CN108890865A - Prefabricated torsion king block demoulding method - Google Patents
Prefabricated torsion king block demoulding method Download PDFInfo
- Publication number
- CN108890865A CN108890865A CN201810613532.0A CN201810613532A CN108890865A CN 108890865 A CN108890865 A CN 108890865A CN 201810613532 A CN201810613532 A CN 201810613532A CN 108890865 A CN108890865 A CN 108890865A
- Authority
- CN
- China
- Prior art keywords
- demoulding
- prefabricated
- king
- work
- crowbar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 238000005498 polishing Methods 0.000 claims abstract description 5
- 238000007789 sealing Methods 0.000 claims description 4
- 230000001360 synchronised effect Effects 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 5
- 239000000463 material Substances 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 abstract description 4
- 238000004519 manufacturing process Methods 0.000 abstract description 4
- 230000002708 enhancing effect Effects 0.000 abstract description 3
- 230000036541 health Effects 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 4
- 238000005452 bending Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000004080 punching Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000009416 shuttering Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B13/00—Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
- B28B13/04—Discharging the shaped articles
- B28B13/06—Removing the shaped articles from moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
The invention discloses a kind of prefabricated torsion king block demoulding methods comprising step used below, step 1 are prepared work;Step 2 splices mobile crowbar;Step 3, aperture;Step 4, circular hole of polishing;Step 5 starts demoulding work;Step 6 is dealt with problems arising from an accident, and packs up sweep scene after the completion.The present invention can combine live site condition well, it is able to satisfy all kinds of large-scale dismounting operations for turning round the fast prefabricated steel-template of king, adaptability is stronger, and structure is simple, making material saves, low manufacture cost, it maintains and goes along with sb. to guard him and is also convenient and easy, with extraordinary economy and practicability, unique advantage is shown to improve the prefabricated large-scale torsion king's block steel form dismounting operating efficiency in construction site, reducing all various aspects such as engineering investment cost, the career safety & health accordance for enhancing operating environment.
Description
Technical field
The present invention relates to a kind of methods, more particularly to a kind of prefabricated torsion king block demoulding method.
Background technique
Currently, constantly building and developing to enlargement, the port that coastal condition preferably can be utilized directly with port engineering
Gulf sea area is all developed totally substantially, in the necessary addressing off-lying sea of the newly-built major port of build or future plan, because of stormy waves hydrology item
The unfavorable ship of part difference reaches port operation, needs auxiliary construction breakwater engineering, and breakwater engineering be unable to do without prefabricated torsion king's block substantially
It is used as the levee body mask wave that disappears.King's block demoulding technique is turned round according to tradition, it is general using the artificial plate lock screw that first loosens the mold, then use
Crowbar bit by bit pries open a side template, and also needs sledge hammer to tap cooperation template and loosen and remove, for small steel form
This method is able to satisfy requirement substantially, but larger to the damage of template, and steel form corner is be easy to cause to deform, serious also to will cause torsion
King's block damages side arrisdefect, and effect is poor.Dismounting of this method for large scale steel mould, not only low efficiency, be easily damaged template and concrete
Component, is also easy to template occurs to topple over, hammer the safety accidents such as hurt sb.'s feelings.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of prefabricated torsion king block demoulding methods, can combine well existing
Site condition is able to satisfy all kinds of large-scale dismounting operations for turning round the fast prefabricated steel-templates of king, and adaptability is stronger, and structure it is simple,
Making material save, low manufacture cost, maintain and go along with sb. to guard him it is also convenient and easy, have extraordinary economy and practicability, for improve
The prefabricated large-scale occupation for turning round king's block steel form and removing operating efficiency, reducing engineering investment cost, enhance operating environment in construction site
All various aspects such as healthy and safe accordance show unique advantage.
The present invention is to solve above-mentioned technical problem by following technical proposals:A kind of prefabricated torsion king block demoulding method,
It is characterized in that, it includes step used below:
Step 1:It is prepared work, is carrying out first being ready to need the tool of demoulding in advance when demoulding work;
Step 2:Splice mobile crowbar, mobile crowbar selects the round steel one meter five long, diameter is 25 millimeters;
Step 3:Aperture, to the round hole for opening 15 centimetres or so in the middle part of torsion king's block steel form;
Step 4:Polishing circular hole, needs the circular hole of split mistake to polish, and polishes smooth, is smooth sealing steel plate inner wall;
Step 5:Start demoulding work, staff begins to use hydraulic jack, mobile crowbar to start to work;
Step 6:It deals with problems arising from an accident, packs up sweep scene after the completion.
Preferably, need the basic holding of three people operation is synchronous to carry out during the progress striking job.
Preferably, the hydraulic jack selects the screw jack that top power is five tons.
Preferably, steel form top two sides are equipped with overturning-preventing pull rod made of long 500 millimeters of zinc-plated screw rod.
The positive effect of the present invention is that:The present invention can combine live site condition well, be able to satisfy all kinds of big
Type turns round the dismounting operation of the fast prefabricated steel-template of king, and adaptability is stronger, and structure is simple, making material saves, low manufacture cost, protects
It supports and goes along with sb. to guard him also convenient and easy, there is extraordinary economy and practicability, construction site is prefabricated large-scale to turn round king's block steel to improve
Form removable operating efficiency reduces all various aspects such as engineering investment cost, the career safety & health accordance for enhancing operating environment
Show unique advantage.
Detailed description of the invention
Fig. 1 is process for using figure of the invention.
Fig. 2 is the prefabricated schematic diagram for turning round king's block template of the present invention.
Fig. 3 is schematic diagram of the present inventor's working drawing for demoulding.
Schematic diagram when Fig. 4 is demoulding of the present invention.
Fig. 5 is the schematic diagram after demoulding of the present invention.
Fig. 6 is the flow chart that template of the present invention hangs shifting.
Specific embodiment
Present pre-ferred embodiments are provided with reference to the accompanying drawing, in order to explain the technical scheme of the invention in detail.
As shown in Figures 1 to 6, the prefabricated torsion king block demoulding method of the present invention includes step used below:
Step 1:It is prepared work, is carrying out first being ready to need the tool of demoulding, including hydraulic thousand in advance when demoulding work
The tools such as jin top, mobile two sets of crowbar, safety rope, limit pull rod, save the time for next work;
Step 2:Splice mobile crowbar, mobile crowbar selects the round steel one meter five long, diameter is 25 millimeters, a conduct
Manipulator's lever, other end bending, bends 250 millimeters of segment length, and cross bar, the weldering of cross bar both ends are welded in portion position in this paragraph
Meet each one, bearing of 62 millimeters of outer diameter of installation, and with electric weld handle bearing inner ring and round steel contact surface firm welding, and it is preceding
Face round steel is welded into trolley form, and bending segment end is made into flat form, and crowbar mobile in this way can agitate more at work
Heavy article can also realize planar movement in agitating shuttering work state, the working efficiency of demoulding can be improved;
Step 3:Aperture, to the round hole for opening 15 centimetres or so in the middle part of king's block steel form is turned round, the hole is when template is installed with slightly
Big circular seal steel plate blocks, and back is by the fastening of wooden wedge choker block, and the circular hole is by the installation site as jack;
Step 4:Polishing circular hole, needs the circular hole of split mistake to polish, and polishes smooth, is smooth sealing steel plate inner wall, hairless
The defects of thorn, pit slot, as steel form material, inner wall surface thereof quality also requires on an equal basis, which constantly seals in casting concrete
Blocking is closed, changes plate to need to remove the circular hole before demoulding, exposes and turn round king's block concrete face, the circular hole by polishing can allow hydraulic
The work of jack becomes more convenient;
Step 5:Start demoulding work, staff begins to use hydraulic jack, mobile crowbar to start to work, first removes top
Upper workbench railing, then the clamping screw between template is loosened, fix overturn-preventing stay-bolt.After the completion of preparation, by
Edge sealing under template to be removed is filled at the tip position that two people hold mobile crowbar respectively, and in addition a people installs jack, by thousand
Jin top is installed by circular hole, and slowly operation jack jacks outward, meanwhile, mobile crowbar firmly sled top upwards, and exert oneself to
Outer drawing moves crowbar handle, and when above-mentioned jack is with mobile crowbar collective effect, holding is coordinated, is synchronous, slowly removes punching block in this way
It after distance reaches 20 centimetres or so between plate, then unscrews overturning-preventing rod nut to the end, repeats above-mentioned mobile crowbar and thousand
Jin top operation sequence, can safely and fast loosen steel form in this way, move to free state, improve work by operating repeatedly
Make efficiency;
Step 6:It deals with problems arising from an accident, all unlocks overturning-preventing pull rod device, hung by loop wheel machine and move on to designated position and polished, removed
The road Zha Dengxia treatment process, packs up sweep scene after the completion.
It carries out needing the basic holding of three people operation is synchronous to carry out during striking job, it is ensured that template safety and steady is torn open
It removes.
Hydraulic jack selects the screw jack that top power is five tons, and the work of such hydraulic jack can become more
It is convenient.
Steel form top two sides are equipped with overturning-preventing pull rod made of long 500 millimeters of zinc-plated screw rod, and protection staff is more
Add safety.
In conclusion the present invention can combine live site condition well, it is able to satisfy all kinds of large-scale torsion kings prefabricated punching block fastly
The dismounting operation of plate, adaptability is stronger, and structure is simple, making material saves, low manufacture cost, maintains and goes along with sb. to guard him and also facilitates province
Thing has extraordinary economy and practicability, for improve construction site it is prefabricated it is large-scale turn round king's block steel form remove operating efficiency,
It reduces all various aspects such as engineering investment cost, the career safety & health accordance for enhancing operating environment and shows unique advantage.
Particular embodiments described above, the technical issues of to solution of the invention, technical scheme and beneficial effects carry out
It is further described, it should be understood that the above is only a specific embodiment of the present invention, is not limited to
The present invention, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should be included in this
Within the protection scope of invention.
Claims (4)
1. a kind of prefabricated torsion king block demoulding method, which is characterized in that it includes step used below:
Step 1:It is prepared work, is carrying out first being ready to need the tool of demoulding in advance when demoulding work;
Step 2:Splice mobile crowbar, mobile crowbar selects the round steel one meter five long, diameter is 25 millimeters;
Step 3:Aperture needs out 15 centimetres or so of round hole to king's block steel form middle part is turned round;
Step 4:Polishing circular hole, needs the circular hole of split mistake to polish, and polishes smooth, is smooth sealing steel plate inner wall;
Step 5:Start demoulding work, staff begins to use hydraulic jack, mobile crowbar to start to work;
Step 6:It deals with problems arising from an accident, packs up sweep scene after the completion.
2. prefabricated torsion king block demoulding method as described in claim 1, which is characterized in that needed during the progress striking job
Want three people operation is basic to keep synchronous progress.
3. prefabricated torsion king block demoulding method as described in claim 1, which is characterized in that the hydraulic jack selection pushes up power and is
Five tons of screw jack.
4. prefabricated torsion king block demoulding method as described in claim 1, which is characterized in that steel form top two sides are equipped with length
Overturning-preventing pull rod made of 500 millimeters of zinc-plated screw rod.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810613532.0A CN108890865A (en) | 2018-06-14 | 2018-06-14 | Prefabricated torsion king block demoulding method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810613532.0A CN108890865A (en) | 2018-06-14 | 2018-06-14 | Prefabricated torsion king block demoulding method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108890865A true CN108890865A (en) | 2018-11-27 |
Family
ID=64345965
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810613532.0A Pending CN108890865A (en) | 2018-06-14 | 2018-06-14 | Prefabricated torsion king block demoulding method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108890865A (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040102272A (en) * | 2003-05-27 | 2004-12-04 | (주)씨씨엘 코리아 | Prestressed concrete double-t beam bridge & formwork applying incremental launching method |
CN105220626A (en) * | 2015-10-27 | 2016-01-06 | 安徽水安建设集团股份有限公司 | Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled |
CN106272936A (en) * | 2016-09-27 | 2017-01-04 | 中交第航务工程局有限公司 | A kind of Zhi Chai mechanism for torsion-bending ratio template |
-
2018
- 2018-06-14 CN CN201810613532.0A patent/CN108890865A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040102272A (en) * | 2003-05-27 | 2004-12-04 | (주)씨씨엘 코리아 | Prestressed concrete double-t beam bridge & formwork applying incremental launching method |
CN105220626A (en) * | 2015-10-27 | 2016-01-06 | 安徽水安建设集团股份有限公司 | Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled |
CN106272936A (en) * | 2016-09-27 | 2017-01-04 | 中交第航务工程局有限公司 | A kind of Zhi Chai mechanism for torsion-bending ratio template |
Non-Patent Citations (1)
Title |
---|
徐望之: "5T扭王字块预制施工工艺改进", 《中国水运》, pages 260 - 261 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210975812U (en) | Underwater pile body cutting device | |
CN108612109A (en) | The carrierless method for dismounting of concrete support beam | |
US4419030A (en) | Apparatus for and method of constructing a sheet piling shoring structure | |
CN108945298B (en) | Marine underwater detection support structure and operation method thereof | |
CN202925896U (en) | A hole reservation device for constructional engineering | |
CN108868194B (en) | Chimney dismantling device and chimney dismantling method | |
CN108890865A (en) | Prefabricated torsion king block demoulding method | |
CN215485871U (en) | Drilling device of reef explosion ship equipment | |
CN208359056U (en) | Prefabricated torsion king block removing device | |
CN202450423U (en) | Milling-planing machine for maintenance of manholes | |
CN106284985A (en) | A kind of Formwork Installation Method of reserved post-cast strip | |
CN106481082B (en) | A kind of improvement casting method of constructional column | |
CN202370252U (en) | Underwater concrete formwork removal device | |
CN215717094U (en) | Cage ladder for maintaining wharf fender | |
CN213288605U (en) | Slab turns over base instrument | |
CN203285056U (en) | Stair formwork supporting base | |
CN202450424U (en) | Inspection well milling device locating device | |
CN211665800U (en) | Well lid replacing machine | |
CN211898417U (en) | Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted | |
CN205063312U (en) | Cantilever beam fixing device | |
CN208870403U (en) | Large form moves back modular system | |
JPH0619642Y2 (en) | Sea garden building equipment | |
JPH0441816A (en) | Plier for pile driving work at water bottom | |
CN102286940B (en) | Construction method for remoulding old pier columns of bridges | |
CN221255459U (en) | Steel pile casing for quick-dismantling pile foundation engineering construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181127 |
|
RJ01 | Rejection of invention patent application after publication |