CN108036108A - A kind of petroleum pipeline installation support base - Google Patents

A kind of petroleum pipeline installation support base Download PDF

Info

Publication number
CN108036108A
CN108036108A CN201711243875.4A CN201711243875A CN108036108A CN 108036108 A CN108036108 A CN 108036108A CN 201711243875 A CN201711243875 A CN 201711243875A CN 108036108 A CN108036108 A CN 108036108A
Authority
CN
China
Prior art keywords
petroleum pipeline
screw rod
placement plate
right sides
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711243875.4A
Other languages
Chinese (zh)
Other versions
CN108036108B (en
Inventor
赵卫祥
黄家荣
陈�峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Ai Suo New Material Science And Technology Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711243875.4A priority Critical patent/CN108036108B/en
Publication of CN108036108A publication Critical patent/CN108036108A/en
Application granted granted Critical
Publication of CN108036108B publication Critical patent/CN108036108B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The present invention relates to a kind of support base, more particularly to a kind of petroleum pipeline installation support base.The technical problem to be solved in the present invention is to provide one kind various types of petroleum pipelines are fixed, and the horizontal level of petroleum pipeline can easily be adjusted, the petroleum pipeline installation support base of fix stably.In order to solve the above technical problem, the present invention provides such a petroleum pipeline installation support base, include base etc.;Base bottom is equipped with regulating device, and sliding slot is provided among base top, apparatus for placing is equipped with sliding slot.The present invention passes through regulating device, the position of petroleum pipeline can be adjusted, and petroleum pipeline is set to be in horizontality, what is be laid with is more preferable, and by gripping mechanism, petroleum pipeline can be fixed more firm, various types of petroleum pipelines can be fixed by having reached, the horizontal level of petroleum pipeline can easily be adjusted, the effect of fix stably.

Description

A kind of petroleum pipeline installation support base
Technical field
The present invention relates to a kind of support base, more particularly to a kind of petroleum pipeline installation support base.
Background technology
Petroleum pipeline is made of oil pipe and its annex, and according to the needs of technological process, is equipped with corresponding oil pump machine Group, design and installation are unloaded to complete oil plant and defeated turn task into a complete pipe-line system.
During petroleum pipeline is laid with, it is required for again appropriately distance to place supporting rack and petroleum pipeline is supported, and it is existing In technology, a kind of supporting rack can only fix a kind of petroleum pipeline of model, and when replacing petroleum pipeline, also need to change support Frame, can't very easily adjust the horizontal level of petroleum pipeline, therefore can be to various types of petroleum pipelines there is an urgent need for research and development one kind Road is fixed, and the horizontal level of petroleum pipeline can easily be adjusted, the petroleum pipeline installation support of fix stably Base.
The content of the invention
(1) technical problems to be solved
The present invention is in order to overcome in the prior art, and a kind of supporting rack can only fix a kind of petroleum pipeline of model, also not The shortcomings that horizontal level of petroleum pipeline can very easily be adjusted, can be to more the technical problem to be solved in the present invention is to provide one kind The petroleum pipeline of kind model is fixed, and the horizontal level of petroleum pipeline can easily be adjusted, the oil of fix stably Pipe installing support base.
(2) technical solution
In order to solve the above technical problem, the present invention provides such a petroleum pipeline installation support base, including There are base, apparatus for placing and regulating device, base bottom is equipped with regulating device, sliding slot is provided among base top, is set in sliding slot There is apparatus for placing.
Preferably, apparatus for placing includes movable block, shaft, the first spring, arc placement plate, arc rubber slab and second Spring, sliding slot is interior to be equipped with two movable blocks coordinated with it, and movable block in sliding slot with being slidably matched, on the inside of the movable block of the left and right sides The first spring is connected between the lower part of face, the first spring is located in sliding slot, left side movable block top right side and right side movable block top Shaft is fitted with the left of portion, shaft is provided with arc placement plate, the installation of arc placement plate medial surface to be symmetrical arranged in shaft There is arc rubber slab, be connected between left and right sides arc placement plate lateral surface lower part and left and right sides movable block leading flank outside Second spring.
Preferably, regulating device includes sleeve, the first screw rod, nut and supporting block, and the base bottom left and right sides is symmetrical Formula is provided with sleeve, and the first screw rod is equipped with sleeve, nut is provided with the middle part of the first screw rod, and nut is located at outside sleeve, and first Screw rod bottom is provided with supporting block.
Preferably, gripping mechanism has been further included, gripping mechanism includes pulley, fixed block, fastening bolt and steel wire rope, left Pulley is installed at the top of the arc placement plate of side, fixed block is installed at the top of the arc placement plate of right side, is laterally provided with the middle part of fixed block Through hole, fixed block crown center are provided with the first threaded hole, and the first threaded hole is equipped with fastening with being connected in through hole in the first threaded hole Bolt, right side arc placement plate top left side rotary type are connected with steel wire rope, and steel wire rope tail end is located in through hole around pulley, Steel wire rope is contacted with fastening bolt.
Preferably, the second screw rod and bull stick have been further included, base right flank top is provided with the second spiral shell with left surface top Pit, the second threaded hole are equipped with the second screw rod with being connected in sliding slot in the second threaded hole, the second screw rod of the left and right sides is inner and left Right both sides movable block lateral surface lower part connection, the left and right sides the second screw rod outer end is fitted with bull stick.
Preferably, montant, the 3rd screw rod and rubber block have been further included, being provided with for base top left and right sides symmetrical expression is perpendicular Bar, montant top are provided with the 3rd threaded hole, are equipped with the 3rd screw rod in the 3rd threaded hole, the 3rd screw rod the inner of the left and right sides is all installed There is rubber block, rubber block is located at left and right sides of the arc placement plate of the left and right sides.
Operation principle:The present apparatus is moved at laying by operating personnel first, then petroleum pipeline is placed on apparatus for placing, And then apparatus for placing fixes petroleum pipeline, you can the position of petroleum pipeline is adjusted by regulating device, and then makes petroleum pipeline In horizontality.In this way, it is more preferable to be laid with petroleum pipeline.
Because apparatus for placing includes movable block, shaft, the first spring, arc placement plate, arc rubber slab and the second bullet Spring, sliding slot is interior to be equipped with two movable blocks coordinated with it, and movable block in sliding slot with being slidably matched, left and right sides movable block medial surface The first spring is connected between lower part, the first spring is located in sliding slot, left side movable block top right side and right side movable block top Left side is fitted with shaft, and shaft is provided with arc placement plate, arc placement plate medial surface is provided with to be symmetrical arranged in shaft Arc rubber slab, on the outside of left and right sides arc placement plate lateral surface lower part and left and right sides movable block leading flank between be connected with the Two springs, when the present apparatus is located at paving location, operating personnel can pull left and right sides arc placement plate to be displaced outwardly, and second Spring elongation, then by petroleum pipeline be placed on the left and right sides arc placement plate between, the first spring elongation, you can unclamp left and right two Side arc placement plate, because of the effect of second spring, left and right sides arc placement plate is moved inward to be contacted with petroleum pipeline, and then will Petroleum pipeline is fixed, and arc rubber slab contacts increasing friction force with petroleum pipeline, and makes left and right sides arc placement plate more preferable Petroleum pipeline is fixed.In this way, laying can be fixed to petroleum pipeline of different sizes.
Because regulating device includes sleeve, the first screw rod, nut and supporting block, base bottom left and right sides symmetrical expression Sleeve is installed, the first screw rod is equipped with sleeve, nut is installed in the middle part of the first screw rod, nut is located at outside sleeve, the first screw rod Bottom is provided with supporting block, and when petroleum pipeline is fixed, operating personnel can twist left and right sides nut positive and negative alternate and rotate, Left and right sides nut positive and negative alternate, which rotates, drives the first screw rod to move up and down, and the first screw rod drives base up and down through sleeve Move up and down, and then drive petroleum pipeline to move up and down, when petroleum pipeline is moved to horizontal level, you can stop twisting spiral shell It is female.In this way, the position of petroleum pipeline can be adjusted, and it is more preferable to be laid with petroleum pipeline.
Because having further included gripping mechanism, gripping mechanism includes pulley, fixed block, fastening bolt and steel wire rope, left side Pulley is installed at the top of arc placement plate, fixed block is installed at the top of the arc placement plate of right side, is laterally provided with the middle part of fixed block logical Hole, fixed block crown center are provided with the first threaded hole, and the first threaded hole is equipped with fastening spiral shell with being connected in through hole, in the first threaded hole Bolt, right side arc placement plate top left side rotary type are connected with steel wire rope, and steel wire rope tail end is located in through hole around pulley, steel Cord is contacted with fastening bolt, and when when the left and right sides, arc placement plate fixes petroleum pipeline, operating personnel can be by wire brush Pulley is wound with, is then passed through through hole, then pulls steel wire rope tail end to move right, steel wire rope, which moves right, pulls left and right sides arc to put Put plate to move inward, when being pulled to suitable position, you can twisting fastening bolt moves inward, and fastening bolt is moved inward steel Cord is fixed, and operating personnel can unclamp steel wire rope.In this way, petroleum pipeline can be fixed more firm.
Because having further included the second screw rod and bull stick, base right flank top is provided with the second screw thread with left surface top Hole, the second threaded hole are equipped with the second screw rod, the second screw rod of left and right sides the inner and left and right with being connected in sliding slot in the second threaded hole Both sides movable block lateral surface lower part connects, and the left and right sides the second screw rod outer end is fitted with bull stick, after petroleum pipeline is fixed, behaviour Left and right sides bull stick can be twisted by making personnel, and left and right sides bar rotation drives the second screw rod of the left and right sides to move inward, left and right The second screw rod of both sides moves inward drive left and right sides movable block and moves inward, and then drives left and right sides arc placement plate inside It is mobile, when when the left and right sides, movable block is moved to suitable position, you can stop twisting left and right sides bull stick.In this way, can be to oil Pipeline is fixed more firm.
Because having further included montant, the 3rd screw rod and rubber block, base top left and right sides symmetrical expression is provided with montant, Montant top is provided with the 3rd threaded hole, is equipped with the 3rd screw rod in the 3rd threaded hole, the 3rd screw rod the inner of the left and right sides is fitted with Rubber block, rubber block is located at left and right sides of the arc placement plate of the left and right sides, after petroleum pipeline is completely fixed, you can twisting is left Right the 3rd screw rod of both sides moves inward, and the 3rd screw rod of the left and right sides, which moves inward, drives rubber block to move inward, and rubber block is inside Movement is contacted with arc placement plate, and then arc placement plate is fixed in rubber block.In this way, it can prevent wire cable rupture from causing Petroleum pipeline drops from arc placement plate.
(3) beneficial effect
The present invention can be adjusted the position of petroleum pipeline by regulating device, and petroleum pipeline is in horizontal State, laying it is more preferable, and by gripping mechanism, petroleum pipeline can be fixed more firm, having reached can be to various types of stone Oil-piping is fixed, and the horizontal level of petroleum pipeline can easily be adjusted, the effect of fix stably.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Mark in attached drawing for:1- bases, 2- sliding slots, 3- apparatus for placing, 31- movable blocks, 32- shafts, the first bullets of 33- Spring, 34- arc placement plates, 35- arc rubber slabs, 36- second springs, 4- regulating devices, 41- sleeves, the first screw rods of 42-, 43- Nut, 44- supporting blocks, 5- gripping mechanisms, 51- pulleys, 52- fixed blocks, the first threaded holes of 53-, 54- fastening bolts, 55- steel wires Rope, 56- through holes, the second threaded holes of 6-, the second screw rods of 7-, 8- bull sticks, 9- montants, the 3rd threaded holes of 10-, the 3rd screw rods of 11-, 12- rubber blocks.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of petroleum pipeline installation support base, as shown in Figs 1-4, includes base 1, apparatus for placing 3 and adjusts dress 4 are put, 1 bottom of base is equipped with regulating device 4, and 1 crown center of base is provided with sliding slot 2, apparatus for placing 3 is equipped with sliding slot 2.
Embodiment 2
A kind of petroleum pipeline installation support base, as shown in Figs 1-4, includes base 1, apparatus for placing 3 and adjusts dress 4 are put, 1 bottom of base is equipped with regulating device 4, and 1 crown center of base is provided with sliding slot 2, apparatus for placing 3 is equipped with sliding slot 2.
Apparatus for placing 3 includes movable block 31, shaft 32, the first spring 33, arc placement plate 34,35 and of arc rubber slab Second spring 36, sliding slot 2 is interior to be equipped with two movable blocks 31 coordinated with it, and movable block 31 in sliding slot 2 with being slidably matched, left and right two The first spring 33 is connected between 31 medial surface lower part of side movable block, the first spring 33 is located in sliding slot 2, and left side movable block 31 pushes up Shaft 32 is fitted with the right side of portion with 31 top left side of right side movable block, shaft 32 is provided with arc to be symmetrical arranged in shaft 32 Shape placement plate 34,34 medial surface of arc placement plate are provided with arc rubber slab 35, under 34 lateral surface of left and right sides arc placement plate Second spring 36 is connected between on the outside of portion and 31 leading flank of left and right sides movable block.
Embodiment 3
A kind of petroleum pipeline installation support base, as shown in Figs 1-4, includes base 1, apparatus for placing 3 and adjusts dress 4 are put, 1 bottom of base is equipped with regulating device 4, and 1 crown center of base is provided with sliding slot 2, apparatus for placing 3 is equipped with sliding slot 2.
Apparatus for placing 3 includes movable block 31, shaft 32, the first spring 33, arc placement plate 34,35 and of arc rubber slab Second spring 36, sliding slot 2 is interior to be equipped with two movable blocks 31 coordinated with it, and movable block 31 in sliding slot 2 with being slidably matched, left and right two The first spring 33 is connected between 31 medial surface lower part of side movable block, the first spring 33 is located in sliding slot 2, and left side movable block 31 pushes up Shaft 32 is fitted with the right side of portion with 31 top left side of right side movable block, shaft 32 is provided with arc to be symmetrical arranged in shaft 32 Shape placement plate 34,34 medial surface of arc placement plate are provided with arc rubber slab 35, under 34 lateral surface of left and right sides arc placement plate Second spring 36 is connected between on the outside of portion and 31 leading flank of left and right sides movable block.
Regulating device 4 includes sleeve 41, the first screw rod 42, nut 43 and supporting block 44, and 1 bottom of the base left and right sides is right Title formula is provided with sleeve 41, and the first screw rod 42 is equipped with sleeve 41, and the middle part of the first screw rod 42 is provided with nut 43,43, nut In outside sleeve 41,42 bottom of the first screw rod is provided with supporting block 44.
Embodiment 4
A kind of petroleum pipeline installation support base, as shown in Figs 1-4, includes base 1, apparatus for placing 3 and adjusts dress 4 are put, 1 bottom of base is equipped with regulating device 4, and 1 crown center of base is provided with sliding slot 2, apparatus for placing 3 is equipped with sliding slot 2.
Apparatus for placing 3 includes movable block 31, shaft 32, the first spring 33, arc placement plate 34,35 and of arc rubber slab Second spring 36, sliding slot 2 is interior to be equipped with two movable blocks 31 coordinated with it, and movable block 31 in sliding slot 2 with being slidably matched, left and right two The first spring 33 is connected between 31 medial surface lower part of side movable block, the first spring 33 is located in sliding slot 2, and left side movable block 31 pushes up Shaft 32 is fitted with the right side of portion with 31 top left side of right side movable block, shaft 32 is provided with arc to be symmetrical arranged in shaft 32 Shape placement plate 34,34 medial surface of arc placement plate are provided with arc rubber slab 35, under 34 lateral surface of left and right sides arc placement plate Second spring 36 is connected between on the outside of portion and 31 leading flank of left and right sides movable block.
Regulating device 4 includes sleeve 41, the first screw rod 42, nut 43 and supporting block 44, and 1 bottom of the base left and right sides is right Title formula is provided with sleeve 41, and the first screw rod 42 is equipped with sleeve 41, and the middle part of the first screw rod 42 is provided with nut 43,43, nut In outside sleeve 41,42 bottom of the first screw rod is provided with supporting block 44.
Gripping mechanism 5 is further included, gripping mechanism 5 includes pulley 51, fixed block 52, fastening bolt 54 and steel wire rope 55, the top of left side arc placement plate 34 is provided with pulley 51, and the top of right side arc placement plate 34 is provided with fixed block 52, fixed block 52 middle parts are laterally provided with through hole 56, and 52 crown center of fixed block is provided with the first threaded hole 53, the first threaded hole 53 with through hole 56 Connect, be equipped with fastening bolt 54 in the first threaded hole 53, arc placement plate 34 top left side rotary type in right side is connected with steel wire Rope 55,55 tail end of steel wire rope is located in through hole 56 around pulley 51, and steel wire rope 55 is contacted with fastening bolt 54.
The second screw rod 7 and bull stick 8 are further included, 1 right flank top of base is provided with the second threaded hole with left surface top 6, connect in the second threaded hole 6 and sliding slot 2, is equipped with the second screw rod 7 in the second threaded hole 6, the inner of the second screw rod of the left and right sides 7 and Movable block 31 lateral surface lower part in the left and right sides connects, and 7 outer end of the second screw rod of the left and right sides is fitted with bull stick 8.
Montant 9, the 3rd screw rod 11 and rubber block 12 are further included, being provided with for 1 top left and right bilateral type of base is perpendicular Bar 9,9 top of montant are provided with the 3rd threaded hole 10, the 3rd screw rod 11, the 3rd screw rod 11 of the left and right sides are equipped with the 3rd threaded hole 10 The inner is fitted with rubber block 12, and rubber block 12 is located at the left and right sides of left and right sides arc placement plate 34.
Operation principle:The present apparatus is moved at laying by operating personnel first, then petroleum pipeline is placed on apparatus for placing 3 On, and then apparatus for placing 3 fixes petroleum pipeline, you can the position of petroleum pipeline is adjusted by regulating device 4, and then makes oil Pipeline is in horizontality.In this way, it is more preferable to be laid with petroleum pipeline.
Because apparatus for placing 3 includes movable block 31, shaft 32, the first spring 33, arc placement plate 34, arc rubber slab 35 and second spring 36, two movable blocks 31 coordinated with it are equipped with sliding slot 2, and movable block 31 in sliding slot 2 with being slidably matched, a left side The first spring 33 is connected between right 31 medial surface lower part of both sides movable block, the first spring 33 is located in sliding slot 2, left side movable block 31 top right sides are fitted with shaft 32 with 31 top left side of right side movable block, and shaft 32 is installed to be symmetrical arranged in shaft 32 There is arc placement plate 34,34 medial surface of arc placement plate is provided with arc rubber slab 35, the outside of left and right sides arc placement plate 34 Second spring 36 is connected between on the outside of face lower part and 31 leading flank of left and right sides movable block, when the present apparatus is located at paving location When, operating personnel can pull left and right sides arc placement plate 34 to be displaced outwardly, and second spring 36 stretches, then petroleum pipeline is put Put between left and right sides arc placement plate 34, the first spring 33 stretches, you can left and right sides arc placement plate 34 is unclamped, because of the The effect of two springs 36, left and right sides arc placement plate 34 is moved inward to be contacted with petroleum pipeline, and then petroleum pipeline is fixed, And arc rubber slab 35 contacts increasing friction force with petroleum pipeline, and make left and right sides arc placement plate 34 preferably to petroleum pipeline Road is fixed.In this way, laying can be fixed to petroleum pipeline of different sizes.
Because regulating device 4 includes sleeve 41, the first screw rod 42, nut 43 and supporting block 44,1 bottom of base or so two Side symmetrical expression is provided with sleeve 41, and the first screw rod 42 is equipped with sleeve 41, and the middle part of the first screw rod 42 is provided with nut 43, nut 43 outside sleeve 41, and 42 bottom of the first screw rod is provided with supporting block 44, and when petroleum pipeline is fixed, operating personnel can turn round The dynamic left and right sides 43 positive and negative alternate of nut rotates, and nut 43 positive and negative alternate in the left and right sides is rotated to drive and moved down on the first screw rod 42 Dynamic, the first screw rod 42 drives base 1 to move up and down up and down through sleeve 41, and then drives petroleum pipeline to move up and down, when When petroleum pipeline is moved to horizontal level, you can stop twisting nut 43.In this way, the position of petroleum pipeline can be adjusted, And it is more preferable to be laid with petroleum pipeline.
Because having further included gripping mechanism 5, gripping mechanism 5 includes pulley 51, fixed block 52, fastening bolt 54 and steel wire Rope 55, the top of left side arc placement plate 34 are provided with pulley 51, and the top of right side arc placement plate 34 is provided with fixed block 52, fixed The middle part of block 52 is laterally provided with through hole 56, and 52 crown center of fixed block is provided with the first threaded hole 53, the first threaded hole 53 and through hole 56 Interior connection, is equipped with fastening bolt 54 in the first threaded hole 53, arc placement plate 34 top left side rotary type in right side is connected with steel Cord 55,55 tail end of steel wire rope are located in through hole 56 around pulley 51, and steel wire rope 55 is contacted with fastening bolt 54, works as the left and right sides When arc placement plate 34 fixes petroleum pipeline, wire brush can be wound with pulley 51 by operating personnel, be then passed through through hole 56, then draw Dynamic 55 tail end of steel wire rope moves right, and steel wire rope 55, which moves right, pulls left and right sides arc placement plate 34 to move inward, and works as drawing When moving to suitable position, you can twisting fastening bolt 54 moves inward, and fastening bolt 54, which moves inward, fixes steel wire rope 55, behaviour Steel wire rope 55 can be unclamped by making personnel.In this way, petroleum pipeline can be fixed more firm.
Because having further included the second screw rod 7 and bull stick 8,1 right flank top of base is provided with the second spiral shell with left surface top Pit 6, connect in the second threaded hole 6 and sliding slot 2, and the second threaded hole 6 is interior to be equipped with the second screw rod 7, in the second screw rod of the left and right sides 7 End is connected with 31 lateral surface lower part of left and right sides movable block, and 7 outer end of the second screw rod of the left and right sides is fitted with bull stick 8, works as oil After pipeline is fixed, operating personnel can twist left and right sides bull stick 8, and left and right sides bull stick 8, which rotates, drives the second spiral shell of the left and right sides Bar 7 moves inward, and the second screw rod of the left and right sides 7 moves inward drive left and right sides movable block 31 and moves inward, and then drives left Right both sides arc placement plate 34 moves inward, when left and right sides movable block 31 is moved to suitable position, you can it is left to stop twisting Right both sides bull stick 8.In this way, petroleum pipeline can be fixed is more firm.
Because having further included montant 9, the 3rd screw rod 11 and rubber block 12, the installation of 1 top left and right bilateral type of base There is montant 9,9 top of montant is provided with the 3rd threaded hole 10, the 3rd screw rod 11, the 3rd spiral shell of the left and right sides are equipped with the 3rd threaded hole 10 11 the inner of bar is fitted with rubber block 12, and rubber block 12 is located at the left and right sides of left and right sides arc placement plate 34, works as petroleum pipeline After being completely fixed, you can the 3rd screw rod 11 of the twisting left and right sides moves inward, and the 3rd screw rod 11 of the left and right sides moves inward band Dynamic rubber block 12 moves inward, and rubber block 12 is moved inward to be contacted with arc placement plate 34, and then rubber block 12 places arc Plate 34 is fixed.In this way, it can prevent the fracture of steel wire rope 55 from causing petroleum pipeline to drop from arc placement plate 34.
Embodiment described above only expresses the preferred embodiment of the present invention, its description is more specific and detailed, but simultaneously Therefore the limitation to the scope of the claims of the present invention cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (6)

1. a kind of petroleum pipeline installation support base, it is characterised in that include base (1), apparatus for placing (3) and adjust dress Put (4), base (1) bottom is equipped with regulating device (4), and base (1) crown center is provided with sliding slot (2), is equipped with and places in sliding slot (2) Device (3).
2. a kind of petroleum pipeline installation support base according to claim 1, it is characterised in that apparatus for placing (3) wraps Movable block (31), shaft (32), the first spring (33), arc placement plate (34), arc rubber slab (35) and second spring are included (36), two movable blocks (31) coordinated with it are equipped with sliding slot (2), movable block (31) in sliding slot (2) with being slidably matched, left and right The first spring (33) is connected between both sides movable block (31) medial surface lower part, the first spring (33) is located in sliding slot (2), left side Movable block (31) top right side is fitted with shaft (32) with right side movable block (31) top left side, and shaft (32) is symmetrically to set Put, arc placement plate (34) is installed in shaft (32), arc placement plate (34) medial surface is provided with arc rubber slab (35), left The second bullet is connected between on the outside of the leading flank of right both sides arc placement plate (34) lateral surface lower part and left and right sides movable block (31) Spring (36).
3. a kind of petroleum pipeline installation support base according to claim 2, it is characterised in that regulating device (4) is wrapped Sleeve (41), the first screw rod (42), nut (43) and supporting block (44), the symmetrical peace in base (1) bottom left and right sides are included Equipped with sleeve (41), the first screw rod (42) is equipped with sleeve (41), nut (43), nut are installed in the middle part of the first screw rod (42) (43) positioned at sleeve (41) outside, the first screw rod (42) bottom is provided with supporting block (44).
4. a kind of petroleum pipeline installation support base according to claim 3, it is characterised in that further included clamping dress Put (5), gripping mechanism (5) includes pulley (51), fixed block (52), fastening bolt (54) and steel wire rope (55), left side arc Pulley (51) is installed at the top of placement plate (34), fixed block (52), fixed block are installed at the top of right side arc placement plate (34) (52) middle part is laterally provided with through hole (56), and fixed block (52) crown center is provided with the first threaded hole (53), the first threaded hole (53) With being connected in through hole (56), fastening bolt (54), right side arc placement plate (34) top left side are equipped with the first threaded hole (53) Rotary type is connected with steel wire rope (55), and steel wire rope (55) tail end is located in through hole (56) around pulley (51), steel wire rope (55) Contacted with fastening bolt (54).
5. a kind of petroleum pipeline installation support base according to claim 4, it is characterised in that further included the second spiral shell Bar (7) and bull stick (8), base (1) right flank top are provided with the second threaded hole (6), the second threaded hole (6) with left surface top With being connected in sliding slot (2), the second screw rod (7), the second screw rod of the left and right sides (7) the inner and left and right are equipped with the second threaded hole (6) Both sides movable block (31) lateral surface lower part connects, and the left and right sides the second screw rod (7) outer end is fitted with bull stick (8).
6. a kind of petroleum pipeline installation support base according to claim 5, it is characterised in that further included montant (9), the 3rd screw rod (11) and rubber block (12), base (1) top left and right bilateral type are provided with montant (9), montant (9) Top is provided with the 3rd threaded hole (10), and the 3rd screw rod (11), the 3rd screw rod (11) of the left and right sides are equipped with the 3rd threaded hole (10) The inner is fitted with rubber block (12), and rubber block (12) is located at left and right sides of left and right sides arc placement plate (34).
CN201711243875.4A 2017-11-30 2017-11-30 Support base is used in a kind of installation of petroleum pipeline Active CN108036108B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711243875.4A CN108036108B (en) 2017-11-30 2017-11-30 Support base is used in a kind of installation of petroleum pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711243875.4A CN108036108B (en) 2017-11-30 2017-11-30 Support base is used in a kind of installation of petroleum pipeline

Publications (2)

Publication Number Publication Date
CN108036108A true CN108036108A (en) 2018-05-15
CN108036108B CN108036108B (en) 2019-10-18

Family

ID=62094803

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711243875.4A Active CN108036108B (en) 2017-11-30 2017-11-30 Support base is used in a kind of installation of petroleum pipeline

Country Status (1)

Country Link
CN (1) CN108036108B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868135A (en) * 2018-07-20 2018-11-23 陶宇 A kind of construction site pipeline fixing device
CN109296829A (en) * 2018-11-21 2019-02-01 邵稚超 Damping base is used in a kind of laying of petroleum pipeline
CN110594489A (en) * 2019-09-02 2019-12-20 中冶天工集团有限公司 Pipeline transportation pipe support device and using method thereof
CN111089222A (en) * 2018-10-23 2020-05-01 成都毅诚机电工程有限公司 PVC tubular product with heat preservation function
CN111878630A (en) * 2020-08-03 2020-11-03 泉州泉港协广工业机械有限公司 Firm type oil pipe fixing mechanism for oil development
CN112030770A (en) * 2020-09-09 2020-12-04 中海外交通建设有限公司 Device and process for bridge support column construction
CN113525218A (en) * 2021-07-05 2021-10-22 杨莉 Polymorphic protector is used to petroleum derivative transportation storage car
KR20230001391U (en) * 2021-12-29 2023-07-06 주식회사 한국가스기술공사 Pipe Support Apparatus with Handle

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203309465U (en) * 2013-05-22 2013-11-27 北京大学 Air cushion running platform
CN104847840A (en) * 2015-03-30 2015-08-19 南京梅山冶金发展有限公司 Online pipeline damping device and method
CN205859371U (en) * 2016-06-27 2017-01-04 山西省交通科学研究院 A kind of pipeline clamping device
CN106641450A (en) * 2016-12-19 2017-05-10 黄斌 Steel tube clamping device
CN206647620U (en) * 2017-04-10 2017-11-17 成都来宝石油设备有限公司 The petroleum pipeline clamp system of vibrations can be reduced
CN107387877A (en) * 2017-09-01 2017-11-24 龚梁涛 A kind of height-adjustable support meanss of oil and gas exploitation

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203309465U (en) * 2013-05-22 2013-11-27 北京大学 Air cushion running platform
CN104847840A (en) * 2015-03-30 2015-08-19 南京梅山冶金发展有限公司 Online pipeline damping device and method
CN205859371U (en) * 2016-06-27 2017-01-04 山西省交通科学研究院 A kind of pipeline clamping device
CN106641450A (en) * 2016-12-19 2017-05-10 黄斌 Steel tube clamping device
CN206647620U (en) * 2017-04-10 2017-11-17 成都来宝石油设备有限公司 The petroleum pipeline clamp system of vibrations can be reduced
CN107387877A (en) * 2017-09-01 2017-11-24 龚梁涛 A kind of height-adjustable support meanss of oil and gas exploitation

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108868135A (en) * 2018-07-20 2018-11-23 陶宇 A kind of construction site pipeline fixing device
CN111089222A (en) * 2018-10-23 2020-05-01 成都毅诚机电工程有限公司 PVC tubular product with heat preservation function
CN109296829A (en) * 2018-11-21 2019-02-01 邵稚超 Damping base is used in a kind of laying of petroleum pipeline
CN110594489A (en) * 2019-09-02 2019-12-20 中冶天工集团有限公司 Pipeline transportation pipe support device and using method thereof
CN111878630A (en) * 2020-08-03 2020-11-03 泉州泉港协广工业机械有限公司 Firm type oil pipe fixing mechanism for oil development
CN112030770A (en) * 2020-09-09 2020-12-04 中海外交通建设有限公司 Device and process for bridge support column construction
CN113525218A (en) * 2021-07-05 2021-10-22 杨莉 Polymorphic protector is used to petroleum derivative transportation storage car
CN113525218B (en) * 2021-07-05 2023-05-26 湖北同威专用汽车有限公司 Multi-form protection device for petroleum derivative transportation and storage vehicle
KR20230001391U (en) * 2021-12-29 2023-07-06 주식회사 한국가스기술공사 Pipe Support Apparatus with Handle
KR200497998Y1 (en) * 2021-12-29 2024-05-14 주식회사 한국가스기술공사 Pipe Support Apparatus with Handle

Also Published As

Publication number Publication date
CN108036108B (en) 2019-10-18

Similar Documents

Publication Publication Date Title
CN108036108A (en) A kind of petroleum pipeline installation support base
KR101261458B1 (en) many cable pulling equipment of underground cable
CN207418025U (en) A kind of power engineering cable fast winding equipment
CN102832572A (en) Cable wellhead arm supporting pulley
CN204103371U (en) A kind of movable type cable laying apparatu
CN106672688A (en) Novel paying-off device
CN202772501U (en) Cable wellhead supporting arm pulley
CN219198337U (en) Pipeline laying device
CN108298431A (en) A kind of natural gas line placement hanging device
CN207811150U (en) A kind of automatic cable arrangement device
CN201910607U (en) Suspension type multi-cable traverse
CN107121280A (en) A kind of handling method of conveyer belt experimental rig and cycloconveyor belt sample
CN207618744U (en) A kind of steel wire rope pay-off rack
CN209052323U (en) A kind of rope-arranging device for oil-extraction vehicle of anti-sticking well
CN107457277A (en) Tube Drawing device
CN211733648U (en) Auxiliary device for quickly installing pressure test plug
CN202090869U (en) Injection head device for continuous oil pipes
CN110802408B (en) Hot dip galvanizing steel pipe apparatus for producing
CN104633276B (en) Hydraulic oil pipe winding disc device
CN206930444U (en) A kind of conveyer belt experimental rig
CN206384655U (en) A kind of synchronous control system of adjust automatically steel wire tension
CN113721337A (en) Underground pipe gallery wiring device for communication pipeline engineering
CN221095130U (en) Perpendicularity control device for precast pile
CN219220326U (en) Automatic screwing-on and unscrewing device of hydraulic power tongs
CN110422685A (en) A kind of coil winding system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190814

Address after: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province

Applicant after: Hefei dragon totem Information Technology Co., Ltd.

Address before: 350007 No. 116 Shoushan Road, Cangshan District, Fuzhou City, Fujian Province

Applicant before: Zhao Weixiang

GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190924

Address after: 225300 Jiangsu Province, Taizhou City Hailing Su Chen Town Industrial Park

Applicant after: Jiangsu Ai Suo new material Science and Technology Ltd.

Address before: 230000 18 Floor, Block C, J2 District, Phase II Innovation Industrial Park, Hefei High-tech Zone, Anhui Province

Applicant before: Hefei dragon totem Information Technology Co., Ltd.