CN208980531U - A kind of facility arrangement of emergency processing black and odorous water - Google Patents

A kind of facility arrangement of emergency processing black and odorous water Download PDF

Info

Publication number
CN208980531U
CN208980531U CN201821407867.9U CN201821407867U CN208980531U CN 208980531 U CN208980531 U CN 208980531U CN 201821407867 U CN201821407867 U CN 201821407867U CN 208980531 U CN208980531 U CN 208980531U
Authority
CN
China
Prior art keywords
water
tank
sludge
gate valve
secondary settling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821407867.9U
Other languages
Chinese (zh)
Inventor
余意
成官文
于春梅
孙帮周
韦克任
卢文峰
欧奕霏
吴龙记
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guirun Environmental Science And Technology Co Ltd
GREEN ENVIRONMENTAL Tech Co Ltd
Original Assignee
Guirun Environmental Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guirun Environmental Science And Technology Co Ltd filed Critical Guirun Environmental Science And Technology Co Ltd
Priority to CN201821407867.9U priority Critical patent/CN208980531U/en
Application granted granted Critical
Publication of CN208980531U publication Critical patent/CN208980531U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W10/00Technologies for wastewater treatment
    • Y02W10/10Biological treatment of water, waste water, or sewage

Landscapes

  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

The utility model discloses a kind of facility of emergency processing black and odorous water arrangement, gate valve is choked water including the grid that is set in city inland river, multistage, and the flood control pumping plant, collecting-tank, the secondary settling tank that are set on riverbank;Wherein: grid includes two groups, and one is mounted on major river bed, and another group is set to major river bed side;Two groups of grids are arranged side by side based on the width of city inland river;Multistage chokes water the downstream that gate valve is located at grid, and the bottoms at different levels choked water are provided with basis and aeration tube, are choking water between gate valve and grid and two neighboring choke water is provided with float filler biological membrane assembly between gate valve, on the basis of which is installed on;The water body that afterbody chokes water overflow at the top of gate valve enters collecting-tank;Bottom of pond portion of catchmenting is equipped with basis and aeration tube, on the basis of be equipped with composite filling biological membrane assembly, the water outlet of collecting-tank is sent into secondary settling tank through pipeline;Water outlet through secondary settling tank is disinfected after discharge again through water outlet outflow to city mainstream.

Description

A kind of facility arrangement of emergency processing black and odorous water
Technical field
The utility model relates to black and odorous water processing technology fields, and in particular to a kind of facility of emergency processing black and odorous water Arrangement.
Background technique
In recent years, with China's Ecological Civilization Construction, sponge urban construction, " water prevention and cure of pollution action plan " (water ten Item) deepen continuously, " city black and odorous water renovation guide " " dirty, endogenous improvement is cut in control source;Running water circulation, clear water are mended It gives;Purification of water quality, restoration of the ecosystem " comprehensive treatment scheme is gradually promoted.To carry out " water prevention and cure of pollution action plan ", Improve urban ecological environment, people's governments at all levels accelerate city black and odorous water renovation.For city inland river is effectively treated Black and odorous water, various physics, chemical, biological and combined sewage disposal technologies come into being.But due in city River and river mainstream intersection are often in city proper, vulnerable to the influence of city inland river rain flood, river flood position, Neng Gouyong It is very in short supply in the land used of black foul sewage water process, and land used, electricity consumption, processing structures and supplementing facility equipment are vulnerable to flood inundation on tracks It influences, it is more difficult in two side of inland river or mainstream embankment construction conventional sewage treatment facility.Therefore, it is necessary to provide a kind of energy Enough emergency and the facility arrangement that black and odorous water can be effectively treated again.
Utility model content
The technical problem to be solved by the present invention is to provide a kind of facility of emergency processing black and odorous water arrangement, the facilities Arragement construction is simple, at low cost, and the black and odorous water in city inland river can be effectively treated in conjunction with specific method.
The facility of emergency processing black and odorous water described in the utility model arranges that facility arrangement includes being set in city The grid of korneforos, multistage choke water gate valve, and the flood control pumping plant, collecting-tank, the secondary settling tank that are set on riverbank;Wherein:
The grid includes two groups, wherein one group of major river bed for being set to city inland river, another group is set to by major river bed Side;Two groups of grids are arranged side by side based on the width of city inland river;
The multistage chokes water the downstream that gate valve is located at grid, and the bottoms at different levels choked water are provided with basis and aeration tube, It is choking water between gate valve and grid and two neighboring choke water is provided with float filler biological membrane assembly between gate valve, the drift Floating filler biological membrane module be installed on it is described on the basis of;The float filler biological membrane assembly includes stuffing frame and is set to Filler on stuffing frame, the filler are semi soft packing;The water body that afterbody chokes water overflow at the top of gate valve, which enters, to catchment Pond;
The bottom of pond portion of catchmenting is provided with basis and aeration tube, and composite filling biomembrane group is provided on the basis of described Part, the filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame;
The secondary settling tank is equipped with entrance, water outlet and sludge outlet, and wherein entrance and the pumping plant of collecting-tank setting are discharged The connection of mouthful pipeline, the water outlet of secondary settling tank are disinfected after discharge again through water outlet outflow to city mainstream, the sludge warp in secondary settling tank Sludge outlet discharge.
In above-mentioned facility arrangement, set on the grid of city inland river river major river bed, preferably grizzly bar gap is 20-30mm Planar grille;And the grid for being set to major river bed side is then preferably the rotary grid of grizzly bar gap 10-20mm.Preferably Grid is set at 200-300m in advance before pumping plant of controlling flood.Every group of grid includes middle grid and fine fack, the middle grid and The quantity of fine fack can be configured as needed, it is generally the case that one group of grid of most upstream is middle grid, subsequent all Grid is fine fack.
In above-mentioned facility arrangement, when the hydraulic gradient of city inland river the is 5-10 ‰ and wherein COD concentration of black and odorous water When >=200mg/L, the series for choking water gate valve is preferably controlled in 10 grades or more, more preferably 10-15 grades;And when in city inland river When the COD concentration < 200mg/L of black and odorous water, series control is choked water at 6-10 grades.
In above-mentioned facility arrangement, the length of the float filler biological membrane assembly is configured as needed, in the application In be advisable with 5m, width is advisable with 3-3.5m, can be arranged in parallel when city inland river river is wider with multiple groups, frame height Expose the surface 20-50cm after then preferably installing, and length and width mentioned here and height are the length and width and height of stuffing frame.For filling out Expect frame, can be the frame with row-column structure for welding and being formed using metal grizzly bar;Filler is installed on flooding under water for frame Part, density of setting of the filler in the frame are that the line space in horizontal direction is 0.25m, and the column pitch in vertical direction is 0.20m.Semi soft packing as filler is existing conventional selection.In the step, the basis is raw according to float filler The length and width of object membrane module is made with concrete block, it should be noted that the upper end surface on each basis is in same level On.During installation, the stuffing frame of float filler biological membrane assembly be installed on it is described on the basis of.
In above-mentioned facility arrangement, the length of the combined biofilm component is configured as needed, and the application is to be greater than 15m is advisable, and width is usually advisable with 3-3.5m;Its height is then the 40-60cm that exposes the surface after installing.The combination biology The width of membrane module is determined according to the collecting-tank width between flood control pumping plant sump and the inland river of city inland river, works as collecting-tank When width >=6m, composite filling biological membrane assembly is designed with multiple groups parallel connection or more gallery pulling flow types, it is preferred to use more gallery plug-flows Formula design.The height of combined biofilm component is the 20-50cm that exposes the surface after installing.Length and width and height mentioned here are to fill out Expect the length and width and height of frame.For stuffing frame, the frame with row-column structure for welding and being formed using metal grizzly bar, institute can be The filler stated is made of soft-filler and hard filler by the volume ratio of 45%:55%.In the step, the basis is basis The length and width of composite filling biological membrane assembly with concrete block make, it should be noted that the upper end surface on each basis in In same level.During installation, the stuffing frame of composite filling biological membrane assembly be installed on it is described on the basis of.
In above-mentioned facility arrangement, the secondary settling tank can be selected according to day output, specifically, day output exists 2000m3Preferred radical sedimentation basin when/d or more;Day output is in 2000m3/ d and following preferred vertical sedimentation basin.The warp Hydraulic detention time of the water outlet of composite filling biological membrane assembly processing in secondary settling tank is usually 0.5-1.0h.
In above-mentioned facility arrangement, it is also preferable to include a sterilization pools, carry out disinfection for the water outlet to secondary settling tank, the sterilization pool Entrance be connected to the water outlet pipeline of secondary settling tank, it is dry that the sterilized pond water outlet of the water body by disinfection treatment discharges city Stream.
In above-mentioned facility arrangement, it is also preferable to include sludge-tank, entrance is connected to the sludge outlet pipeline of secondary settling tank, is used for The sludge being discharged from secondary settling tank is collected, carries out conventional treatment again after being collected, such as sludge is dehydrated, is filled often Rule processing.
It further further include the sludge integration concentration being dehydrated to the sludge in sludge-tank in above-mentioned facility arrangement Machine, the sludge in sludge-tank are pumped into sludge integration thickening machine through sludge pump and are dehydrated.
In above-mentioned facility arrangement, for the aeration tube of city inland river bottom of river channel sum aggregate basin bottom is arranged in, preferably Micro-nano aeration tube, it is preferred to use micro-nano aerator oxygen supply.Micro-nano aerator specifically be can be through aeration main pipe, aeration branch Pipe is connected with each aeration tube, and controls air demand by the valve on each aeration branch pipe.
In above-mentioned facility arrangement, lifts and remove for the ease of the flood passage phase, it can also be in float filler biological membrane assembly and group Close filler biological membrane module stuffing frame on install Liftable becket, and need to install float filler biological membrane assembly and Steelframe is arranged in the position of composite filling biological membrane assembly.
Compared with prior art, the utility model structure is simple, at low cost, black to city inland river smelly in conjunction with specific method Water body has good treatment effect.
Detailed description of the invention
Fig. 1 is that a kind of structure for embodiment that the facility of emergency processing black and odorous water described in the utility model is arranged is shown It is intended to.
Figure label are as follows:
Grid in 1,2 fine facks, 3 bases, 4 micro-nano aeration tubes, 5 beckets, 6 float filler biological membrane assemblies, 7 choke water Gate valve, 8 composite filling biological membrane assemblies, 9 collecting-tanks, 10 submersible sewage pumps, 11 water sprayers, 12 secondary settling tanks;13 sterilization pools;14 sludge Pond;15 sludge pumps;16 sludge integration thickening machines.
Specific embodiment
Embodiment 1: the facility arrangement of emergency processing black and odorous water
As shown in Figure 1, the facility arrangement of emergency processing black and odorous water described in the utility model includes being set in city The grid of korneforos, multistage choke water gate valve 7, and the flood control pumping plant, collecting-tank 9, the secondary settling tank 12, sterilization pool that are set on riverbank 13, sludge-tank 14 and sludge integration thickening machine 16;Wherein:
The grid includes two groups, wherein one group of major river bed for being set to city inland river, another group is set to by major river bed Side;Two groups of grids are arranged side by side based on the width of city inland river;Every group of grid includes middle grid 1 and fine fack 2.It is set to master The gap of adjacent two grid in riverbed is 20mm, and the gap for being set to adjacent two grid of major river bed side is 10mm;
The multistage chokes water the downstream that gate valve 7 is located at grid, and the bottoms at different levels choked water are provided with basis 3 and micro-nano Rice aeration tube 4, is being choked water between gate valve 7 and grid and two neighboring choke water is provided with float filler biomembrane group between gate valve 7 Part 6, the float filler biological membrane assembly 6 are installed on the basis 3;The float filler biological membrane assembly 6 wraps The filler for including stuffing frame and being set on stuffing frame, the filler are semi soft packing;Afterbody is choked water to overflow at the top of gate valve 7 The water body of stream enters collecting-tank 9;
9 bottom of collecting-tank is provided with basis 3 and micro-nano aeration tube 4, is provided with combination on the basis 3 and fills out Expect that biological membrane assembly 8, the composite filling biological membrane assembly 8 include stuffing frame and the filler being set on stuffing frame;Through collecting The water body that composite filling biological membrane assembly 8 is handled in pond 9 is pumped into secondary settling tank 12 through submersible sewage pump 10;In the pressure pipe of submersible sewage pump 10 Water sprayer 11 is set in path, compound coagulant is added by 11 negative pressure of water sprayer and is sufficiently mixed with black foul sewage water;
The secondary settling tank 12 is equipped with entrance, water outlet and sludge outlet, and the pumping plant that wherein entrance is arranged with collecting-tank 9 goes out The connection of mouth of a river pipeline, the water outlet of secondary settling tank 12 are connected to the inlet duct of sterilization pool 13, and the water body by disinfection treatment is through disappearing Malicious 13 water outlet of pond is expelled to city mainstream, and the sludge in secondary settling tank 12 is discharged through sludge outlet;
The sludge outlet of the secondary settling tank 12 is connected to the inlet duct of sludge-tank 14, is provided with sludge in sludge-tank 14 15 are pumped, the sludge in sludge-tank 14 is pumped into sludge integration thickening machine 16 through the sludge pump 15 and is dehydrated.
In above embodiment, the spacing of city inland river flood control pumping plant and the grid farthest apart from its is 270m;Every 30m design level-one chokes water gate valve 7, and in 3.0m, finally choking water series is 8 grades for available depth control at this time;Choking water 7 dative of gate valve Between grid and two neighboring choke water is respectively provided with 5 groups of float filler biological membrane assemblies 6 between gate valve 7, and the stuffing frame is to use Metal grizzly bar welds the frame with row-column structure to be formed, a length of 5m, width 3m, a height of 3.5m;The filler is half Soft-filler floods filling (i.e. all fillers are submerged under water) under water, and density of setting of the filler in the frame is level Line space on direction is 0.25m, and the column pitch in vertical direction is 0.20m.Float filler biological membrane assembly 6 is fixed on inland river On the basis 3 of bottom, expose the surface 50cm at top.Collecting-tank 9 after excavating is having a size of 18m × 17m (long × wide), the depth of water 4m.The long 18m of 5 gallerys, width 3m, high 4.5m are set in collecting-tank 9, fill the composite filling biology of soft-filler and hard filler Membrane module 8, stuffing frame are that the frame with row-column structure to be formed is welded using metal grizzly bar, are equipped in stuffing frame capable of hoisting The becket 5 of dress;Filler is the combination of soft-filler and hard filler, and the soft-filler and hard filler are in filling space Accounting be 45%:55% (volume ratio).The secondary settling tank 12 is radical sedimentation basin.It is described at different levels to choke water bottom and catchment The basis 3 of 9 bottom of pond is all made of concrete block and makes, and each basic 3 top end face is in same level;The heap soil or fertilizer over and around the roots at different levels Water-bed portion and 9 bottom of collecting-tank are arranged micro-nano aeration tube 4 and are supplied oxygen using micro-nano aerator.The composition of the compound coagulant And its additional amount is identical as existing conventional techniques.
Embodiment 2: the method that processing city inland river black and odorous water is arranged using facility shown in Fig. 1
In one city inland river black and odorous water of south Guangxi city, the COD of annual black foul sewage water in 2016crConcentration is 155- 268mg/L, dissolved oxygen 0.3-1.7mg/L, transparency 8-17cm, oxidation-reduction potential are in 8--39mV, ammonia nitrogen 4.69- 15.66mg/L.The hydraulic gradient in the city is inland river 4.5 ‰.
1) two groups of grids are arranged side by side in advance in the river of 300m before city inland river controls flood pumping plant, wherein one group is set to River Channel major river bed, the gap of adjacent two grid are 20mm, and usually gate valve is closed, and rain flood opens flood passage before arriving;Another group Be set to major river bed side, the gap of adjacent two grid is 10mm, in daily interception black and odorous water bulk suspended matter with Floating material;
2) according to the hydraulic gradient in the inland river, gate valve is being choked water every 30m design level-one, depth of water control is being effective and exists 3.0m opens flood passage during choking water gate valve rain flood, and daily closing is choked water, and black and odorous water passes through overflow at the top of gate valve to next stage;
Finishing slope protection is carried out to the rivers at different levels of choking water of formation, increases safety device, in bottom of river channel by interval 5m Concrete foundation is set, and the top end face for controlling each basis is in same level;
Micro-nano aeration tube is set in city inland river bottom, is supplied oxygen using micro-nano aerator;
It is choking water between gate valve and grid and 5 groups of float filler biological membrane assemblies are arranged in two neighboring choke water between gate valve, The filler that the float filler biological membrane assembly includes stuffing frame and is set on stuffing frame, wherein stuffing frame is using gold Belong to grizzly bar and welds the frame with row-column structure to be formed, a length of 5m, width 3m, a height of 3.5m;The filler is medium-soft Property filler, flood under water filling (i.e. all fillers are submerged under water), density of setting of the filler in the frame be level side Upward line space is 0.25 m, and the column pitch in vertical direction is 0.20m.Float filler biological membrane assembly is fixed on interior river bed On the basis of portion, expose the surface 50cm at top;
Since the COD concentration of black and odorous water is fluctuated in 200mg/L or so, therefore series is choked water using 10 grades of designs in inland river;
The water body that the afterbody chokes water overflow at the top of gate valve enters collecting-tank;
3) collecting-tank between the flood control pumping plant sump and inland river of city inland river is 20m × 18m (long × wide), and the depth of water is about 2.5m.Collecting-tank is excavated, depth 1.5m is dug, is allowed to the depth of water up to 4.0m;
In bottom of pond portion setting concrete foundation of catchmenting, the top end face for controlling each basis is in same level;
Catchmenting, micro-nano aeration tube is arranged in bottom of pond portion, is supplied oxygen using micro-nano aerator;
The long 20m of 5 gallerys, width 3m, high 4.5m are set in collecting-tank, the composite filling for filling soft-filler and hard filler is raw Object membrane module, the filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame, wherein stuffing frame To weld the frame with row-column structure to be formed using metal grizzly bar, filler is the combination of soft-filler and hard filler, institute Stating the accounting of soft-filler and hard filler in filling space is 45%:55% (volume ratio);It is being mounted with composite filling The becket that Liftable is installed on stuffing frame, removes to lift when rainy season flood passage;
In the bottom of pond portion setting submersible sewage pump that catchments, by the water body handled through composite filling biological membrane assembly in collecting-tank through being pumped into Secondary settling tank;And water sprayer is set on the pressure pipeline path of submersible sewage pump, by water sprayer negative pressure by compound coagulant add with Black foul sewage water is sufficiently mixed;The compound coagulant is made of the aluminium chloride of 65mol% and the ferric sulfate of 35mol%, is thrown Dosage is added the benchmark of 45mg by every liter of black and odorous water;
4) through submersible sewage pump to be promoted to urban river mainstream big for the water outlet of combined filler biological membrane module processing in collecting-tank Secondary settling tank (radical sedimentation basin) on the outside of dike carries out mud-water separation, and it is 1.0h that secondary settling tank, which designs hydraulic detention time,;Through detecting, The transparency > 30cm of secondary clarifier effluent, dissolved oxygen are greater than 2.2mg/L, and oxidation-reduction potential is greater than 65mV, and ammonia nitrogen is less than 6.5mg/L, water outlet are sent into sterilization pool through secondary clarifier effluent mouth and carry out ultraviolet disinfection, and then sterilized pond water outlet is expelled to city River mainstream, the sludge of precipitating are expelled to sludge-tank, and the sludge in the sludge-tank is set the pump of the sludge pump in sludge-tank Enter sludge integration thickening machine to be dehydrated, send refuse landfill landfill disposal later.

Claims (6)

1. a kind of facility of emergency processing black and odorous water is arranged, it is characterised in that: including the grid, more being set in city inland river Grade chokes water gate valve, and the flood control pumping plant, collecting-tank, the secondary settling tank that are set on riverbank;Wherein:
The grid includes two groups, wherein one group of major river bed for being set to city inland river, another group is set to major river bed side;Two Group grid is arranged side by side based on the width of city inland river;
The multistage chokes water the downstream that gate valve is located at grid, and the bottoms at different levels choked water are provided with basis and aeration tube, are stopping up Between Water gate valve and grid and two neighboring choke water is provided with float filler biological membrane assembly between gate valve, the float filler Biological membrane assembly be installed on it is described on the basis of;The float filler biological membrane assembly includes stuffing frame and is set to stuffing frame On filler, the filler be semi soft packing;The water body that afterbody chokes water overflow at the top of gate valve enters collecting-tank;
The bottom of pond portion of catchmenting is provided with basis and aeration tube, and composite filling biological membrane assembly is provided on the basis of described, The filler that the composite filling biological membrane assembly includes stuffing frame and is set on stuffing frame;It is raw through composite filling in collecting-tank The water body of object membrane module processing is sent into secondary settling tank through pipeline;
The secondary settling tank is equipped with entrance, water outlet and sludge outlet, and wherein entrance is connected to the water outlet pipeline of collecting-tank, and two The water outlet in heavy pond is disinfected after discharge again through water outlet outflow to city mainstream, and the sludge in secondary settling tank is discharged through sludge outlet.
2. facility arrangement according to claim 1, it is characterised in that: be set to the bases at different levels for choking water bottom and setting The basis for bottom of pond portion of catchmenting is placed in as according to the length and width of float filler biological membrane assembly or composite filling biological membrane assembly It is made with concrete block, the upper end surface on the basis is in same level.
3. facility arrangement according to claim 1, it is characterised in that: the secondary settling tank is radical sedimentation basin or perpendicular stream Formula sedimentation basin.
4. facility according to any one of claim 1-3 arrangement, it is characterised in that: further include a sterilization pool, for pair The water outlet of secondary settling tank carries out disinfection, and the entrance of the sterilization pool is connected to the water outlet pipeline of secondary settling tank, by the water of disinfection treatment The sterilized pond water outlet of body discharges city mainstream.
5. facility arrangement according to any one of claim 1-3, it is characterised in that: further include a sludge-tank, entrance It is connected to the sludge outlet pipeline of secondary settling tank, for collecting the sludge being discharged from secondary settling tank.
6. facility arrangement according to any one of claim 1-3, it is characterised in that: further include to the sludge in sludge-tank The sludge integration thickener being dehydrated, the sludge in sludge-tank are pumped into sludge integration thickening machine through sludge pump and carry out Dehydration.
CN201821407867.9U 2018-08-30 2018-08-30 A kind of facility arrangement of emergency processing black and odorous water Active CN208980531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821407867.9U CN208980531U (en) 2018-08-30 2018-08-30 A kind of facility arrangement of emergency processing black and odorous water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821407867.9U CN208980531U (en) 2018-08-30 2018-08-30 A kind of facility arrangement of emergency processing black and odorous water

Publications (1)

Publication Number Publication Date
CN208980531U true CN208980531U (en) 2019-06-14

Family

ID=66782672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821407867.9U Active CN208980531U (en) 2018-08-30 2018-08-30 A kind of facility arrangement of emergency processing black and odorous water

Country Status (1)

Country Link
CN (1) CN208980531U (en)

Similar Documents

Publication Publication Date Title
CN204151144U (en) The artificial wet land treating system of river training water quality
CN102351376B (en) Riverbank multiple pond wetland waste sewage treatment method and device
CN104529089B (en) Serious pollution small rivers cleaning system
CN107739098B (en) Method for purifying water quality and restoring water ecology of polluted urban internal lake
CN102583759B (en) Cascaded combined-flow artificial wetland system and sewage ecological purifying method thereof
CN105401552B (en) A kind of method that salt-alkali shoaly land is transformed into low-pollution water wetland advanced treatment system
CN109020091A (en) A kind of combined type artificial marsh sewage treatment system and its processing method
CN101254991A (en) Method for controlling lake eutrophication by eliminating river or aqueduct pollution
CN104193095B (en) The method of stagewise comprehensive control city river sewage
CN103991934B (en) A kind of Multi-level deflector being suitable for Sewage advanced treatment declines electrolyzer and method
CN101205096B (en) Sewage treatment method capable of avoiding filler silting of subsurface flow constructed wetland and facilities thereof
CN212504449U (en) In-situ gravel purification system in river channel
CN105040636B (en) A kind of gravel bed structure and the urban river water in-situ purification system of composition thereof
CN113233525A (en) Underground water flow field-based pyrite mountain land sewage pollution remediation and treatment method
CN104817184A (en) Back-washable vertical flow subsurface-flow constructed wetland
CN108083578A (en) A kind of preposition cleaning system of water body and its construction method being used for into water section
CN2876081Y (en) Apparatus for purifying river water
CN207525045U (en) A kind of riverbank formula percolating device with water remediation
KR102061064B1 (en) Apparatus for Groundwater Artificial Recharge System
CN107806062B (en) Construction method of biological filtration slope protection for riverway restoration
CN109403264A (en) Rivers and canals enter the method that river mouth sewage treatment facility setting pot uses artificial bend to choke water
CN208980531U (en) A kind of facility arrangement of emergency processing black and odorous water
CN107466571B (en) Siphon irrigation system and siphon irrigation method
CN101585605B (en) Water quality self-purification ability incremental device
CN212954725U (en) Leading ecological management system in agricultural non-point source pollution water source of middle-size and small-size basin

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant