CN108894217A - 一种变直径桩及其施工方法 - Google Patents

一种变直径桩及其施工方法 Download PDF

Info

Publication number
CN108894217A
CN108894217A CN201810784879.1A CN201810784879A CN108894217A CN 108894217 A CN108894217 A CN 108894217A CN 201810784879 A CN201810784879 A CN 201810784879A CN 108894217 A CN108894217 A CN 108894217A
Authority
CN
China
Prior art keywords
segmentation
steel pipe
variable diameters
stake
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810784879.1A
Other languages
English (en)
Inventor
左熹
顾荣蓉
倪红
毛昆明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinling Institute of Technology
Original Assignee
Jinling Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinling Institute of Technology filed Critical Jinling Institute of Technology
Priority to CN201810784879.1A priority Critical patent/CN108894217A/zh
Publication of CN108894217A publication Critical patent/CN108894217A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/48Piles varying in construction along their length, i.e. along the body between head and shoe, e.g. made of different materials along their length

Abstract

本发明涉及一种变直径桩及其施工方法,变直径桩的结构包括内侧的固定杆和外周的分段钢管,所述的分段钢管由分段的钢管与分段的柔性橡胶管依次相间隔设置而成;所述的固定杆用于将分段钢管支撑为竖直的整体;所述分段的钢管的侧壁留有孔洞,在高压注浆的过程中,水泥浆可从侧壁的孔洞流出,采用由下往上的方式,为双管注浆,通过一根管用于注入水泥浆,通过另一根管用于注入膨胀剂。本发明还公布了上述变直径桩的施工方法本发明可大幅提高软弱场地中桩的承载力。

Description

一种变直径桩及其施工方法
技术领域
本发明涉及土木工程施工的技术领域,具体涉及一种变直径桩及其施工方法。
背景技术
由于软土地基具有天然含水量高、孔隙比大、压缩性高、抗剪强度低、固结系数小、固结时间长、透水性差、土层层状分布、各层之间物理力学性质相差大的特点,地基承载力普遍很低,整体稳定性较差,因此利用此类软弱地基时工程必须采取适当的地基处理方式。
发明内容
本发明的目的是提供一种变直径桩及其施工方法,可大幅提高软弱场地中桩的承载力。
本发明提供的技术方案是:
一种变直径桩,变直径桩的结构包括内侧的固定杆和外周的分段钢管,所述的分段钢管由分段的钢管与分段的柔性橡胶管依次相间隔设置而成;所述的固定杆用于将分段钢管支撑为竖直的整体;所述分段的钢管的侧壁留有孔洞,在高压注浆的过程中,水泥浆可从侧壁的孔洞流出。
所述固定杆与分段钢管采用焊接的方式连接。
本发明还公布了上述变直径桩的施工方法,包括以下步骤:
1)在场地中钻孔;
2)将安装有固定杆的变直径桩打入地下,使其整体打入土体中;
3)高压注浆:采用由下往上的方式,为双管注浆,通过一根管用于注入水泥浆,通过另一根管用于注入膨胀剂,当管口到达分段的柔性橡胶管位置时注入膨胀剂;
4)在分段的柔性橡胶管处形成鼓状,部分水泥浆从分段的钢管侧壁的孔洞流出。
其中水泥浆为持续注入,膨胀剂为间断注入。
在双管注浆过程中,管发生旋转,使水泥浆和膨胀剂搅拌更加均匀。
加入膨胀剂使柔性橡胶管处的水泥浆发生一定程度的膨胀,所产生的鼓状更加饱满。
与现有技术相比,本发明的有益效果是:
本发明的变直径桩尤其适合于软弱场地,采用钢管与柔性橡胶管相间隔的方法,通过向桩内部高压注入泥浆,由于软弱场地中土体较软,柔性橡胶管发生侧向膨胀,形成了鼓状。
这种桩型由于对土体产生侧向力作用,并且可提高与土体的接触面积,同时鼓型结构更利于桩的稳定性,因此,这种桩型可大幅提高软弱场地中桩的承载力。
本发明的变直径桩侧壁留有孔洞,在高压注浆的过程中,水泥浆可以部分流出,可以加大桩与土之间的连接力,提高桩的承载力。
附图说明
图1:变直径桩安装之前的结构示意图。
图2:变直径桩剖面结构示意图。
图3:变直径桩安装之后的结构示意图。
图中:1-分段的钢管,2-分段的柔性橡胶管,3-孔洞,4-固定杆。
具体实施方式
下面结合具体实施例对本发明作进一步说明。
一种变直径桩,变直径桩的结构包括内侧的固定杆4和外周的分段钢管,所述的分段钢管由分段的钢管1与分段的柔性橡胶管2依次相间隔设置而成;所述的固定杆4用于将分段钢管支撑为竖直的整体;所述分段的钢管1的侧壁留有孔洞3,在高压注浆的过程中,水泥浆可从侧壁的孔洞3流出。
所述固定杆4与分段钢管采用焊接的方式连接。
本发明还公布了上述变直径桩的施工方法,其特征在于
1)在场地中钻孔;
2)将安装有固定杆4的变直径桩打入地下,使其整体打入土体中;
3)高压注浆:采用由下往上的方式,为双管注浆,通过一根管用于注入水泥浆,通过另一根管用于注入膨胀剂,当管口到达分段的柔性橡胶管2位置时注入膨胀剂;
4)在分段的柔性橡胶管2处形成鼓状,部分水泥浆从分段的钢管1侧壁的孔洞3流出。
其中水泥浆为持续注入,膨胀剂为间断注入。
在双管注浆过程中,管发生旋转,使水泥浆和膨胀剂搅拌更加均匀。
加入膨胀剂使柔性橡胶管处的水泥浆发生一定程度的膨胀,所产生的鼓状更加饱满。
以上所述,仅是本发明的较佳实施例,并非对本发明作任何形式上的限制,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,依据本发明的技术实质,对以上实施例所作的任何简单的修改、等同替换与改进等,均仍属于本发明技术方案的保护范围之内。

Claims (6)

1.一种变直径桩,其特征在于:变直径桩的结构包括内侧的固定杆和外周的分段钢管,所述的分段钢管由分段的钢管与分段的柔性橡胶管依次相间隔设置而成;所述的固定杆用于将分段钢管支撑为竖直的整体;所述分段的钢管的侧壁留有孔洞,在高压注浆的过程中,水泥浆可从侧壁的孔洞流出。
2.根据权利要求1所述的变直径桩,其特征在于:所述固定杆与分段钢管采用焊接的方式连接。
3.权利要求1所述的变直径桩的施工方法,其特征在于:包括以下步骤:
1)在场地中钻孔;
2)将安装有固定杆的变直径桩打入地下,使其整体打入土体中;
3)高压注浆:采用由下往上的方式,为双管注浆,通过一根管用于注入水泥浆,通过另一根管用于注入膨胀剂,当管口到达分段的柔性橡胶管位置时注入膨胀剂;
4)在分段的柔性橡胶管处形成鼓状,部分水泥浆从分段的钢管侧壁的孔洞流出。
4.根据权利要求3所述的变直径桩的施工方法,其特征在于:其中水泥浆为持续注入,膨胀剂为间断注入。
5.根据权利要求3所述的变直径桩的施工方法,其特征在于:在双管注浆过程中,管发生旋转,使水泥浆和膨胀剂搅拌更加均匀。
6.根据权利要求3所述的变直径桩的施工方法,其特征在于:加入膨胀剂使柔性橡胶管处的水泥浆发生一定程度的膨胀,所产生的鼓状更加饱满。
CN201810784879.1A 2018-07-17 2018-07-17 一种变直径桩及其施工方法 Pending CN108894217A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810784879.1A CN108894217A (zh) 2018-07-17 2018-07-17 一种变直径桩及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810784879.1A CN108894217A (zh) 2018-07-17 2018-07-17 一种变直径桩及其施工方法

Publications (1)

Publication Number Publication Date
CN108894217A true CN108894217A (zh) 2018-11-27

Family

ID=64349989

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810784879.1A Pending CN108894217A (zh) 2018-07-17 2018-07-17 一种变直径桩及其施工方法

Country Status (1)

Country Link
CN (1) CN108894217A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965398A (zh) * 2019-11-25 2020-04-07 中南大学 一种含无砟轨道路基的膨胀土地基构造及施工方法
CN114575340A (zh) * 2022-03-07 2022-06-03 中南大学 一种抗拔性能稳定的多节泡装配式锚杆及其锚固施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493437A (zh) * 2011-11-26 2012-06-13 山东大学 注浆式微型钢管桩及注浆加固方法
CN105625302A (zh) * 2016-03-29 2016-06-01 江西博慧工程技术服务有限公司 一种变截面劲芯增强活性材料复合桩结构及施工方法
CN107829428A (zh) * 2017-11-22 2018-03-23 盐城市双强管桩有限公司 一种变直径竹节式砂浆桩
CN108265718A (zh) * 2018-03-12 2018-07-10 中国建筑第八工程局有限公司 注浆钢管桩地基加固体系及其施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102493437A (zh) * 2011-11-26 2012-06-13 山东大学 注浆式微型钢管桩及注浆加固方法
CN105625302A (zh) * 2016-03-29 2016-06-01 江西博慧工程技术服务有限公司 一种变截面劲芯增强活性材料复合桩结构及施工方法
CN107829428A (zh) * 2017-11-22 2018-03-23 盐城市双强管桩有限公司 一种变直径竹节式砂浆桩
CN108265718A (zh) * 2018-03-12 2018-07-10 中国建筑第八工程局有限公司 注浆钢管桩地基加固体系及其施工方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
崔江余等: "《建筑基坑工程设计计算与施工》", 30 November 1999, 中国建材工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110965398A (zh) * 2019-11-25 2020-04-07 中南大学 一种含无砟轨道路基的膨胀土地基构造及施工方法
CN114575340A (zh) * 2022-03-07 2022-06-03 中南大学 一种抗拔性能稳定的多节泡装配式锚杆及其锚固施工方法

Similar Documents

Publication Publication Date Title
CN107083977A (zh) 一种泥质软岩巷道分区多粒度的注浆加固方法
CN107387095B (zh) 隧道衬砌背后空洞的施工方法及施工后的复合衬砌结构
CN106894423B (zh) 自排水串式扩体锚杆支护结构及施工方法
CN105134248B (zh) 一种盾构隧道与竖井连接部位的抗震与减震方法
CN107143358A (zh) 控制隧道偏压变形的对拉锚索结构及其施工方法
CN106640120A (zh) 地表定点深孔分层注浆施工方法
CN101230570A (zh) 分层多次调压调浆注浆方法
CN106703692A (zh) 一种地面定向顺层钻孔注浆加固薄层灰岩的方法
CN106761835A (zh) 一种岩溶隧道漏水分段注浆施工方法
KR101907141B1 (ko) 강관다단 그라우팅을 위한 실재용 조성물 및 이의 제조방법
CN206752482U (zh) 控制偏压变形的组合支挡结构
CN106996299A (zh) 控制隧道偏压变形的钢花管桩支挡结构及其施工方法
CN105178285B (zh) 一种扩大岩土注浆加固和防渗堵塞范围的方法
CN106566501A (zh) 一种柔性堵漏剂及其制备方法与应用
CN110258536A (zh) 减小偏压载荷的对拉锚索结构及施工方法
CN108894217A (zh) 一种变直径桩及其施工方法
CN205400757U (zh) 一种高地应力区tbm施工隧洞初期支护结构
CN107201909A (zh) 膨胀土隧道支护结构及方法
CN107023005A (zh) 一种带有吸水膨胀环的串式扩体锚杆及其施工方法
CN206844107U (zh) 一种带有吸水膨胀环的串式扩体锚杆
CN105625302B (zh) 一种变截面劲芯增强活性材料复合桩结构及施工方法
CN109441486A (zh) 用于隧道注浆加固的注浆方法
CN109440757A (zh) 一种用于岩溶区的地基加固方法
CN107034905A (zh) 控制偏压变形的组合支挡结构及其施工方法
CN206220101U (zh) 一种深基坑的支护加固结构

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127

RJ01 Rejection of invention patent application after publication