CN108868135A - A kind of construction site pipeline fixing device - Google Patents

A kind of construction site pipeline fixing device Download PDF

Info

Publication number
CN108868135A
CN108868135A CN201810805813.6A CN201810805813A CN108868135A CN 108868135 A CN108868135 A CN 108868135A CN 201810805813 A CN201810805813 A CN 201810805813A CN 108868135 A CN108868135 A CN 108868135A
Authority
CN
China
Prior art keywords
pipe clamp
mounting plate
right pipe
left pipe
construction site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810805813.6A
Other languages
Chinese (zh)
Inventor
陶宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810805813.6A priority Critical patent/CN108868135A/en
Publication of CN108868135A publication Critical patent/CN108868135A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a kind of construction site pipeline fixing devices, including left pipe clamp, right pipe clamp, mounting plate and support frame, there are two support frames for installation on the mounting plate, the outer lower portion of left pipe clamp and right pipe clamp is provided with support base, the support base of left pipe clamp is hinged by articulated shaft and the support frame upper end on the left of mounting plate, the support base of right pipe clamp is hinged by articulated shaft and the support frame upper end on the right side of mounting plate, the middle inside of left pipe clamp is connected with elastic webbing, the other end of elastic webbing is connected to the middle inside of right pipe clamp, the upper end of left pipe clamp and right pipe clamp is also equipped with auxiliary fixing assembly, it is additionally provided in the middle part of mounting plate for the detent component fixed to left pipe clamp and right pipe clamp detent.Structure of the invention is novel, easily operated, and to the good fixing effect of pipeline, easy disassembly is conducive to promote.

Description

A kind of construction site pipeline fixing device
Technical field
The present invention relates to technical field of building construction, specifically a kind of construction site pipeline fixing device.
Background technique
Construction refers to the production activity of engineering construction implementation phase, is the building course of all kinds of buildings, can also be with It says it is various lines on design drawing, in specified place, becomes process in kind.It includes basic engineering construction, master Body structure construction, roof construction, decorative engineering construction etc..The place of construction operation is known as " construction site " or cries " construction site ", is also named building site.
With the continuous development of society, construction building site is seen everywhere in city, in construction work superstructure Disorderly pendulum leaves about problem than more serious to construction pipeline, needs to carry out construction pipeline effective management and fixes.For this purpose, we mention Go out a kind of structure novel, it is easily operated, to the good fixing effect of pipeline, easy disassembly, conducive to the construction site of popularization Pipeline fixing device solves the above problems.
Summary of the invention
The purpose of the present invention is to provide a kind of construction site pipeline fixing devices, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the present invention provides the following technical solutions:
A kind of construction site pipeline fixing device, including left pipe clamp, right pipe clamp, mounting plate and support frame, the mounting plate There are two support frame, the both ends of mounting plate are equipped with fixing bolt for upper installation, and the outer lower portion of the left pipe clamp and right pipe clamp is set It is equipped with support base, the support base of the left pipe clamp is hinged by articulated shaft and the support frame upper end on the left of mounting plate, right pipe clamp Support base is hinged by articulated shaft and the support frame upper end on the right side of mounting plate, and the middle inside connection of the left pipe clamp is flexible Band, the other end of elastic webbing are connected to the middle inside of right pipe clamp, and the upper end of the left pipe clamp and right pipe clamp is also equipped with auxiliary Fixation kit is additionally provided in the middle part of the mounting plate for the detent component fixed to left pipe clamp and right pipe clamp detent.
As a further solution of the present invention:Support frame as described above is vertically arranged with mounting plate, and support frame and mounting plate one Body formed to be processed into, the upper end of two support frames is obliquely installed towards 15~30 ° opposite of direction.
As a further solution of the present invention:The left pipe clamp and right pipe clamp are 2/5~1/2 arc-shaped structure.
As a further solution of the present invention:The elastic webbing is made of elastic insulated fire proofing.
As a further solution of the present invention:The auxiliary fixing assembly includes adjusting bolt and auxiliary clamping plate, the left side Pipe clamp and right pipe clamp upper end offer screw hole, adjust bolt and pass through from screw hole, and adjust bolt and screw hole threaded connection, left pipe clamp Auxiliary clamping plate is installed in adjusting bolt end with the inside of right pipe clamp, auxiliary clamping plate is arc panel.
As a further solution of the present invention:Attachment base, attachment base are installed between the auxiliary clamping plate and adjusting bolt It is rotation connection with bolt is adjusted, attachment base is to be fixedly connected with auxiliary clamping plate, is additionally provided with rubber on the inside of the auxiliary clamping plate Pad.
As a further solution of the present invention:The detent component includes the card column at left and right sides of mounting plate, card column The hemispherical shape in upper end, the lower end of left pipe clamp and right pipe clamp offers the card slot matched with card column, the lower section of the card column In offering mobile cavity on mounting plate, card column is extended in mobile cavity, and to be slidably connected between card column and mounting plate, the shifting Move it is intracavitary be additionally provided with spring, one end of spring is fixedly connected with card column, and the other end of spring is fixed on the bottom of mobile cavity, two Front and rear sides between card column are equipped with U-shaped frame across setting.
As a further solution of the present invention:It is assisted after the closure of the upper end of the left pipe clamp and right pipe clamp, on left pipe clamp solid The auxiliary clamping plate for determining auxiliary fixing assembly on the auxiliary clamping plate and right pipe clamp of component can be close to against under left pipe clamp and right pipe clamp The distance between end is greater than the diameter of pipeline.
As a further solution of the present invention:After the closure of the upper end of the left pipe clamp and right pipe clamp, two of detent component Card column, which can respectively correspond, to be positioned on left pipe clamp and the card slot of right pipe clamp lower end.
Compared with prior art, the beneficial effects of the invention are as follows:The construction site pipeline fixing device, passes through installation The fixing bolt of board ends setting facilitates and carries out installation fixation, and by pressing U-shaped frame, card column is moved down, may make card column with The exact separation of left pipe clamp and right pipe clamp lower end facilitates the upper end of left pipe clamp and right pipe clamp opening being put into pipeline, and pipeline is put into After between left pipe clamp and right pipe clamp, under the gravity of pipeline, the lower end of left pipe clamp and right pipe clamp is opened, left pipe clamp and right pipe The upper end of folder is closed, and can be flexibly supported to pipeline by elastic webbing, by the auxiliary clamping plate of auxiliary fixing assembly can to pipeline into Row is auxiliarily fixed, the stability of lift line;After the closure of the upper end of left pipe clamp and right pipe clamp, by unclamping U-shaped frame, card column exists The elastic force effect of spring is lower to be played to left pipe clamp and right pipe clamp auxiliary admittedly in detent to left pipe clamp and the card slot of right pipe clamp lower end Fixed effect, is fixed conveniently, and stability is high.
Detailed description of the invention
Fig. 1 is initial configuration schematic diagram of the invention.
Fig. 2 is the structural schematic diagram after pipeline of the invention is fixed.
Fig. 3 is the enlarged drawing of A in Fig. 1.
Fig. 4 is the enlarged drawing of B in Fig. 2.
Fig. 5 is the overlooking structure diagram of U-shaped frame and card column part in the present invention.
In figure:1- pipeline, the left pipe clamp of 2-, the right pipe clamp of 3-, 4- adjust bolt, and 5- assists clamping plate, 6- support base, 7- installation Plate, 8- fixing bolt, 9- elastic webbing, 10-U shape frame, 11- mobile cavity, 12- spring, 13- card column, 14- card slot, 15- articulated shaft, 16- support frame, 17- screw hole, 18- attachment base, 19- rubber pad.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~5, in the embodiment of the present invention, a kind of construction site pipeline fixing device, including left pipe clamp 2, Right pipe clamp 3, mounting plate 7 and support frame 16, there are two support frame 16, support frame 16 and mounting plates 7 to hang down for installation on the mounting plate 7 Straight setting, and support frame 16 is processed into the integrated molding of mounting plate 7, the both ends of the mounting plate 7 are equipped with fixing bolt 8, The installation of device is fixed by the way that fixing bolt 8 is convenient, the upper end of two support frames 16 is tilted towards 15~30 ° opposite of direction Setting, the left pipe clamp 2 and right pipe clamp 3 are 2/5~1/2 arc-shaped structure, the outer lower portion setting of left pipe clamp 2 and right pipe clamp 3 There is support base 6, the support base 6 of the left pipe clamp 2 is hinged by articulated shaft 15 and 16 upper end of support frame in 7 left side of mounting plate, right The support base 6 of pipe clamp 3 is hinged by articulated shaft 15 and 16 upper end of support frame on 7 right side of mounting plate.
The middle inside of the left pipe clamp 2 is connected with elastic webbing 9, and the other end of elastic webbing 9 is connected to the inside of right pipe clamp 3 Middle part, the elastic webbing 9 are made of elastic insulated fire proofing, can be flexibly supported to pipeline 1 by elastic webbing 9, the left side The upper end of pipe clamp 2 and right pipe clamp 3 is also equipped with auxiliary fixing assembly, and the auxiliary fixing assembly includes adjusting bolt 4 and auxiliary Clamping plate 5, the left pipe clamp 2 and 3 upper end of right pipe clamp offer screw hole 17, adjust bolt 4 and pass through from screw hole 17, and adjust bolt 4 It is threadedly coupled with screw hole 17, the inside of left pipe clamp 2 and right pipe clamp 3 is equipped with auxiliary clamping plate 5 in adjusting 4 end of bolt, described auxiliary Helping clamping plate 5 is arc panel, and assists clamping plate 5 and adjust to be equipped with attachment base 18 between bolt 4, attachment base 18 and adjusting bolt 4 For rotation connection, attachment base 18 is to be fixedly connected with auxiliary clamping plate 5, and the inside of the auxiliary clamping plate 5 is additionally provided with rubber pad 19, is led to Pipeline 1 can be protected by crossing rubber pad 19.
The middle part of the mounting plate 7 is additionally provided with for the detent component fixed to left pipe clamp 2 and 3 detent of right pipe clamp, described Detent component includes the card column 13 set on 7 left and right sides of mounting plate, the hemispherical shape in the upper end of card column 13, left pipe clamp 2 and right pipe The lower end of folder 3 offers the card slot 14 matched with card column 13, and the lower section of the card column 13 is in offering mobile cavity on mounting plate 7 11, card column 13 extends in mobile cavity 11, and also sets in the mobile cavity 11 between card column 13 and mounting plate 7 to be slidably connected There is spring 12, one end of spring 12 is fixedly connected with card column 13, and the other end of spring 12 is fixed on the bottom of mobile cavity 11, passes through Spring 12 can flexibly support card column 13, as shown in figure 5, the front and rear sides between two card columns 13 are equipped with U-shaped frame 10 across setting, By pressing U-shaped frame 10, card column 13 can be moved down, and after unclamping U-shaped frame 10, card column 13 can be acted in the elastic force of spring 12 Under set back.
In the present embodiment, after the upper end closure of the left pipe clamp 2 and right pipe clamp 3, auxiliary fixing assembly is auxiliary on left pipe clamp 2 Help the auxiliary clamping plate 5 of auxiliary fixing assembly on clamping plate 5 and right pipe clamp 3 can be close to against, left pipe clamp 2 and 3 lower end of right pipe clamp it Between distance be greater than pipeline 1 diameter.
In the present embodiment, after the upper end closure of the left pipe clamp 2 and right pipe clamp 3, two card columns 13 of detent component can It respectively corresponds and is positioned on the card slot 14 of 3 lower end of left pipe clamp 2 and right pipe clamp.
The construction site pipeline fixing device is facilitated by the fixing bolt 8 that 7 both ends of mounting plate are arranged and is installed Fixed, by pressing U-shaped frame 10, card column 13 is moved down, and may make the card slot of card column 13 Yu 3 lower end of left pipe clamp 2 and right pipe clamp 14 separation, facilitate to open the upper end of left pipe clamp 2 and right pipe clamp 3 and are put into pipeline 1, pipeline 1 be put into left pipe clamp 2 and right pipe clamp 3 it Between after, under the gravity of pipeline 1, the lower end of left pipe clamp 2 and right pipe clamp 3 is opened, and the upper end of left pipe clamp 2 and right pipe clamp 3 is closed It closes, pipeline 1 can be flexibly supported by elastic webbing 9, pipeline 1 can be assisted by the auxiliary clamping plate 5 of auxiliary fixing assembly It is fixed, the stability of lift line 1;After the closure of the upper end of left pipe clamp 2 and right pipe clamp 3, by unclamping U-shaped frame 10, card column 13 It can be played to left pipe clamp 2 and the right side in card slot 14 of the detent to 3 lower end of left pipe clamp 2 and right pipe clamp under the elastic force effect of spring 12 The effect that pipe clamp 3 is auxiliarily fixed, is fixed conveniently, and stability is high.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
The above are merely the preferred embodiment of the present invention, it is noted that for those skilled in the art, not Under the premise of being detached from present inventive concept, several modifications and improvements can also be made, these also should be considered as protection model of the invention It encloses, these all will not influence the effect and patent practicability that the present invention is implemented.

Claims (9)

1. a kind of construction site pipeline fixing device, including left pipe clamp(2), right pipe clamp(3), mounting plate(7)And support frame (16), which is characterized in that the mounting plate(7)There are two support frames for upper installation(16), mounting plate(7)Both ends fixation is installed Bolt(8), the left pipe clamp(2)With right pipe clamp(3)Outer lower portion be provided with support base(6), the left pipe clamp(2)Support Seat(6)Pass through articulated shaft(15)With mounting plate(7)The support frame in left side(16)Upper end is hinged, right pipe clamp(3)Support base(6)It is logical Cross articulated shaft(15)With mounting plate(7)The support frame on right side(16)Upper end is hinged, the left pipe clamp(2)Middle inside be connected with Elastic webbing(9), elastic webbing(9)The other end be connected to right pipe clamp(3)Middle inside, the left pipe clamp(2)With right pipe clamp(3) Upper end be also equipped with auxiliary fixing assembly, the mounting plate(7)Middle part be additionally provided with for left pipe clamp(2)With right pipe clamp (3)The fixed detent component of detent.
2. construction site pipeline fixing device according to claim 1, which is characterized in that support frame as described above(16)With Mounting plate(7)It is vertically arranged, and support frame(16)With mounting plate(7)Integrated molding is processed into, two support frames(16)It is upper End is obliquely installed towards 15~30 ° opposite of direction.
3. construction site pipeline fixing device according to claim 1, which is characterized in that the left pipe clamp(2)With Right pipe clamp(3)For 2/5~1/2 arc-shaped structure.
4. construction site pipeline fixing device according to claim 1, which is characterized in that the elastic webbing(9)It adopts It is made of elastic insulated fire proofing.
5. construction site pipeline fixing device according to claim 1 or 3, which is characterized in that described to be auxiliarily fixed Component includes adjusting bolt(4)With auxiliary clamping plate(5), the left pipe clamp(2)With right pipe clamp(3)Upper end offers screw hole(17), Adjust bolt(4)From screw hole(17)It passes through, and adjusts bolt(4)And screw hole(17)It is threadedly coupled, left pipe clamp(2)With right pipe clamp (3)Inside in adjust bolt(4)End is equipped with auxiliary clamping plate(5), assist clamping plate(5)For arc panel.
6. construction site pipeline fixing device according to claim 5, which is characterized in that the auxiliary clamping plate(5) With adjusting bolt(4)Between attachment base is installed(18), attachment base(18)With adjusting bolt(4)For rotation connection, attachment base (18)With auxiliary clamping plate(5)To be fixedly connected, the auxiliary clamping plate(5)Inside be additionally provided with rubber pad(19).
7. construction site pipeline fixing device according to claim 1, which is characterized in that the detent component includes Set on mounting plate(7)The card column of the left and right sides(13), card column(13)The hemispherical shape in upper end, left pipe clamp(2)With right pipe clamp(3) Lower end offer and card column(13)The card slot matched(14), the card column(13)Lower section in mounting plate(7)On offer Mobile cavity(11), card column(13)Extend to mobile cavity(11)It is interior, and card column(13)With mounting plate(7)Between to be slidably connected, institute State mobile cavity(11)Inside it is additionally provided with spring(12), spring(12)One end and card column(13)It is fixedly connected, spring(12)It is another Mobile cavity is fixed at end(11)Bottom, two card columns(13)Between front and rear sides U-shaped frame is installed across setting(10).
8. construction site pipeline fixing device according to claim 6, which is characterized in that the left pipe clamp(2)With Right pipe clamp(3)Upper end closure after, left pipe clamp(2)The auxiliary clamping plate of upper auxiliary fixing assembly(5)With right pipe clamp(3)Upper auxiliary is solid Determine the auxiliary clamping plate of component(5)It can be close to against left pipe clamp(2)With right pipe clamp(3)The distance between lower end is greater than pipeline(1) Diameter.
9. construction site pipeline fixing device according to claim 7, which is characterized in that the left pipe clamp(2)With Right pipe clamp(3)Upper end closure after, two card columns of detent component(13)It can respectively correspond and be positioned in left pipe clamp(2)With right pipe Folder(3)The card slot of lower end(14)On.
CN201810805813.6A 2018-07-20 2018-07-20 A kind of construction site pipeline fixing device Pending CN108868135A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810805813.6A CN108868135A (en) 2018-07-20 2018-07-20 A kind of construction site pipeline fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810805813.6A CN108868135A (en) 2018-07-20 2018-07-20 A kind of construction site pipeline fixing device

Publications (1)

Publication Number Publication Date
CN108868135A true CN108868135A (en) 2018-11-23

Family

ID=64303889

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810805813.6A Pending CN108868135A (en) 2018-07-20 2018-07-20 A kind of construction site pipeline fixing device

Country Status (1)

Country Link
CN (1) CN108868135A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7406344B2 (en) 2019-10-30 2023-12-27 株式会社ブリヂストン Piping support and piping installation method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101789573A (en) * 2010-03-31 2010-07-28 如皋市凯凯电信器材有限公司 Lever-type leakage cable fixture
CN201610977U (en) * 2010-03-02 2010-10-20 镇江市正恺电子有限公司 Cable fixing hoop for high-speed system
CN103807506A (en) * 2013-10-17 2014-05-21 浙江吉利控股集团有限公司 Device for fixing wire harness of engine compartment
CN104613236A (en) * 2015-03-05 2015-05-13 苏州市凯业金属制品有限公司 Novel U-shaped pipe clamp
CN206246833U (en) * 2016-11-25 2017-06-13 武汉力祯环保科技有限公司 A kind of vibration damping pipe support
CN206943578U (en) * 2017-06-02 2018-01-30 山西建筑工程有限公司 A kind of adaptability building pipe support meanss
CN207093930U (en) * 2017-07-27 2018-03-13 力帆实业(集团)股份有限公司 The quick cable clip structure of versatility
CN108036108A (en) * 2017-11-30 2018-05-15 赵卫祥 A kind of petroleum pipeline installation support base
CN207577549U (en) * 2017-07-28 2018-07-06 上海景朋建设工程有限公司 A kind of rotary cutting equipment for construction large-diameter pipeline

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201610977U (en) * 2010-03-02 2010-10-20 镇江市正恺电子有限公司 Cable fixing hoop for high-speed system
CN101789573A (en) * 2010-03-31 2010-07-28 如皋市凯凯电信器材有限公司 Lever-type leakage cable fixture
CN103807506A (en) * 2013-10-17 2014-05-21 浙江吉利控股集团有限公司 Device for fixing wire harness of engine compartment
CN104613236A (en) * 2015-03-05 2015-05-13 苏州市凯业金属制品有限公司 Novel U-shaped pipe clamp
CN206246833U (en) * 2016-11-25 2017-06-13 武汉力祯环保科技有限公司 A kind of vibration damping pipe support
CN206943578U (en) * 2017-06-02 2018-01-30 山西建筑工程有限公司 A kind of adaptability building pipe support meanss
CN207093930U (en) * 2017-07-27 2018-03-13 力帆实业(集团)股份有限公司 The quick cable clip structure of versatility
CN207577549U (en) * 2017-07-28 2018-07-06 上海景朋建设工程有限公司 A kind of rotary cutting equipment for construction large-diameter pipeline
CN108036108A (en) * 2017-11-30 2018-05-15 赵卫祥 A kind of petroleum pipeline installation support base

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
太田哲: "《冲压模具结构与设计图解》", 31 May 1980 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7406344B2 (en) 2019-10-30 2023-12-27 株式会社ブリヂストン Piping support and piping installation method

Similar Documents

Publication Publication Date Title
CN108868135A (en) A kind of construction site pipeline fixing device
CN103378190A (en) Solar panel fastening device
CN202139724U (en) Stone pendant with dip angle being suitable for being changed
CN205935519U (en) Hang accessory, wall body board and wall body futilely
CN201500403U (en) Fire extinguisher fixing device
CN205189207U (en) Universal hemisphere turns to suspended structure
CN205776980U (en) The curtain wall panel of plug-in curtain wall and plug-in curtain wall
CN201254704Y (en) Open type traffic guard rail
CN103400879B (en) Solar panels fastener
CN109763730A (en) A kind of composite furniture cabinet door connection buckle
CN210737953U (en) Hinged glass clamp for guardrail upright column glass
CN205117041U (en) Translation door transmission rack adjusting fixtures device
CN208486665U (en) A kind of gardens ancient architecture protection column
CN210713398U (en) Support piece for avoiding steel truss and scaffold of special-shaped curtain wall
CN207392545U (en) A kind of connection structure at glass curtain wall expansion joint
CN207582750U (en) The mounting structure of Architecture Outer Curtain Wall
CN203176101U (en) Bathroom-cabinet-used right-angle fixing part provided with protective gaskets
CN202787574U (en) Frame connecting structure of functional plate or back plate of shower room
CN202672425U (en) Multidimensional adapter for stone curtain wall
CN204430611U (en) Desktop mechanical arm
CN208072227U (en) A kind of bridge construction support equipment
CN219061733U (en) Hydraulic support top beam installation auxiliary device
CN213508954U (en) Channel-section steel pipe supporting beam fixing device
CN206175001U (en) Embedding slot way for subway tunnel
CN209817597U (en) Protective bracket for constructional engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123

RJ01 Rejection of invention patent application after publication