CN108856558A - A kind of tunnel inverted arch reinforcing bar pre-bending device and its control method - Google Patents

A kind of tunnel inverted arch reinforcing bar pre-bending device and its control method Download PDF

Info

Publication number
CN108856558A
CN108856558A CN201810573309.8A CN201810573309A CN108856558A CN 108856558 A CN108856558 A CN 108856558A CN 201810573309 A CN201810573309 A CN 201810573309A CN 108856558 A CN108856558 A CN 108856558A
Authority
CN
China
Prior art keywords
driving wheel
supporting device
hydraulic supporting
reinforcing bar
inverted arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810573309.8A
Other languages
Chinese (zh)
Other versions
CN108856558B (en
Inventor
杨攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, Fourth Engineering Co Ltd of China Railway 11th Bureau Group Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201810573309.8A priority Critical patent/CN108856558B/en
Publication of CN108856558A publication Critical patent/CN108856558A/en
Application granted granted Critical
Publication of CN108856558B publication Critical patent/CN108856558B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F1/00Bending wire other than coiling; Straightening wire
    • B21F1/004Bending wire other than coiling; Straightening wire by means of press-type tooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C51/00Measuring, gauging, indicating, counting, or marking devices specially adapted for use in the production or manipulation of material in accordance with subclasses B21B - B21F
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F23/00Feeding wire in wire-working machines or apparatus
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of tunnel inverted arch reinforcing bar pre-bending device and its control method, driving wheel I in device(2)With driving wheel II(4)Line and operating platform between central point(1)It is upper following parallel, driving wheel II(4)With follower I(8)Line and operating platform between central point(1)Two sides are parallel, hydraulic supporting device II(6)Positioned at driving wheel I(2)With driving wheel II(4)Between, graduated scale(3)Positioned at hydraulic supporting device II(6)Side digitizes report control platform(7)Respectively with driving wheel I(2), driving wheel II(4), hydraulic supporting device I(5)With hydraulic supporting device II(6)It is connected.Method passes through digitlization report control platform(7)Control driving wheel I(2), driving wheel II(4), hydraulic supporting device I(5)With hydraulic supporting device II(6)It realizes.Realize that inverted arch reinforcing bar automates accurate pre-bending, so that tunnel lining reinforcing steel bar construction standardization, automation.

Description

A kind of tunnel inverted arch reinforcing bar pre-bending device and its control method
Technical field
The present invention relates to a kind of pre-bending device, more specifically to a kind of tunnel inverted arch reinforcing bar pre-bending device and its manipulation Method belongs to lining construction technical field.
Background technique
Currently, with the rapid development of China's high-speed rail, tunnel is more and more.With construction quality and standardized construction requirement It is continuously improved, manpower and material resources needed for tunnel lining reinforcing steel bar construction are also continuously increased, and security risk is continuously improved;But high-speed rail Tunnel generallys use two-wire design, and big, inverted arch two serves as a contrast number of steel bars that there are tunnel cross-sections is more and needs that the radian of pre-bending is more, process friendship The features such as wrong complicated, the method for traditional artificial pre-bending lining cutting reinforcing bar, so that manpower consumption is larger, pre-bending effect is poor, Bu Nengyou The construction quality of effect control lining cutting reinforcing bar, and there are huge security risks, therefore can no longer meet the demand of construction quality.
Summary of the invention
It is an object of the invention to the low, manpowers for construction effect existing for existing inverted arch reinforcing bar pre-bending construction method to throw Enter the disadvantages of big, pre-bending effect is poor, a kind of tunnel inverted arch reinforcing bar pre-bending device and its control method are provided.
To achieve the above object, the technical solution of the invention is as follows:A kind of tunnel inverted arch reinforcing bar pre-bending device, including behaviour Make platform, driving wheel I, graduated scale, driving wheel II, hydraulic supporting device I, hydraulic supporting device II and digitlization report control platform, Driving wheel I, graduated scale, driving wheel II, hydraulic supporting device I and the hydraulic supporting device II is separately positioned on operating platform On, it is provided with follower I on the hydraulic supporting device I, follower II, institute are provided on the hydraulic supporting device II Line between II central point of the driving wheel I stated and driving wheel is following parallel on operating platform, the driving wheel II and by Line between I central point of driving wheel is parallel with operating platform two sides, and the hydraulic supporting device II is located at driving wheel I and master Between driving wheel II, the graduated scale is located at hydraulic II side of supporting device, and hydraulic supporting device II is passive in initial position Take turns II central point and correspond to graduated scale zero graduation, the digitlization report control platform respectively with driving wheel I, driving wheel II, hydraulic top Support arrangement I is connected with hydraulic supporting device II.
A kind of control method of tunnel inverted arch reinforcing bar pre-bending device, includes the following steps:Step 1, according to construction demand, The inverted arch reinforcing bar for needing pre-bending is divided into:Reinforcing bar reserves section AB, long L1, pre- curved segment BC, long L2, pre-bending radian R1, pre- curved segment CD, Long L3, pre-bending radian R2, reinforcing bar reserve section DE, long L4;Dress by driving wheel II and hydraulic is shored in the inverted arch end reinforcing bar A by step 2 After setting the gap entrance between I, controls hydraulic supporting device I and shore so that inverted arch reinforcing bar is clamped;Step 3 is grasped in digitlization Reinforcing bar, which is sequentially input, on control platform reserves section AB length L1, pre- curved segment BC length L2 and pre-bending radian R1, pre- curved segment CD length L3 Section DE length L4 is reserved with pre-bending radian R2, reinforcing bar, the digital control computer in report control platform is digitized and calculates pre- curved segment BC and pre- Length b and c are shored needed for the corresponding hydraulic supporting device II of curved segment CD pre-bending radian;Step 4, the rotation of driving wheel II drive The transmission of inverted arch reinforcing bar, when the B point on inverted arch reinforcing bar is sent to hydraulic II top of supporting device, driving wheel II and driving wheel I stop Rotation stop is dynamic, and hydraulic supporting device II shores b length, and then driving wheel II and driving wheel I drive inverted arch reinforcing bar to continue to transmit, and works as C When point reaches hydraulic II top of supporting device, the pre-bending to BC sections of radian R1 of inverted arch reinforcing bar is completed, at this time hydraulic supporting device II C length is shored, then driving wheel II and driving wheel I drive inverted arch reinforcing bar to continue to transmit, and push up when D point reaches hydraulic supporting device II The pre-bending to CD sections of radian R2 of reinforcing bar is completed when portion, controls II pressure release of hydraulic supporting device I and hydraulic supporting device at this time, actively Wheel I and driving wheel II stop operating, and inverted arch reinforcing bar completes pre-bending;Step 5 digitizes report control platform after the completion of pre-bending and controls liquid Bear down on one support arrangement I and hydraulic supporting device II II resets.
Compared with prior art, the beneficial effects of the invention are as follows:
1, the line in the present invention between II central point of driving wheel I and driving wheel and parallel, driving wheel II following on operating platform Line between I central point of follower is parallel with operating platform two sides, and hydraulic supporting device II is located at driving wheel I and active Between wheel II, graduated scale is located at hydraulic II side of supporting device, and II center of follower in initial position of hydraulic supporting device II The corresponding graduated scale zero graduation of point, digitlization report control platform respectively with driving wheel I, driving wheel II, hydraulic supporting device I and hydraulic top Support arrangement II is connected.It realizes tunnel inverted arch reinforcing bar and automates accurate pre-bending, save manual labor, improve inverted arch steel Muscle pre-bending quality guarantees Tunnel Second Lining inverted arch thickness of protection tier quality.
2, the present invention can carry out automating accurate pre-bending to two lining inverted arch reinforcing bars, so that tunnel lining reinforcing steel bar construction reference Change, automation.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention.
Fig. 2 is pre-bending lining cutting reinforcing bar structure schematic diagram in the present invention.
In figure, operating platform 1, driving wheel I 2, graduated scale 3, driving wheel II 4, hydraulic supporting device I 5, hydraulic supporting device II 6, digitize report control platform 7, follower I 8, follower II 9.
Specific embodiment
Below in conjunction with Detailed description of the invention and specific embodiment, the present invention is described in further detail.
Referring to Fig. 1, a kind of tunnel inverted arch reinforcing bar pre-bending device is pre- for inverted arch reinforcing bar during tunnel inverted arch lining construction It is curved, including operating platform 1, driving wheel I 2, graduated scale 3, driving wheel II 4, hydraulic supporting device I 5, II 6 and of hydraulic supporting device Digitize report control platform 7.
Referring to Fig. 1, the driving wheel I 2, graduated scale 3, driving wheel II 4, hydraulic supporting device I 5 and hydraulic supporting device II 6 are separately positioned on operating platform 1, are provided with follower I 8 on the hydraulic supporting device I 5, described hydraulic to shore Follower II 9 is provided on device II 6.Line and operating platform 1 between II 4 central point of driving wheel I 2 and driving wheel Upper following parallel, the line between I 8 central point of driving wheel II 4 and follower is parallel with 1 two sides of operating platform.Institute For the hydraulic supporting device II 6 stated between driving wheel I 2 and driving wheel II 4, the graduated scale 3 is located at hydraulic supporting device II 6 sides;And hydraulic supporting device II 6 II 9 central point of follower in initial position corresponds to 3 zero graduation of graduated scale.The number Word report control platform 7 is connected with driving wheel I 2, driving wheel II 4, hydraulic supporting device I 5 and hydraulic supporting device II 6 respectively, Driving wheel I 2, driving wheel II 4, hydraulic supporting device I 5 and hydraulic supporting device II 6 are controlled by digitlization report control platform 7.
Referring to fig. 2, a kind of control method of tunnel inverted arch reinforcing bar pre-bending device, includes the following steps:
The inverted arch reinforcing bar for needing pre-bending is divided by step 1 according to construction demand:Reinforcing bar reserves section AB, long L1, pre- curved segment BC, Long L2, pre-bending radian R1, pre- curved segment CD, long L3, pre-bending radian R2, reinforcing bar reserve section DE, long L4.
Step 2, after the inverted arch end reinforcing bar A is entered by the gap between driving wheel II 4 and hydraulic supporting device I 5, control Hydraulic supporting device I 5 is shored so that inverted arch reinforcing bar is clamped.
Step 3, digitlization report control platform 7 on sequentially input reinforcing bar reserve section AB length L1, pre- curved segment BC length L2 and Pre-bending radian R1, pre- curved segment CD length L3 and pre-bending radian R2, reinforcing bar reserve section DE length L4;It digitizes in report control platform 7 Digital control computer, which calculates, shores length b needed for pre- curved segment BC and the corresponding hydraulic supporting device II 6 of pre- curved segment CD pre-bending radian And c, what graduated scale 3 was used to veritify hydraulic supporting device II 6 shores length.
Step 4, the rotation of driving wheel II 4 drives the transmission of inverted arch reinforcing bar, when the B point on inverted arch reinforcing bar is sent to hydraulic shore When II 6 top of device, driving wheel II 4 and driving wheel I 2 stop operating, and hydraulic supporting device II 6 shores b length, can lead at this time It crosses manipulator and observes whether II 9 central point of follower corresponds to b length on graduated scale 3.Then I 2 band of driving wheel II 4 and driving wheel Dynamic inverted arch reinforcing bar continues to transmit, and when C point reaches hydraulic II 6 top of supporting device, completes to BC sections of radian R1's of inverted arch reinforcing bar Pre-bending, hydraulic supporting device II 6 shores c length at this time, can observe whether II 9 central point of follower corresponds to quarter by manipulator Spend the c length on ruler 3;Then driving wheel II 4 and driving wheel I 2 drive inverted arch reinforcing bar to continue to transmit, when D point reaches hydraulic shore The pre-bending to CD sections of radian R2 of reinforcing bar is completed when II 6 top of device, controls hydraulic supporting device I 5 and hydraulic supporting device at this time II 6 pressure releases, driving wheel I 2 and driving wheel II 4 stop operating, and inverted arch reinforcing bar completes pre-bending.
Step 5 digitizes report control platform 7 after the completion of pre-bending and controls hydraulic supporting device I 5 and hydraulic supporting device II II 6 reset.
Referring to Fig. 1 to Fig. 2, low, human input that present invention improves over traditional inverted arch reinforcing bar pre-bending construction method construction effects Greatly, the disadvantages of pre-bending effect is poor realizes the accurate pre-bending of automation of inverted arch reinforcing bar, and artificial less investment, reinforcing bar are pre- after installation Curved speed is fast and can be realized the accurate pre-bending of continuous multiple arc degree, greatly improves effect and reinforcement construction quality;And guaranteeing Accomplish under the premise of inverted arch reinforcing bar binding quality economic, practical, easy.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that Specific implementation of the invention is only limited to these instructions.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, and above structure all shall be regarded as belonging to Protection scope of the present invention.

Claims (2)

1. a kind of tunnel inverted arch reinforcing bar pre-bending device, it is characterised in that:Including operating platform(1), driving wheel I(2), graduated scale (3), driving wheel II(4), hydraulic supporting device I(5), hydraulic supporting device II(6)With digitlization report control platform(7), described Driving wheel I(2), graduated scale(3), driving wheel II(4), hydraulic supporting device I(5)With hydraulic supporting device II(6)It is respectively set In operating platform(1)On, the hydraulic supporting device I(5)On be provided with follower I(8), the hydraulic supporting device II (6)On be provided with follower II(9), the driving wheel I(2)With driving wheel II(4)Line and operation between central point is flat Platform(1)Upper following parallel, described driving wheel II(4)With follower I(8)Line and operating platform between central point(1)Two Side is parallel, the hydraulic supporting device II(6)Positioned at driving wheel I(2)With driving wheel II(4)Between, the graduated scale (3)Positioned at hydraulic supporting device II(6)Side, and hydraulic supporting device II(6)The follower II in initial position(9)Central point pair Answer graduated scale(3)Zero graduation, the digitlization report control platform(7)Respectively with driving wheel I(2), driving wheel II(4), hydraulic top Support arrangement I(5)With hydraulic supporting device II(6)It is connected.
2. a kind of control method of tunnel inverted arch reinforcing bar pre-bending device, which is characterized in that include the following steps:
The inverted arch reinforcing bar for needing pre-bending is divided by step 1 according to construction demand:Reinforcing bar reserves section AB, long L1, pre- curved segment BC, Long L2, pre-bending radian R1, pre- curved segment CD, long L3, pre-bending radian R2, reinforcing bar reserve section DE, long L4;
Step 2, by the inverted arch end reinforcing bar A by driving wheel II(4)With hydraulic supporting device I(5)Between gap enter after, control Hydraulic supporting device I(5)It shores so that inverted arch reinforcing bar is clamped;
Step 3, in digitlization report control platform(7)On sequentially input reinforcing bar and reserve section AB length L1, pre- curved segment BC length L2 and pre- Curved arc degree R1, pre- curved segment CD length L3 and pre-bending radian R2, reinforcing bar reserve section DE length L4, digitize report control platform(7)In Digital control computer calculates pre- curved segment BC and the corresponding hydraulic supporting device II of pre- curved segment CD pre-bending radian(6)Required shores length B and c;
Step 4, driving wheel II(4)Rotation drives the transmission of inverted arch reinforcing bar, hydraulic shores dress when the B point on inverted arch reinforcing bar is sent to Set II(6)When top, driving wheel II(4)With driving wheel I(2)It stops operating, hydraulic supporting device II(6)B length is shored, then Driving wheel II(4)With driving wheel I(2)Inverted arch reinforcing bar is driven to continue to transmit, when C point reaches hydraulic supporting device II(6)When top, The pre-bending to BC sections of radian R1 of inverted arch reinforcing bar is completed, at this time hydraulic supporting device II(6)C length is shored, then driving wheel II(4) With driving wheel I(2)Inverted arch reinforcing bar is driven to continue to transmit, when D point reaches hydraulic supporting device II(6)It completes when top to reinforcing bar CD The pre-bending of section radian R2, controls hydraulic supporting device I at this time(5)With hydraulic supporting device II(6)Pressure release, driving wheel I(2)And master Driving wheel II(4)It stops operating, inverted arch reinforcing bar completes pre-bending;
Step 5 digitizes report control platform after the completion of pre-bending(7)Control hydraulic supporting device I(5)With hydraulic supporting device II II (6)It resets.
CN201810573309.8A 2018-06-06 2018-06-06 Tunnel inverted arch steel bar pre-bending device and control method thereof Active CN108856558B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810573309.8A CN108856558B (en) 2018-06-06 2018-06-06 Tunnel inverted arch steel bar pre-bending device and control method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810573309.8A CN108856558B (en) 2018-06-06 2018-06-06 Tunnel inverted arch steel bar pre-bending device and control method thereof

Publications (2)

Publication Number Publication Date
CN108856558A true CN108856558A (en) 2018-11-23
CN108856558B CN108856558B (en) 2023-06-27

Family

ID=64337037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810573309.8A Active CN108856558B (en) 2018-06-06 2018-06-06 Tunnel inverted arch steel bar pre-bending device and control method thereof

Country Status (1)

Country Link
CN (1) CN108856558B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1411071A1 (en) * 1986-01-07 1988-07-23 Центральное Конструкторско-Технологическое Бюро Велостроения Arrangement for spatial bending of tubular billets
DE29604267U1 (en) * 1996-03-08 1996-11-28 Rasi Maschinenbau u. -handels-GmbH, 75428 Illingen Device for determining the bending radius of a bent part
CN101952062A (en) * 2008-02-12 2011-01-19 Cml国际有限公司 The variable radius of curvature serves method and the machine of controlling like this of the roller type bending machine of bending elongation workpiece are continuously pressed in inspection and control
CN201768787U (en) * 2010-08-12 2011-03-23 天津二十冶建设有限公司 Bending device of metal section
CN201940451U (en) * 2011-04-08 2011-08-24 重庆建工工业有限公司 Multifunctional pipe bending machine
CN204866956U (en) * 2015-07-01 2015-12-16 柴鹏 Steel pipe becomes curvature radius bending apparatus
CN205629212U (en) * 2016-05-17 2016-10-12 中铁十七局集团第三工程有限公司 Steel bar bending device
CN107206451A (en) * 2014-12-12 2017-09-26 屋罗斯·杜兰强尼 The application of shape bending process of the 3D video cameras on the bending machine of three and four rollers

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1411071A1 (en) * 1986-01-07 1988-07-23 Центральное Конструкторско-Технологическое Бюро Велостроения Arrangement for spatial bending of tubular billets
DE29604267U1 (en) * 1996-03-08 1996-11-28 Rasi Maschinenbau u. -handels-GmbH, 75428 Illingen Device for determining the bending radius of a bent part
CN101952062A (en) * 2008-02-12 2011-01-19 Cml国际有限公司 The variable radius of curvature serves method and the machine of controlling like this of the roller type bending machine of bending elongation workpiece are continuously pressed in inspection and control
CN201768787U (en) * 2010-08-12 2011-03-23 天津二十冶建设有限公司 Bending device of metal section
CN201940451U (en) * 2011-04-08 2011-08-24 重庆建工工业有限公司 Multifunctional pipe bending machine
CN107206451A (en) * 2014-12-12 2017-09-26 屋罗斯·杜兰强尼 The application of shape bending process of the 3D video cameras on the bending machine of three and four rollers
US20170333968A1 (en) * 2014-12-12 2017-11-23 Uros Turanjanin The application of the 3d cameras to the profile bending process on the bending machine with three and four rollers
CN204866956U (en) * 2015-07-01 2015-12-16 柴鹏 Steel pipe becomes curvature radius bending apparatus
CN205629212U (en) * 2016-05-17 2016-10-12 中铁十七局集团第三工程有限公司 Steel bar bending device

Also Published As

Publication number Publication date
CN108856558B (en) 2023-06-27

Similar Documents

Publication Publication Date Title
CN108687256A (en) A kind of building bar bender and its bending method
CN108536933A (en) A kind of system and method for automatic arrangement reinforcing bar
CN208513553U (en) A kind of tunnel inverted arch reinforcing bar pre-bending device
CN108856558A (en) A kind of tunnel inverted arch reinforcing bar pre-bending device and its control method
CN105414391A (en) Conveying device of steel bar hoop bending machine
CN206954678U (en) A kind of water cooling swager
CN207958977U (en) A kind of device to bind for bridge hollow pier
CN208733154U (en) A kind of vanadium extraction steel-smelting device
CN204109125U (en) The shaped device of channel concrete prefabricated component
CN107938657B (en) A kind of application method of steel reinforcement cage straight screw sleeve anti-deformation attachment device
CN103195448B (en) A kind of tunnel concrete longitudinal joint treatment method and equipment
CN206768606U (en) The positioning auxiliary device of Thin-wall Hollow Pier pier shaft reinforcing bar
CN204627628U (en) The adjustable top template device of fully automatic hydraulic concrete-liner steel formwork trolley
CN201512946U (en) Barrel storeroom sliding form system structure
CN209716304U (en) A kind of reinforcing bar bending device
CN206668283U (en) Tunnel-liner pours device
CN209368705U (en) A kind of efficient culvert construction movable type trussing
CN109052138A (en) Bidirectional movable template handling apparatus and its construction method
CN209338929U (en) Groove-shape rail bending track device
CN204672729U (en) The winding displacement flatness sampling equipment of steel cord water tank drawbench
CN208473881U (en) Simple tunnel lining cutting band valve grouting device
CN204713995U (en) Product correct equipment on a kind of conveyor line
CN210239696U (en) Rotary concrete pouring equipment
CN209024942U (en) A kind of two-way traffic trestle of three main spars
CN207647520U (en) A kind of concrete shunt conduit device of tunnel lining trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant