and structure recently | |
CN109056694A (en) | A kind of method of shear boost combined vacuum precompressed processing barged-in fill | |
CN105926579B (en) | A kind of adding pressure type sleeve pipe impact drain consolidation system and method | |
CN106120701B (en) | Prepressing structure and method for Perioperative cardiac events blowing-filling sludge epeirogenetic | |
CN104652409A (en) | Continuous forced drainage and compaction combined soft foundation treatment technical method | |
CN206599786U (en) | A kind of construction drainage of foundation pit device | |
CN109295969A (en) | The construction technology of different length drain bar series turbocharging vacuum pre-pressed soft soil foundation | |
CN205142817U (en) | Alkali device falls in saline soil reclamation wind -force vacuum | |
CN105484229B (en) | Vacuum preloading method is sealed suitable for the overlying mud layer of the soft base in waters | |
CN104278686A (en) | Spatial drainage and anti-seepage system for high-water-content dredged sediment yard cofferdam | |
CN207749509U (en) | It is pressurized compound vacuum pre-pressed soft soil foundation processing constructing device | |
CN205917685U (en) | Integral type well dotted arranges vacuum system | |
CN206667225U (en) | A kind of novel solid drainage system of reinforcing soft ground | |
CN105926577B (en) | Vacuum preloading seepage consolidation method | |
CN102912787B (en) | Vacuum preloading method for fine sand mats and filter tube sealing | |
CN104762951A (en) | Construction method of new hydraulic fill muck reclamation by twice straight-line vacuum prepressing treatment | |
CN205917709U (en) | Integral type well dotted arranges house steward vacuum system | |
CN105970910B (en) | Well point plastic strip overlay film vacuum pre-pressed joint precipitating, pre-pressing dynamic consolidation method | |
CN105970909B (en) | Well point plastic strip vacuum preloading seepage consolidation joint precipitating, pre-pressing dynamic consolidation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |
|
RJ01 | Rejection of invention patent application after publication |