CN108890865A - Prefabricated torsion king block demoulding method - Google Patents

Prefabricated torsion king block demoulding method Download PDF

Info

Publication number
CN108890865A
CN108890865A CN201810613532.0A CN201810613532A CN108890865A CN 108890865 A CN108890865 A CN 108890865A CN 201810613532 A CN201810613532 A CN 201810613532A CN 108890865 A CN108890865 A CN 108890865A
Authority
CN
China
Prior art keywords
demoulding
prefabricated
king
work
crowbar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810613532.0A
Other languages
Chinese (zh)
Inventor
覃仁林
王洪建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN201810613532.0A priority Critical patent/CN108890865A/en
Publication of CN108890865A publication Critical patent/CN108890865A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B13/00Feeding the unshaped material to moulds or apparatus for producing shaped articles; Discharging shaped articles from such moulds or apparatus
    • B28B13/04Discharging the shaped articles
    • B28B13/06Removing the shaped articles from moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of prefabricated torsion king block demoulding methods comprising step used below, step 1 are prepared work;Step 2 splices mobile crowbar;Step 3, aperture;Step 4, circular hole of polishing;Step 5 starts demoulding work;Step 6 is dealt with problems arising from an accident, and packs up sweep scene after the completion.The present invention can combine live site condition well, it is able to satisfy all kinds of large-scale dismounting operations for turning round the fast prefabricated steel-template of king, adaptability is stronger, and structure is simple, making material saves, low manufacture cost, it maintains and goes along with sb. to guard him and is also convenient and easy, with extraordinary economy and practicability, unique advantage is shown to improve the prefabricated large-scale torsion king's block steel form dismounting operating efficiency in construction site, reducing all various aspects such as engineering investment cost, the career safety & health accordance for enhancing operating environment.

Description

Prefabricated torsion king block demoulding method
Technical field
The present invention relates to a kind of methods, more particularly to a kind of prefabricated torsion king block demoulding method.
Background technique
Currently, constantly building and developing to enlargement, the port that coastal condition preferably can be utilized directly with port engineering Gulf sea area is all developed totally substantially, in the necessary addressing off-lying sea of the newly-built major port of build or future plan, because of stormy waves hydrology item The unfavorable ship of part difference reaches port operation, needs auxiliary construction breakwater engineering, and breakwater engineering be unable to do without prefabricated torsion king's block substantially It is used as the levee body mask wave that disappears.King's block demoulding technique is turned round according to tradition, it is general using the artificial plate lock screw that first loosens the mold, then use Crowbar bit by bit pries open a side template, and also needs sledge hammer to tap cooperation template and loosen and remove, for small steel form This method is able to satisfy requirement substantially, but larger to the damage of template, and steel form corner is be easy to cause to deform, serious also to will cause torsion King's block damages side arrisdefect, and effect is poor.Dismounting of this method for large scale steel mould, not only low efficiency, be easily damaged template and concrete Component, is also easy to template occurs to topple over, hammer the safety accidents such as hurt sb.'s feelings.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of prefabricated torsion king block demoulding methods, can combine well existing Site condition is able to satisfy all kinds of large-scale dismounting operations for turning round the fast prefabricated steel-templates of king, and adaptability is stronger, and structure it is simple, Making material save, low manufacture cost, maintain and go along with sb. to guard him it is also convenient and easy, have extraordinary economy and practicability, for improve The prefabricated large-scale occupation for turning round king's block steel form and removing operating efficiency, reducing engineering investment cost, enhance operating environment in construction site All various aspects such as healthy and safe accordance show unique advantage.
The present invention is to solve above-mentioned technical problem by following technical proposals:A kind of prefabricated torsion king block demoulding method, It is characterized in that, it includes step used below:
Step 1:It is prepared work, is carrying out first being ready to need the tool of demoulding in advance when demoulding work;
Step 2:Splice mobile crowbar, mobile crowbar selects the round steel one meter five long, diameter is 25 millimeters;
Step 3:Aperture, to the round hole for opening 15 centimetres or so in the middle part of torsion king's block steel form;
Step 4:Polishing circular hole, needs the circular hole of split mistake to polish, and polishes smooth, is smooth sealing steel plate inner wall;
Step 5:Start demoulding work, staff begins to use hydraulic jack, mobile crowbar to start to work;
Step 6:It deals with problems arising from an accident, packs up sweep scene after the completion.
Preferably, need the basic holding of three people operation is synchronous to carry out during the progress striking job.
Preferably, the hydraulic jack selects the screw jack that top power is five tons.
Preferably, steel form top two sides are equipped with overturning-preventing pull rod made of long 500 millimeters of zinc-plated screw rod.
The positive effect of the present invention is that:The present invention can combine live site condition well, be able to satisfy all kinds of big Type turns round the dismounting operation of the fast prefabricated steel-template of king, and adaptability is stronger, and structure is simple, making material saves, low manufacture cost, protects It supports and goes along with sb. to guard him also convenient and easy, there is extraordinary economy and practicability, construction site is prefabricated large-scale to turn round king's block steel to improve Form removable operating efficiency reduces all various aspects such as engineering investment cost, the career safety & health accordance for enhancing operating environment Show unique advantage.
Detailed description of the invention
Fig. 1 is process for using figure of the invention.
Fig. 2 is the prefabricated schematic diagram for turning round king's block template of the present invention.
Fig. 3 is schematic diagram of the present inventor's working drawing for demoulding.
Schematic diagram when Fig. 4 is demoulding of the present invention.
Fig. 5 is the schematic diagram after demoulding of the present invention.
Fig. 6 is the flow chart that template of the present invention hangs shifting.
Specific embodiment
Present pre-ferred embodiments are provided with reference to the accompanying drawing, in order to explain the technical scheme of the invention in detail.
As shown in Figures 1 to 6, the prefabricated torsion king block demoulding method of the present invention includes step used below:
Step 1:It is prepared work, is carrying out first being ready to need the tool of demoulding, including hydraulic thousand in advance when demoulding work The tools such as jin top, mobile two sets of crowbar, safety rope, limit pull rod, save the time for next work;
Step 2:Splice mobile crowbar, mobile crowbar selects the round steel one meter five long, diameter is 25 millimeters, a conduct Manipulator's lever, other end bending, bends 250 millimeters of segment length, and cross bar, the weldering of cross bar both ends are welded in portion position in this paragraph Meet each one, bearing of 62 millimeters of outer diameter of installation, and with electric weld handle bearing inner ring and round steel contact surface firm welding, and it is preceding Face round steel is welded into trolley form, and bending segment end is made into flat form, and crowbar mobile in this way can agitate more at work Heavy article can also realize planar movement in agitating shuttering work state, the working efficiency of demoulding can be improved;
Step 3:Aperture, to the round hole for opening 15 centimetres or so in the middle part of king's block steel form is turned round, the hole is when template is installed with slightly Big circular seal steel plate blocks, and back is by the fastening of wooden wedge choker block, and the circular hole is by the installation site as jack;
Step 4:Polishing circular hole, needs the circular hole of split mistake to polish, and polishes smooth, is smooth sealing steel plate inner wall, hairless The defects of thorn, pit slot, as steel form material, inner wall surface thereof quality also requires on an equal basis, which constantly seals in casting concrete Blocking is closed, changes plate to need to remove the circular hole before demoulding, exposes and turn round king's block concrete face, the circular hole by polishing can allow hydraulic The work of jack becomes more convenient;
Step 5:Start demoulding work, staff begins to use hydraulic jack, mobile crowbar to start to work, first removes top Upper workbench railing, then the clamping screw between template is loosened, fix overturn-preventing stay-bolt.After the completion of preparation, by Edge sealing under template to be removed is filled at the tip position that two people hold mobile crowbar respectively, and in addition a people installs jack, by thousand Jin top is installed by circular hole, and slowly operation jack jacks outward, meanwhile, mobile crowbar firmly sled top upwards, and exert oneself to Outer drawing moves crowbar handle, and when above-mentioned jack is with mobile crowbar collective effect, holding is coordinated, is synchronous, slowly removes punching block in this way It after distance reaches 20 centimetres or so between plate, then unscrews overturning-preventing rod nut to the end, repeats above-mentioned mobile crowbar and thousand Jin top operation sequence, can safely and fast loosen steel form in this way, move to free state, improve work by operating repeatedly Make efficiency;
Step 6:It deals with problems arising from an accident, all unlocks overturning-preventing pull rod device, hung by loop wheel machine and move on to designated position and polished, removed The road Zha Dengxia treatment process, packs up sweep scene after the completion.
It carries out needing the basic holding of three people operation is synchronous to carry out during striking job, it is ensured that template safety and steady is torn open It removes.
Hydraulic jack selects the screw jack that top power is five tons, and the work of such hydraulic jack can become more It is convenient.
Steel form top two sides are equipped with overturning-preventing pull rod made of long 500 millimeters of zinc-plated screw rod, and protection staff is more Add safety.
In conclusion the present invention can combine live site condition well, it is able to satisfy all kinds of large-scale torsion kings prefabricated punching block fastly The dismounting operation of plate, adaptability is stronger, and structure is simple, making material saves, low manufacture cost, maintains and goes along with sb. to guard him and also facilitates province Thing has extraordinary economy and practicability, for improve construction site it is prefabricated it is large-scale turn round king's block steel form remove operating efficiency, It reduces all various aspects such as engineering investment cost, the career safety & health accordance for enhancing operating environment and shows unique advantage.
Particular embodiments described above, the technical issues of to solution of the invention, technical scheme and beneficial effects carry out It is further described, it should be understood that the above is only a specific embodiment of the present invention, is not limited to The present invention, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should be included in this Within the protection scope of invention.

Claims (4)

1. a kind of prefabricated torsion king block demoulding method, which is characterized in that it includes step used below:
Step 1:It is prepared work, is carrying out first being ready to need the tool of demoulding in advance when demoulding work;
Step 2:Splice mobile crowbar, mobile crowbar selects the round steel one meter five long, diameter is 25 millimeters;
Step 3:Aperture needs out 15 centimetres or so of round hole to king's block steel form middle part is turned round;
Step 4:Polishing circular hole, needs the circular hole of split mistake to polish, and polishes smooth, is smooth sealing steel plate inner wall;
Step 5:Start demoulding work, staff begins to use hydraulic jack, mobile crowbar to start to work;
Step 6:It deals with problems arising from an accident, packs up sweep scene after the completion.
2. prefabricated torsion king block demoulding method as described in claim 1, which is characterized in that needed during the progress striking job Want three people operation is basic to keep synchronous progress.
3. prefabricated torsion king block demoulding method as described in claim 1, which is characterized in that the hydraulic jack selection pushes up power and is Five tons of screw jack.
4. prefabricated torsion king block demoulding method as described in claim 1, which is characterized in that steel form top two sides are equipped with length Overturning-preventing pull rod made of 500 millimeters of zinc-plated screw rod.
CN201810613532.0A 2018-06-14 2018-06-14 Prefabricated torsion king block demoulding method Pending CN108890865A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810613532.0A CN108890865A (en) 2018-06-14 2018-06-14 Prefabricated torsion king block demoulding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810613532.0A CN108890865A (en) 2018-06-14 2018-06-14 Prefabricated torsion king block demoulding method

Publications (1)

Publication Number Publication Date
CN108890865A true CN108890865A (en) 2018-11-27

Family

ID=64345965

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810613532.0A Pending CN108890865A (en) 2018-06-14 2018-06-14 Prefabricated torsion king block demoulding method

Country Status (1)

Country Link
CN (1) CN108890865A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040102272A (en) * 2003-05-27 2004-12-04 (주)씨씨엘 코리아 Prestressed concrete double-t beam bridge & formwork applying incremental launching method
CN105220626A (en) * 2015-10-27 2016-01-06 安徽水安建设集团股份有限公司 Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled
CN106272936A (en) * 2016-09-27 2017-01-04 中交第航务工程局有限公司 A kind of Zhi Chai mechanism for torsion-bending ratio template

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040102272A (en) * 2003-05-27 2004-12-04 (주)씨씨엘 코리아 Prestressed concrete double-t beam bridge & formwork applying incremental launching method
CN105220626A (en) * 2015-10-27 2016-01-06 安徽水安建设集团股份有限公司 Steel form device and the construction method that combines with outer steel mould plate thereof in a kind of self-propelled
CN106272936A (en) * 2016-09-27 2017-01-04 中交第航务工程局有限公司 A kind of Zhi Chai mechanism for torsion-bending ratio template

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐望之: "5T扭王字块预制施工工艺改进", 《中国水运》, pages 260 - 261 *

Similar Documents

Publication Publication Date Title
CN210975812U (en) Underwater pile body cutting device
CN108612109A (en) The carrierless method for dismounting of concrete support beam
US4419030A (en) Apparatus for and method of constructing a sheet piling shoring structure
CN108945298B (en) Marine underwater detection support structure and operation method thereof
CN202925896U (en) A hole reservation device for constructional engineering
CN108868194B (en) Chimney dismantling device and chimney dismantling method
CN108890865A (en) Prefabricated torsion king block demoulding method
CN215485871U (en) Drilling device of reef explosion ship equipment
CN208359056U (en) Prefabricated torsion king block removing device
CN202450423U (en) Milling-planing machine for maintenance of manholes
CN106284985A (en) A kind of Formwork Installation Method of reserved post-cast strip
CN106481082B (en) A kind of improvement casting method of constructional column
CN202370252U (en) Underwater concrete formwork removal device
CN215717094U (en) Cage ladder for maintaining wharf fender
CN213288605U (en) Slab turns over base instrument
CN203285056U (en) Stair formwork supporting base
CN202450424U (en) Inspection well milling device locating device
CN211665800U (en) Well lid replacing machine
CN211898417U (en) Construction structure based on cutter-suction type ground is wall local to replace campshed and is strutted
CN205063312U (en) Cantilever beam fixing device
CN208870403U (en) Large form moves back modular system
JPH0619642Y2 (en) Sea garden building equipment
JPH0441816A (en) Plier for pile driving work at water bottom
CN102286940B (en) Construction method for remoulding old pier columns of bridges
CN221255459U (en) Steel pile casing for quick-dismantling pile foundation engineering construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181127

RJ01 Rejection of invention patent application after publication