CN108894113A - A kind of pylon adjusts cable system and method automatically - Google Patents

A kind of pylon adjusts cable system and method automatically Download PDF

Info

Publication number
CN108894113A
CN108894113A CN201810765824.6A CN201810765824A CN108894113A CN 108894113 A CN108894113 A CN 108894113A CN 201810765824 A CN201810765824 A CN 201810765824A CN 108894113 A CN108894113 A CN 108894113A
Authority
CN
China
Prior art keywords
jack
setting value
strand wires
steel strand
pretightening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810765824.6A
Other languages
Chinese (zh)
Inventor
韩洪举
郭吉平
张基进
欧军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Road and Bridge Group Co Ltd
Original Assignee
Guizhou Road and Bridge Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Road and Bridge Group Co Ltd filed Critical Guizhou Road and Bridge Group Co Ltd
Priority to CN201810765824.6A priority Critical patent/CN108894113A/en
Publication of CN108894113A publication Critical patent/CN108894113A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides a kind of pylons to adjust cable system automatically comprising:Control centre interconnected and pumping station system, and the pretightening jack and stretch-draw jack that pass through oil circuit connection with the pumping station system;Pretightning force setting value, stretching force setting value or displacement setting value are inputted to the control centre;The control centre is according to the parameter value of input, issue corresponding instruction, control the pretightening jack carry out pre-tighten work to steel strand wires reach the pretightning force setting value, and the pretightening jack oil inlet oil circuit is controlled simultaneously and is closed, the stretch-draw jack oil inlet oil circuit is opened, until steel twisted-line tension-force or displacement reach the stretching force setting value or the displacement setting value.The technical solution can be automatically performed the preload work of each knotted rope, anchor cable steel strand wires setting initial tensioning force, and have the function of continuously to adjust cable stretching.In addition a kind of pylon of cable system is adjusted to adjust Suo Fangfa automatically automatically based on the pylon the present invention also provides a kind of.

Description

A kind of pylon adjusts cable system and method automatically
Technical field
The present invention relates to a kind of pylons to adjust cable system and method automatically.
Background technique
After founding of New, with the rapid development of bridge construction cause, a large amount of arch bridge has been built successively.Concrete arch Bridge is applied to earliest among the railroad bridge construction in China, and the bridge of rich Sha County Yongdinghe River 7 of the main span 150m built for 1966 is The concrete arch-type bridge of largest domestic span at that time.China is concentrated mainly on the excellent of construction method for the research of concrete arch-type bridge Change aspect.With non-support cable crane system method, limited bracket construction method, cantilever-construction, construction by swing, Synchronous lifting method, strength Property the construction methods such as skeleton construction method successive appearance, concrete arch-type bridge welcome the spring of development.2007, China was for the first time The concrete arch-type bridge of 150m has been built up using Hanging Basket cantilever pouring technology --- white sand ditch 1# bridge.However, being poured using Hanging Basket cantilever When building construction method and pouring arch ring concrete, dynamic measurement and correction, the continuous preload of knotted rope (anchor cable) of pylon offset are to apply Work difficult point and priority control technique.Do not had using common construction method to pylon offset and each Suo Li actual loading etc. The automatic collection of data, entirely with manual control, error is big, and risk is high.
When general concrete Arch Bridge Construction arch ring is poured, the offset of pylon is all by total station or GPS positioning system System assists rectifying a deviation using the Suo Li, jack stroke, cable wind rope that manually adjust knotted rope and anchor cable, the preceding card of work progress Then knotted rope and the single preload of anchor cable steel strand wires are integrally adjusted rope with large-tonnage jack, need to meet arch ring simultaneously by formula jack Linear and pylon is stablized, and mainly by artificial observation and record, the method defect is as follows:
1) husky top grand bridge arch ring is constructed using Hanging Basket cantilever pouring, in concreting process, due to concrete weight The increase of amount, pylon can be tilted along axis into bridge, if monitoring is improper with observation measures, pylon has unstability risk, be made At serious safe mass accident.
2) since the steel strand wires that knotted rope (anchor cable) uses use the single preload of preceding clip type jack, jack stroke is short, by It is many and longer in steel strand wires, it needs to carry out jack repeatedly to fall to open, preload can be met, labor intensity is big, effect Rate is low, high altitude operation, increases security risk, since successively to pre-tighten stress inconsistent for each steel strand wires when single preload, steel is caused to twist Line discontinuity, practical not to be able to satisfy the identical pretightning force of each steel strand wires, there are risks in anchoring procedure.
3) construction period is long, construction efficiency is low.
Summary of the invention
It is an object of that present invention to provide one kind can be automatically performed each knotted rope, anchor cable steel strand wires set the pre- of initial tensioning force Tight work, and cable system is adjusted automatically with a kind of continuous pylon for adjusting cable stretching function.
A kind of adjust a kind of pylon of cable system automatic automatically based on the pylon another object of the present invention is that providing Adjust Suo Fangfa.
Technical solution of the present invention is:A kind of pylon adjusts cable system automatically comprising:
Control centre interconnected and pumping station system, and the preload thousand for passing through oil circuit connection with the pumping station system Jin top and stretch-draw jack;
Pretightning force setting value, stretching force setting value or displacement setting value are inputted to the control centre;The control centre According to the parameter value of input, corresponding instruction is issued, the pretightening jack is controlled and carries out pre-tightening work to steel strand wires and reach described Pretightning force setting value, and control the pretightening jack oil inlet oil circuit simultaneously and close, the stretch-draw jack oil inlet oil circuit is opened It opens, until steel twisted-line tension-force or displacement reach the stretching force setting value or the displacement setting value.
Preferably, a kind of above-mentioned pylon adjusts cable system automatically, wherein the pretightening jack and/or the tensioning thousand Jin top includes cylinder piston, and the cylinder piston is connected with an external anchor slab, and the anchor slab is correspondingly connected with the steel and twists Line.
Preferably, a kind of above-mentioned pylon adjusts cable system automatically, is suitable for clamping the steel wherein being additionally provided on the anchor slab The tool clamping piece of twisted wire is equipped with reset spring between the tool clamping piece and the anchor slab.
Preferably, a kind of above-mentioned pylon adjusts cable system automatically, wherein the pumping station system includes fuel tank, control valve group And pressure sensor, the control valve group include valve body, solenoid directional control valve, automatically controlled overflow valve, are provided in the control valve group Oil inlet, oil return opening, each oil inlet and oil return opening are separately equipped with the solenoid directional control valve;The pressure sensor and The automatically controlled overflow valve is arranged on oil inlet oil circuit.
Preferably, a kind of above-mentioned pylon adjusts cable system automatically, wherein the control centre is suitable for instruction separate unit or more The pumping station system synchronous working.
A kind of pylon adjusts Suo Fangfa automatically comprising following steps:
S1:Equipment is installed, control centre, pumping station system and pretightening jack are connected peace with stretch-draw jack Dress;
S2:Parameter input inputs pretightning force setting value, stretching force setting value or displacement setting value to control centre;
S3:It pre-tightens, control centre issues corresponding instruction according to the parameter value of input, controls the oil inlet oil of pretightening jack Road is opened, and the oil inlet oil circuit of stretch-draw jack is closed, and pretightening jack fuel feeding carries out preload work to steel strand wires and reaches pretightning force Setting value;
S4:Whole to adjust rope, preload finishes, and control centre issues instruction, and the oil inlet oil circuit for controlling pretightening jack is closed, The oil inlet oil circuit of stretch-draw jack is opened, and stretch-draw jack fuel feeding carries out tensioning to steel strand wires, until stretching force or displacement reach Setting value.
Preferably, a kind of above-mentioned pylon adjusts Suo Fangfa automatically, when a certain steel strand wires pretightning force reaches in step S3 When pretightning force setting value, pressure information is transferred to control centre by pressure sensor, and control centre issues instruction, automatically controlled overflow Valve starting, pretightening jack can not be pressurized again, and the cylinder piston of the pretightening jack stops working, remaining does not reach preload and sets The corresponding pretightening jack of steel strand wires for determining power works on, until all steel strand wires reach pretightning force setting value, master control Center issues instruction, and electromagnetic switch valve events stop to pretightening jack fuel feeding.
Preferably, a kind of above-mentioned pylon adjusts Suo Fangfa, the step S3 to include automatically:
S3.1:Overall control center issues instruction, and the check valve mounted in pretightening jack oil inlet oil circuit is opened, and is mounted in tensioning The closed check valve of jack oil inlet oil circuit, electromagnetic switch valve events, pretightening jack fuel feeding;
S3.2:Hydraulic oil sequentially enters the cylinder body of each pretightening jack, cylinder piston by pretightening jack oil inlet Elongation, anchor slab, together to Forward, loose steel strand wires are tensed, while pressure sensing with the tool clamping piece for clamping steel strand wires Pressure data is simultaneously transmitted to overall control center by device real-time measurement pressure value;
S3.3:Automated backhaul carries out the preload of next stroke after cylinder piston one stroke of elongation, in piston driving anchor slab When backhaul, the tool clamping piece of anchor slab resets under the action of reset spring, pre-tightens and prepares for next stroke, while being mounted on and opening Tool clamping piece self-locking under the action of reset spring on the cylinder piston of jack is drawn, prevents steel strand wires from falling after rise, follows in this way Ring is reciprocal, until pretightning force reaches setting value.
Preferably, a kind of above-mentioned pylon adjusts Suo Fangfa, the step S4 to include automatically:
S4.1:After the completion of pre-tightening step, overall control center, which issues, to be instructed, the closed check valve of pretightening jack oil inlet oil circuit, The check valve of stretch-draw jack oil inlet oil circuit is opened, electromagnetic switch valve events, gives stretch-draw jack fuel feeding;
S4.2:Stretch-draw jack oil inlet simultaneously stretches cylinder, carries out tensioning, while pressure sensor real-time measurement pressure to steel strand wires Pressure data is simultaneously transferred to overall control center and/or displacement sensor real-time measurement shift value and transmits displacement data by force value To overall control center.
Preferably, a kind of above-mentioned pylon adjusts Suo Fangfa automatically, in step S4 after one stroke of tensioning, as pressure and/ Or displacement does not reach setting value, then automated backhaul carries out the tensioning of next stroke;It is driven in the cylinder piston of stretch-draw jack When anchor slab backhaul, the tool clamping piece of automated tool anchor resets under the action of reset spring, is next stroke pulling preparation, from Self-locking under the action of steel strand wires retraction force or component gravity of the tool clamping piece of power driven tools anchor, steel strand wires relaxation or component return It falls, moves in circles in this way, until stretching force or displacement reach setting value.
The present invention having the beneficial effect that compared with the prior art:The technical solution adjusts cable system automatic complete automatically At the preload work of each knotted rope, anchor cable steel strand wires setting initial tensioning force, and pumping plant provides power source, configuration to jack Automated tool anchor has the function of continuously to adjust rope (tensioning), and control system can instruct to separate unit or more pumping plants synchronous workings, can general Offset monitoring system adjusts cable system to combine in same operating platform with automatic, realizes acquiring and deposit in real time for pylon offset data Storage, can be transferred to office system for related data by network and be observed in real time.
Data show, steel strand wires pre-tighten speed automatically and can reach 16m/ hours the program in actual operation.
Detailed description of the invention
It, below will be to tool in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Body embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing be some embodiments of the present invention, for those of ordinary skill in the art, what is do not made the creative labor Under the premise of, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is schematic diagram of the embodiment of the present invention.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described reality Applying example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common Technical staff's every other embodiment obtained without making creative work belongs to what the present invention protected Range.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integrally connect It connects;It can be mechanical connection, be also possible to be electrically connected;Can be directly connected, can also indirectly connected through an intermediary, It can be the connection inside two elements.For the ordinary skill in the art, can be understood with concrete condition above-mentioned The concrete meaning of term in the present invention.
As shown in Figure 1, a kind of pylon adjusts cable system automatically comprising:
Control centre 1 interconnected and pumping station system 2, and the preload for passing through oil circuit connection with the pumping station system 2 Jack 3 and stretch-draw jack 4;
Pretightning force setting value, stretching force setting value or displacement setting value are inputted to the control centre;The control centre According to the parameter value of input, corresponding instruction is issued, the pretightening jack 3 is controlled and carries out pre-tightening work to steel strand wires 5 and reach institute Pretightning force setting value is stated, and controls the 3 oil inlet oil circuit of pretightening jack simultaneously and closes, the 4 oil inlet oil circuit of stretch-draw jack It opens, until 5 stretching force of steel strand wires or displacement reach the stretching force setting value or the displacement setting value.
Wherein the pretightening jack 3 and/or the stretch-draw jack 4 include cylinder piston, the cylinder piston and one External anchor slab is connected, and the anchor slab is correspondingly connected with the steel strand wires.
Wherein be additionally provided with the tool clamping piece for being suitable for clamping the steel strand wires 5 on the anchor slab, the tool clamping piece with it is described Reset spring is equipped between anchor slab.
Wherein the pumping station system 2 include fuel tank, control valve group and pressure sensor, the control valve group include valve body, Solenoid directional control valve, automatically controlled overflow valve are provided with oil inlet, oil return opening, each oil inlet and oil return opening point in the control valve group It Pei She not a solenoid directional control valve;The pressure sensor and the automatically controlled overflow valve are arranged on oil inlet oil circuit.
Wherein the control centre 1 is suitable for instruction separate unit or the more pumping station systems 2 work asynchronously.
A kind of pylon adjusts Suo Fangfa automatically comprising following steps:
S1:Equipment is installed, control centre 1, pumping station system 2 and pretightening jack 3 are connected with stretch-draw jack 4 Installation;
S2:Parameter input inputs pretightning force setting value, stretching force setting value or displacement setting value to control centre 1;
S3:It pre-tightens, control centre 1 issues corresponding instruction according to the parameter value of input, controls the oil inlet of pretightening jack 3 Oil circuit is opened, and the oil inlet oil circuit of stretch-draw jack 4 is closed, and 3 fuel feeding of pretightening jack carries out preload work to steel strand wires 5 and reaches Pretightning force setting value;
S4:Whole to adjust rope, preload finishes, and control centre issues instruction, and the oil inlet oil circuit of control pretightening jack 3 is closed, The oil inlet oil circuit of stretch-draw jack 4 is opened, and 4 fuel feeding of stretch-draw jack carries out tensioning to steel strand wires 5, until stretching force or displacement Reach setting value.
In its step S3 when a certain steel strand wires pretightning force reaches pretightning force setting value, pressure sensor believes pressure Breath is transferred to control centre, and control centre issues instruction, automatically controlled overflow valve starting, and pretightening jack can not be pressurized again, the preload The cylinder piston of jack stops working, remaining does not reach the corresponding pretightening jack continuation work of steel strand wires for pre-tightening setting power Make, until all steel strand wires reach pretightning force setting value, overall control center issues instruction, electromagnetic switch valve events, stopping pair Pretightening jack fuel feeding.
Its step S3 further includes:
S3.1:Overall control center issues instruction, and the check valve mounted in pretightening jack oil inlet oil circuit is opened, and is mounted in tensioning The closed check valve of jack oil inlet oil circuit, electromagnetic switch valve events, pretightening jack fuel feeding;
S3.2:Hydraulic oil sequentially enters the cylinder body of each pretightening jack, cylinder piston by pretightening jack oil inlet Elongation, anchor slab, together to Forward, loose steel strand wires are tensed, while pressure sensing with the tool clamping piece for clamping steel strand wires Pressure data is simultaneously transmitted to overall control center by device real-time measurement pressure value;
S3.3:Automated backhaul carries out the preload of next stroke after cylinder piston one stroke of elongation, in piston driving anchor slab When backhaul, the tool clamping piece of anchor slab resets under the action of reset spring, pre-tightens and prepares for next stroke, while being mounted on and opening Tool clamping piece self-locking under the action of reset spring on the cylinder piston of jack is drawn, prevents steel strand wires from falling after rise, follows in this way Ring is reciprocal, until pretightning force reaches setting value.
Its step S4 further includes:
S4.1:After the completion of pre-tightening step, overall control center, which issues, to be instructed, the closed check valve of pretightening jack oil inlet oil circuit, The check valve of stretch-draw jack oil inlet oil circuit is opened, electromagnetic switch valve events, gives stretch-draw jack fuel feeding;
S4.2:Stretch-draw jack oil inlet simultaneously stretches cylinder, carries out tensioning, while pressure sensor real-time measurement pressure to steel strand wires Pressure data is simultaneously transferred to overall control center and/or displacement sensor real-time measurement shift value and transmits displacement data by force value To overall control center.
In its step S4 after one stroke of tensioning, such as pressure and/or displacement do not reach setting value, then automated backhaul into The tensioning of the next stroke of row;When the cylinder piston of stretch-draw jack drives anchor slab backhaul, the tool clamping piece of automated tool anchor exists Resetted under the action of reset spring, be next stroke pulling preparation, the tool clamping piece of automated tool anchor in steel strand wires retraction force or Self-locking under the action of component gravity, steel strand wires relaxation or component fall after rise, move in circles in this way, until stretching force or displacement reach To setting value.
The technical solution adjusts cable system that can be automatically performed each knotted rope, anchor cable steel strand wires setting initial tensioning force automatically Preload work, and pumping plant to jack provide power source, configuration automated tool anchor have the function of continuously to adjust rope (tensioning), Control system can instruct to separate unit or more pumping plant synchronous workings, cable system can be adjusted to combine with automatic offset monitoring system Same operating platform realizes the real-time acquisition of pylon offset data and storage, can be transferred to related data by network and do Public system is observed in real time.
Data show, steel strand wires pre-tighten speed automatically and can reach 16m/ hours the program in actual operation.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations; Although present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that:Its It is still possible to modify the technical solutions described in the foregoing embodiments, or special to some or all of technologies Sign is equivalently replaced;And these are modified or replaceed, the present invention that it does not separate the essence of the corresponding technical solution is each to be implemented The range of example technical solution.

Claims (10)

1. a kind of pylon adjusts cable system automatically, which is characterized in that including:
Control centre interconnected and pumping station system, and with the pumping station system by the pretightening jack of oil circuit connection and Stretch-draw jack;
Pretightning force setting value, stretching force setting value or displacement setting value are inputted to the control centre;The control centre according to The parameter value of input, issue corresponding instruction, control the pretightening jack carry out pre-tighten work to steel strand wires reach the preload Power setting value, and control the pretightening jack oil inlet oil circuit simultaneously and close, the stretch-draw jack oil inlet oil circuit is opened, until Steel twisted-line tension-force or displacement reach the stretching force setting value or the displacement setting value.
2. a kind of pylon according to claim 1 adjusts cable system automatically, it is characterised in that:The pretightening jack and/or The stretch-draw jack includes cylinder piston, and the cylinder piston is connected with an external anchor slab, and the anchor slab is correspondingly connected with The steel strand wires.
3. a kind of pylon according to claim 2 adjusts cable system automatically, it is characterised in that:It is additionally provided with and is suitable on the anchor slab The tool clamping piece of the steel strand wires is clamped, reset spring is equipped between the tool clamping piece and the anchor slab.
4. a kind of pylon according to claim 1 adjusts cable system automatically, it is characterised in that:The pumping station system includes oil Case, control valve group and pressure sensor, the control valve group include valve body, solenoid directional control valve, automatically controlled overflow valve, the control valve Oil inlet, oil return opening are provided in group, each oil inlet and oil return opening are separately equipped with the solenoid directional control valve;The pressure Sensor and the automatically controlled overflow valve are arranged on oil inlet oil circuit.
5. a kind of pylon according to claim 1 adjusts cable system automatically, it is characterised in that:The control centre is suitable for instruction Separate unit or the more pumping station system synchronous workings.
6. a kind of pylon adjusts Suo Fangfa automatically, which is characterized in that include the following steps:
S1:Equipment is installed, control centre, pumping station system and pretightening jack are connected installation with stretch-draw jack;
S2:Parameter input inputs pretightning force setting value, stretching force setting value or displacement setting value to control centre;
S3:It pre-tightens, control centre issues corresponding instruction according to the parameter value of input, and the oil inlet oil circuit for controlling pretightening jack is opened It opens, the oil inlet oil circuit of stretch-draw jack is closed, and pretightening jack fuel feeding carries out preload work to steel strand wires and reaches pretightning force setting Value;
S4:Whole to adjust rope, preload finishes, and control centre issues instruction, and the oil inlet oil circuit for controlling pretightening jack is closed, tensioning thousand The oil inlet oil circuit on jin top is opened, and stretch-draw jack fuel feeding carries out tensioning to steel strand wires, until stretching force or displacement reach setting value.
7. a kind of pylon according to claim 6 adjusts Suo Fangfa automatically, which is characterized in that when a certain steel twists in step S3 When line pretightning force reaches pretightning force setting value, pressure information is transferred to control centre by pressure sensor, and control centre, which issues, to be referred to It enables, automatically controlled overflow valve starting, pretightening jack can not be pressurized again, and the cylinder piston of the pretightening jack stops working, remaining does not have The corresponding pretightening jack of steel strand wires for reaching preload setting power works on, until all steel strand wires reach pretightning force setting Value, overall control center issue instruction, and electromagnetic switch valve events stop to pretightening jack fuel feeding.
8. a kind of pylon according to claim 6 adjusts Suo Fangfa automatically, which is characterized in that step S3 includes:
S3.1:Overall control center issues instruction, and the check valve mounted in pretightening jack oil inlet oil circuit is opened, and is mounted in stretch-draw jack The closed check valve of oil inlet oil circuit, electromagnetic switch valve events, pretightening jack fuel feeding;
S3.2:Hydraulic oil sequentially enters the cylinder body of each pretightening jack by pretightening jack oil inlet, and cylinder piston extends, Anchor slab, together to Forward, loose steel strand wires is tensed, while pressure sensor is real-time with the tool clamping piece for clamping steel strand wires Pressure data is simultaneously transmitted to overall control center by measured pressure value;
S3.3:Automated backhaul carries out the preload of next stroke after cylinder piston one stroke of elongation, in piston driving anchor slab backhaul When, the tool clamping piece of anchor slab resets under the action of reset spring, pre-tightens and prepares for next stroke, while it is very heavy to be mounted on tensioning Tool clamping piece self-locking under the action of reset spring on the cylinder piston on top, prevents steel strand wires from falling after rise, moves in circles in this way, Until pretightning force reaches setting value.
9. a kind of pylon according to claim 6 adjusts Suo Fangfa automatically, which is characterized in that step S4 includes:
S4.1:After the completion of pre-tightening step, overall control center issues instruction, the closed check valve of pretightening jack oil inlet oil circuit, tensioning The check valve of jack oil inlet oil circuit is opened, electromagnetic switch valve events, gives stretch-draw jack fuel feeding;
S4.2:Stretch-draw jack oil inlet simultaneously stretches cylinder, carries out tensioning to steel strand wires, while pressure sensor real-time measurement pressure value is simultaneously Pressure data is transferred to overall control center and/or displacement sensor real-time measurement shift value and displacement data is transmitted to master control Center.
10. a kind of pylon according to claim 6 adjusts Suo Fangfa automatically, which is characterized in that one row of tensioning in step S4 Cheng Hou, if pressure and/or displacement do not reach setting value, then automated backhaul carries out the tensioning of next stroke;In stretch-draw jack Cylinder piston drive anchor slab backhaul when, the tool clamping piece of automated tool anchor resets under the action of reset spring, be next line Journey pulling preparation, tool clamping piece self-locking under the action of steel strand wires retraction force or component gravity of automated tool anchor, steel strand wires Loose or component is fallen after rise, is moved in circles in this way, until stretching force or displacement reach setting value.
CN201810765824.6A 2018-07-12 2018-07-12 A kind of pylon adjusts cable system and method automatically Pending CN108894113A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810765824.6A CN108894113A (en) 2018-07-12 2018-07-12 A kind of pylon adjusts cable system and method automatically

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810765824.6A CN108894113A (en) 2018-07-12 2018-07-12 A kind of pylon adjusts cable system and method automatically

Publications (1)

Publication Number Publication Date
CN108894113A true CN108894113A (en) 2018-11-27

Family

ID=64349324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810765824.6A Pending CN108894113A (en) 2018-07-12 2018-07-12 A kind of pylon adjusts cable system and method automatically

Country Status (1)

Country Link
CN (1) CN108894113A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112458919A (en) * 2020-12-12 2021-03-09 中国铁路设计集团有限公司 Railway bridge synchronous tensioning and cable adjusting construction system and construction method thereof
CN114808727A (en) * 2022-05-12 2022-07-29 湖南联智智能科技有限公司 Automatic control method for prestress multi-stroke tensioning

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064227A (en) * 1998-08-27 2000-02-29 Sumitomo Constr Co Ltd Bridge erection method
CN103526948A (en) * 2013-10-24 2014-01-22 柳州黔桥工程材料有限公司 Control method of intelligent tension system and intelligent tension system
CN106285013A (en) * 2016-10-18 2017-01-04 柳州黔桥工程材料有限公司 Steel strand wires group's anchor monoblock type automatic synchronization control method
CN108239937A (en) * 2017-09-14 2018-07-03 贵州桥梁建设集团有限责任公司 Arch bridge tower frame self-balance control method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064227A (en) * 1998-08-27 2000-02-29 Sumitomo Constr Co Ltd Bridge erection method
CN103526948A (en) * 2013-10-24 2014-01-22 柳州黔桥工程材料有限公司 Control method of intelligent tension system and intelligent tension system
CN106285013A (en) * 2016-10-18 2017-01-04 柳州黔桥工程材料有限公司 Steel strand wires group's anchor monoblock type automatic synchronization control method
CN108239937A (en) * 2017-09-14 2018-07-03 贵州桥梁建设集团有限责任公司 Arch bridge tower frame self-balance control method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112458919A (en) * 2020-12-12 2021-03-09 中国铁路设计集团有限公司 Railway bridge synchronous tensioning and cable adjusting construction system and construction method thereof
CN114808727A (en) * 2022-05-12 2022-07-29 湖南联智智能科技有限公司 Automatic control method for prestress multi-stroke tensioning

Similar Documents

Publication Publication Date Title
CN101200916B (en) Construction method of prestressed suspension type building structure
CN103088750B (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN106087752B (en) Multispan cable-carried arch bridge construction method
CN108004925B (en) Prestress reinforced concrete circular arch tower construction method
CN106812328B (en) The whole two step lifting construction methods of string prestressed steel structure rack with hanging layer
CN110886423A (en) BIM technology-based steel structure tension beam roof construction method
CN109972493A (en) A kind of self-anchored suspension bridge design and construction method of First cable later girder
CN104790675B (en) Reinforced concrete block masonry structure assemblage construction method
CN102168405B (en) Construction method of steel-concrete mixed Y-shaped tower of low-pylon cable-stayed bridge
CN110409304A (en) A kind of precast segment bent cap free cantilever erection construction method
CN108894113A (en) A kind of pylon adjusts cable system and method automatically
CN101446075B (en) Synchronous vertical swing lift construction method for double inclination arc tower
CN102922601A (en) Bridge prestress tensioning control and feedback method
CN107059622A (en) A kind of post-stressed intelligent construction technology of precast beam
CN111636693A (en) Steel truss installation construction method based on BIM
CN212025936U (en) Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge
CN108894112A (en) A kind of deformation of pylon pre-tightens and system for automatically correcting
CN108894114A (en) A kind of pylon based on ultrasonic displacement sensor adjusts cable system automatically
CN202826047U (en) Prestress tensioning system
CN106120573B (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method
CN107476263A (en) A kind of construction method of prestressed pier anchor cable
CN217651826U (en) System is transferred in step to aquatic cushion cap construction steel cofferdam
CN201199213Y (en) Microcomputer-controlled still-loading anchoring tester
CN107023036B (en) A kind of station load segment rapid constructing method
CN203096616U (en) Intelligent synchronous tensioning system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127

RJ01 Rejection of invention patent application after publication