CN108842964A - Steel construction assembled-type house Prefabricated superposed beam construction method - Google Patents

Steel construction assembled-type house Prefabricated superposed beam construction method Download PDF

Info

Publication number
CN108842964A
CN108842964A CN201810681078.2A CN201810681078A CN108842964A CN 108842964 A CN108842964 A CN 108842964A CN 201810681078 A CN201810681078 A CN 201810681078A CN 108842964 A CN108842964 A CN 108842964A
Authority
CN
China
Prior art keywords
superposed beam
prefabricated superposed
steel
holding frame
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810681078.2A
Other languages
Chinese (zh)
Inventor
于晓利
李社增
张永
姜丽丽
李雪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201810681078.2A priority Critical patent/CN108842964A/en
Publication of CN108842964A publication Critical patent/CN108842964A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/29Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures
    • E04C3/293Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces built-up from parts of different material, i.e. composite structures the materials being steel and concrete

Abstract

The present invention relates to a kind of steel construction assembled-type house Prefabricated superposed beam construction methods, steel holding frame is made first, place support system, place steel holding frame, the supporting leg of steel holding frame is upward, Prefabricated superposed beam is placed in steel holding frame by tower crane, and the reinforcing bar at Prefabricated superposed beam both ends is bound with structural column and reinforcing bar with the reinforcing bar of structural column;The binding of in-situ layer reinforcing bar, installation template at the top of Prefabricated superposed beam;Carry out concreting;Form removal, holding frame after concrete setting.Steel construction assembled-type house Prefabricated superposed beam construction method of the present invention can effectively expand forced area and reduce pressure, avoid the large batch of destruction that finished product occurs in the construction process, avoid the various maintenance costs in later period, it has saved the duration, has guaranteed construction quality, improved construction efficiency.

Description

Steel construction assembled-type house Prefabricated superposed beam construction method
Technical field
The present invention relates to a kind of construction techniques, in particular to a kind of steel construction assembled-type house is prefabricated folded Close beam construction method.
Background technique
In assembled architecture dwelling house system, Prefabricated superposed beam need to be temporarily anchored to installation position by support system It sets, then the reinforcing bar at Prefabricated superposed beam both ends can be helped bundle and unified installation template, installation with reinforcing bars of structural columns by operating personnel It, can be to the unified cast-in-place concrete such as composite beam in-situ layer, structural column after complete template.In the construction process, by Prefabricated superposed beam The influence of the various construction loads such as self weight, cast-in-place layer weight, concrete vibrating, Prefabricated superposed beam are contacted with the wooden frame of support system Position different degrees of destruction frequent occurrence increases the maintenance process work in later period, also causes while delaying the duration many Manpower and material resources waste.
It is directed to this problem at present, not relatively good solution is all folded to the finished product destroyed by the later period Beam is closed to be repaired to make up this defect.
Summary of the invention
In view of the deficiency of the prior art, the present invention provides a kind of raising construction efficiency, reduces the steel of construction cost Standard formula house Prefabricated superposed beam construction method.
The technical solution adopted by the present invention is that:
A kind of steel construction assembled-type house Prefabricated superposed beam construction method,
A, steel holding frame 6 is made first;
B, support system is placed, according to drawing, coarse adjustment supports top mark high;
C, after the complete support system top mark of coarse adjustment is high, steel holding frame 6 is placed, the supporting leg of steel holding frame 6 is upward;It needs after placement according to drawing Its horizontal position and absolute altitude are checked again;
D, after verification, tower crane can be installed Prefabricated superposed beam 1 in place, and Prefabricated superposed beam 1 is just no longer directly same at this time The wooden frame 5 of support system contacts, and steel holding frame 6 also starts stress (self weight of institute's stress from Prefabricated superposed beam 1), reduces pressure By force;
E, after Prefabricated superposed beam 1 is in place, start to finely tune support system absolute altitude according to drawing, until meeting drawing and code requirement. It, can assembling reinforcement after adjustment;The reinforcing bar at 1 both ends of Prefabricated superposed beam with structural column 2 and reinforcing bar with structural column 3 reinforcing bar into Row binding;The binding of 1 top in-situ layer reinforcing bar of Prefabricated superposed beam, installation template 7;
F, template 7 installs and after acceptance(check), can carry out unified concreting;
G, similarly, during casting concrete, steel holding frame 6 can also bear each from in-situ layer self weight, concrete vibrating etc. Kind of construction loads, avoid because Prefabricated superposed beam 1 directly with support system footprint pressure it is excessive caused by finished product destroy;
Etc. h, after concrete settings, the use that the dismountings such as template, holding frame can be carried out to next round is installed.
The support system includes the wooden frame 5 for supporting 4 and 4 top of support being arranged in.
The steel holding frame includes rectangular frame, and four angles of the rectangular frame are provided with supporting leg.
The height of the rectangular frame is the one third of Prefabricated superposed beam height to half;The rectangular frame Length is the half of Prefabricated superposed beam length to 3/4ths;It is wide that the width of the rectangular frame is greater than Prefabricated superposed beam Degree.
The beneficial effect of the present invention compared with the prior art:
Steel construction assembled-type house Prefabricated superposed beam construction method of the present invention can effectively expand forced area and reduce pressure, keep away The large batch of destruction that finished product occurs in the construction process is exempted from, has accelerated the duration, reduces various maintenance costs.Pass through production Holding frame is placed into support system between Prefabricated superposed beam by one steel holding frame, i.e., Prefabricated superposed beam is no longer direct with support system Contact is changed to holding frame and contacts with support system, forced area is virtually increased, pressure is reduced.Prefabricated superposed beam is being pacified Finished product protection during dress plays strong technical guarantee, avoids the various maintenance costs in later period, has saved the duration, protects Construction quality is demonstrate,proved, construction efficiency is improved.
Detailed description of the invention
Fig. 1 is holding frame schematic diagram;
Fig. 2 is Prefabricated superposed beam schematic diagram;
Fig. 3 is Prefabricated superposed beam floor plan;
Fig. 4 is the partial enlargement diagram of Fig. 3;
Fig. 5 is that support system installs schematic diagram
Fig. 6 is the structural schematic diagram that support system places steel holding frame;
Fig. 7 is the structural schematic diagram that Prefabricated superposed beam is placed in steel holding frame;
Fig. 8 is the structure schematic diagram of installation template knot;
Fig. 9 is the structural schematic diagram of form removal;
Figure 10 is the structural schematic diagram for removing support system and steel holding frame.
Main component symbol description in attached drawing:
In figure:
1, Prefabricated superposed beam 2, concrete structure column
3, concrete structure column 4, support
5, wooden frame 6, steel holding frame
7, template.
Specific embodiment
Referring to the drawings and embodiment the present invention will be described in detail:
Attached drawing 1-10 it is found that a kind of steel construction assembled-type house Prefabricated superposed beam construction method,
A, steel holding frame 6 is made first;
B, support system is placed, according to drawing, coarse adjustment supports top mark high;
C, after the complete support system top mark of coarse adjustment is high, steel holding frame 6 is placed, the supporting leg of steel holding frame 6 is upward;It needs after placement according to drawing Its horizontal position and absolute altitude are checked again;
D, after verification, tower crane can be installed Prefabricated superposed beam 1 in place, and Prefabricated superposed beam 1 is just no longer directly same at this time The wooden frame 5 of support system contacts, and steel holding frame 6 also starts stress (self weight of institute's stress from Prefabricated superposed beam 1), reduces pressure By force;
E, after Prefabricated superposed beam 1 is in place, start to finely tune support system absolute altitude according to drawing, until meeting drawing and code requirement. It, can assembling reinforcement after adjustment;The reinforcing bar at 1 both ends of Prefabricated superposed beam with structural column 2 and reinforcing bar with structural column 3 reinforcing bar into Row binding;The binding of 1 top in-situ layer reinforcing bar of Prefabricated superposed beam, installation template 7;
F, template 7 installs and after acceptance(check), can carry out unified concreting;
G, similarly, during casting concrete, steel holding frame 6 can also bear each from in-situ layer self weight, concrete vibrating etc. Kind of construction loads, avoid because Prefabricated superposed beam 1 directly with support system footprint pressure it is excessive caused by finished product destroy;
Etc. h, after concrete settings, the use that the dismountings such as template, holding frame can be carried out to next round is installed.
The support system includes the wooden frame 5 for supporting 4 and 4 top of support being arranged in;Steel holding frame is placed on wooden frame 5.
The steel holding frame includes rectangular frame, and four angles of the rectangular frame are provided with supporting leg.
The height of the rectangular frame is the one third of Prefabricated superposed beam height to half;The rectangular frame Length is the half of Prefabricated superposed beam length to 3/4ths;It is wide that the width of the rectangular frame is greater than Prefabricated superposed beam Degree.
Steel construction assembled-type house Prefabricated superposed beam construction method of the present invention can effectively expand forced area and reduce pressure By force, the large batch of destruction that finished product occurs in the construction process is avoided, the duration is accelerated, reduces various maintenance costs.It is logical One steel holding frame of production is crossed, holding frame is placed into support system between Prefabricated superposed beam, i.e., Prefabricated superposed beam is no longer the same as support system System directly contacts, and is changed to holding frame and contacts with support system, forced area is virtually increased, pressure is reduced.To prefabricated overlapping The finished product protection of beam during the installation process plays strong technical guarantee, avoids the various maintenance costs in later period, saves Duration guarantees construction quality, improves construction efficiency.
The above described is only a preferred embodiment of the present invention, not making in any form to structure of the invention Limitation.Any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, Belong within the scope of technical solution of the present invention.

Claims (4)

1. a kind of steel construction assembled-type house Prefabricated superposed beam construction method, which is characterized in that
A, steel holding frame 6 is made first;
B, support system is placed, according to drawing, coarse adjustment supports top mark high;
C, after the complete support system top mark of coarse adjustment is high, steel holding frame 6 is placed, the supporting leg of steel holding frame 6 is upward;It needs after placement according to drawing Its horizontal position and absolute altitude are checked again;
D, after verification, tower crane can be installed Prefabricated superposed beam 1 in place, and Prefabricated superposed beam 1 is just no longer directly same at this time The wooden frame 5 of support system contacts, and steel holding frame 6 also starts stress;
E, after Prefabricated superposed beam 1 is in place, start to finely tune support system absolute altitude according to drawing, until meeting drawing and code requirement;
It, can assembling reinforcement after adjustment;The reinforcing bar at 1 both ends of Prefabricated superposed beam is with structural column 2 and reinforcing bar with the steel of structural column 3 Muscle is bound;The binding of 1 top in-situ layer reinforcing bar of Prefabricated superposed beam, installation template 7;
F, template 7 installs and after acceptance(check), can carry out unified concreting;
G, similarly, during casting concrete, steel holding frame 6 can also be born from in-situ layer self weight, concrete vibrating construction Load;
Etc. h, after concrete settings, the use that the dismountings such as template, holding frame can be carried out to next round is installed.
2. steel construction assembled-type house Prefabricated superposed beam construction method according to claim 1, it is characterised in that:The support System includes the wooden frame 5 for supporting 4 and 4 top of support being arranged in.
3. steel construction assembled-type house Prefabricated superposed beam construction method according to claim 1, it is characterised in that:The steel support Frame includes rectangular frame, and four angles of the rectangular frame are provided with supporting leg.
4. steel construction assembled-type house Prefabricated superposed beam construction method according to claim 3, it is characterised in that:The rectangle The height of frame is the one third of Prefabricated superposed beam height to half;The length of the rectangular frame is Prefabricated superposed beam The half of length is to 3/4ths;The width of the rectangular frame is greater than Prefabricated superposed beam width.
CN201810681078.2A 2018-06-27 2018-06-27 Steel construction assembled-type house Prefabricated superposed beam construction method Pending CN108842964A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810681078.2A CN108842964A (en) 2018-06-27 2018-06-27 Steel construction assembled-type house Prefabricated superposed beam construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810681078.2A CN108842964A (en) 2018-06-27 2018-06-27 Steel construction assembled-type house Prefabricated superposed beam construction method

Publications (1)

Publication Number Publication Date
CN108842964A true CN108842964A (en) 2018-11-20

Family

ID=64199872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810681078.2A Pending CN108842964A (en) 2018-06-27 2018-06-27 Steel construction assembled-type house Prefabricated superposed beam construction method

Country Status (1)

Country Link
CN (1) CN108842964A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2261430A2 (en) * 2009-06-10 2010-12-15 Hämeen Teräsrakenne Oy Constructing an overhang
CN105696806A (en) * 2016-01-26 2016-06-22 晟通科技集团有限公司 Supporting device
CN107663951A (en) * 2017-11-24 2018-02-06 浙江新邦远大绿色建筑产业有限公司 The support system and construction technology of superimposed sheet and wallboard formed by integrally casting
CN107700648A (en) * 2017-10-23 2018-02-16 浙江展诚建设集团股份有限公司 Prefabricated component and cast-in-place post assembled integral concrete frame structure construction

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2261430A2 (en) * 2009-06-10 2010-12-15 Hämeen Teräsrakenne Oy Constructing an overhang
CN105696806A (en) * 2016-01-26 2016-06-22 晟通科技集团有限公司 Supporting device
CN107700648A (en) * 2017-10-23 2018-02-16 浙江展诚建设集团股份有限公司 Prefabricated component and cast-in-place post assembled integral concrete frame structure construction
CN107663951A (en) * 2017-11-24 2018-02-06 浙江新邦远大绿色建筑产业有限公司 The support system and construction technology of superimposed sheet and wallboard formed by integrally casting

Similar Documents

Publication Publication Date Title
JP6312459B2 (en) Truss beam construction method
US20180345535A1 (en) Formwork for providing a concrete foundation element, in particular a plinth with exposed horizontal reinforcing bars, plinth provided with such formwork, and structure comprising such plinth
CN110965474A (en) Construction method of cable tower cross beam
KR102059552B1 (en) Modular work platform of a long span bridge main tower rebar and construction method using the same
JP2018115489A (en) Anchor frame and method of building steel frame structure using the same
JP2007154544A (en) Floor board structure using precast concrete plate
CN108842964A (en) Steel construction assembled-type house Prefabricated superposed beam construction method
KR101661449B1 (en) Methods for controlling the camber of the cantilever truss half precast panel and, constructing methods using the same
KR101376484B1 (en) Steel box manufacturing method using elastic recovering force adjustment and steel box girder and bridge construction method therewith
JP6728552B2 (en) Base mortar construction method
CN214117507U (en) Convenient ring beam template system is dismantled in installation
CN109184193A (en) A kind of early-dismantling formwork system and its construction method
KR100791991B1 (en) Temporary bridge consruction method using composite slab girder
CN110805308B (en) Method for installing and dismantling temporary support at top center of silo
CN105971287A (en) Vertical prestress construction method of reaction wall
CN106836637A (en) Multiple material pipe binding type steel concrete connecting-beam and its construction method
JP6690988B2 (en) How to build a composite foundation structure
JP6774781B2 (en) How to build a composite foundation structure
CN107642240B (en) A method of strengthening concrete girder steel is installed in concrete bearing
CN110409711A (en) A kind of Cast-in-situ Beam steel bar arrangement and its construction technology
CN105019655B (en) A kind of construction method of casting concrete beam
CN216474550U (en) Concrete high pier construction template device
CN110894753B (en) Wall formwork device and manufacturing method
KR20090022451A (en) The underground wall body gang form and will reach and construction method of the underground wall body which it uses
EP3795749B1 (en) Scaffold and method for supporting a bridge casting mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181120