- Publication number
- CN108894177B CN108894177B CN201810885202.7A CN201810885202A CN108894177B CN 108894177 B CN108894177 B CN 108894177B CN 201810885202 A CN201810885202 A CN 201810885202A CN 108894177 B CN108894177 B CN 108894177B
- Authority
- CN
- China
- Prior art keywords
- racing track
- sled
- support
- module
- fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H4/00—Working on surfaces of snow or ice in order to make them suitable for traffic or sporting purposes, e.g. by compacting snow
- E01H4/02—Working on surfaces of snow or ice in order to make them suitable for traffic or sporting purposes, e.g. by compacting snow for sporting purposes, e.g. preparation of ski trails; Construction of artificial surfacings for snow or ice sports ; Trails specially adapted for on-the-snow vehicles, e.g. devices adapted for ski-trails
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01H—STREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
- E01H4/00—Working on surfaces of snow or ice in order to make them suitable for traffic or sporting purposes, e.g. by compacting snow
- E01H4/02—Working on surfaces of snow or ice in order to make them suitable for traffic or sporting purposes, e.g. by compacting snow for sporting purposes, e.g. preparation of ski trails; Construction of artificial surfacings for snow or ice sports ; Trails specially adapted for on-the-snow vehicles, e.g. devices adapted for ski-trails
- E01H2004/026—Working on surfaces of snow or ice in order to make them suitable for traffic or sporting purposes, e.g. by compacting snow for sporting purposes, e.g. preparation of ski trails; Construction of artificial surfacings for snow or ice sports ; Trails specially adapted for on-the-snow vehicles, e.g. devices adapted for ski-trails for making half pipes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Specifically a kind of sled sled racing track modularization assembling of the present invention and hanging method;It is characterized in that: including carrying out three-dimensional modeling according to the drawing of sled sled racing track, and then carry out modularization segmentation to racing track;And the lifting lug installation site of each racing track module is planned simultaneously;Work makes fixture used in racing track modular construction, support frame and other temporary supports, lifting lug;On modular construction place, according to the deployment scenarios of support frame, it is supported the construction of frame base foundation, every group of support frame of modular segment is successively assembled according to drawing, refrigerator pipes are caught in by number in the rectangular teeth of support of pipelines, it is tied up securely with iron wire, the components such as erecting and welding module other support, lifting lugs;Module hoisting, while module two sides need to hang cable wind rope.Use this hanging method, it is ensured that racing track fixture and the interim racing track of refrigerator pipes modular construction support section, while ensure that the assembly precision of fixture and refrigeration piping, establish good basis for the concrete ejection molding of racing track.
Description
Technical field
The present invention relates to the field of building of large complicated high-precision refrigeration piping, specifically a kind of sled sled racing track module
Change assembling and hanging method.
Background technique
Sled sled racing track is to be formed by combining a kind of curved surface by refrigeration piping fixture, refrigerator pipes and external wrapping concrete to make
The movement slideway of type, pipeline jig are the main skeletons of racing track, and a racing track is by (2 meters to 2.5 of spacing of several set of tubes fixtures
Rice) it forms, every sleeve clamp is distributed in different level, different coordinate positions according to racing track moulding, and fixture is presented according to racing track moulding
Various bending mouldings, refrigerator pipes are supported on pipeline jig, arrange that pipeline jig and refrigeration piping are all mixed along racing track
Solidifying soil is wrapped in inside, it is desirable that finally formed racing track curved surface is smooth, and planarity requirements are no more than ± 5mm.Due to racing track basis
How long construction period guarantees that racing track refrigeration piping and its fixture construction can smoothly complete, the modularization group of spy's research racing track
Dress and hanging method, while control module racing track lifting stability and accuracy error are a technical problems.
Summary of the invention
The purpose of the present invention is to provide a kind of high-precision sled sled racing track modularization assembling and hanging methods.
In order to achieve the above object, the present invention is implemented as follows:
A kind of sled sled racing track modularization assembling and hanging method, including
Step 1, according to the drawing of sled sled racing track carry out three-dimensional modeling, thus obtain all refrigeration pipings, fixture with
And its information of support frame, and then modularization segmentation is carried out to racing track;And the lifting lug installation site of each racing track module is planned simultaneously;
Step 2, fixture, support frame and other temporary supports according to used in drawing processing and fabricating racing track modular construction,
Lifting lug;
Step 3, on modular construction place, according to the deployment scenarios of support frame, be supported applying for frame base foundation
Work, on the basis of pre-buried 30mm steel plate, precision be ± 1mm;
Step 4 successively assembles every group of support frame of modular segment according to drawing, adjusts its accuracy error ± 3mm;
Step 5, support frame after the installation is completed, carry out the installation of fixture, according to support of pipelines spatial coordinate location, using exempting from
Prism precision total station carries out space orientation installation to support of pipelines, guarantees absolute altitude, verticality and the angle of support of pipelines;Benefit
With theodolite or messenger wire pendant mode check support of pipelines whether design position of center line, installation deviation be ± 5mm;
Step 6, fixture after the installation is completed reinforce its two sides, prevent from deforming, reinforce position be distributed on fixture,
In, lower position;
Refrigerator pipes are caught in the rectangular teeth of support of pipelines by step 7 by number, are tied up securely with iron wire, are tied up to more than needed
Wire-tie excision;
The components such as step 8, erecting and welding module other support, lifting lugs make module form rock-steady structure;
Step 9, module hoisting can select loop wheel machine according to lifting field condition, be typically chosen 50 tons of truck cranes, transport is selected
12 meters of flat cars;
Step 10, lifting must use lifting device, prevent wirerope lifting angle from causing module deformation, while module two
Side need to hang cable wind rope.
By using this kind of sled sled racing track modularization assembling and hanging method, it is ensured that racing track fixture and refrigeration pipe die
The interim racing track of blockization construction supports section, while ensure that the assembly precision of fixture and refrigeration piping, and then substantially increase match
The installation effectiveness of road fixture and refrigeration piping, shortens installation period, establishes good basis for the concrete ejection molding of racing track.
Detailed description of the invention
Fig. 1 is the sectional view of formal racing track base support in this hanging method.
Fig. 2 is the sectional view of interim racing track base support in this hanging method.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1 and Figure 2, a kind of sled sled racing track modularization assembling and hanging method, including
Step 1, according to the drawing of sled sled racing track carry out three-dimensional modeling, thus obtain all refrigeration pipings, fixture with
And its information of support frame, and then modularization segmentation is carried out to racing track 3;And the lifting lug installation position of each racing track module is planned simultaneously
It sets;
Step 2, fixture, support frame 1 and other temporary supports according to used in drawing processing and fabricating racing track modular construction
2, lifting lug;
Step 3, on modular construction place, according to the deployment scenarios of support frame, be supported applying for frame base foundation
Work, on the basis of pre-buried 30mm steel plate, precision be ± 1mm;
Step 4 successively assembles every group of support frame of modular segment according to drawing, adjusts its accuracy error ± 3mm;
Step 5, support frame after the installation is completed, carry out the installation of fixture, according to support of pipelines spatial coordinate location, using exempting from
Prism precision total station carries out space orientation installation to support of pipelines, guarantees absolute altitude, verticality and the angle of support of pipelines;Benefit
With theodolite or messenger wire pendant mode check support of pipelines whether design position of center line, installation deviation be ± 5mm;
Step 6, fixture after the installation is completed reinforce its two sides, prevent from deforming, reinforce position be distributed on fixture,
In, lower position;
Refrigerator pipes are caught in the rectangular teeth of support of pipelines by step 7 by number, are tied up securely with iron wire, are tied up to more than needed
Wire-tie excision;
The components such as step 8, erecting and welding module other support, lifting lugs make module form rock-steady structure;
Step 9, module hoisting can select loop wheel machine according to lifting field condition, be typically chosen 50 tons of truck cranes, transport is selected
12 meters of flat cars;
Step 10, lifting must use lifting device, prevent wirerope lifting angle from causing module deformation, while module two
Side need to hang cable wind rope.
By using this kind of sled sled racing track modularization assembling and hanging method, it is ensured that racing track fixture and refrigeration pipe die
The interim racing track of blockization construction supports section, while ensure that the assembly precision of fixture and refrigeration piping, and then substantially increase match
The installation effectiveness of road fixture and refrigeration piping, shortens installation period, establishes good basis for the concrete ejection molding of racing track.
Claims (1)
1. a kind of sled sled racing track modularization assembling and hanging method, it is characterized in that: including
Step 1, according to the drawing of sled sled racing track carry out three-dimensional modeling, thus obtain all refrigeration pipings, fixture and its
The information of support frame, and then modularization segmentation is carried out to racing track;And the lifting lug installation site of each racing track module is planned simultaneously;
Step 2, the fixture according to used in drawing processing and fabricating racing track modular construction, support frame and other temporary supports, lifting lug;
Step 3, on modular construction place, according to the deployment scenarios of support frame, be supported the construction of frame base foundation, base
The steel plate of pre-buried 30mm on plinth, precision are ± 1mm;
Step 4 successively assembles every group of support frame of modular segment according to drawing, adjusts its accuracy error ± 3mm;
Step 5, support frame after the installation is completed, carry out the installation of fixture, according to support of pipelines spatial coordinate location, using non-prism
Accurate total station carries out space orientation installation to support of pipelines, guarantees absolute altitude, verticality and the angle of support of pipelines;Utilize warp
Latitude instrument or messenger wire pendant mode check support of pipelines whether design position of center line, installation deviation be ± 5mm;
Step 6, fixture after the installation is completed reinforce its two sides, prevent from deforming, and reinforce position and are distributed in fixture upper, middle and lower
Position;
Refrigerator pipes are caught in the rectangular teeth of support of pipelines by step 7 by number, are tied up securely with iron wire, to binding iron more than needed
Silk excision;
Step 8, erecting and welding module other support, lifting lug, components make module form rock-steady structure;
Step 9, module hoisting select 50 tons of truck cranes according to lifting field condition, and 12 meters of flat cars are selected in transport;
Step 10, lifting must use lifting device, prevent wirerope lifting angle from causing module deformation, while module two sides need
Hang cable wind rope.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810885202.7A CN108894177B (en) | 2018-08-06 | 2018-08-06 | Sled sled racing track modularization assembling and hanging method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810885202.7A CN108894177B (en) | 2018-08-06 | 2018-08-06 | Sled sled racing track modularization assembling and hanging method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108894177A CN108894177A (en) | 2018-11-27 |
CN108894177B true CN108894177B (en) | 2019-12-03 |
Family
ID=64353235
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810885202.7A Active CN108894177B (en) | 2018-08-06 | 2018-08-06 | Sled sled racing track modularization assembling and hanging method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108894177B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111368355B (en) * | 2019-10-31 | 2023-02-28 | 上海宝冶集团有限公司 | Rapid generation method of parameterized modeling drawing of refrigeration pipeline |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9377885B2 (en) * | 2010-04-21 | 2016-06-28 | Faro Technologies, Inc. | Method and apparatus for locking onto a retroreflector with a laser tracker |
KR101151907B1 (en) * | 2011-10-28 | 2012-05-31 | 강원대학교산학협력단 | Construction method of bobsleigh track using wet-mix shotcrete composition |
CN203996527U (en) * | 2014-04-03 | 2014-12-10 | 张志杰 | The special sled of snow wagon |
CN204891148U (en) * | 2015-08-22 | 2015-12-23 | 宁波曼切斯体育用品有限公司 | Equipment sitting posture sled |
CN206110735U (en) * | 2016-11-02 | 2017-04-19 | 盘锦广利达电气有限公司 | Automatically controlled integrated device of modular assembly formula skid -mounted |
CN107944096A (en) * | 2017-11-07 | 2018-04-20 | 山东住工装配建筑有限公司 | A kind of assembled architecture prefabricated components simulation hanging method and system based on BIM |
CN108061198A (en) * | 2017-12-12 | 2018-05-22 | 中国冶集团有限公司 | Lifting pipeline device and its hanging method |
-
2018
- 2018-08-06 CN CN201810885202.7A patent/CN108894177B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN108894177A (en) | 2018-11-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104060544B (en) | The construction technology that a kind of pipeline suspension crossing bridge body of a bridge is installed | |
CN114086669B (en) | Modularized rapid construction method for large-scale space special-shaped curved surface steel net rack | |
CN1978801B (en) | Super-span steel skew arch construction method | |
CN102828470B (en) | Method for locating main girder cable sleeve of cable-stayed bridge | |
CN104695715A (en) | Construction method of beam string structure of roof | |
CN103982045A (en) | Installation construction method of roof lattice shell structure without supports and cantilevers | |
CN110566720A (en) | construction method of arc corridor pipeline | |
CN108894177B (en) | Sled sled racing track modularization assembling and hanging method | |
CN104895035A (en) | High-efficiency mounting method of large ship reception chamber of vertical ship lift and auxiliary tool device for mounting and location | |
CN110219326A (en) | The underwater vertical adjustment construction technology of inverse method one-column one-pile | |
CN106836829B (en) | A kind of mounting structure and its installation method of ring crane corbel | |
CN102966041A (en) | Spatial stay-cable positioning method of multispan continuous S-shaped landscape bridge | |
CN106012848A (en) | Construction method for embedded bracket of cast-in-place box beam and bridge | |
CN107386125A (en) | The construction method that a kind of Steel Box Girder of Self-Anchored Suspension beam closes up | |
CN204112222U (en) | The bracing or strutting arrangement of main rope of suspension bridge anchoring prestress pipeline | |
CN106827193A (en) | Multiple box culvert makes mould and the method for producing box culvert using three hole box culvert moulds | |
CN102720137A (en) | Prefabrication construction method for trough girder sections of track traffic high-level bridge | |
CN103993745A (en) | Integral transfer girder hoisting device and hoisting method thereof | |
CN101736925B (en) | Modular construction method for nuclear island of nuclear power station | |
CN109185558A (en) | The method that a kind of major diameter GRP tube road is installed under water | |
CN104060838B (en) | A kind of vestibule divides into groups aerial group to Method for Installation | |
CN202202265U (en) | Three-dimensional coordinate controller of cable duct | |
CN103482042B (en) | A kind of deep water comb shape slideway cross beam construction method of installation | |
CN104264781A (en) | Latticed cylindrical surface steel structure latticed shell and construction method thereof | |
CN108867316A (en) | Single-tower self-anchored suspension bridge Large-span Steel Box Beam walking incremental launching construction technique |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |