CN108868001A CN201810723911.5A CN201810723911A CN108868001A CN 108868001 A CN108868001 A CN 108868001A CN 201810723911 A CN201810723911 A CN 201810723911A CN 108868001 A CN108868001 A CN 108868001A
Authority
CN
China
Prior art keywords
steel pipe
steel
concrete
splice region
binding type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810723911.5A
Other languages
Chinese (zh)
Inventor
王宣鼎
刘界鹏
周绪红
张孝林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201810723911.5A priority Critical patent/CN108868001A/en
Publication of CN108868001A publication Critical patent/CN108868001A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Abstract

The present invention provides steel tube binding type steel concrete column splicing node and construction method, including:Prefabricated steel tube binding type steel concrete upper prop, prefabricated steel tube binding type steel concrete lower prop, splice region steel pipe, splice region cast-in-place concrete, fashioned iron butt weld, butt welding of steel tube seam composition.On the one hand splice region steel pipe can be used as the template of casting concrete, after another aspect moulding by casting again can confined concrete, guarantee the bearing capacity of pillar.The effect of contraction of outer steel pipe simultaneously, it is ensured that Large-size rebar or profile and the common stress of core concrete compatibility of deformation reduce connection workload.Outside steel pipe can guarantee the co-operation performance of connecting sleeve and concrete, if easily there is sag of protecting coating without outside steel pipe.In addition, steel pipe disconnects, i.e., it is vertical discontinuous, be conducive to assemble.Node security of the present invention is reliable, good integrity, is convenient for assembly, advantageous in stress and construction party mask.

Description

A kind of prefabricated steel tube binding type steel concrete column splicing node and its construction technology
Technical field
The invention belongs to building structure technology field, in particular to a kind of prefabricated steel tube binding type steel concrete column splicing section Point.
Background technique
Steel tube confined concrete structure is a kind of novel steel-concrete combined structure, has both concrete filled steel tube and fashioned iron The advantages of two kinds of structure type of concrete, while solving the difficult point of concrete filled steel tube and steel reinforced concrete structure in construction.
Frame column is typically subject to the collective effect of axle power, moment of flexure and shearing in Practical Project, there is no at present reasonable pre- Steel tube binding type steel concrete column processed splices joint form, limit the application of assembled steel tube binding type steel concrete structure with It promotes.
Summary of the invention
The object of the present invention is to provide a kind of prefabricated steel tube binding type steel concrete columns to splice node, it is characterised in that:It is main It to include prefabricated steel tube binding type steel concrete upper prop, prefabricated steel tube binding type steel concrete lower prop and splice region steel pipe.
The prefabricated steel tube binding type steel concrete upper prop includes upper steel pipe, upper fashioned iron and upper precast concrete.On described After steel duct fills the upper precast concrete, there is distance in the lower end of upper precast concrete away from the lower nozzle of upper steel pipe.It is described Pre-buried upper fashioned iron in upper precast concrete.Extend the lower nozzle of upper steel pipe in the lower end of the upper fashioned iron.
The prefabricated steel tube binding type steel concrete lower prop includes lower steel pipe, lower fashioned iron and lower precast concrete.Under described After steel duct fills the lower precast concrete, there is distance in the upper end of lower precast concrete away from the upper orifice of lower steel pipe.It is described Pre-buried lower fashioned iron in lower precast concrete.The upper orifice of lower steel pipe is stretched out in the upper end of the lower fashioned iron.
It is welded after the upper fashioned iron and the docking of lower fashioned iron, forms fashioned iron butt weld.
The splice region steel pipe includes two semi-steel pipes.The two packets form splice region steel around fashioned iron butt weld Pipe.Splice region steel pipe lower end is welded after docking with the upper orifice of lower steel pipe, forms butt welding of steel tube seam.
There is gap between the upper end tube nozzle of the splice region steel pipe and the lower end of upper steel pipe.
Using gap of the set cuff between splice region steel pipe and upper steel pipe.
The splice region steel pipe is provided with filling concrete hole.By the fill orifice, between upper steel pipe and lower steel pipe Node area concrete perfusion removes the cuff of constraint steel pipe edge joint position after concrete hardening.
Further, the prefabricated steel tube binding type steel concrete upper prop, prefabricated steel tube binding type steel concrete lower prop, spelling Connect area's steel pipe, the axis of splice region cast-in-place concrete is located along the same line, the vertical basic plane of axis.
Further, it is L2 that the length of the lower nozzle of upper steel pipe is extended in the lower end of the upper fashioned iron.The length L2=of extension 150-180mm。
Further, the length of lower nozzle of the lower end of upper precast concrete away from upper steel pipe is L1.The length L1=10- of indent 20mm。
Further, the upper end of lower precast concrete is L3 away from the length of the upper orifice of lower steel pipe.The length L3=10- of indent 20mm。
Further, the length that the upper orifice of lower steel pipe is stretched out in the upper end of the lower fashioned iron is L4.Extension L4=150- 180mm。
Further, the splice region steel pipe and connect in area that there are the gaps 10-20mm between steel pipe.
Further, a kind of prefabricated steel tube binding type steel concrete column splices node, and construction technology is characterized in that:
1) it will be welded after upper prop and already installed lower prop steel sections abutting joint, form fashioned iron butt weld.
2) it is welded by butt weld, forms splice region steel pipe.
3) splice region steel pipe is aligned welding with fashioned iron under splice region, forms butt welding of steel tube seam.
4) the steel pipe constraint steel pipe edge joint position cuff splicing on splice region steel pipe and splice region, creates a seal to pour Concrete.
5) to node area concrete perfusion, constraint steel pipe edge joint position cuff is removed after concrete hardening, makes splice region steel Gap in the area Guan Yujie between steel pipe there are 10-20mm.
It is worth noting that on the one hand splice region steel pipe can be used as the template of casting concrete, on the other hand in the present invention After moulding by casting again can confined concrete, guarantee the bearing capacity of pillar.The effect of contraction of outer steel pipe simultaneously, it is ensured that major diameter Reinforcing bar or profile and the common stress of core concrete compatibility of deformation reduce connection workload.Outside steel pipe can guarantee connecting sleeve With the co-operation performance of concrete, if easily there is sag of protecting coating without outside steel pipe.In addition, steel pipe disconnects, i.e., vertically Discontinuously, be conducive to assemble.
The splicing node and construction technology of prefabricated components directly influence the stability and safety of assembled arthitecutral structure, The operative constraint due to steel pipe of the invention acts on, and in steel tube binding type steel concrete column does not need that vertical muscle and stirrup is arranged, and Steel pipe does not directly take on vertical load, is easily installed, and is suitable for prefabricated construction, has following advantages:
1, the splicing of welding fashioned iron is convenient, and securely and reliably, power transmission is clear, conveniently pours, can reach rigid joint requirement.
2, the effect of contraction of splice region steel pipe, it is ensured that Large-size rebar or profile and core concrete compatibility of deformation are common Stress reduces connection workload.
3, center pillar splicing joint structure of the present invention is simple and can realize that batch production assembles, and fashioned iron, external application are welded in node area Casing constraint, favorably guarantees construction quality.
Detailed description of the invention
The prefabricated steel tube binding type steel concrete column reinforcing joint of Fig. 1;
The prefabricated Column border node weld seam elevation of the top Fig. 2 prefabricated post and lower part;
The prefabricated steel tube binding type steel concrete column A-A sectional view of Fig. 3;
Fig. 4 constrains steel pipe edge joint position cuff;
In figure:Prefabricated steel tube binding type steel concrete upper prop (1), prefabricated steel tube binding type steel concrete lower prop (2), splicing Area's steel pipe (3), splice region cast-in-place concrete (4), fashioned iron butt weld (5), butt welding of steel tube stitch (6), cuff (7), splice region Fashioned iron (12) on upper steel pipe (11), splice region, on splice region under precast concrete (13), splice region under steel pipe (21), splice region Precast concrete (23), filling concrete hole (31) under fashioned iron (22), splice region.
Specific embodiment
Below with reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, should all include within the scope of the present invention.
Embodiment 1:
A kind of prefabricated steel tube binding type steel concrete column splicing node, it is characterised in that:It mainly include prefabricated steel tube confinement Steel reinforced concrete upper prop 1, prefabricated steel tube binding type steel concrete lower prop 2 and splice region steel pipe 3.
The prefabricated steel tube binding type steel concrete upper prop 1 includes upper steel pipe 11, upper fashioned iron 12 and upper precast concrete 13. After filling the upper precast concrete 13 inside the upper steel pipe 11, the lower end of upper precast concrete 13 is away from the down tube of upper steel pipe 11 The length of mouth is L1.The length L1=10-20mm of indent.Pre-buried upper fashioned iron 12 in the upper precast concrete 13.The mo(u)ld top half The length that the lower nozzle of upper steel pipe 11 is extended in the lower end of steel 12 is L2.The length L2=150-180mm of extension.
The prefabricated steel tube binding type steel concrete lower prop 2 includes lower steel pipe 21, lower fashioned iron 22 and lower precast concrete 23. After filling the lower precast concrete 23 inside the lower steel pipe 21, the upper tube of lower steel pipe 21 is stretched out in the upper end of the lower fashioned iron 22 The length of mouth is L4.Extension L4=150-180mm.Pre-buried lower fashioned iron 22 in the lower precast concrete 23.Under it is prefabricated mixed The length of upper orifice of the upper end away from lower steel pipe 21 of solidifying soil 23 is L3.The length L3=10-20mm of indent.
It is welded after the upper fashioned iron 12 and the docking of lower fashioned iron 22, forms fashioned iron butt weld 5.
The splice region steel pipe 3 includes two semi-steel pipes.The two packets form splice region around fashioned iron butt weld 5 Steel pipe 3.3 lower end of splice region steel pipe is welded after docking with the upper orifice of lower steel pipe 21, forms butt welding of steel tube seam 6.
The splice region steel pipe 3 and connect in area that there are the gaps 10-20mm between steel pipe 11.
Using 7 sets of the cuff gaps between splice region steel pipe 3 and upper steel pipe 11.
The splice region steel pipe 3 is provided with filling concrete hole 31.By the fill orifice 31, to upper steel pipe 11 and lower steel pipe Node area concrete perfusion between 21 removes the cuff 7 of constraint steel pipe edge joint position after concrete hardening.
The prefabricated steel tube binding type steel concrete upper prop 1, prefabricated steel tube binding type steel concrete lower prop 2, splice region Steel pipe 3, splice region cast-in-place concrete 4 axis be located along the same line, the vertical basic plane of axis.
Embodiment 2:
The present embodiment discloses the construction work for the splicing node of prefabricated steel tube binding type steel concrete column described in embodiment 1 Skill:
1) it will be welded after upper prop and already installed lower prop steel sections abutting joint, form fashioned iron butt weld 5.
2) it is welded by butt weld, forms splice region steel pipe 3.
3) splice region steel pipe 3 is aligned welding with fashioned iron 22 under splice region, forms butt welding of steel tube seam 6.
4) the constraint steel pipe edge joint position cuff 7 of steel pipe 11 splices on splice region steel pipe 3 and splice region, creates a seal to Casting concrete.
5) to node area concrete perfusion, constraint steel pipe edge joint position cuff is removed after concrete hardening, makes splice region steel Pipe 3 and connect the gap in area between steel pipe 11 there are 10-20mm.

Claims (8)

1. a kind of prefabricated steel tube binding type steel concrete column splices node, it is characterised in that:Mainly about including the prefabricated steel pipe Beamforming steel concrete upper prop (1), prefabricated steel tube binding type steel concrete lower prop (2) and splice region steel pipe (3);
The prefabricated steel tube binding type steel concrete upper prop (1) includes upper steel pipe (11), upper fashioned iron (12) and upper precast concrete (13);After filling the upper precast concrete (13) inside the upper steel pipe (11), the lower end of upper precast concrete (13) is away from upper The lower nozzle of steel pipe (11) has distance;Pre-buried upper fashioned iron (12) in the upper precast concrete (13);The upper fashioned iron (12) Extend the lower nozzle of upper steel pipe (11) in lower end.
The prefabricated steel tube binding type steel concrete lower prop (2) includes lower steel pipe (21), lower fashioned iron (22) and lower precast concrete (23);After filling the lower precast concrete (23) inside the lower steel pipe (21), the upper end of lower precast concrete (23) is away under The upper orifice of steel pipe (21) has distance;Pre-buried lower fashioned iron (22) in the lower precast concrete (23);The lower fashioned iron (22) The upper orifice of lower steel pipe (21) is stretched out in upper end;
It welds, is formed fashioned iron butt weld (5) after the upper fashioned iron (12) and lower fashioned iron (22) docking;
The splice region steel pipe (3) includes two semi-steel pipes;The two packets form splice region around fashioned iron butt weld (5) Steel pipe (3);Splice region steel pipe (3) lower end is welded after docking with the upper orifice of lower steel pipe (21), forms butt welding of steel tube seam (6);
There is gap between the upper end tube nozzle of the splice region steel pipe (3) and the lower end of upper steel pipe (11);
The gap between splice region steel pipe (3) and upper steel pipe (11) is covered using cuff (7);
The splice region steel pipe (3) is provided with filling concrete hole (31);By the fill orifice (31), to upper steel pipe (11) and under Node area concrete perfusion between steel pipe (21) removes the cuff (7) of constraint steel pipe edge joint position after concrete hardening.
2. a kind of prefabricated steel tube binding type steel concrete column according to claim 1 splices node, it is characterised in that:It is described Prefabricated steel tube binding type steel concrete upper prop (1), prefabricated steel tube binding type steel concrete lower prop (2), splice region steel pipe (3), The axis of splice region cast-in-place concrete (4) is located along the same line, the vertical basic plane of axis.
3. a kind of prefabricated steel tube binding type steel concrete column according to claim 1 or 2 splices node, it is characterised in that:
The length that the lower nozzle of upper steel pipe (11) is extended in the lower end of the upper fashioned iron (12) is L2;The length L2=150- of extension 180mm。
4. a kind of prefabricated steel tube binding type steel concrete column according to claim 1 or 3 splices node, it is characterised in that: The lower end of upper precast concrete (13) is L1 away from the length of the lower nozzle of upper steel pipe (11);The length L1=10-20mm of indent.
5. a kind of prefabricated steel tube binding type steel concrete column according to claim 1 or 3 splices node, it is characterised in that: The upper end of lower precast concrete (23) is L3 away from the length of the upper orifice of lower steel pipe (21);The length L3=10-20mm of indent.
6. a kind of prefabricated steel tube binding type steel concrete column according to claim 1 or 3 splices node, it is characterised in that: The length that the upper orifice of lower steel pipe (21) is stretched out in the upper end of the lower fashioned iron (22) is L4;Extension L4=150-180mm.
7. a kind of prefabricated steel tube binding type steel concrete column according to claim 1 or 3 splices node, it is characterised in that: The splice region steel pipe (3) and connect between steel pipe in area (11) that there are the gaps 10-20mm.
8. a kind of prefabricated steel tube binding type steel concrete column according to claim 1 splices node, construction technology feature It is:
1) it will weld, formed fashioned iron butt weld (5) after the upper prop and already installed lower prop steel sections abutting joint;
2) it is welded, is formed splice region steel pipe (3) by butt weld;
3) splice region steel pipe (3) is aligned welding with fashioned iron under splice region (22), forms butt welding of steel tube seam (6).
4) steel pipe (11) constraint steel pipe edge joint position cuff (7) is spliced on splice region steel pipe (3) and splice region, formed sealing with Just casting concrete;
5) to node area concrete perfusion, constraint steel pipe edge joint position cuff is removed after concrete hardening, makes splice region steel pipe (3) With connect between steel pipe in area (11) that there are the gaps of 10-20mm.
CN201810723911.5A 2018-07-04 2018-07-04 A kind of prefabricated steel tube binding type steel concrete column splicing node and its construction technology Pending CN108868001A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810723911.5A CN108868001A (en) 2018-07-04 2018-07-04 A kind of prefabricated steel tube binding type steel concrete column splicing node and its construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810723911.5A CN108868001A (en) 2018-07-04 2018-07-04 A kind of prefabricated steel tube binding type steel concrete column splicing node and its construction technology

Publications (1)

Publication Number Publication Date
CN108868001A true CN108868001A (en) 2018-11-23

Family

ID=64298579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810723911.5A Pending CN108868001A (en) 2018-07-04 2018-07-04 A kind of prefabricated steel tube binding type steel concrete column splicing node and its construction technology

Country Status (1)

Country Link
CN (1) CN108868001A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130580A (en) * 2019-05-20 2019-08-16 福建工程学院 Steel tube confinement formula precast concrete column connection structure and construction method
CN112922234A (en) * 2021-01-27 2021-06-08 海南大学 Equivalent steel reinforced concrete prefabricated column and construction method thereof
CN113216397A (en) * 2021-05-19 2021-08-06 西华大学 Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column
CN113266106A (en) * 2021-07-19 2021-08-17 中南大学 Novel assembled concrete support column
CN114960988A (en) * 2022-05-23 2022-08-30 中国一冶集团有限公司 Steel pipe confined concrete column structural joint plugging device and method
CN110130580B (en) * 2019-05-20 2024-04-26 福建工程学院 Steel pipe constraint type precast concrete column connecting structure and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3322652B2 (en) * 1999-06-17 2002-09-09 安藤建設株式会社 Precast composite column joining method
JP2004011203A (en) * 2002-06-05 2004-01-15 Kajima Corp Precast src-column joining section structure
CN102383530A (en) * 2011-09-08 2012-03-21 张吉华 Prefabricated reinforced concrete structural column for prefabricated buildings
CN103422620A (en) * 2013-08-27 2013-12-04 陕西建科兴业钢结构有限公司 Prefabricated hollow steel-reinforced concrete column and splicing structure and splicing method thereof
CN106906954A (en) * 2017-03-14 2017-06-30 安徽工程大学 A kind of built-in profile steel steel tubes concrete column structure and preparation method thereof
CN108179842A (en) * 2018-02-07 2018-06-19 安徽工程大学 A kind of assembled steel tube confined concrete models and its production technology

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3322652B2 (en) * 1999-06-17 2002-09-09 安藤建設株式会社 Precast composite column joining method
JP2004011203A (en) * 2002-06-05 2004-01-15 Kajima Corp Precast src-column joining section structure
CN102383530A (en) * 2011-09-08 2012-03-21 张吉华 Prefabricated reinforced concrete structural column for prefabricated buildings
CN103422620A (en) * 2013-08-27 2013-12-04 陕西建科兴业钢结构有限公司 Prefabricated hollow steel-reinforced concrete column and splicing structure and splicing method thereof
CN106906954A (en) * 2017-03-14 2017-06-30 安徽工程大学 A kind of built-in profile steel steel tubes concrete column structure and preparation method thereof
CN108179842A (en) * 2018-02-07 2018-06-19 安徽工程大学 A kind of assembled steel tube confined concrete models and its production technology

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国建筑学会抗震防灾分会等: "《第七届全国地震工程学术会议论文集 下》", 30 November 2006, 北京:地震出版社 *
张正国: "《组合结构》", 31 March 1989, 郑州:河南科学技术出版社 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110130580A (en) * 2019-05-20 2019-08-16 福建工程学院 Steel tube confinement formula precast concrete column connection structure and construction method
CN110130580B (en) * 2019-05-20 2024-04-26 福建工程学院 Steel pipe constraint type precast concrete column connecting structure and construction method
CN112922234A (en) * 2021-01-27 2021-06-08 海南大学 Equivalent steel reinforced concrete prefabricated column and construction method thereof
CN113216397A (en) * 2021-05-19 2021-08-06 西华大学 Novel splicing mode of assembled GFRP (glass fiber reinforced plastic) pipe concrete column
CN113266106A (en) * 2021-07-19 2021-08-17 中南大学 Novel assembled concrete support column
CN113266106B (en) * 2021-07-19 2021-09-21 中南大学 Novel assembled concrete support column
CN114960988A (en) * 2022-05-23 2022-08-30 中国一冶集团有限公司 Steel pipe confined concrete column structural joint plugging device and method
CN114960988B (en) * 2022-05-23 2023-05-16 中国一冶集团有限公司 Steel pipe confined concrete column structural joint plugging device and method

Similar Documents

Publication Publication Date Title
CN108868001A (en) A kind of prefabricated steel tube binding type steel concrete column splicing node and its construction technology
CN108049498B (en) The prefabricated post and Prefabricated beam connection structure and method of assembled architecture frame structure
CN204753844U (en) Circular steel tube concrete column sleeve connected node
CN107299683B (en) Compound concrete-filled tubular column assembled docks node and connection method
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN104831818B (en) The connecting node of precast reinforced concrete beam and superposed column
CN103850363B (en) Prefabricated through hole assembly type reinforced concrete shear wall and construction method of prefabricated through hole assembly type reinforced concrete shear wall
CN108166531B (en) Foundation post-cast strip template and construction method for casting post-cast strip
CN208486364U (en) Frame structure system
JP4998198B2 (en) Mechanical joint grout filling method, PC member joining method, column beam joint construction method, column beam joint construction method, floor member and PC wall member joining method, PC member joining structure, column beam joining Structure, column beam joint structure, floor / wall joint structure
CN106948504A (en) Assembled wallboard water seepage prevention vertical abutment joint structure and its construction method
CN108952014A (en) A kind of shear force wall reinforcing steel bar positioning device
CN207794327U (en) A kind of precast assembly structure of Subway Station Platform plate
CN210529680U (en) Connecting structure of vertical splicing precast pile
CN209723690U (en) A kind of node connecting newly-increased concrete column and original concrete column
CN209653108U (en) Prefabricated reinforced concrete column connection structure
CN109537741B (en) Sleeve type steel-concrete beam node connecting structure and installation method thereof
CN105113640B (en) The mechanical anchor formula connecting joint structure of steel core concrete column and reinforced beam
CN114135000A (en) Assembled beam-column connecting joint partially wrapped with U-shaped steel and construction method thereof
CN108824189A (en) A kind of steel plate connection prefabricated assembling type reinforced concrete side crashproof guardrail
CN108867361A (en) A kind of half grout sleeve connection prefabricated assembling type reinforced concrete side crashproof guardrail
CN105951987A (en) Sub-frame post-cast joint with external permanent aluminum plate outer mold
CN111270691A (en) Side slope prefabricated frame lattice beam structure and construction method
CN105839851A (en) Construction method of prefabricated frame column formed by using split connection
CN208346973U (en) Concrete-filled steel tubular hollow steel structure technique and steel construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123

RJ01 Rejection of invention patent application after publication