CN108867654A - A kind of foundation pit supporting method for recent fill - Google Patents

A kind of foundation pit supporting method for recent fill Download PDF

Info

Publication number
CN108867654A
CN108867654A CN201810523337.9A CN201810523337A CN108867654A CN 108867654 A CN108867654 A CN 108867654A CN 201810523337 A CN201810523337 A CN 201810523337A CN 108867654 A CN108867654 A CN 108867654A
Authority
CN
China
Prior art keywords
foundation pit
hole
supporting
steel
pipe pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810523337.9A
Other languages
Chinese (zh)
Inventor
陈维超
牛建东
张可能
黄友汉
冉凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Construction Industry Group Co Ltd
Central South University
Original Assignee
Hunan Construction Industry Group Co Ltd
Central South University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Construction Industry Group Co Ltd, Central South University filed Critical Hunan Construction Industry Group Co Ltd
Priority to CN201810523337.9A priority Critical patent/CN108867654A/en
Publication of CN108867654A publication Critical patent/CN108867654A/en
Priority to CN201811587061.7A priority patent/CN109371985B/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/30Landfill technologies aiming to mitigate methane emissions

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The invention proposes a kind of foundation pit supporting methods for recent fill, including:Step 1, obtain the Soil Parameters at scene, step 2, according to Soil Parameters, the first injected hole is formed on the radial outside ground of foundation pit, step 3, pre-pouring grout is into first injected hole to form pre-pouring grout supporting, the method for protecting support improves the engineering properties of the soil body in foundation pit side-wall and a certain range by pre-pouring grout supporting, to guarantee subsequent construction.

Description

A kind of foundation pit supporting method for recent fill
Technical field
The present invention relates to Geotechnical Engineering fields, and in particular to a kind of foundation pit supporting method for recent fill.
Background technique
With the in-depth of urban construction, upper overburden layer is that the region of recent fill is increasingly becoming Engineering Construction Land-Occupation.Newly It closely bankets and refers to the waste soil of recent landfill, the natural consolidation time is no more than 5 years.According to property of banketing, it is classified as viscosity Soil, muck soil, severely-weathered block of (piece) stone, building waste and house refuse.Due to recent fill with laxity and unevenly Property, mechanics index of physics is poor, permeability is stronger, and engineering properties is difficult to hold.
During foundation pit construction, for recent fill, having no related specifications, calculation model for design can directly be referred to.Often The supporting structure systems such as deep-mixed pile and composite soil nailing wall, cast-in-situ bored pile recent fill place applicability not By force, not only difficulty of construction is larger, sealing and supporting effect are poor, and construction cost is higher.
For this reason, it may be necessary to which inventing a kind of foundation pit supporting method for recent fill is assistant officer's technical problem to be solved.
Summary of the invention
For some or all of of the above-mentioned technical problem in the presence of the prior art, the invention proposes one kind to be used for The foundation pit supporting method of recent fill.Before excavation of foundation pit, improved by pre-pouring grout supporting in foundation pit side-wall and a certain range The engineering properties of the soil body, to guarantee subsequent construction.The method for protecting support is technologically advanced, safe and reliable, Social benefit and economic benefit Obviously.
According to the invention it is proposed that a kind of foundation pit supporting method for recent fill, including:
Step 1 obtains the Soil Parameters at scene,
Step 2 forms the first injected hole on the radial outside ground of foundation pit according to Soil Parameters,
Step 3, into first injected hole, pre-pouring grout is to form pre-pouring grout supporting.
In one embodiment, further include step 4, carry out steel-pipe pile supporting, and the steel in the outside of the foundation pit Tubular pole supporting is located at the inside of the pre-pouring grout supporting.
In one embodiment, it in step 3, is formed in 3.5-5 meters of radial outside of region of the foundation pit described pre- Grouting support, also, the pre-pouring grout supporting extends to the region of the 0.8-1.5 rice under the bottom surface of the foundation pit.
In one embodiment, in step 2, first Grouting Pipe drills as drilling rod, first note after pore-forming Slurry pipe stays in stratum and forms first injected hole.
It in one embodiment, is that deep hole and shallow bore hole compartment are distributed in first injected hole of foundation pit lateral area, And it is constructed by the way of jumping hole.
In one embodiment, if the level of ground water in region locating for foundation pit is located under two meters of the foundation pit, using certainly Deep hole carries out pre-pouring grout to Shallow hole grouting mode, if the level of ground water in region locating for foundation pit be located at two meters or two meters of foundation pit it On, pre-pouring grout is carried out using from shallow bore hole to deep hole grouting mode.
In one embodiment, in step 3, into first injected hole injection comprising cement and waterglass the One injection slurry, wherein the volume of waterglass is the 12%-18% of cement in the first injection slurry.
In one embodiment, in step 4, first the second Grouting Pipe, is inserted by the tripping in steel-pipe pile into stratum later Slip casting is carried out using the second injection slurry in the steel-pipe pile, screen slurry a period of time is carried out after slip casting.
In one embodiment, during using the second slip casting liquid grout, the first slip casting into the steel-pipe pile, meter to be implanted After calculating dosage, grouting pressure is improved into 0.8-1.5MPa, reinjects the 8%-12% for calculating dosage.
In one embodiment, blossom type is distributed second is arranged on steel-pipe pile lower end outer wall and returns slurry hole.
Compared with the prior art, the advantages of the present invention are as follows carry out pre-pouring grout branch to recent fill before excavation of foundation pit Shield to improve the uneven engineering properties banketed, and enables Foundation Pit Support Design to be processed to refer to mature computation model, Avoid the problem that conventional method is not able to satisfy related checking computations or needs using large scale, big rigidity supporting construction.Also, the supporting Method and technology is advanced, safe and reliable, and Social benefit and economic benefit is obvious.
Detailed description of the invention
The preferred embodiment of the present invention is described in detail below in conjunction with attached drawing, in figure:
Fig. 1 shows pattern foundation pit supporting structure sectional view according to an embodiment of the invention;
Fig. 2 shows the structure chart of the first Grouting Pipe according to the present invention;
Fig. 3 shows the structure chart of steel-pipe pile according to the present invention;
The attached drawing is not drawn according to the actual ratio.
Specific embodiment
Below in conjunction with attached drawing, the present invention will be further described.
Method for protecting support according to the present invention be suitable for recent fill place in various plain fills, miscellaneous fill, including cohesive soil, Muck soil, severely-weathered block of (piece) stone, building waste and house refuse etc..
Before the excavation of foundation pit 1, Soil Parameters test first is carried out to construction object, to obtain required Soil Parameters.According to examination Acquired Soil Parameters are tested, need to carry out pre-pouring grout supporting in the outside of foundation pit 1 to be excavated.
Firstly, it is necessary to foundation pit 1 radial outside punched with formed the first injected hole 2 (" first " at this is only used In description purpose).Before punching, the hole location of the first injected hole 2 should be determined according to design requirement, and makes label.Practical operation In the process, using electric coal drill pore-forming, the first Grouting Pipe 3 also serves as drilling rod.It does not extract the first Grouting Pipe 3 after the pore-forming of stratum and makes it Subsequent grouting operation is carried out as the first injected hole 2.Preferably, the structure of first Grouting Pipe 3 is as shown in Fig. 2, first note Starching pipe 3 includes main body 4 and drill bit 5.Wherein, main body 4 can be welded tube or coating steel pipe.For example, the caliber of the main body 4 can be 20mm, wall thickness are not less than 2.0mm.The lower end of main body 4 is arranged in by modes such as welding for drill bit 5.It is provided with and is used on drill bit 5 The anti-slurry hole 6 of first be connected to the inner cavity of main body 4, so that when injecting the first injection slurry slurry can be returned from the first anti-slurry hole 6.This Kind of setting can make after slip casting, and the first Grouting Pipe 3, which is retained in the soil body, forms pre-pouring grout supporting, be equivalent to be provided with plus Muscle strengthens the stability of the soil body.
The reinforcing scope of pre-pouring grout supporting is the region that foundation pit 1 pushes up contour line radial outward expansion 3.5-5.0m.The reinforcing Range can be adjusted according to 1 projected depth of foundation pit, for example, 1 depth of foundation pit is 5m, then reinforcing width is 3.5m.If foundation pit 1 Depth is 8-9m, then reinforcing width is 5m.
During using electric coal drill at the first injected hole 2, for the vibration for reducing drilling with the soil body during subsequent construction It interferes, should be constructed between the first neighbouring injected hole 2 using hole mode is jumped.Also, it during the first injected hole 2, answers Strict control penetration rate, and average rate is crept into as far as possible, to prevent the first Grouting Pipe 3 to be bent and deformation.Preferably, the first injected hole 2 set in arrangement, in radial directions, multiple rows of first injected hole 2 can be set, and the first injected hole 2 between adjacent row is Blossom type is laid.For example, the distance between first adjacent injected hole 2 can be 500mm.
Then, pre-pouring grout is carried out, it is, utilizing the slip casting into the first injected hole 2 of the first injection slurry.Slip casting uses water Mud-waterglass carries out two fluid grouting.Wherein, cement is ordinary portland cement (P.O.32.5), and waterglass is used for additive The presetting period of injection slurry is adjusted, and is 40Be.Preferably, Water glass content is the 12%~18% of cement, strength of cement grout For M20.It needs to carry out pump testing work before pre-pouring grout to guarantee that grouting pump runs well.Meanwhile mud jacking test need to be carried out, after guidance The slip casting operation in face.Preferably, in the slip casting into the first injected hole 2, injection speed is controlled in 30-40L/min, such as 35L/ min.It is further preferred that grouting operation should follow the principle progress slip casting for jumping hole point sequence.
According to different soil properties, different grouting parameters, such as the following table 1 can be used.
Table 1
It bankets classification Cloth pitch of holes m The ratio of mud Grouting pressure MPa
Cohesive soil 1.0-1.5 0.5-0.75 1.0-2.0
Muck soil 1.5-2.0 0.5-0.75 1.0-2.0
Severely-weathered block of (piece) stone 2-2.5 0.5-0.75 0.5-1.0
Building waste 2-2.5 0.5-0.75 0.5-1.0
House refuse 2-2.5 0.75-1.0 0.8-2.0
It is that deep hole and shallow bore hole compartment are distributed in the first injected hole 2 of 1 lateral area of foundation pit.Deep hole is for reinforcing deep soil Body, and shallow bore hole reinforces the shallow-layer soil body, this mode is layered the soil body for reinforcing various trait, and realize stability and economy has Effect combines.Wherein, deep hole hole depth should extend into the region of the 0.8-1.5 rice under the bottom surface of foundation pit 1.It, need to be in conjunction with existing when slip casting Field level of ground water selects grouting sequence.If the groundwater level is high, for example, lower water level is in substrate 2m or more, slip casting is answered According to the sequence of " from shallow bore hole to deep hole grouting ", to be conducive to cut off the route of supple of underground water.If the groundwater level is low, For example, level of ground water is in substrate 2m hereinafter, then slip casting should be according to the sequence of " from deep hole to Shallow hole grouting ", to be conducive to ensure Slip casting solidifies quality.
First injection slurry is strictly measured and is stirred evenly by match ratio, with mixing with the slurries of a mix should be in initial set Before be finished, and prevent that stone, sundries are mixed into.During injecting the first injection slurry, according to different soil properties, the first note need to be controlled Concentration of slurry corresponding change.For example, controlling the first injection slurry concentration from dense to dilute in muck soil.In other soil bodys, control First injection slurry concentration is from thin to thick.
Before slip casting starts or when midway was stopped more than 10 minutes, using water or thin cement slurry lubrication slip casting machine and its pipeline. First injected hole 2 must not the complete grouting behind shaft or drift lining of all drilled hole, in order to avoid hole location grout leaking.For example, 20-100 the first injected holes 2 can bored Afterwards with regard to carrying out grouting operation.
The slip casting end time can be controlled according to the amount of the first injection slurry of grouting pressure and injection.For example, working as slip casting pressure Power is stepped up, and is further continued for 5~10min of slip casting after reaching design final pressure, can be terminated this 2 slip casting of the first injected hole.
By carrying out pre-pouring grout supporting in a certain range of the radial outside of foundation pit 1.Cement-water-clay system passes through infiltration Thoroughly, compacted, splitting and filling comprehensive function, displacement, package soil body particle form the solid body of slurries or viscous with rigid piece stone Even, composite junction entity is formed together with the first Grouting Pipe 3.C, φ value banketed is greatly improved in the compactness for improving the soil body, Original loose, non-uniform banket is cured as having the soil of certain cohesiveness, good integrity by the mechanical property for improving the soil body Body.It after soil body pre-pouring grout, is improved with the cohesive force of anchor pole (rope), soil nailing, so that the supportings such as anchor pole, soil nailing are applied, become can Energy.Meanwhile pre-pouring grout can also play the role of sealing, reduce influence of the water to subsequent construction.First slip casting after pre-pouring grout In the liquid indwelling soil body, the stability of the soil body is strengthened.
After the completion of pre-pouring grout supporting, for no slope condition or the foundation pit for needing uprightly to excavate, using steel-pipe pile supporting, with Play the role of earth-retaining.As shown in Figure 1, steel-pipe pile supporting is located at the inside of the pre-pouring grout supporting.
Specifically, firstly, after being drilled using geological drilling rig, by 7 tripping in of steel-pipe pile.For example, steel-pipe pile 7 can use D108 Seamless steel pipe and D127 seamless steel pipe.According to the specific geological conditions of the depth of foundation pit 1 and scene, steel-pipe pile 7 in radial directions It can beat multiple rows of.Steel-pipe pile pilespacing is 400mm-500mm in radial directions.In addition, steel-pipe pile 7 is quincunx in radial section Arrangement.Foundation pit 1 pushes up ground and does crown beam using channel steel 11, is welded on steel-pipe pile 7.
Second is opened in the 2-3 rice range of 7 lower end of steel-pipe pile and returns slurry hole 8, as shown in Figure 3.Also, under 2-3 meters of regions Lower end surface of the end face apart from steel-pipe pile 7 is 0.25-0.35 meters, such as 0.3 meter.Preferably, which can be with It is 10 millimeters, for axial hole away from 30 centimetres, circumferential upper one, which arranges 3-4 second, returns slurry hole 8, and adjacent two ranked second and return 8 mistake of slurry hole It is split into quincuncial arrangement.
Preferably, in order to guarantee the stability of 7 supporting of steel-pipe pile, 7 bottom building-in depth of steel-pipe pile is not less than 5m, such as can Think 6 meters.
Then, it is inserted into the second Grouting Pipe 9 into steel-pipe pile 7 and carries out slip casting.Second injection slurry used by its slip casting can be with It is same or similar with the first above-mentioned injection slurry.Certainly, grouting process and parameter can also with employed in pre-pouring grout supporting Grouting process and parameter are same or similar.In slip casting, need to dispose in the steel-pipe pile 7 at aperture and between the second Grouting Pipe 9 bored First 10.Preferably, into steel-pipe pile 7 when slip casting, grouting pressure is controlled between 1.5-2.0MPa, to ensure in steel-pipe pile 7 the The filling of two injection slurries is closely knit, and the second injection slurry is made to return outflow from slurry hole 8 from the second of 7 bottom of steel-pipe pile, fills from bottom to top Steel-pipe pile 7 and the gap between drilling, and take body refuse out of.After injection calculates dosage, so that grouting pressure improves 0.8- 1.5MPa stops slip casting after reinjecting the 8%-12% for calculating dosage.Above-mentioned setting can guarantee the effect of slip casting, to maintain work Journey stability.It is, of course, also possible to determine that slip casting terminates otherwise, for example, the aperture or surrounding bored occur grout, surpass Decline suddenly after crossing predetermined pressure or pressure stabilization or grout absorption is very low.And engineering staff can be according to different engineering feelings Condition is judged and is determined using different standards.
After steel-pipe pile supporting slip casting, the valve of the second Grouting Pipe 9 must be closed, blocks the second Grouting Pipe 9, and shield slurry 15 minutes or so.It can prevent from terminating in slip casting by this set, underground water agitates pile grouting back and forth after unexpected off-load, makes At slurries partial dilution, and reduce slip casting effect.
After carrying out steel-pipe pile supporting operation, soil excavation is carried out, and also need to carry out rubbish anchor supporting in digging process Deng operation, and these subsequent constructions are that those skilled in the art can carry out according to arrangement and method for construction in the prior art, This is repeated no more.
The above is only the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, any this field Technical staff in technical scope disclosed by the invention, can be easy to carry out and be altered or varied, and this be altered or varied all It is covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection scope of claims It is quasi-.

Claims (10)

1. a kind of foundation pit supporting method for recent fill, which is characterized in that including:
Step 1 obtains the Soil Parameters at scene,
Step 2 forms the first injected hole on the radial outside ground of foundation pit according to Soil Parameters,
Step 3, into first injected hole, pre-pouring grout is to form pre-pouring grout supporting.
2. method for protecting support according to claim 1, which is characterized in that further include step 4, the outside of the foundation pit into Row steel-pipe pile supporting, and the steel-pipe pile supporting is located at the inside of the pre-pouring grout supporting.
3. method for protecting support according to claim 1 or 2, which is characterized in that outside in the diameter of the foundation pit in step 3 Side 3.5-5 meters of region forms the pre-pouring grout supporting, also, the pre-pouring grout supporting extends under the bottom surface of the foundation pit 0.8-1.2 rice region.
4. according to claim 1 to method for protecting support described in any one of 3, which is characterized in that in step 2, first note It starches pipe to drill as drilling rod, first Grouting Pipe stays in stratum and forms first injected hole after pore-forming.
5. method for protecting support according to claim 4, which is characterized in that be in first injected hole of foundation pit lateral area Deep hole and the distribution of shallow bore hole compartment, and constructed by the way of jumping hole.
6. method for protecting support according to claim 5, which is characterized in that if the level of ground water in region locating for foundation pit is located at institute It states under two meters of foundation pit, pre-pouring grout is carried out using from deep hole to Shallow hole grouting mode, if the level of ground water in region locating for foundation pit On two meters or two meters of foundation pit, pre-pouring grout is carried out using from shallow bore hole to deep hole grouting mode.
7. according to claim 1 to method for protecting support described in any one of 6, which is characterized in that in step 3, to described first Injection includes the first injection slurry of cement and waterglass in injected hole, wherein the volume of waterglass is cement in the first injection slurry 12%-18%.
8. method for protecting support according to claim 2, which is characterized in that in step 4, the first tripping in steel-pipe pile into stratum, The second Grouting Pipe is inserted into the steel-pipe pile later and carries out slip casting using the second injection slurry, screen slurry one is carried out after slip casting The section time.
9. method for protecting support according to claim 8, which is characterized in that during using the second slip casting liquid grout, first to institute It states slip casting in steel-pipe pile, after calculating dosage to be implanted, grouting pressure is improved into 0.8-1.5MPa, reinject the 8%- for calculating dosage 12%.
10. method for protecting support according to claim 8 or claim 9, which is characterized in that blossom type is arranged on steel-pipe pile lower end outer wall The second of distribution returns slurry hole.
CN201810523337.9A 2018-05-28 2018-05-28 A kind of foundation pit supporting method for recent fill Pending CN108867654A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810523337.9A CN108867654A (en) 2018-05-28 2018-05-28 A kind of foundation pit supporting method for recent fill
CN201811587061.7A CN109371985B (en) 2018-05-28 2018-12-25 Foundation pit supporting method for recent filling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810523337.9A CN108867654A (en) 2018-05-28 2018-05-28 A kind of foundation pit supporting method for recent fill

Publications (1)

Publication Number Publication Date
CN108867654A true CN108867654A (en) 2018-11-23

Family

ID=64335295

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201810523337.9A Pending CN108867654A (en) 2018-05-28 2018-05-28 A kind of foundation pit supporting method for recent fill
CN201811587061.7A Active CN109371985B (en) 2018-05-28 2018-12-25 Foundation pit supporting method for recent filling

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201811587061.7A Active CN109371985B (en) 2018-05-28 2018-12-25 Foundation pit supporting method for recent filling

Country Status (1)

Country Link
CN (2) CN108867654A (en)

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5256004A (en) * 1990-07-31 1993-10-26 Fondazioni Speciali, S.R.L. Method of forming consolidated earth columns by injection and the relevant plant and column
US20070286687A1 (en) * 2006-06-12 2007-12-13 Cesare Melegari Method and equipment for constructing micropiles in soil
CN100465386C (en) * 2008-02-02 2009-03-04 浙江环宇建设集团有限公司 Pile-anchor foundation ditch supporting construction method
CN102877470B (en) * 2012-07-27 2015-11-25 湖南恒盾岩土工程注浆科技有限公司 Combined soil nailing construction method for supporting
CN103898916B (en) * 2014-04-09 2016-01-20 浙江理工大学 Mini stake Composite Braced Retaining Structure and construction method
CN105569051A (en) * 2015-12-31 2016-05-11 中铁二局集团有限公司 Foundation pit support system of sandy pebble boulder geological stratification and construction method
CN105970955A (en) * 2016-06-07 2016-09-28 青岛海川建设集团有限公司 Self-drilling type nail and pipe combined double-liquid grouting soil nail construction process
CN106368219B (en) * 2016-10-17 2019-11-12 上海建工一建集团有限公司 A kind of the support reinforcement structure and construction method of deep basal pit

Also Published As

Publication number Publication date
CN109371985B (en) 2022-08-26
CN109371985A (en) 2019-02-22

Similar Documents

Publication Publication Date Title
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN104499479B (en) It is a kind of to pass through the dug pile construction method that sand gravel backfills layer
CN101560764B (en) Method for calking exploratory hole by intermittent high-pressure rotary jet grouting
CN104988907A (en) Construction method of concrete pile
CN106088099B (en) A kind of subway foundation pit anchor cable processing method
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN105804761A (en) Construction method suitable for making shield penetrate through building in close range on liquefied sandy soil stratum
CN108661650A (en) A kind of rich water magmatic body area depth pozo shaft construction method
CN106122589A (en) A kind of earth pressure balance method
CN107513994A (en) One kind segmentation becomes supporting rotary digging stake and its construction method without leave
CN106049195A (en) Method for strengthening subgrade basement of existing high speed railway line
CN108265706A (en) A kind of engineering pile and pile-formation process in solution cavity geology
CN105673025A (en) Underground engineering loess tunnel ground surface settlement control construction process
CN103015429A (en) Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method
CN110130936A (en) It dashes forward in a kind of shield tunneling process and meets the construction method of untreated solution cavity or crack
CN105926624A (en) Non-return type collecting hole grouting device and construction method thereof
CN105064335A (en) Ultrahigh pressure rotary jet grouting method suitable for sandy cobble stratum shield end well reinforcement
CN109487777A (en) A method of a reinforcing deep soft soil foundation of filling the span of a man's arms is formed using slip casing by pressure
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN104775412B (en) Stratum reinforcement PSC construction method
CN110241837A (en) A kind of construction method for preventing basement bottom board from cracking under high artesian geological conditions
CN104032763A (en) Combined-type anti-seepage waterstop curtain structure and construction method thereof
CN109440757A (en) A kind of foundation reinforcement method for karst region
CN107829747A (en) Construction method suitable for swelled ground area shallow-depth-excavation tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181123

WD01 Invention patent application deemed withdrawn after publication