CN108911431A - A kind of method and facility arrangement for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage - Google Patents

A kind of method and facility arrangement for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage Download PDF

Info

Publication number
CN108911431A
CN108911431A CN201810999443.4A CN201810999443A CN108911431A CN 108911431 A CN108911431 A CN 108911431A CN 201810999443 A CN201810999443 A CN 201810999443A CN 108911431 A CN108911431 A CN 108911431A
Authority
CN
China
Prior art keywords
water
filler
biological membrane
membrane assembly
grid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810999443.4A
Other languages
Chinese (zh)
Inventor
余意
成官文
于春梅
孙帮周
韦克任
卢文峰
欧奕霏
吴龙记
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANNING GUIRUN ENVIRONMENT ENGINEERING Co Ltd
Original Assignee
NANNING GUIRUN ENVIRONMENT ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANNING GUIRUN ENVIRONMENT ENGINEERING Co Ltd filed Critical NANNING GUIRUN ENVIRONMENT ENGINEERING Co Ltd
Priority to CN201810999443.4A priority Critical patent/CN108911431A/en
Publication of CN108911431A publication Critical patent/CN108911431A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00Multistage treatment of water, waste water or sewage
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/08Aerobic processes using moving contact bodies
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F3/00Biological treatment of water, waste water, or sewage
    • C02F3/02Aerobic processes
    • C02F3/10Packings; Fillings; Grids
    • C02F3/101Arranged-type packing, e.g. stacks, arrays
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/001Processes for the treatment of water whereby the filtration technique is of importance
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/30Treatment of water, waste water, or sewage by irradiation
    • C02F1/32Treatment of water, waste water, or sewage by irradiation with ultraviolet light
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00Treatment of water, waste water, or sewage
    • C02F1/52Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities
    • C02F1/5236Treatment of water, waste water, or sewage by flocculation or precipitation of suspended impurities using inorganic agents
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/007Contaminated open waterways, rivers, lakes or ponds
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00Specific treatment goals
    • C02F2303/04Disinfection
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Abstract

The invention discloses a kind of methods and facility arrangement that compound bio catalytic oxidation emergency processing black and odorous water is choked water using multistage.The method includes:1) grid is set before the flood control pumping plant that the black and odorous water of city inland river enters urban river mainstream;2) multistage is rationally designed between grid and flood control pumping plant choke water gate valve, in the bottom setting bases at different levels choked water and aeration tube, choke water between gate valve and grid and it is two neighboring choke water setting float filler biological membrane assembly between gate valve, on the basis of which is installed on;3) collecting-tank between flood control pumping plant sump and the inland river of city inland river dig deep, in bottom of pond portion setting basis and the aeration tube of catchmenting, on the basis of composite filling biological membrane assembly is set, be sent into the combined filler biological membrane module of collecting-tank by the water outlet that float filler biological membrane assembly is handled and handle;4) water outlet handled through component in collecting-tank carries out mud-water separation, is discharged into city mainstream after disinfection of effluent, sludge then carries out conventional treatment.

Description

A kind of side choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage Method and facility arrangement
Technical field
The present invention relates to the processing methods of black and odorous water, and in particular to a kind of to choke water compound bio catalytic oxidation using multistage The method and facility of emergency processing black and odorous water are arranged.
Background technique
In recent years, with China's Ecological Civilization Construction, sponge urban construction,《Water prevention and cure of pollution action plan》(ten, water) Deepen continuously,《City black and odorous water renovation guide》" dirty, endogenous improvement is cut in control source;Running water circulation, clear water supply; Purification of water quality, restoration of the ecosystem " comprehensive treatment scheme is gradually promoted.To carry out《Water prevention and cure of pollution action plan》, change Kind urban ecological environment, people's governments at all levels accelerate city black and odorous water renovation.It is black for city inland river is effectively treated Smelly water body, various physics, chemical, biological and combined sewage disposal technologies come into being.But due to city inland river Intersection is often in city proper with river mainstream, vulnerable to the influence of city inland river rain flood, river flood position, can be used in The land used of black foul sewage water process is very in short supply, and land used, electricity consumption, processing structures and supplementing facility equipment are vulnerable to flood inundation on tracks shadow It rings, it is more difficult in two side of inland river or mainstream embankment construction conventional sewage treatment facility.It can therefore, it is necessary to provide one kind Emergency and the method that black and odorous water can be effectively treated again.
Summary of the invention
Compound bio catalytic oxidation emergency processing is choked water using multistage the technical problem to be solved in the present invention is to provide a kind of The method and facility of black and odorous water arrange that the black and odorous water in city inland river can be effectively treated in this method, improve urban ecology Environment.
The method of the present invention for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage, including with Lower step:
1) grid is set before the flood control pumping plant that the black and odorous water of city inland river enters urban river mainstream, and grid presses two groups Parallel Design, wherein one is mounted on major river bed, usually gate valve is closed, and rain flood opens flood passage before arriving;It is another to be mounted on major river bed Side, for the bulk suspended matter and floating material in daily interception black and odorous water;
2) according to the COD concentration of black and odorous water in city inland river hydraulic gradient and city inland river, in grid and flood control pumping plant Between rationally design multistage and choke water gate valve, be all turned on flood passage during choking water gate valve rain flood, daily closing is choked water, and black and odorous water is logical Gate valve top overflow is crossed to next stage;
The bottoms setting basis choked water at different levels and aeration tube are being choked water between gate valve and grid and two neighboring are being choked water Float filler biological membrane assembly is set between gate valve, the float filler biological membrane assembly be installed on it is described on the basis of;
The filler that the float filler biological membrane assembly includes stuffing frame and is set on stuffing frame, the filler are Semi soft packing;
3) collecting-tank between flood control pumping plant sump and the inland river of city inland river dig deeply, later at collecting-tank bottom Portion setting basis and aeration tube, are arranged composite filling biological membrane assembly on the basis of described, described to pass through float filler biomembrane The combined filler biological membrane module processing of collecting-tank is sent into the water outlet of component processing;Wherein,
The filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame, the filler by Soft-filler and hard filler press 40-50%:The volume ratio of 50-60% forms;
4) water outlet of combined filler biological membrane module processing is sent into secondary settling tank and carries out mud-water separation in collecting-tank, and water outlet disappears City mainstream is discharged into after poison, sludge then carries out conventional treatment.
In the step 1) of the above method, set on the grid of city inland river river major river bed, preferably grizzly bar gap is 20- The planar grille of 30mm;And the grid for being set to major river bed side is then preferably the rotary grid of grizzly bar gap 10-20mm.Setting Position is preferably before pumping plant of controlling flood at 200-300m.
In the step 2) of the above method, when the hydraulic gradient of city inland river is 5-10 ‰, usually interval 20-25m is set It sets one and chokes water gate valve, choke water available depth and be preferably controlled in 3.0-3.5m.Our experimental result show that working as city inland river When COD concentration >=200mg/L of middle black and odorous water, chokes water series and be preferably controlled in 10 grades or more, more preferably 10-15 grades;When In city inland river when the COD concentration < 200mg/L of black and odorous water, series control is choked water at 6-10 grades, can reach so preferably Treatment effect.
In the step 2) of the above method, the length of the float filler biological membrane assembly is configured as needed, at this It is advisable in application with 5m, width is advisable with 3-3.5m, can be arranged in parallel when city inland river river is wider with multiple groups, frame Height is then preferably the 20-50cm that exposes the surface after installing, and length and width mentioned here and height are the length and width and height of stuffing frame.It is right In stuffing frame, the frame with row-column structure for welding and being formed using metal grizzly bar can be;Filler is installed on the underwater of frame Part is flooded, density of setting of the filler in the frame is that the line space in horizontal direction is 0.25m, between the column in vertical direction Away from for 0.20m.Semi soft packing as filler is existing conventional selection.In the step, the basis is filled out according to floating Expect that the length and width of biological membrane assembly is made with concrete block, it should be noted that the upper end surface on each basis is in same water In plane.During installation, the stuffing frame of float filler biological membrane assembly be installed on it is described on the basis of.
In the step 3) of the above method, the length of the combined biofilm component is configured as needed, the application with It is advisable greater than 15m, width is usually advisable with 3-3.5m;Its height is then the 40-60cm that exposes the surface after installing.Described group of symphysis The width of object membrane module determines according to the collecting-tank width between flood control pumping plant sump and the inland river of city inland river, when catchmenting When pond width >=6m, composite filling biological membrane assembly is designed with multiple groups parallel connection or more gallery pulling flow types, it is preferred to use more gallerys push away Streaming design.The height of combined biofilm component is the 20-50cm that exposes the surface after installing.Length and width and height mentioned here are The length and width and height of stuffing frame.For stuffing frame, the frame with row-column structure for welding and being formed using metal grizzly bar can be, The filler presses 45% by soft-filler and hard filler:55% volume ratio composition.In the step, the basis is root It is made according to the length and width of composite filling biological membrane assembly with concrete block, it should be noted that the upper end surface on each basis In in same level.During installation, the stuffing frame of composite filling biological membrane assembly be installed on it is described on the basis of.
In the step 4) of the above method, when carrying out mud-water separation in secondary settling tank, compound coagulant can be added to improve mud The effect of water separation.The composition and dosage of the compound coagulant are same as the prior art, in the application preferably consisting of: By mole meter, it is made of the aluminium salt of 50-70% and the molysite of 30-50%;Preferably, as COD concentration >=200mg/L When, additional amount is to add by 40-50mg/L;As COD concentration < 200mg/L, additional amount is added by 25-35mg/L.Institute The secondary settling tank stated is preferably radical sedimentation basin (when secondary settling tank diameter >=10m) or vertical sedimentation basin (secondary settling tank diameter≤8m When).Hydraulic detention time of the water outlet of the combined filler biological membrane module processing in secondary settling tank is usually 0.5-1.0h.
In the step 4) of the above method, the operation being dehydrated to sludge is same as the prior art, to dewatered sludge It can carry out the conventional treatments such as strange land landfill.
For the aeration tube of city inland river bottom of river channel sum aggregate basin bottom is arranged in, preferably micro-nano aeration tube is excellent Choosing is supplied oxygen using micro-nano aerator.Micro-nano aerator specifically be can be through aeration main pipe, aeration branch pipe and each aeration tube phase Even, and by the valve on each aeration branch pipe air demand is controlled.
It lifts and removes for the ease of the flood passage phase, it can also be in float filler biological membrane assembly and composite filling biological membrane assembly Stuffing frame on the becket of Liftable is installed, and needing to install float filler biological membrane assembly and composite filling biomembrane group Steelframe is arranged in the position of part.
The invention also includes the facility arrangement used based on above method processing black and odorous water, facility arrangement includes setting Grid, multistage in city inland river choke water gate valve, and the flood control pumping plant, collecting-tank, the secondary settling tank that are set on riverbank;Its In:
The grid includes two groups, wherein one group of major river bed for being set to city inland river, another group is set to by major river bed Side;Two groups of grids are arranged side by side based on the width of city inland river;
The multistage chokes water the downstream that gate valve is located at grid, and the bottoms at different levels choked water are provided with basis and aeration tube, It is choking water between gate valve and grid and two neighboring choke water is provided with float filler biological membrane assembly between gate valve, the drift Floating filler biological membrane module be installed on it is described on the basis of;The float filler biological membrane assembly includes stuffing frame and is set to Filler on stuffing frame, the filler are semi soft packing;
The bottom of pond portion of catchmenting is provided with basis and aeration tube, and composite filling biomembrane group is provided on the basis of described Part, the filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame;
The secondary settling tank is equipped with entrance, water outlet and sludge outlet, and wherein entrance and the pumping plant of collecting-tank setting are discharged The connection of mouthful pipeline, the water outlet of secondary settling tank are disinfected after discharge again through water outlet outflow to city mainstream, the sludge warp in secondary settling tank Sludge outlet discharge.
In above-mentioned facility arrangement, set on the grid of city inland river river major river bed, preferably grizzly bar gap is 20-30mm's Planar grille;And the grid for being set to major river bed side is then preferably the rotary grid of grizzly bar gap 10-20mm.Preferably anti- Grid is set at 200-300m in advance before big vast pumping plant.Every group of grid includes middle grid and fine fack, the middle grid and thin lattice The quantity of grid can be configured as needed, it is generally the case that one group of grid of most upstream is middle grid, subsequent all grids It is fine fack.
In above-mentioned facility arrangement, when the hydraulic gradient of city inland river the is 5-10 ‰ and wherein COD concentration of black and odorous water When >=200mg/L, the series for choking water gate valve is preferably controlled in 10 grades or more, more preferably 10-15 grades;And when black in city inland river When the COD concentration < 200mg/L of smelly water body, series control is choked water at 6-10 grades.
In above-mentioned facility arrangement, the length of the float filler biological membrane assembly is configured as needed, in the application In be advisable with 5m, width is advisable with 3-3.5m, can be arranged in parallel when city inland river river is wider with multiple groups, frame height Expose the surface 20-50cm after then preferably installing, and length and width mentioned here and height are the length and width and height of stuffing frame.For filling out Expect frame, can be the frame with row-column structure for welding and being formed using metal grizzly bar;Filler is installed on flooding under water for frame Part, density of setting of the filler in the frame are that the line space in horizontal direction is 0.25m, and the column pitch in vertical direction is 0.20m.Semi soft packing as filler is existing conventional selection.In the step, the basis is raw according to float filler The length and width of object membrane module is made with concrete block, it should be noted that the upper end surface on each basis is in same level On.During installation, the stuffing frame of float filler biological membrane assembly be installed on it is described on the basis of.
In above-mentioned facility arrangement, the length of the combined biofilm component is configured as needed, and the application is to be greater than 15m is advisable, and width is usually advisable with 3-3.5m;Its height is then the 40-60cm that exposes the surface after installing.The combined biofilm The width of component is determined according to the collecting-tank width between flood control pumping plant sump and the inland river of city inland river, when collecting-tank is wide When degree >=6m, composite filling biological membrane assembly is designed with multiple groups parallel connection or more gallery pulling flow types, it is preferred to use more gallery pulling flow types Design.The height of combined biofilm component is the 20-50cm that exposes the surface after installing.Length and width and height mentioned here are filler The length and width and height of frame.For stuffing frame, the frame with row-column structure for welding and being formed using metal grizzly bar can be, it is described Filler press 45% by soft-filler and hard filler:55% volume ratio composition.In the step, the basis is according to group It closes the length and width of filler biological membrane module to make with concrete block, it should be noted that the upper end surface on each basis is in same On one horizontal plane.During installation, the stuffing frame of composite filling biological membrane assembly be installed on it is described on the basis of.
In above-mentioned facility arrangement, the secondary settling tank can be selected according to day output, specifically, day output exists 2000m3Preferred radical sedimentation basin when/d or more;Day output is in 2000m3/ d and following preferred vertical sedimentation basin.The warp Hydraulic detention time of the water outlet of composite filling biological membrane assembly processing in secondary settling tank is usually 0.5-1.0h.
In above-mentioned facility arrangement, it is also preferable to include a sterilization pools, carry out disinfection for the water outlet to secondary settling tank, the sterilization pool Entrance be connected to the water outlet pipeline of secondary settling tank, it is dry that the sterilized pond water outlet of the water body by disinfection treatment discharges city Stream.
In above-mentioned facility arrangement, it is also preferable to include sludge-tank, entrance is connected to the sludge outlet pipeline of secondary settling tank, is used for The sludge being discharged from secondary settling tank is collected, carries out conventional treatment again after being collected, such as sludge is dehydrated, is filled often Rule processing.
It further further include the sludge integration concentration being dehydrated to the sludge in sludge-tank in above-mentioned facility arrangement Machine, the sludge in sludge-tank are pumped into sludge integration thickening machine through sludge pump and are dehydrated.
In above-mentioned facility arrangement, for the aeration tube of city inland river bottom of river channel sum aggregate basin bottom is arranged in, preferably Micro-nano aeration tube, it is preferred to use micro-nano aerator oxygen supply.Micro-nano aerator specifically be can be through aeration main pipe, aeration branch Pipe is connected with each aeration tube, and controls air demand by the valve on each aeration branch pipe.
In above-mentioned facility arrangement, lifts and remove for the ease of the flood passage phase, it can also be in float filler biological membrane assembly and group Close filler biological membrane module stuffing frame on install Liftable becket, and need to install float filler biological membrane assembly and Steelframe is arranged in the position of composite filling biological membrane assembly.
Compared with prior art, the method for the invention uses float filler biological membrane assembly and composite filling biomembrane group Part is handled, and organic loading is high, can adaptation to local conditions make full use of only narrow city inland river flood control pumping plant and its city River Channel space, which carries out black and odorous water biological treatment, can be effectively treated black and odorous water by aerobic aeration, biological cleaning Transparency, dissolved oxygen, oxidation-reduction potential, ammonia nitrogen make to have little time for the moment at reorganization and expansion or newly-built sewage treatment facility at present The city inland river black and odorous water of reason obtains emergency processing.Meanwhile it avoiding land used, electricity consumption, processing structures and affiliated facility and setting The standby influence vulnerable to flood inundation on tracks.The facility arragement construction used based on the method for the invention is simple, at low cost, treatment effect It is good.
Detailed description of the invention
Fig. 1 is the method institute of the present invention that compound bio catalytic oxidation emergency processing black and odorous water is choked water using multistage A kind of structural schematic diagram of embodiment of the facility arrangement of use.
Figure label is:
Grid in 1,2 fine facks, 3 bases, 4 micro-nano aeration tubes, 5 beckets, 6 float filler biological membrane assemblies, 7 choke water Gate valve, 8 composite filling biological membrane assemblies, 9 collecting-tanks, 10 submersible sewage pumps, 11 water sprayers, 12 secondary settling tanks;13 sterilization pools;14 sludge Pond;15 sludge pumps;16 sludge integration thickening machines.
Specific embodiment
The present invention is described in further detail combined with specific embodiments below, content to better understand the invention, but The present invention is not limited to following embodiments.
Embodiment 1:It is choked water using multistage and is set used by the method for compound bio catalytic oxidation emergency processing black and odorous water Apply arrangement
As shown in Figure 1, facility of the present invention arrangement includes that the grid being set in city inland river, multistage choke water gate valve 7, and the flood control pumping plant, collecting-tank 9, secondary settling tank 12, sterilization pool 13, sludge-tank 14 and the sludge integration that are set on riverbank be dense Contracting dewaterer 16;Wherein:
The grid includes two groups, wherein one group of major river bed for being set to city inland river, another group is set to by major river bed Side;Two groups of grids are arranged side by side based on the width of city inland river;Every group of grid includes middle grid 1 and fine fack 2.It is set to master The gap of adjacent two grid in riverbed is 20mm, and the gap for being set to adjacent two grid of major river bed side is 10mm;
The multistage chokes water the downstream that gate valve 7 is located at grid, and the bottoms at different levels choked water are provided with basis 3 and micro-nano Aeration tube 4 is being choked water between gate valve 7 and grid and two neighboring choke water is provided with float filler biological membrane assembly between gate valve 7 6, the float filler biological membrane assembly 6 is installed on the basis 3;The float filler biological membrane assembly 6 includes Stuffing frame and the filler being set on stuffing frame, the filler are semi soft packing;The afterbody chokes water 7 top of gate valve The water body of overflow enters collecting-tank 9;
9 bottom of collecting-tank is provided with basis 3 and micro-nano aeration tube 4, is provided with combination on the basis 3 and fills out Expect that biological membrane assembly 8, the composite filling biological membrane assembly 8 include stuffing frame and the filler being set on stuffing frame;Through collecting The water body that composite filling biological membrane assembly 8 is handled in pond 9 is pumped into secondary settling tank 12 through submersible sewage pump 10;In the pressure pipe of submersible sewage pump 10 Water sprayer 11 is set in path, compound coagulant is added by 11 negative pressure of water sprayer and is sufficiently mixed with black foul sewage water;
The secondary settling tank 12 is equipped with entrance, water outlet and sludge outlet, and the pumping plant that wherein entrance is arranged with collecting-tank 9 goes out The connection of mouth of a river pipeline, the water outlet of secondary settling tank 12 are connected to the inlet duct of sterilization pool 13, and the water body by disinfection treatment is through disappearing Malicious 13 water outlet of pond is expelled to city mainstream, and the sludge in secondary settling tank 12 is discharged through sludge outlet;
The sludge outlet of the secondary settling tank 12 is connected to the inlet duct of sludge-tank 14, is provided with sludge in sludge-tank 14 15 are pumped, the sludge in sludge-tank 14 is pumped into sludge integration thickening machine 16 through the sludge pump 15 and is dehydrated.
In above embodiment, the spacing of city inland river flood control pumping plant and the grid farthest apart from its is 270m;Every 30m Design level-one chokes water gate valve 7, and in 3.0m, finally choking water series is 8 grades for available depth control at this time;Choking water gate valve 7 and grid Between and two neighboring choke water 5 groups of float filler biological membrane assemblies 6 are respectively provided between gate valve 7, the stuffing frame be using gold Belong to grizzly bar and welds the frame with row-column structure to be formed, a length of 5m, width 3m, a height of 3.5m;The filler is medium-soft Property filler, flood under water filling (i.e. all fillers are submerged under water), density of setting of the filler in the frame be level side Upward line space is 0.25m, and the column pitch in vertical direction is 0.20m.Float filler biological membrane assembly 6 is fixed on interior river bed On the basis 3 in portion, expose the surface 50cm at top.Collecting-tank 9 after excavating is having a size of 18m × 17m (long × wide), the depth of water 4m.The long 18m of 5 gallerys, width 3m, high 4.5m are set in collecting-tank 9, fill the composite filling biomembrane of soft-filler and hard filler Component 8, stuffing frame are that the frame with row-column structure to be formed is welded using metal grizzly bar, are equipped with Liftable in stuffing frame Becket 5;Filler is the combination of soft-filler and hard filler, and the soft-filler and hard filler are in filling space Accounting is 45%:55% (volume ratio).The secondary settling tank 12 is radical sedimentation basin.It is described at different levels to choke water bottom and collecting-tank The basis 3 of 9 bottoms is all made of concrete block and makes, and each basic 3 top end face is in same level;It is described at different levels to choke water bottom Portion and 9 bottom of collecting-tank are arranged micro-nano aeration tube 4 and are supplied oxygen using micro-nano aerator.The composition of the compound coagulant and its Additional amount is identical as existing conventional techniques.
Embodiment 2:The method that processing city inland river black and odorous water is arranged using facility shown in Fig. 1
In one city inland river black and odorous water of south Guangxi city, the COD of annual black foul sewage water in 2016crConcentration is 155- 268mg/L, dissolved oxygen 0.3-1.7mg/L, transparency 8-17cm, oxidation-reduction potential are in 8--39mV, ammonia nitrogen 4.69- 15.66mg/L.The hydraulic gradient in the city is inland river 4.5 ‰.
1) two groups of grids are arranged side by side in advance in the river of 300m before city inland river controls flood pumping plant, wherein one group is set to River Channel major river bed, the gap of adjacent two grid are 20mm, and usually gate valve is closed, and rain flood opens flood passage before arriving;Another group Be set to major river bed side, the gap of adjacent two grid is 10mm, in daily interception black and odorous water bulk suspended matter with Floating material;
2) according to the hydraulic gradient in the inland river, gate valve is being choked water every 30m design level-one, depth of water control is being effective and exists 3.0m opens flood passage during choking water gate valve rain flood, and daily closing is choked water, and black and odorous water passes through overflow at the top of gate valve to next stage;
Finishing slope protection is carried out to the rivers at different levels of choking water of formation, increases safety device, in bottom of river channel by interval 5m Concrete foundation is set, and the top end face for controlling each basis is in same level;
Micro-nano aeration tube is set in city inland river bottom, is supplied oxygen using micro-nano aerator;
It is choking water between gate valve and grid and 5 groups of float filler biological membrane assemblies are arranged in two neighboring choke water between gate valve, The filler that the float filler biological membrane assembly includes stuffing frame and is set on stuffing frame, wherein stuffing frame is using gold Belong to grizzly bar and welds the frame with row-column structure to be formed, a length of 5m, width 3m, a height of 3.5m;The filler is medium-soft Property filler, flood under water filling (i.e. all fillers are submerged under water), density of setting of the filler in the frame be level side Upward line space is 0.25m, and the column pitch in vertical direction is 0.20m.Float filler biological membrane assembly is fixed on interior river bed On the basis of portion, expose the surface 50cm at top;
Since the COD concentration of black and odorous water is fluctuated in 200mg/L or so, therefore series is choked water using 10 grades of designs in inland river;
The water body that the afterbody chokes water overflow at the top of gate valve enters collecting-tank;
3) collecting-tank between the flood control pumping plant sump and inland river of city inland river is 20m × 18m (long × wide), and the depth of water is about 2.5m.Collecting-tank is excavated, depth 1.5m is dug, is allowed to the depth of water up to 4.0m;
In bottom of pond portion setting concrete foundation of catchmenting, the top end face for controlling each basis is in same level;
Catchmenting, micro-nano aeration tube is arranged in bottom of pond portion, is supplied oxygen using micro-nano aerator;
The long 20m of 5 gallerys, width 3m, high 4.5m are set in collecting-tank, the composite filling for filling soft-filler and hard filler is raw Object membrane module, the filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame, wherein stuffing frame To weld the frame with row-column structure to be formed using metal grizzly bar, filler is the combination of soft-filler and hard filler, institute Stating the accounting of soft-filler and hard filler in filling space is 45%:55% (volume ratio);It is being mounted with composite filling The becket that Liftable is installed on stuffing frame, removes to lift when rainy season flood passage;
In the bottom of pond portion setting submersible sewage pump that catchments, by the water body handled through composite filling biological membrane assembly in collecting-tank through being pumped into Secondary settling tank;And water sprayer is set on the pressure pipeline path of submersible sewage pump, by water sprayer negative pressure by compound coagulant add with Black foul sewage water is sufficiently mixed;The compound coagulant is made of the aluminium chloride of 65mol% and the ferric sulfate of 35mol%, is thrown Dosage is added the benchmark of 45mg by every liter of black and odorous water;
4) through submersible sewage pump to be promoted to urban river mainstream big for the water outlet of combined filler biological membrane module processing in collecting-tank Secondary settling tank (radical sedimentation basin) on the outside of dike carries out mud-water separation, and it is 1.0h that secondary settling tank, which designs hydraulic detention time,;Through detecting, The transparency > 30cm of secondary clarifier effluent, dissolved oxygen are greater than 2.2mg/L, and oxidation-reduction potential is greater than 65mV, and ammonia nitrogen is less than 6.5mg/L, water outlet are sent into sterilization pool through secondary clarifier effluent mouth and carry out ultraviolet disinfection, and then sterilized pond water outlet is expelled to city River mainstream, the sludge of precipitating are expelled to sludge-tank, and the sludge in the sludge-tank is set the pump of the sludge pump in sludge-tank Enter sludge integration thickening machine to be dehydrated, send refuse landfill landfill disposal later.
Embodiment 3:The method for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage
In one city inland river black and odorous water of Central Guangxi city, the COD of annual black foul sewage water in 2017crConcentration is 165- 336mg/L, dissolved oxygen 0.2-1.3mg/L, transparency 5-16cm, oxidation-reduction potential are in 3--69mV, ammonia nitrogen 5.67- 27.01mg/L.The hydraulic gradient in the city is inland river 4 ‰.
1) two groups of parallel connection grids are set in advance in the river of 380m before city inland river controls flood pumping plant, wherein one group is set to River Channel major river bed, the gap of adjacent two grid are 20mm, and usually gate valve is closed, and rain flood opens flood passage before arriving;Another group Be set to major river bed side, the gap of adjacent two grid is 10mm, in daily interception black and odorous water bulk suspended matter with Floating material.
2) according to the hydraulic gradient in the inland river, gate valve is choked water designing one every 30m, depth of water control is effective and exists 3.5m opens flood passage during choking water gate valve rain flood, and daily closing is choked water, and black and odorous water passes through overflow at the top of gate valve to next stage;
River is choked water to the multistage of formation and carries out finishing slope protection, increases safety device, in bottom of river channel by interval 5m Concrete foundation is set, and the top end face for controlling each basis is in same level;
Micro-nano aeration tube is set in city inland river bottom, is supplied oxygen using micro-nano aerator;
It is choking water between gate valve and grid and 5 groups of float filler biomembrane groups are arranged in two neighboring choke water between gate valve Part, the filler that the float filler biological membrane assembly includes stuffing frame and is set on stuffing frame, wherein stuffing frame is to use Metal grizzly bar welds the frame with row-column structure to be formed, a length of 5m, width 3m, a height of 4.0m;The filler is half Soft-filler floods filling (all fillers are submerged under water) under water, and density of setting of the filler in the frame is level side Upward line space is 0.25m, and the column pitch in vertical direction is 0.20m.Float filler biological membrane assembly is fixed on interior river bed On the basis of portion, expose the surface 50cm at top;
When being greater than 200mg/L due to the COD concentration most of time of black and odorous water, therefore inland river is choked water series and is set using 12 grades Meter.
3) collecting-tank between the flood control pumping plant sump and inland river of city inland river is 20m × 18m (long × wide), and the depth of water is about 2.6m.Collecting-tank is excavated, depth 1.4m is dug, is effective the depth of water up to 4.0m;
In bottom of pond portion setting concrete foundation of catchmenting, the top end face for controlling each basis is in same level;
Catchmenting, micro-nano aeration tube is arranged in bottom of pond portion, is supplied oxygen using micro-nano aerator;
The long 20m of 5 gallerys, width 3.2m, depth 4.5m are set in collecting-tank, fill the composite filling of soft-filler and hard filler Biological membrane assembly, the filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame, wherein filler Frame is that the frame with row-column structure to be formed is welded using metal grizzly bar, and filler is the combination of soft-filler and hard filler, The accounting of the soft-filler and hard filler in filling space is 40%:60% (volume ratio);It is raw in filling composite filling The becket that Liftable is installed on the stuffing frame of object membrane module, removes to lift when rainy season flood passage;
In the bottom of pond portion setting submersible sewage pump that catchments, by the water body handled through composite filling biological membrane assembly in collecting-tank through being pumped into Secondary settling tank;And water sprayer is set on the pressure pipeline path of submersible sewage pump, by water sprayer negative pressure by compound coagulant add with Black foul sewage water is sufficiently mixed;The compound coagulant is made of the aluminium chloride of 70mol% and the ferric sulfate of 30mol%, is thrown Dosage is added the benchmark of 55mg by every liter of black and odorous water;
4) through submersible sewage pump to be promoted to urban river mainstream big for the water outlet of combined filler biological membrane module processing in collecting-tank Secondary settling tank (radical sedimentation basin) on the outside of dike carries out mud-water separation, and it is 1.0h that secondary settling tank, which designs hydraulic detention time,;Through detecting, The transparency > 30cm of secondary clarifier effluent, dissolved oxygen > 2.2mg/L, oxidation-reduction potential > 60mV, ammonia nitrogen < 7.1mg/L, out Water is sent into sterilization pool through secondary clarifier effluent mouth and carries out ultraviolet disinfection, and then sterilized pond water outlet is expelled to urban river mainstream, The sludge of precipitating is expelled to sludge-tank, and the sludge in the sludge-tank is set the sludge pump in sludge-tank and is pumped into sludge one Change thickening machine to be dehydrated, send refuse landfill landfill disposal later.

Claims (10)

1. it is a kind of using the multistage method for choking water compound bio catalytic oxidation emergency processing black and odorous water, include the following steps:
1) grid is set before the flood control pumping plant that the black and odorous water of city inland river enters urban river mainstream, and grid is in parallel by two groups Design, wherein one is mounted on major river bed, usually gate valve is closed, and rain flood opens flood passage before arriving;It is another to be mounted on major river bed side, For the bulk suspended matter and floating material in daily interception black and odorous water;
2) according to the COD concentration of black and odorous water in city inland river hydraulic gradient and city inland river, between grid and flood control pumping plant It rationally designs multistage and chokes water gate valve, be all turned on flood passage during choking water gate valve rain flood, daily closing is choked water, and black and odorous water passes through lock Overflow is to next stage at the top of valve;
The bottoms setting basis choked water at different levels and aeration tube, choke water between gate valve and grid and it is two neighboring choke water gate valve it Between float filler biological membrane assembly is set, the float filler biological membrane assembly be installed on it is described on the basis of;
The filler that the float filler biological membrane assembly includes stuffing frame and is set on stuffing frame, the filler are medium-soft Property filler;
3) collecting-tank between flood control pumping plant sump and the inland river of city inland river dig deeply, be set later in bottom of pond portion of catchmenting Basis and aeration tube are set, composite filling biological membrane assembly is set on the basis of described, it is described to pass through float filler biological membrane assembly The combined filler biological membrane module processing of collecting-tank is sent into the water outlet of processing;Wherein,
The filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame, the filler is by soft Filler and hard filler press 40-50%:The volume ratio of 50-60% forms;
4) water outlet of combined filler biological membrane module processing is sent into secondary settling tank and carries out mud-water separation in collecting-tank, after disinfection of effluent It is discharged into city mainstream, sludge then carries out conventional treatment.
2. according to the method described in claim 1, it is characterized in that:In step 1), set on the grid of major river bed, adjacent two grid Gap be 20-30mm;Set on the grid of major river bed side, the gap of adjacent two grid is then preferably 10-20mm.
3. according to the method described in claim 1, it is characterized in that:In step 2), when the COD of black and odorous water in city inland river is dense When degree >=200mg/L, series control is choked water at 10 grades or more;As the COD concentration < 200mg/L of black and odorous water in city inland river When, series control is choked water at 6-10 grades.
4. according to the method described in claim 1, it is characterized in that:In step 2), the width of the float filler biological membrane assembly Degree is 3-3.5m, and height is the 20-50cm that exposes the surface after installing.
5. according to the method described in claim 1, it is characterized in that:In step 3), the width root of the combined biofilm component It is determined according to the collecting-tank width between flood control pumping plant sump and the inland river of city inland river, as collecting-tank width >=6m, group Filler biological membrane module is closed with multiple groups parallel connection or the design of more gallery pulling flow types, height is the 20-50cm that exposes the surface after installing.
6. according to the method described in claim 1, it is characterized in that:In step 3), the filler is by soft-filler and hardness Filler presses 45%:55% volume ratio composition.
7. according to the method described in claim 1, it is characterized in that:Step 2) and 3) in, the basis be filled out according to floating The length and width of material biological membrane assembly or composite filling biological membrane assembly is made with concrete block, the upper surface on the basis In same level.
8. the facility arrangement used based on claim 1 the method processing black and odorous water, it is characterised in that:Including being set to city The grid of city korneforos, multistage choke water gate valve, and the flood control pumping plant, collecting-tank, the secondary settling tank that are set on riverbank;Wherein:
The grid includes two groups, wherein one group of major river bed for being set to city inland river, another group is set to major river bed side;Two Group grid is arranged side by side based on the width of city inland river;
The multistage chokes water the downstream that gate valve is located at grid, and the bottoms at different levels choked water are provided with basis and aeration tube, are stopping up Between Water gate valve and grid and two neighboring choke water is provided with float filler biological membrane assembly between gate valve, the float filler Biological membrane assembly be installed on it is described on the basis of;The float filler biological membrane assembly includes stuffing frame and is set to stuffing frame On filler, the filler be semi soft packing;The water body that the afterbody chokes water overflow at the top of gate valve enters collecting-tank;
The bottom of pond portion of catchmenting is provided with basis and aeration tube, and composite filling biological membrane assembly is provided on the basis of described, The filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame;It is raw through composite filling in collecting-tank The water body of object membrane module processing is sent into secondary settling tank through pipeline;
The secondary settling tank is equipped with entrance, water outlet and sludge outlet, and wherein entrance is connected to the water outlet pipeline of collecting-tank, and two The water outlet in heavy pond is disinfected after discharge again through water outlet outflow to city mainstream, and the sludge in secondary settling tank is discharged through sludge outlet.
9. facility arrangement according to claim 8, it is characterised in that:It is set to the bases at different levels for choking water bottom and is setting The basis for bottom of pond portion of catchmenting is placed in as according to the length and width of float filler biological membrane assembly or composite filling biological membrane assembly It is made with concrete block, the upper end surface on the basis is in same level.
10. facility arrangement according to claim 8 or claim 9, it is characterised in that:The secondary settling tank be radical sedimentation basin or Vertical sedimentation basin.
CN201810999443.4A 2018-08-30 2018-08-30 A kind of method and facility arrangement for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage Pending CN108911431A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810999443.4A CN108911431A (en) 2018-08-30 2018-08-30 A kind of method and facility arrangement for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810999443.4A CN108911431A (en) 2018-08-30 2018-08-30 A kind of method and facility arrangement for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage

Publications (1)

Publication Number Publication Date
CN108911431A true CN108911431A (en) 2018-11-30

Family

ID=64406965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810999443.4A Pending CN108911431A (en) 2018-08-30 2018-08-30 A kind of method and facility arrangement for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage

Country Status (1)

Country Link
CN (1) CN108911431A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012010096A1 (en) * 2010-07-20 2012-01-26 华南理工大学 Device for synchronously removing nitrogen and phosphorus in mixed municipal sewage and fecal sewage by using a2/o-biomembrane and method thereof
CN204752468U (en) * 2015-05-16 2015-11-11 深圳市万山红环保实业有限公司 Pollute river course water normal position and administer device
CN107721087A (en) * 2017-11-22 2018-02-23 广东中环生态科技有限公司 Black and odorous water multi-stage filtration systems and multistage purification technique

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012010096A1 (en) * 2010-07-20 2012-01-26 华南理工大学 Device for synchronously removing nitrogen and phosphorus in mixed municipal sewage and fecal sewage by using a2/o-biomembrane and method thereof
CN204752468U (en) * 2015-05-16 2015-11-11 深圳市万山红环保实业有限公司 Pollute river course water normal position and administer device
CN107721087A (en) * 2017-11-22 2018-02-23 广东中环生态科技有限公司 Black and odorous water multi-stage filtration systems and multistage purification technique

Similar Documents

Publication Publication Date Title
CN104529089B (en) Serious pollution small rivers cleaning system
CN102531289B (en) On-site purification system for urban black and smelly inland rivers
CN1876977A (en) Water flow quality-divided discharge method for urban river rain and sewage mixed flow pipe network
CN100464812C (en) Artificial reinforced land percolation sewage treatment apparatus
CN109020091A (en) A kind of combined type artificial marsh sewage treatment system and its processing method
CN103991934B (en) A kind of Multi-level deflector being suitable for Sewage advanced treatment declines electrolyzer and method
CN212504449U (en) In-situ gravel purification system in river channel
CN112047535A (en) Quality-classified and partition CSO regulation and storage purification system and rainwater purification method
CN110790451A (en) Black odorous water treatment system and method for treating black odorous water by using same
CN109403264A (en) Rivers and canals enter the method that river mouth sewage treatment facility setting pot uses artificial bend to choke water
CN108408802A (en) System is cut down in the overflow of combined system pipe network and water pollution integration
CN108483827B (en) Treatment and purification system for urban rain water channel main channel effluent
CN208980531U (en) A kind of facility arrangement of emergency processing black and odorous water
CN108911431A (en) A kind of method and facility arrangement for choking water compound bio catalytic oxidation emergency processing black and odorous water using multistage
CN215102348U (en) Overflow sewage treatment and regulation system for reducing bottom mud pollution of drainage pipe network
KR101709908B1 (en) Multipurpose Dam For Eco Friendly
JPH04265329A (en) Rain-water disposal method of sewerags system, and construction method of rain-water disposal equipment and rain-water retardation pipe line
CN107651751A (en) A kind of riverbank formula filtration system and method with water remediation function
CN210764871U (en) Small-size riverway water body repair system
DE19938922A1 (en) Purification of groundwater containing pollutants, using chemical reaction and adsorption container
KR102036353B1 (en) Environment-friendly duct-type eco-beam
JP4634492B2 (en) Underground storage tank
CN105178415A (en) System and method for disposal of sediment in combined drainage pipeline
CN109095706A (en) A kind of river channel ERP integration cuts dirty governing system and method
CN108892332A (en) A kind of method and facility arrangement using tower biological filter emergency processing city inland river black and odorous water

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 530200 Datang No. 1 Building 903, 21 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region

Applicant after: Guirun Environmental Science and Technology Co., Ltd.

Address before: 530200 Datang No. 1 Building 903, 21 Pingle Avenue, Liangqing District, Nanning City, Guangxi Zhuang Autonomous Region

Applicant before: NANNING GUIRUN ENVIRONMENT ENGINEERING CO., LTD.