CN108830560A - A kind of organizational structure generator and the organizational structure generation method based on block chain technology - Google Patents
A kind of organizational structure generator and the organizational structure generation method based on block chain technology Download PDFInfo
- Publication number
- CN108830560A CN108830560A CN201810585301.3A CN201810585301A CN108830560A CN 108830560 A CN108830560 A CN 108830560A CN 201810585301 A CN201810585301 A CN 201810585301A CN 108830560 A CN108830560 A CN 108830560A
- Authority
- CN
- China
- Prior art keywords
- organization
- tree
- framework
- organizational structure
- static tissue
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention discloses a kind of organizational structure generator and the organizational structure generation method based on block chain technology, wherein organizational structure generator, which is characterized in that including:Static tissue architectures module, for generating and managing static tissue framework;Dynamic organization's architectures module:For after user is added or creates static tissue framework, the template of offer dynamic organization tree, creation project organization tree, triggering message push process and invite information to the push of the configuration node of projects organization tree, ultimately generate and manage dynamic organization's framework corresponding to the project that it is responsible for, the present invention is directed to disparity items, different team is set up and by special combination, to achieve the effect that quickly propel project;It records, the everything of the project of participation can be recorded in conjunction with individual affair, record the contribution that each employee is done in completion this task.
Description
Technical field
The present invention relates to information technology field more particularly to a kind of organizational structure generator software and it is based on block chain technology
Organizational structure generation method.
Background technique
In present personnel system, what is established is all the organizational structure of static type, whole to imitate during handling special project
Rate is not high.The organizational structure established in personnel system usually will appear in project cooperating process because the difference of subordinate relation is difficult to
It transfers, it is difficult to cooperation.And when needing to modify organizational structure, process is cumbersome, and in-fighting is serious, and will cause personnel's upheaval, shadow
The sense of ownership of employee is rung, increases and links up cost;And after project terminates, it tends to be difficult to which the contribution degree of statistician influences achievement
The landing of effect.
Summary of the invention
It is an object of the invention to overcome the deficiencies of the prior art and provide a kind of organizational structure generator and it is based on block chain
The organizational structure generation method of technology.
The purpose of the present invention is realized by following scheme:
A kind of organizational structure generator, which is characterized in that including:
Static tissue architectures module, for providing template, the creation static tissue tree, triggering message push of static tissue tree
Process invites information to the push of the configuration node of each organization tree, ultimately generates and manage static tissue framework;
Dynamic organization's architectures module:For providing dynamic organization tree after user is added or creates static tissue framework
Template, creation project organization tree, triggering message push process to the configuration node of projects organization tree push invite information, most
Throughout one's life at dynamic organization's framework corresponding to the project that it is responsible for management.
It preferably, further include personal event logging module, for recording the execution item of member in each dynamic organization's framework
Purpose affairs and/or progress, and it is synchronized to each configuration node in dynamic organization's framework.
Preferably, the personal event logging module passes through block chain technology for of member in each dynamic organization's framework
Occurrences in human life item is synchronized to each configuration node in dynamic organization's framework.
Preferably, the static tissue architectures module is also used to safeguard the unique of the static tissue framework of each user
Property.
Preferably, further include personnel information module, provide inquiry, storage for other modules for organizational structure generator
Or the personnel information of management everyone.
Preferably, the static tissue architectures module provides the template of static tissue tree, and from personnel information module
The personnel information for obtaining linked groups member, when user is added in static tissue tree, completion static tissue tree is created;It will be added
Inviting for tissue requests to push to the terminal where the configuration node of organization tree with message mode respectively;The terminal of organized member
After confirmation, corresponding static tissue architectures are completed.
Preferably, after the completion of the static tissue architectures, the relevant information or data of static tissue framework, which synchronize, is deposited
The corresponding terminal of storage each node in organization tree;Simultaneously after the variation of some node, information is same simultaneously also by block chain technology
Walk other nodes.
Preferably, dynamic organization's architectures module judges whether with dynamic organization's architectures permission, if
Have, then the template of project organization tree is provided, and obtain the personnel information of linked groups member from personnel information module, adds income
In mesh organization tree, dynamic project organization tree creation is completed;The request of inviting that tissue is added is pushed to respectively with message mode
The confirmation to be added such as each configuration node of project organization tree;After organized member adds " content wielded " and confirms, completion pair
The dynamic organization's architectures answered.
Preferably, dynamic organization's architectures module is by after the completion of dynamic organization's architectures, dynamic organization's framework
Relevant information or the corresponding terminal of data sync storage each node in organization tree;After the variation of some node, information is simultaneously
Other nodes are synchronized to also by block chain technology.
The present invention also provides a kind of organizational structure generation methods based on block chain technology, which is characterized in that including following
Step:
A static tissue framework is added in creation, obtains by providing the template of static tissue tree, and from personnel information module
The personnel information of linked groups member, when user is added in static tissue tree, completion static tissue tree is created;Tissue will be added
Request of inviting terminal where the configuration node of organization tree is pushed to message mode respectively;The terminal check of organized member
Afterwards, corresponding static tissue architectures are completed
One or more dynamic organization's framework is created or is added, after user is added or creates static tissue framework,
By providing template, the creation project organization tree, triggering message push composition of the process to projects organization tree of dynamic organization tree
Information is invited in node push, ultimately generates and manage dynamic organization's framework corresponding to the project that it is responsible for;
It records with synchronous personal event, each configuration node record individual affair and/or progress in dynamic organization's framework, and synchronous
Each configuration node in dynamic organization's framework.
Preferably, the data of static tissue framework, dynamic organization's framework and personal event by block chain technology it is synchronous and
It is maintained on each configuration node.
Compared with the existing technology, organizational structure generator of the present invention and method use static tissue framework and dynamic group stretching frame
Structure combine mode, and each user created or addition static tissue framework have uniqueness, and create or be added
Dynamic organization's framework can set up different team and by special for disparity items according to project needs, dynamic combined
Combination, to achieve the effect that quickly propel project;It records, the everything of the project of participation can be remembered in conjunction with individual affair
Record records the contribution that each employee is done in completion this task;In conjunction with block chain technology, can to project achievement and contribute into
The verifying and measurement of row decentralization, shift onto each other when project being avoided to cause to delay.
Detailed description of the invention
Fig. 1 is the overall structure block diagram of organizational structure generator in certain preferred embodiment;
Fig. 2 is synchronization and the management schematic diagram of the data decentralization of organizational structure node in certain preferred embodiment;
Fig. 3 is organization tree visioning procedure schematic diagram in certain preferred embodiment;
Fig. 4 is the message push process that request is invited in certain preferred embodiment;
Fig. 5 is that organization tree confirms visioning procedure in certain preferred embodiment;
Fig. 6 is personnel selection process in certain preferred embodiment;
Fig. 7 is project type organizational structure visioning procedure in certain preferred embodiment.
Specific embodiment
Certain preferred embodiment of the invention is described further below in conjunction with drawings and embodiments.
Referring to figs. 1 to 7, in certain preferred embodiment, a kind of organizational structure generator, including
Personnel information module:Inquiry, storage or the people for managing everyone are provided for other modules for organizational structure generator
Thing information, such as department, post, post, permission.
Static tissue architectures module:For providing template, the creation static tissue tree, triggering message of static tissue tree
Push process invites information to the push of the configuration node of each organization tree, ultimately generates static tissue framework;Management generates static
Organizational structure safeguards the uniqueness of the static tissue framework of each user.Specifically, static tissue architectures module provides
The template of static tissue tree, and from the personnel information of personnel information module acquisition linked groups member, when user is added to static state
In organization tree, the creation of static tissue tree is completed;The request of inviting that tissue is added is pushed into organization tree respectively with message mode
Terminal where configuration node;After the terminal check of organized member, corresponding static tissue architectures are completed.Everyone is only
It can be added in a static organizational structure.Static tissue architectures are initiated by department head and are responsible for creation.Static group
After the completion of knitting architectures, the relevant information or data sync storage of static tissue framework each node in organization tree corresponding end
End;Simultaneously after the variation of some node, information is synchronized to other nodes simultaneously also by block chain technology.
Dynamic organization's architectures module:For being born according to it after user is added or creates static tissue framework
The project of duty creates projected-based organization framework corresponding with project.Including providing template, the creation project organization of dynamic organization tree
Tree, triggering message push process and invite information to the push of the configuration node of projects organization tree, ultimately generate dynamic organization's framework
's;Management generates dynamic organization's framework.Specifically, dynamic organization's architectures module judges whether with dynamic organization's framework
Permission is created, if so, then providing the template of project organization tree, and obtains the occurrences in human life of linked groups member from personnel information module
Information is added in project organization tree, completes dynamic project organization tree creation;Inviting for tissue will be added to request respectively to disappear
Breath mode pushes to the confirmation to be added such as each configuration node of project organization tree;Organized member adds " content wielded " and true
After recognizing, corresponding dynamic organization's architectures are completed.Final realize is the theme with project, can dynamic creation and each project it is right
The team answered.Multiple dynamic organization's frameworks can be added in the same person.Dynamic organization's framework is initiated and is responsible for by project leader
Creation, in addition to project leader, the structure of static tissue framework where the member in dynamic organization's framework can be project leader
At node(That is the member of static tissue framework), it is also possible to the configuration node of other static tissue frameworks.Dynamic organization's framework
After the completion of creation, the corresponding terminal of the relevant information or data sync storage of dynamic organization's framework each node in organization tree;Together
When some node variation after, information is synchronized to other nodes simultaneously also by block chain technology.
Personal event logging module:For recording affairs, the correspondence of the project implementation of member in each dynamic organization's framework
Individual's item such as progress;And each configuration node in dynamic organization's framework is synchronized to by block chain technology, in order to project
Each one item progress of the timely dynamic knowledge of participant is supervised mutually, while preventing from deliberately modifying, and is prevented to the responsibility in project
It shift onto each other.
With reference to Fig. 3, organization tree visioning procedure, after user clicks newly-built the "+" button, the related of department corresponding to typing is believed
Breath, the content wielded such as department name, department's responsibility, promoter(That is the responsibility of promoter), show static tissue tree/project
The template of tissue;After clicking member's addition button on template, triggering personnel information module selects or searches for corresponding personnel, into
Row addition operation.After the completion of personnel's addition, after clicking creation ACK button, inviting for tissue will be added and request respectively with message side
Formula pushes to each configuration node of organization tree.
Preferably, organization tree visioning procedure, after user clicks newly-built the "+" button, the relevant information of department corresponding to typing, such as
The content that department name, department's responsibility, promoter are wielded(That is the responsibility of promoter), organizational structure generator judges whether
It is added or is created in a static organizational structure, if it is directly display the template of the project organization;Otherwise by user
Selection static tissue tree/project organization one of template is operated.
With reference to Fig. 4, the message push process of request is invited:Judge whether user confirms creation organizational structure, if it is confirmed that
The information of the configuration node of organization tree is then obtained, and request is invited to the push of the terminal of all participants by block chain technology
Message.
With reference to Fig. 5, organization tree confirms visioning procedure:Organization tree information is submitted, judges whether there is the personnel to have left office, such as
Fruit is to report an error and show that the employee has left office, and is submitted again after modification;If there is no leaving office, then judge whether it is existing its
In its organization tree, other tissues are had been participating in if there is employee, then prompt " to contact after it exits existing static tissue framework
Add again ", otherwise static tissue tree and data creation success.
With reference to Fig. 6, personnel selection process:Input need to add information such as name, work number of people etc., pass through personnel information module
The personnel of other personnel systems on search server end or network judge whether it is empty, if so, this, which reports an error, " asks data operator
Work name or number ", otherwise judges whether there is matching result.If it is present the personnel that need to be added according to display selection.Sentence
Whether the personnel of disconnected selection have left office, and if it is report an error and show that the employee has left office, reselect personnel;If do not deposited
What is left office, then further determine whether that the employee has been participating in other tissues, then prompt " please contact its exit have it is quiet
Added again after state organizational structure ", otherwise choose personnel's success.
With reference to Fig. 7, projected-based organization architectures process:User creates project organization framework tree first, then will be added
The terminal of tissue invited request and push to organizational member with message mode respectively;After participant receives message, it is added determining
Before, it first inquires and judges whether project has deleted, if it is, prompt project has been deleted, otherwise inquire and judge the project
Whether complete, the project is if it is prompted to dismiss completion, has otherwise inputted participant and be somebody's turn to do " wielding content ", point confirmation
Information notifies that the success of dynamic organization's framework is added to founder afterwards.
In it is preferred that, as shown in Fig. 2, the static tissue framework of organizational structure generator, dynamic organization's framework and personal event
Data it is synchronous by block chain technology and be maintained on each configuration node.As participant's B terminal organizational structure generator in,
The personal event of the node establishs or updates the organizational structure that participant's A, C ... ..N terminal is synchronized to by block chain technology every time
Generator.
The foregoing is merely some of the invention or certain preferred embodiments, are not intended to limit patent model of the invention
It encloses, it is all using equivalent structure or equivalent transformation made by description of the invention and accompanying drawing content, it is applied directly or indirectly in
Other relevant technical fields, should all similarly be included within the scope of the present invention.In addition, the above verbal description is not most
Place can also go to implement with reference to the direct expression and the understanding of routine and prior art combination of figure.
Claims (11)
1. a kind of organizational structure generator, which is characterized in that including:
Static tissue architectures module, for providing template, the creation static tissue tree, triggering message push of static tissue tree
Process invites information to the push of the configuration node of each organization tree, ultimately generates and manage static tissue framework;
Dynamic organization's architectures module:For providing dynamic organization tree after user is added or creates static tissue framework
Template, creation project organization tree, triggering message push process to the configuration node of projects organization tree push invite information, most
Throughout one's life at dynamic organization's framework corresponding to the project that it is responsible for management.
2. organizational structure generator according to claim 1, which is characterized in that further include personal event logging module, use
In recording the affairs and/or progress of the project implementation of member in each dynamic organization's framework, and it is synchronized in dynamic organization's framework
Each configuration node.
3. organizational structure generator according to claim 2, which is characterized in that individual's event logging module passes through area
The personal item of member in each dynamic organization's framework is synchronized to each configuration node in dynamic organization's framework by block chain technology.
4. organizational structure generator according to claim 2, which is characterized in that the static tissue architectures module is also
For safeguarding the uniqueness of the static tissue framework of each user.
5. organizational structure generator according to claim 4, which is characterized in that further include personnel information module, for for
Other modules of organizational structure generator provide the personnel information of inquiry, storage or management everyone.
6. organizational structure generator according to claim 5, which is characterized in that the static tissue architectures module mentions
For the template of static tissue tree, and from personnel information module obtain linked groups member personnel information, when user be added to it is quiet
In state organization tree, the creation of static tissue tree is completed;The request of inviting that tissue is added is pushed into organization tree respectively with message mode
Configuration node where terminal;After the terminal check of organized member, corresponding static tissue architectures are completed.
7. organizational structure generator according to claim 6, which is characterized in that the static tissue architectures are completed
Afterwards, the corresponding terminal of the relevant information or data sync storage of static tissue framework each node in organization tree;Work as some simultaneously
After node variation, information is synchronized to other nodes simultaneously also by block chain technology.
8. organizational structure generator according to claim 7, which is characterized in that dynamic organization's architectures module is sentenced
It is disconnected whether to there is dynamic organization's architectures permission, if so, then provide the template of project organization tree, and from personnel information module
The personnel information for obtaining linked groups member, is added in project organization tree, completes dynamic project organization tree creation;It will be added
Tissue invites the confirmations to be added such as each configuration node for requesting to push to project organization tree respectively with message mode;It is organized
After member's addition " content wielded " and confirmation, corresponding dynamic organization's architectures are completed.
9. organizational structure generator according to claim 8, which is characterized in that dynamic organization's architectures module will
After the completion of dynamic organization's architectures, the relevant information or data sync storage of dynamic organization's framework each node pair in organization tree
The terminal answered;After the variation of some node, information is synchronized to other nodes simultaneously also by block chain technology.
10. a kind of organizational structure generation method based on block chain technology, which is characterized in that include the following steps:
A static tissue framework is added in creation, obtains by providing the template of static tissue tree, and from personnel information module
The personnel information of linked groups member, when user is added in static tissue tree, completion static tissue tree is created;Tissue will be added
Request of inviting terminal where the configuration node of organization tree is pushed to message mode respectively;The terminal check of organized member
Afterwards, corresponding static tissue architectures are completed
One or more dynamic organization's framework is created or is added, after user is added or creates static tissue framework,
By providing template, the creation project organization tree, triggering message push composition of the process to projects organization tree of dynamic organization tree
Information is invited in node push, ultimately generates and manage dynamic organization's framework corresponding to the project that it is responsible for;
It records with synchronous personal event, each configuration node record individual affair and/or progress in dynamic organization's framework, and synchronous
Each configuration node in dynamic organization's framework.
11. the organizational structure generation method according to claim 10 based on block chain technology, which is characterized in that static group
The data of stretching frame structure, dynamic organization's framework and individual's event are synchronous by block chain technology and are maintained on each configuration node.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810585301.3A CN108830560A (en) | 2018-06-08 | 2018-06-08 | A kind of organizational structure generator and the organizational structure generation method based on block chain technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810585301.3A CN108830560A (en) | 2018-06-08 | 2018-06-08 | A kind of organizational structure generator and the organizational structure generation method based on block chain technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108830560A true CN108830560A (en) | 2018-11-16 |
Family
ID=64144842
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810585301.3A Pending CN108830560A (en) | 2018-06-08 | 2018-06-08 | A kind of organizational structure generator and the organizational structure generation method based on block chain technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108830560A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110223040A (en) * | 2019-05-31 | 2019-09-10 | 深圳市元征科技股份有限公司 | Project management method, device, electronic equipment and storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070179790A1 (en) * | 2002-06-28 | 2007-08-02 | Matthew Leitch | Dynamic workflow approvals |
WO2008042677A2 (en) * | 2006-10-02 | 2008-04-10 | Authoria, Inc. | Employee management |
JP2009093215A (en) * | 2007-10-03 | 2009-04-30 | Casio Comput Co Ltd | Organizational chart editing device and program |
CN104573921A (en) * | 2014-12-18 | 2015-04-29 | 四川联友电讯技术有限公司 | Group-based task allocation method through enterprise mobile office system |
US9049249B2 (en) * | 2012-11-26 | 2015-06-02 | Linkedin Corporation | Techniques for inferring an organizational hierarchy from a social graph |
CN105373896A (en) * | 2015-11-24 | 2016-03-02 | 杭州构家网络科技有限公司 | Project management system |
CN105634916A (en) * | 2015-12-11 | 2016-06-01 | 中青冠岳科技(北京)有限公司 | Management method based on tree chatting group organization |
CN106209947A (en) * | 2015-05-07 | 2016-12-07 | 中兴通讯股份有限公司 | The data processing method of a kind of decentration autonomy organization and system |
CN107609721A (en) * | 2016-07-11 | 2018-01-19 | 上海新昇半导体科技有限公司 | Project task distribution method, device, computer equipment and project management system |
-
2018
- 2018-06-08 CN CN201810585301.3A patent/CN108830560A/en active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20070179790A1 (en) * | 2002-06-28 | 2007-08-02 | Matthew Leitch | Dynamic workflow approvals |
WO2008042677A2 (en) * | 2006-10-02 | 2008-04-10 | Authoria, Inc. | Employee management |
JP2009093215A (en) * | 2007-10-03 | 2009-04-30 | Casio Comput Co Ltd | Organizational chart editing device and program |
US9049249B2 (en) * | 2012-11-26 | 2015-06-02 | Linkedin Corporation | Techniques for inferring an organizational hierarchy from a social graph |
CN104573921A (en) * | 2014-12-18 | 2015-04-29 | 四川联友电讯技术有限公司 | Group-based task allocation method through enterprise mobile office system |
CN106209947A (en) * | 2015-05-07 | 2016-12-07 | 中兴通讯股份有限公司 | The data processing method of a kind of decentration autonomy organization and system |
CN105373896A (en) * | 2015-11-24 | 2016-03-02 | 杭州构家网络科技有限公司 | Project management system |
CN105634916A (en) * | 2015-12-11 | 2016-06-01 | 中青冠岳科技(北京)有限公司 | Management method based on tree chatting group organization |
CN107609721A (en) * | 2016-07-11 | 2018-01-19 | 上海新昇半导体科技有限公司 | Project task distribution method, device, computer equipment and project management system |
Non-Patent Citations (1)
Title |
---|
我的职场JOY: "钉钉管理员手册", 《百度文库,HTTPS://WENKU.BAIDU.COM/VIEW/822FAC1AA300A6C30C229F4B.HTML》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110223040A (en) * | 2019-05-31 | 2019-09-10 | 深圳市元征科技股份有限公司 | Project management method, device, electronic equipment and storage medium |
CN110223040B (en) * | 2019-05-31 | 2024-02-09 | 深圳市元征科技股份有限公司 | Project management method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Da Silva et al. | User experience design and agile development: From theory to practice | |
CN111027936B (en) | Workflow realization method, device and medium based on intelligent contract in alliance network | |
Jägers et al. | Characteristics of virtual organizations | |
CN105553683B (en) | Meeting signature method and system | |
Karsten et al. | The long and winding road: Collaborative IT and organisational change | |
CN109639413A (en) | A kind of block catenary system based on mobile ad hoc network | |
CN105577398B (en) | A kind of meeting message treating method and apparatus | |
CN107103448A (en) | Data integrated system based on workflow | |
US20090157469A1 (en) | System and Method for Management of Multi-Session, Sequential, Synchronized Electronic Conferencing | |
CN109299909A (en) | A kind of organizational structure managing device and method | |
CN108170842A (en) | Hot microblog topic source tracing method based on tripartite graph model | |
Dorairaj et al. | Agile software development with distributed teams: Agility, distribution and trust | |
CN107527294A (en) | A kind of method and server realized both sides and carry out group activity jointly | |
CN103136621B (en) | Engineering is submitted to a higher level for approval or revision the online management method of auditing flow of list | |
CN108830560A (en) | A kind of organizational structure generator and the organizational structure generation method based on block chain technology | |
Najdawi et al. | Which Project Management Methodology is better for AI-Transformation and Innovation Projects? | |
Gardner | Coming through when it matters most | |
US8131579B2 (en) | Web-based system and application for collaborative planning of a networked program schedule | |
El Haiba et al. | Idea management: Idea generation stage with a qualitative focus | |
CN108510246A (en) | A kind of information feedback method and device | |
CN112990849A (en) | Performance management method and system | |
CN107862512A (en) | A kind of task processing method, terminal and computer-readable recording medium | |
CN109165929A (en) | A kind of individual's event recorder and recording method | |
Simon et al. | Transforming Safety Culture Grassroots-led/Management-supported Change At a Major Utility | |
Cheng et al. | Can process facilitation improve globally distributed collaboration? An action design research |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181116 |