CN108894131A - A kind of quickly emergency hangar tunnel equipment and implementation method - Google Patents

A kind of quickly emergency hangar tunnel equipment and implementation method Download PDF

Info

Publication number
CN108894131A
CN108894131A CN201810936628.0A CN201810936628A CN108894131A CN 108894131 A CN108894131 A CN 108894131A CN 201810936628 A CN201810936628 A CN 201810936628A CN 108894131 A CN108894131 A CN 108894131A
Authority
CN
China
Prior art keywords
hangar tunnel
telescoping rod
hole
steel grating
hangar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810936628.0A
Other languages
Chinese (zh)
Inventor
殷跃平
魏云杰
王文沛
张楠
王俊豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA INSTITUTE FOR GEO-ENVIRONMENTAL MONITORING
Original Assignee
CHINA INSTITUTE FOR GEO-ENVIRONMENTAL MONITORING
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA INSTITUTE FOR GEO-ENVIRONMENTAL MONITORING filed Critical CHINA INSTITUTE FOR GEO-ENVIRONMENTAL MONITORING
Priority to CN201810936628.0A priority Critical patent/CN108894131A/en
Publication of CN108894131A publication Critical patent/CN108894131A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • E01F7/045Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

A kind of quickly emergency hangar tunnel equipment and implementation method, are related in the lifeline engineerings such as highway, railway, the processing of collapse rock-fall calamity emergency.Equipment is characterized in that:Including by steel grating (1), pearl cotton (2), solid foot device (3), telescoping rod (4), support construction (5) and hinge (6);Steel grating (1) is connected with telescoping rod (4) by hinge (6);Pearl cotton (2) covering is pasted on steel grating (1), is arranged on the inside of steel grating (1) Gu foot device (3) is fixed on, and its role is to fixed hangar tunnels, and riverside slumping mass lateral pressure is avoided to be pushed open;Determine clamping telescoping rod after the length of telescoping rod (4);The left and right upper angle of hangar tunnel respectively symmetrically property be equipped with support construction (5).The device structure is simple, easy to use, foldable transportation to callapsed landslide scene, and hangar tunnel equipment can be put up in a short time, road is dredged, is resumed traffic normal, the secondary slump for also avoiding subsequent fragmentary falling rocks or geological disaster causes damages to Pedestrians and vehicles current on road.

Description

A kind of quickly emergency hangar tunnel equipment and implementation method
Technical field
The present invention relates in the lifeline engineerings such as highway, railway, the novel device of collapse rock-fall calamity emergency processing is used for Emergency hangar tunnel fast moves placement.
Background technique
Hangar tunnel has been widely used in as a kind of effective protection engineering and has resisted mountain road collapse rock-fall.But hangar tunnel is built Or installation generally requires regular hour, this period, road closed, and construction personnel and is substantially exposed to also to exist at any time In the dangerous situation of collapse rock-fall, when aftershock or rainfall especially after violent earthquake, road and personnel safety have been seriously affected. It is not able to satisfy quick emergency demand.
Summary of the invention
In order to overcome drawbacks described above, a kind of quickly emergency hangar tunnel equipment is proposed, the device structure is simple, and it is easy to use, it can Collapsed transportable is live to callapsed landslide, and can put up hangar tunnel equipment in a short time, dredges road, resumes traffic normal, very It is good to alleviate traffic blocking problem in harnessing landslide avalanche this period, also avoid subsequent fragmentary falling rocks or geological disaster Secondary slump causes damages to Pedestrians and vehicles current on road, can meet an urgent need in short term and be provided conveniently for geological disaster, and obtain good Good effect.
A kind of quickly emergency hangar tunnel equipment, it is characterised in that:Including by steel grating (1), pearl cotton (2), solid foot device (3), telescoping rod (4), support construction (5) and hinge (6);Steel grating (1) is connected with telescoping rod (4) by hinge (6);Pearl Cotton (2) covering is pasted on steel grating (1), is arranged on the inside of steel grating (1) Gu foot device (3) is fixed on, and its role is to solid Determine hangar tunnel, riverside slumping mass lateral pressure is avoided to be pushed open;Determine clamping telescoping rod after the length of telescoping rod (4); The left and right upper angle of hangar tunnel respectively symmetrically property be equipped with support construction (5).Further, support construction (5) include fixed hinge (51), Strut (52), fixed thread through-hole (53), rod end through-hole (54) and bolt (55), fixed thread through-hole (53) is multiple to be arranged in steel On grid (1), rod end through-hole (54) can coincide from different fixed thread through-holes (53), to change hangar tunnel width, and use spiral shell Bolt (55), which passes through, is overlapped through-hole to fix two adjacent steel gratings (1).Further, fixed device (3) are by the steel plate with through-hole (31) it is formed with long rivet (32), and equidistant arrangement, in steel grating (1) bottom, the through-hole that long rivet (32) passes through steel plate (31) is inserted Enter underground.
Steel grating, buffer layer, solid foot device, support construction, telescoping rod and hinge composition, back in slumped mass a side The rod piece that can be stretched by three forms, and has the screw thread rotation handle of locking rod length on telescoping rod, and telescoping rod can be with Different terrain landforms are adapted to very well, play support hangar tunnel effect, and excess-three face is made of three pieces of steel gratings, steel grating intensity Height, and an equal amount of steel plate of mass ratio is light, convenient for the Fast Installation at scene, steel grating grid size is 10 × 10cm, each One layer of buffer layer of covering is pasted above steel grating, buffer layer is made of pearl cotton, because it is strong with crashworthiness power, toughness is strong, Many advantages, such as water proof is moisture-proof, plasticity is good, reconstituted circularly, environmental protection plays the buffer function to avalanche rubble, and can be effective The space for filling steel grating, avoids small stone from falling from space.Steel grating is directly connect by hinge with telescoping rod, can be certainly By rotating.
Face the steel grating of hillside side, telescoping rod is distinguished between steel grating adjacent thereto equipped with support construction, support Structure is made of strut, fixed thread through-hole, bolt, and one section of strut is fixed hinge, and the other end is to be provided with rod end through-hole, fixed Tapped through hole arrangement is fixed on adjacent steel grating plate, and fixed thread through-hole is consistent with rod end hole size, passes through bar with bolt Through-hole and fixed thread through-hole are held, fixes its adjacent two pieces of steel grating at a certain angle, by this come in the form of lockking hangar tunnel. Strut is connected from different fixed thread through-holes, and the width of hangar tunnel can be made different, the road surface of different in width is adapted to this.
Backer side steel grating bottom is just equipped with a solid foot device every 50cm, Gu foot device is by steel plate and long rivet group At Interal fixation is open in steel grating bottom, parallel to the ground and above be equipped with, and long rivet is inserted into underground by opening, with this Fixed hangar tunnel, prevents riverside slumping mass from pushing hangar tunnel open.The single length 3m of the hangar tunnel, has 3 support constructions and telescoping rod, often It is spaced 1m between each telescoping rod between a support construction, can be stitched together to form long straight channel or curved with multiple hangar tunnels Triton road can preferably adapt to various landform, different kinds of roads.
Operation of the present invention process is as follows:When landslide or avalanche blocking road surface occurs, hangar tunnel will be folded and transported to scene, led to Digging machine shovel open circuit surface accumulation body is crossed, unfolded hangar tunnel locks telescoping rod length after adjusting telescoping rod length, opens support knot Structure adjusts hangar tunnel width by strut depending on width of roadway, fixes hangar tunnel form, then long rivet is passed through to the steel plate of solid foot device It is inserted into underground, fixes hangar tunnel, then splices multiple hangar tunnels depending on road surface bending degree;It builds the good each hangar tunnel of splicing to be open to traffic, directly Geological hazard control engineering terminates to this.
Detailed description of the invention
Fig. 1 is overall schematic of the present invention.
Fig. 2 is diagrammatic cross-section of the present invention.
Fig. 3 is steel grating and pearl cotton combination diagram of the present invention.
Fig. 4 is different unfolded state schematic diagrames of the invention.
Fig. 5 is support device schematic diagram of the present invention
Fig. 6 is the solid foot device schematic diagram of the present invention.
In figure:1. steel grating;2. pearl cotton;3. solid foot device;31. steel plate;32. long rivet;4. telescoping rod;41. spiral shell Line rotating handle;5. support construction;51. fixed hinge;52. strut;53. fixed thread through-hole;54. rod end through-hole;55. bolt; 6. hinge.
Specific embodiment
Present invention will be further explained below with reference to the attached drawings and specific embodiments.
As shown in Figure 1, Figure 2, Figure 3 and Figure 4, the present invention is by steel grating (1), pearl cotton (2), solid foot device (3), telescopic rod Part (4), support construction (5) and hinge (6) composition.Steel grating (1) is connected with telescoping rod (4) by hinge (6), can freely be revolved Turn and folds;Pearl cotton (2) covering is pasted on steel grating (1), is played the buffer function to avalanche rubble and is filled up steel lattice The grid gap of grid (1);It is arranged on the inside of steel grating (1) Gu foot device (3) is fixed on, its role is to fixed hangar tunnels, avoid Riverside slumping mass lateral pressure is pushed open;Its adjustable rod length of telescoping rod (4), can adapt to outside mountain highway very well The precipitous landform in side, facilitate hangar tunnel builds support, avoid due to rod piece cross section or it is too long caused by it is inconvenient, determine and stretch By twisting screw thread rotation handle (41) come clamping telescoping rod after the length of contracting rod piece (4);The left and right upper angle of hangar tunnel respectively symmetrically property Be equipped with support construction (5), can change the width of hangar tunnel by adjusting support construction (5) support angle, can adapt to very well not With the road of width.
As shown in figure 5, support construction (5) is by fixed hinge (51), strut (52), fixed thread through-hole (53), rod end Through-hole (54) and bolt (55) composition, fixed thread through-hole (53) is multiple to be arranged on steel grating (1), and rod end through-hole (54) can be with It coincides from different fixed thread through-holes (53), to change hangar tunnel width, blending bolt (55), which passes through, is overlapped through-hole to fix Two adjacent steel gratings (1).
As shown in fig. 6, fixed device (3) are made of the steel plate (31) with through-hole and long rivet (32), and equidistant arrangement In steel grating (1) bottom, the through-hole that long rivet (32) can pass through steel plate (31) is inserted into underground, fixes entire hangar tunnel with this.
The present invention is transported to scene in folding when implementing, and the accumulation body of open circuit surface is shoveled with digging machine, according to the wide choosing of site road It takes suitable fixed thread through-hole (53) to be connected with strut (52) by bolt (55), is adjusted by screw thread rotation handle (41) solid The length for setting telescoping rod (4) is inserted into underground from the hole of steel plate (31) in the long rivet (32) that will consolidate in foot device (3), Gu Hangar tunnel is set, multiple hangar tunnels are spliced further according to road surface bending degree, having spliced hangar tunnel can be open to traffic until slope treatment work Journey terminates.More specifically, when landslide or avalanche blocking road surface occurs, hangar tunnel will be folded and transported to scene, opened by digging machine shovel Road surface accumulation body, unfolded hangar tunnel, it is long to adjust telescoping rod that rotation handle blocks rod piece, and it is long to lock telescoping rod with this Degree opens support construction, determines which fixed thread through-hole strut connects depending on width of roadway, adjusts hangar tunnel width with this, Hangar tunnel form is fixed with bolt, then the steel plate that long rivet passes through solid foot device is inserted into underground, fixes hangar tunnel, then regard road surface Bending degree splices multiple hangar tunnels.Building the good each hangar tunnel of splicing can be open to traffic, until geological hazard control engineering knot at this Beam.
The configuration of the present invention is simple, easy to operate, the good hangar tunnel of Fast Installation in the energy short time, to geological disasters such as landslips Road surface running vehicle pedestrains safety is threatened to play good protective action.
Above description is explanation of the invention, is not limitation of the invention.

Claims (4)

1. a kind of quickly emergency hangar tunnel equipment, it is characterised in that:Including by steel grating (1), pearl cotton (2), solid foot device (3), Telescoping rod (4), support construction (5) and hinge (6);Steel grating (1) is connected with telescoping rod (4) by hinge (6);Pearl cotton (2) covering is pasted on steel grating (1), is arranged on the inside of steel grating (1) Gu foot device (3) is fixed on, its role is to fixations Hangar tunnel avoids riverside slumping mass lateral pressure from being pushed open;Determine clamping telescoping rod after the length of telescoping rod (4);Canopy The left and right upper angle in hole respectively symmetrically property be equipped with support construction (5).
2. device according to claim 1, it is characterised in that:Support construction (5) include fixed hinge (51), strut (52), Fixed thread through-hole (53), rod end through-hole (54) and bolt (55), fixed thread through-hole (53) is multiple to be arranged in steel grating (1) On, rod end through-hole (54) can coincide from different fixed thread through-holes (53), and to change hangar tunnel width, blending bolt (55) is worn Coincidence through-hole is crossed to fix two adjacent steel gratings (1).
3. device according to claim 1, it is characterised in that:Fixed device (3) are by the steel plate (31) with through-hole and long riveting (32) composition is followed closely, and equidistant arrangement, in steel grating (1) bottom, the through-hole that long rivet (32) passes through steel plate (31) is inserted into underground.
4. the method for application such as claim 1-3 any one described device, it is characterised in that:When generation landslide or avalanche blocking When road surface, hangar tunnel will be folded and transported to scene, open circuit surface accumulation body is shoveled by digging machine, unfolded hangar tunnel adjusts telescoping rod Telescoping rod length is locked after length, opens support construction, and hangar tunnel width is adjusted by strut depending on width of roadway, fixes hangar tunnel shape State, then the steel plate that long rivet passes through solid foot device is inserted into underground, hangar tunnel is fixed, then multiple to splice depending on road surface bending degree Hangar tunnel;It builds the good each hangar tunnel of splicing to be open to traffic, until geological hazard control engineering terminates at this.
CN201810936628.0A 2018-08-16 2018-08-16 A kind of quickly emergency hangar tunnel equipment and implementation method Pending CN108894131A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810936628.0A CN108894131A (en) 2018-08-16 2018-08-16 A kind of quickly emergency hangar tunnel equipment and implementation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810936628.0A CN108894131A (en) 2018-08-16 2018-08-16 A kind of quickly emergency hangar tunnel equipment and implementation method

Publications (1)

Publication Number Publication Date
CN108894131A true CN108894131A (en) 2018-11-27

Family

ID=64354594

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810936628.0A Pending CN108894131A (en) 2018-08-16 2018-08-16 A kind of quickly emergency hangar tunnel equipment and implementation method

Country Status (1)

Country Link
CN (1) CN108894131A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109775258A (en) * 2018-12-29 2019-05-21 铜陵天奇蓝天机械设备有限公司 A kind of driving tension vehicle having ceiling able to turn on or off
CN111236099A (en) * 2020-03-19 2020-06-05 中铁第一勘察设计院集团有限公司 Assembly rigid-flexible combined buffer structure at top of rockfall-proof shed
CN111321678A (en) * 2020-04-01 2020-06-23 四川省交通勘察设计研究院有限公司 Steel shed tunnel structure convenient for transportation and rapid in forming on site and construction method
CN112726440A (en) * 2020-12-31 2021-04-30 四川省交通勘察设计研究院有限公司 Shed tunnel structure suitable for turning zone and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040231808A1 (en) * 2003-05-19 2004-11-25 Belanger Michael B. Folding grille assembly
CN101967802A (en) * 2010-07-30 2011-02-09 陈洪凯 Energy-dissipating hangar tunnel and energy-dissipating supporting base thereof
CN104499767A (en) * 2014-11-28 2015-04-08 上海理工大学 Adjustable shed frame
CN206376619U (en) * 2016-12-22 2017-08-04 陈思杰 A kind of sunshading board
CN108239940A (en) * 2017-06-19 2018-07-03 石晓峰 A kind of novel bridge equipment
CN208949752U (en) * 2018-08-16 2019-06-07 中国地质环境监测院 A kind of quickly emergency hangar tunnel equipment

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040231808A1 (en) * 2003-05-19 2004-11-25 Belanger Michael B. Folding grille assembly
CN101967802A (en) * 2010-07-30 2011-02-09 陈洪凯 Energy-dissipating hangar tunnel and energy-dissipating supporting base thereof
CN104499767A (en) * 2014-11-28 2015-04-08 上海理工大学 Adjustable shed frame
CN206376619U (en) * 2016-12-22 2017-08-04 陈思杰 A kind of sunshading board
CN108239940A (en) * 2017-06-19 2018-07-03 石晓峰 A kind of novel bridge equipment
CN208949752U (en) * 2018-08-16 2019-06-07 中国地质环境监测院 A kind of quickly emergency hangar tunnel equipment

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109775258A (en) * 2018-12-29 2019-05-21 铜陵天奇蓝天机械设备有限公司 A kind of driving tension vehicle having ceiling able to turn on or off
CN111236099A (en) * 2020-03-19 2020-06-05 中铁第一勘察设计院集团有限公司 Assembly rigid-flexible combined buffer structure at top of rockfall-proof shed
CN111321678A (en) * 2020-04-01 2020-06-23 四川省交通勘察设计研究院有限公司 Steel shed tunnel structure convenient for transportation and rapid in forming on site and construction method
CN111321678B (en) * 2020-04-01 2024-02-09 四川省交通勘察设计研究院有限公司 Steel shed tunnel structure convenient for rapid forming on transportation site and construction method
CN112726440A (en) * 2020-12-31 2021-04-30 四川省交通勘察设计研究院有限公司 Shed tunnel structure suitable for turning zone and construction method thereof

Similar Documents

Publication Publication Date Title
CN108894131A (en) A kind of quickly emergency hangar tunnel equipment and implementation method
CN208949752U (en) A kind of quickly emergency hangar tunnel equipment
JP5670927B2 (en) Protective fence
CN107761584A (en) A kind of freeway tunnel mouth Dangerous Rock Body Treatment Methods
CN108360560A (en) A kind of assembled steel case hangar tunnel and construction method suitable for rescue and relief work
CN207714344U (en) A kind of passive protection net for complex mountainous cut slope
CN204572001U (en) For the shed hole structure at mountain tunnel hole
CN106894330B (en) A kind of anti-Rolling Stone percussion mechanism of bridge pier based on waste tire and its construction method
KR20120105847A (en) Structure for preventing debris flow
KR101390354B1 (en) Method for stabilizing forest hillslope and siffening structure thereof
RU121860U1 (en) PROTECTIVE SCREEN SECTION
CN207878306U (en) A kind of assembled steel case hangar tunnel device suitable for rescue and relief work
CN204530357U (en) Cliff side slope plank road
CN104631474B (en) A kind of side slope protection greening structure
KR101235717B1 (en) Assembly type temporary structure for tunnel work
CN110273386A (en) A kind of passive side slope protective screen and its construction method
JPH05171626A (en) Protective shed
CN216948271U (en) Pile foundation fore shaft slidingtype safety cover plate
NO20170994A1 (en) Temporary tunnel
Khali Construction of Railway Tunnel T-49A in Highly Adverse Geological Conditions in Himalayas by Using NATM-A Case Study
CN214832041U (en) Can assemble fast, folding prevent falling rocks device
RU2540180C1 (en) Barrier to protect objects from rockfalls and protection system using it
KR102473275B1 (en) Protection Facility for Rock Breaking
CN218204490U (en) Slope dangerous rock falling stone protection SNS flexible active protective net
KR101914693B1 (en) Multi stage separated earth and stone flow buffer net and method for constructing this same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination