CN108824630A - A kind of balcony - Google Patents

A kind of balcony Download PDF

Info

Publication number
CN108824630A
CN108824630A CN201810556636.2A CN201810556636A CN108824630A CN 108824630 A CN108824630 A CN 108824630A CN 201810556636 A CN201810556636 A CN 201810556636A CN 108824630 A CN108824630 A CN 108824630A
Authority
CN
China
Prior art keywords
floor
building enclosure
balcony
closeouts
drain assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810556636.2A
Other languages
Chinese (zh)
Inventor
杨泓斌
李缙
陈祥祥
颜旺龙
刘博�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Bozhilin Robot Co Ltd
Original Assignee
Building Dream High Tech Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Building Dream High Tech Construction Co Ltd filed Critical Building Dream High Tech Construction Co Ltd
Priority to CN201810556636.2A priority Critical patent/CN108824630A/en
Publication of CN108824630A publication Critical patent/CN108824630A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03FSEWERS; CESSPOOLS
    • E03F5/00Sewerage structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Building Environments (AREA)

Abstract

A kind of balcony, including:Building enclosure and anti-bank structure and floor.One end of building enclosure is for being inserted in floor;Anti- bank structure includes drain assembly and blocking component;Drain assembly is for being mounted on floor, and drain assembly is disposed adjacent with building enclosure;Blocking component is set to position of the building enclosure close to floor, for blocking the building enclosure.Using above-mentioned balcony, rainwater and sewage are discharged by the concave shape of drain assembly, blocking component is for sealing building enclosure and floor gap, and the first closeouts and the second closeouts are fixed in building enclosure and mutually abut, so that the sealing effect of closeouts is more preferably;In construction, anti-bank is set on balcony floor construction layer, eliminates the wet construction of anti-bank, that is, is eliminated anti-bank form erecting operation, reduced flitch usage amount, and subsequent plastering and patch block operation are also eliminated.Since the anti-bank structure structure of balcony is simple so that installation speed it is fast, improve work efficiency, reduce construction cost.

Description

A kind of balcony
Technical field
The present invention relates to the anti-bank technical field of mold of balcony.
Background technique
Currently, anti-bank is there are in numerous building body structures, anti-bank, which refers to, prevents water from flowing into indoor way, with structural concrete It pours simultaneously, be also flashing or turn over water.Wherein, the anti-bank of balcony is made, conventional fabrication method is tied first, in accordance with building Structure plans the position of anti-bank, and makes corresponding template on it, secondly into template concrete perfusion and with main structure one Body pouring molding, maintenance remove mold after completing.
Not only speed of application is slow for the production method of traditional anti-bank of balcony, low efficiency, and anti-bank is easy to appear after the completion of pouring Height it is different, be unfavorable for subsequent construction operation, moreover, balcony anti-bank demoulding initial stage, concrete strength is low, is easy to appear and tears open It collapses and dismounts badly and other issues, the anti-bank of balcony is plastered, the subsequent jobs such as Puttying after structure construction, operational procedure It is relatively complicated.
Summary of the invention
Based on this, it is necessary to provide a kind of anti-bank of balcony for saving anti-bank branch die process.
A kind of balcony comprising:Building enclosure and anti-bank structure and floor;One end of the building enclosure is for being inserted in In floor;The anti-bank structure includes drain assembly and blocking component;The drain assembly is for being mounted on the floor On, and the drain assembly is disposed adjacent with the building enclosure;The blocking component is set to the building enclosure close to institute The position for stating floor, for blocking the building enclosure.
The balcony further includes the first fixing piece in one of the embodiments, and the other end of first closeouts is used It is connect in passing through first fixing piece with the floor.
The anti-bank structure is aluminium alloy structure in one of the embodiments,.
The drain assembly and the blocking component are Al-alloy parts in one of the embodiments,.
The height of the blocking component is arranged according to the height of the building enclosure in one of the embodiments,.
The building enclosure includes coaming plate, railing or the parapeted coaming plate of tool in one of the embodiments,.
The balcony further includes floor in one of the embodiments,.
The floor offers mounting groove in one of the embodiments, and one end of the building enclosure is inserted in described In mounting groove.
The floor is provided with mounting plate in the mounting groove in one of the embodiments, the building enclosure One end is inserted in the mounting groove and is fixed on the floor by the mounting plate.
The floor is additionally provided with an at least setscrew, one end of the building enclosure in one of the embodiments, It is inserted in the mounting groove and the floor is fixed on by the mounting plate and the setscrew.
The building enclosure of above-mentioned balcony is inserted in balcony floor construction layer, for safeguarding entire balcony, passes through draining group Sanitary sewage is discharged the concave shape of part, and blocking component is for sealing building enclosure and floor gap, the first closeouts and the Two closeouts are fixed in building enclosure and mutually abut, so that the sealing effect of closeouts is more preferably.In construction, balcony setting In on balcony floor construction layer, the wet construction of the anti-bank of balcony is eliminated, that is, eliminates the anti-bank form erecting operation of balcony, reduces flitch Usage amount, while also eliminating subsequent plastering and patch block operation.Since the anti-bank structure structure of balcony is simple, so that anti-bank structure Installation speed it is fast, improve work efficiency, reduce cost.
Detailed description of the invention
Fig. 1 is the balcony schematic perspective view of an embodiment;
Fig. 2 is the broken isometric schematic diagram of Fig. 1 balcony;
Fig. 3 is the first anchor structure schematic diagram of an embodiment;
Fig. 4 is the second anchor structure schematic diagram of an embodiment;
Fig. 5 is the drain assembly structural schematic diagram of an embodiment;
Fig. 6 is the first closeouts structural schematic diagram of an embodiment;
Fig. 7 is the second closeouts structural schematic diagram of an embodiment;
Fig. 8 is the covering members structural schematic diagram of an embodiment;
Fig. 9 is the locating element structure schematic diagram of an embodiment;
Figure 10 is the broken isometric schematic diagram of Fig. 9 locating piece side;
Figure 11 is the handgrips schematic diagram of an embodiment.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing to the present invention Specific embodiment be described in detail.Many details are explained in the following description in order to fully understand this hair It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not Similar improvement is done in the case where violating intension of the present invention, therefore the present invention is not limited to the specific embodiments disclosed below.
It should be noted that it can directly on the other element when element is referred to as " being set to " another element Or there may also be elements placed in the middle.When an element is considered as " connection " another element, it, which can be, is directly connected to To another element or it may be simultaneously present centering elements.Term as used herein " vertical ", " horizontal ", " left side ", " right side " and similar statement for illustrative purposes only, are not meant to be the only embodiment.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.Term " and or " used herein includes one or more Any and all combinations of relevant listed item.
The present invention provides a kind of balconies.For example, the balcony include building enclosure, drain assembly and blocking component and Floor;One end of the building enclosure is for being at least partly inserted in floor;For example, the draining is set up for installing fixation In on the floor, and the drain assembly is disposed adjacent with the building enclosure;For example, the blocking component includes the first envelope Blocking piece and the second closeouts, first closeouts and second closeouts are set in turn in the building enclosure close to described The position of floor, for example, first closeouts are connected to the outside of the one end of the building enclosure close to the floor, and institute It states first closeouts one end to connect with the drain assembly, the other end with the floor for connecting;For example, described second blocks Part is connected to the building enclosure close to the side of the drain assembly, and second closeouts are supported with first closeouts It connects.For another example, a kind of balcony, including building enclosure, drain assembly and blocking component;One end of the building enclosure is at least portion Divide and is inserted in floor;For example, the draining is set up for being mounted on the floor, and the drain assembly with it is described Building enclosure is disposed adjacent;For example, the blocking component include the first closeouts and the second closeouts, first closeouts and Second closeouts are set in turn in the building enclosure close to the position of the floor, for example, first closeouts are supported The building enclosure is connected to close to the outside of one end of the floor, and first closeouts one end and the drain assembly connect It connects, the other end with the floor for connecting;For example, second closeouts are connected to the building enclosure close to the draining The side of component, and second closeouts are abutted with first closeouts.
In order to be further illustrated to above-mentioned balcony, for example, referring to Fig. 1, the balcony 10 includes building enclosure 11 With anti-bank structure, the anti-bank structure includes drain assembly 12 and blocking component 13, and the drain assembly 12 is for installing fixation In on floor 20, and the drain assembly 12 is disposed adjacent with the building enclosure 11, and the blocking component 13 is set to described Building enclosure 11 is close to the position of the floor 20, for blocking the building enclosure 11.In one embodiment, the draining group Part 12 and the blocking component 13 are Al-alloy parts, and one end of the building enclosure 11 is described for being inserted in floor 20 Building enclosure 11 is determined according to practice of construction environment, for example, the building enclosure 11 is including coaming plate, railing or has parapeted enclose Plate.The drain assembly 12 is for being mounted on the floor 20, and the drain assembly 12 and the building enclosure 11 It is disposed adjacent, the blocking component 13 includes the first closeouts 131 and the second closeouts 132, first closeouts 131 and institute It states the second closeouts 132 and is set in turn in the building enclosure 11 close to the position of the floor 20, first closeouts 131 The building enclosure 11 is connected to close to the outside of one end of the floor 20, and described first closeouts, 131 one end with it is described Drain assembly 12 connects, and the other end with the floor 20 for connecting;Second closeouts 132 are connected to the building enclosure 11 close to the side of the drain assembly 12, and second closeouts 132 are abutted with first closeouts 131.
Rainwater and sewage are discharged by the concave shape of draining group 12, blocking component 13 is for sealing building enclosure and building Sheet separation, the corrosion in order to avoid rainwater and sewage to drain assembly 12 and blocking component 13, in the present embodiment, draining group The material of part 12 and blocking component 13 is stainless steel.First closeouts 131 and the second closeouts 132 be fixed in building enclosure and It mutually abuts, so that the sealing effect of closeouts 13 is more preferably, the height of the blocking component 13 is according to the building enclosure 11 Height is arranged, i.e., the sum of height of described first closeouts 131 and second closeouts 132 is according to the building enclosure 11 Height is arranged, for example, the length of the blocking component 13 is not less than 120mm.The building enclosure 11 is vertically inserted in the building In the rim of a cup opened up on plate 20, in construction, the building enclosure 11 is placed in one, and casting concrete, it is solidifying to concrete After Gu, by the conglutination of concrete, so that the building enclosure 11 is securely set in the floor 20, consequently facilitating row The installation of water assembly, blocking component and other component forms a simple and practical balcony structure, improves work effect Rate reduces construction cost.In another embodiment, in order to improve the service life of anti-bank structure, the drain assembly 12 and institute The material for stating blocking component 13 is galvanized steel, corrosion of steel can be effectively prevent raw by zinc-plated processing normal carbon building iron Rust is to extend steel service life, so that the anti-bank structure, while with higher corrosion resistance, also having makes The characteristics of with lasting a long time.
For the ease of the installation of the first fixing piece, also referring to Fig. 1 and Fig. 2, the building enclosure 11 further includes including One fixing piece 14, first closeouts 131 are connect by first fixing piece 14 with the floor 20.Described first is fixed One end of part 14 is connect with first closeouts 131, and the other end of first fixing piece 14 is then connect with the floor 20, For first fixing piece 14 to be fixed on the floor 20, since first closeouts 131 are fixed with described first Part 14 is fixedly connected, in this way, can keep at first closeouts 131 at fixed position, so that described first blocks A fixed base point of the part 131 as first fixing piece 14, the floor 20 are another as first fixing piece 14 A basic point, consequently facilitating the installation of first fixing piece 14.
It is described in order to further convenient for the installation of the first fixing piece 14 and the first closeouts 131, please refer to Fig. 2 and Fig. 3 First fixing piece 14 has " L " character form structure, i.e., described first fixing piece 14 includes two parts, and first fixing piece 14 wraps Include the first fixed part 141 and the second fixed part 142, one end of first fixed part 141 and described second fixed part, 142 one end Connection, first fixed part 141 is mutually perpendicular to second fixed part 142, first fixed part 141 for it is described Floor 20 connects, and second fixed part 142 is connect with first closeouts 131.First fixed part 141 is parallel to institute Floor 20 is stated, so that first fixed part 141 is attached at the floor 20,20 weight of first fixing piece 14 and the floor Folded part is provided with steel nail on that is, described first fixed part 141 and the floor 20 through there is steel nail, so that described first is solid Determine portion 141 and be fixedly connected with the floor 20 by the steel nail, i.e., so that first fixing piece 14 by the steel nail and The floor 20 is fixedly connected;For second fixed part 142 perpendicular to the floor 20, i.e., described second fixed part 142 is parallel It is attached in first closeouts 131 in the end of first closeouts 131 namely second fixed part 142, it is described The part of first closeouts 131 and second fixed part 142 overlapping is equipped with spiro connecting piece, for example, spiro connecting piece is screw, so that Second fixed part 142 is connect by the spiro connecting piece with 131 spiral of the first closeouts.In this way, described first is fixed The both ends of part 14 are individually fixed on the floor 20 and first closeouts 131, when the anti-bank structure is installed, First first fixed part 141 of first fixing piece 14 is installed on the floor 20, due to second fixed part 142, perpendicular to the floor 20, allow first closeouts 131 directly by second fixed part 142 as benchmark Portion, by the spiro connecting piece Fast Installation on first fixing piece 14, to facilitate first fixing piece 14 and institute State the installation of the first closeouts 131.
For the ease of the fixation of drain assembly 12, referring to Figure 2 together and Fig. 4, the balcony 10 further include second solid Determine part 15, the drain assembly 12 is connect by second fixing piece 15 with the floor 20, second fixing piece 15 One end is connect with the floor 20, and the other end of second fixing piece 15 is connect with the drain assembly 12.In order to above-mentioned Second fixing piece 15 further illustrates that second fixing piece 15 includes third fixed part 151 and the 4th fixed part 152, described One end of third fixed part 151 is connect with one end of the 4th fixed part 152, the 4th fixed part 152 be used for it is described Floor 20 connects, and offers clamping groove 153 on the third fixed part 151, and the clamping groove 153 is towards the floor 20, The drain assembly 12 is inserted in the clamping groove 153 far from one end of the building enclosure 11.4th fixed part 152 It is parallel to the floor 20, i.e., described 4th fixed part 152 is attached at the floor 20, second fixing piece 15 and the building The part that plate 20 is overlapped is provided with steel nail, i.e., described 4th fixed part 152 part Chong Die with the floor 20, which is run through, steel nail, 4th fixed part 152 is fixedly connected by steel nail with the floor 20, so that the 4th of second fixing piece 15 is fixed Portion 152 is fixed on the floor 20;The drain assembly 12 is set to the third far from the end of the building enclosure 11 In clamping groove 153 on fixed part 151, since the clamping groove 153 is towards the floor 20, i.e. the clamping groove 153 is opened Mouthful direction is perpendicular to the floor 20, and the third fixed part 151 is by the clamping groove 153 by the one of the drain assembly 12 End clamps, i.e., the described third fixed part 151 and the floor 20 clamp the drain assembly 12 namely the drain assembly 12 one end far from the building enclosure 11 are between the third fixed part 151 and the floor 20.In this way, the draining Component 12 is connect by snap fit with second fixing piece 15, and second fixing piece 15 passes through steel nail and the floor 20 It is fixedly connected, so that the drain assembly 12 is fixed on the floor 20 by second fixing piece 15, thus assembling When the anti-bank structure, after the drain assembly 12 is set on the floor 20, by the institute of second fixing piece 15 It states third fixed part 151 and is buckled in end of the drain assembly 12 far from the building enclosure 11, so that the draining Component 12 is firmly set on the floor 20.
In order to further be convenient for the fixation of drain assembly 12, referring to Figure 2 together and Fig. 5, the drain assembly 12 are wrapped Water drain part body 121, clamping portion 122 and interconnecting piece 123 are included, the clamping portion 122 is with the water drain part body 121 far from institute One end connection of building enclosure 11 is stated, and is clamped with second fixing piece 15, the interconnecting piece 123 is set to the drainage element Ontology 121 is connect close to the position of the building enclosure 11, the interconnecting piece 123 with first closeouts 131, the draining Part ontology 121 with the floor 20 for connecting.The water drain part body 121 is parallel to the floor 20, i.e., the described drainage element Ontology 121 is attached on the floor 20, and the water drain part body 121 is connect by steel nail with the floor 20, the steel nail It is set to the one end of the water drain part body 121 far from second fixing piece 15, the steel nail is contained in described first and blocks In part 131;The clamping portion 122 is perpendicular to being set on the floor 20, so that having on the floor 20 protruding upward Protrusion is set in the clamping groove 153 convenient for the connection with second fixing piece 15 convenient for the clamping portion 122, lead to It crosses the clamping portion 122 and is connected in second fixing piece 15, second fixing piece 15 is further through the clamping groove 153 by institute Drainage element component is stated to be fixed on the floor 20;The interconnecting piece 123 is vertically installed on the floor 20, the interconnecting piece 123 connect with one end of first closeouts 131, and the interconnecting piece 123 and one end of first closeouts 131 are spirally connected, It is provided with spiro connecting piece in the i.e. described interconnecting piece 123 and first closeouts 131, for example, the spiro connecting piece is sunk screw, by It is fixed on the floor 20 in described this part of drainage element by steel nail, the interconnecting piece 123 and the water drain part body 121 are solid Fixed connection, so that first closeouts 131 are fixedly connected by spiro connecting piece with the interconnecting piece 123, in this way, making the row Water assembly 12 is steadily connect with the floor 20 and first closeouts 131, convenient for the fixation of the drain assembly 12.
For the ease of the installation of the first closeouts 131, referring to Figure 2 together and Fig. 6, first closeouts 131 are wrapped Include the first side plate 1311, the second side plate 1312 and the first plugging plate 1313, first side plate 1311 and second side plate 1312 are respectively arranged at the both ends of first plugging plate 1313, and first side plate 1311 is with the drain assembly 12 close to institute One end connection of building enclosure 11 is stated, second side plate 1312 is connect with first fixing piece 14, first side plate Accommodating space 1314 is formed between 1311 and second side plate 1312, it is fixed that the accommodating space 1314 accommodates described first Part 14 and at least partly described drain assembly 12.Wherein, first plugging plate 1313 is set in the building enclosure 11, example Such as, first plugging plate 1313 is connected in the building enclosure 11, and for another example, first plugging plate 1313 is solid by steel nail Due in the building enclosure 11, for another example, first plugging plate 1313 is fixed in the building enclosure 11 by screw, is The whole height of the holding closeouts, first plugging plate 1313 are set to the building enclosure 11 close to the floor 20 position, and perpendicular to the building enclosure 11;First side plate 1311 and second side plate 1312 are each perpendicular to institute The first plugging plate 1313 is stated, i.e., described first side plate 1311 is parallel to each other with second side plate 1312 namely first side Plate 1311 is parallel to the interconnecting piece 123, and second side plate 1312 is parallel to second fixed part 142, first side Plate 1311 is connected by screw in the interconnecting piece 123, and second side plate 1312 is connected to described second by another screw Fixed part 142, so that first side plate 1311 is fixed by the drain assembly 12 and the floor 20, second side plate 1312 is fixed by first fixing piece 14 and the floor 20, in this way, being set to the stabilization of the first closeouts 131 20 top of floor, and, it is only necessary to institute is can be realized into first side plate 1311 and second side plate 1312 fixation The installation of the first closeouts 131 is stated, is convenient to the installation of first closeouts 131, while also facilitating the installation of balcony 10.
Second closeouts 132 are set to 131 top position of the first closeouts, and second closeouts 132 are supported First closeouts 131 are connected to, the problem of first closeouts 131 move up in construction is avoided, for the ease of Second closeouts 132 are installed in the building enclosure 11, and second closeouts 132 pass through with the building enclosure 11 One screw connection.
In order to be preferably illustrated to second closeouts 132, referring to Figure 2 together and Fig. 7, second envelope Blocking piece 132 includes that the second plugging plate 1321 and at least one recessed portion 1322, the recessed portion 1322 are set to second envelope On closure plate 1321, the bottom of the recessed portion 1322 is connect with the building enclosure 11, is connected by screw between the two, example Such as, the quantity of the recessed portion 1322 is one, and the recessed portion 1322 is set to the middle position of second plugging plate 1321 It sets, and is connect by a screw with second plugging plate 1321, for another example, the quantity of the recessed portion 1322 is two, two The recessed portion 1322 is respectively arranged at the both ends of second plugging plate 1321, i.e., described second closeouts 132 are " bow " word Shape structure is provided with a screw in each recessed portion 1322, when the quantity of the recessed portion 1322 is more, second envelope The stability of blocking piece 132 is higher, and the screw in each recessed portion 1322 is more, can be further improved described second and blocks The stability of part 132 is no longer gone to live in the household of one's in-laws on getting married herein in the case of the quantity of the recessed portion 1322 is three and three or more It states.
For the ease of the sealing of second closeouts 132, referring to Figure 7 together and Fig. 8, second closeouts 132 further include at least one covering members 1323, forms jagged 1324, Mei Yisuo between the two side walls of the recessed portion 1322 It states covering component and blocks a notch 1324.The quantity of the covering members 1323 is equal with the quantity of the recessed portion 1322, Each covering members 1323 are corresponding with a recessed portion 1322, for fixing due to being provided in the recessed portion 1322 Screw, the notch 1324 on the recessed portion 1322 are used for the disengaging of screw, i.e., the described notch 1324 convenient for screw installation and Disassembly.Second closeouts 132 need to keep higher leakproofness in construction operation, and the covering members 1323 are set to institute It states in recessed portion 1322, so that the covering members 1323 block the notch 1324, i.e., each covering component blocks one The notch 1324.
In order to promote the leakproofness of second closeouts 132, referring to Figure 7 together and Fig. 8, the recessed portion 1322 Two side walls on be respectively arranged with a protrusion, the protrusion includes the first protrusion 1325 and second protrusion 1326, described first It is formed with the first groove 1327 between protrusion 1325 and second protrusion 1326, the end of the covering members 1323 is set to institute It states in the first groove 1327, so that the both ends of the covering members 1323 are connected on 1322 side wall of recessed portion, i.e., the described screening The both ends of cover piece 1323 are connected on 1322 side wall of recessed portion, in this way, the covering members 1323 are complete by the notch 1324 It full covering and blocks.
It is fixed in second closeouts 132 for the ease of covering members 1323, the both ends difference of the covering members 1323 It is provided with a positioning region 1328, the positioning region 1328 and the end of the covering members 1323 are formed with the second groove 1329, institute It states the second protrusion 1326 to be set in second groove 1329, the positioning region 1328 is connected in second groove 1329 Side wall, so that the positioning region 1328 is stably connected with second protrusion 1326, so that the covering members 1323 are stablized It is connected in second closeouts 132.In order to further enhance the company of the covering members 1323 and second closeouts 132 Connecing property, the positioning region 1328 have rounded corners, and the center of circle of the chamfering of the positioning region 1328 is located remotely from the protrusion The chamfering of side, i.e., the described positioning region 1328 curves inwardly, so that the covering members 1323 have " [" character form structure, to make The covering members 1323 are obtained more easily to be fixed in second closeouts 132.
For the ease of the fixation of the building enclosure 11, mounting groove is offered on floor 20, the one of the building enclosure 11 End is inserted in the mounting groove, mounting plate is provided in the mounting groove, one end of the building enclosure is inserted in the peace The floor is fixed in tankage and by the mounting plate.At least one setscrew being provided on mounting plate, the building Plate is additionally provided with an at least setscrew, and one end of the building enclosure is inserted in the mounting groove and by the mounting plate And the setscrew is fixed on the floor, the mounting plate is fixedly connected by the cross bar screw with the floor 20. In construction operation, the building enclosure 11 is installed on the mounting plate, makes the building enclosure 11 by casting concrete It is fixed in the mounting groove, provides support force for the balcony, to ensure that the balcony is vertically installed in the mounting groove, Convenient for the fixation of the building enclosure 11, after the concrete setting in the mounting groove, stablize the building enclosure of setting 11 make the installation of the drain assembly 12 and the blocking component 13 more convenient.
Strut is installed for the ease of the balcony, please refers to Fig. 9 and Figure 10, there are two fixed for setting in the building enclosure Position part 16, at least one connecting hole 161 offered on the locating piece 16 are provided with connector in the connecting hole 161, institute It states locating piece 16 and is connect by the connector with the building enclosure, the medium position of the building enclosure offers locating slot 162, the locating slot 162 is for being clamped locating rod.For the ease of being clamped locating rod, convex is provided in the building enclosure Block 163, the locating slot 162 are set on the locating convex block 163 so that the middle part of the locating convex block 163 formed it is oriented The slot of sunken inside, i.e., so that the locating slot 162 can be used for accommodating locating rod, convenient for strut is arranged between locating rod.
For the ease of the dismounting of the balcony, Figure 11 is please referred to, handle 17 is additionally provided in the building enclosure, it is described to mention Hand 17 is set to the one end of the building enclosure far from the floor 20, is provided in the building enclosure and connects with the handle 17 The fastener 171 connect, it is described to be connect by screw with the handle 17 through fastener 171, for example, the fastener 171 is arranged In on the building enclosure lateral wall, for another example, the fastener 171 is set to the inside of the building enclosure, the fastener 171 are tightly attached to the upper top surface of the building enclosure, and are connected by screw to the handle 17, so that the handle 17 is solid securely It, only need to can will be described by the handle 17 in this way, when mounting and dismounting the building enclosure due in the building enclosure Building enclosure is put into and detaches the floor 20, provides a device convenient for crawl to dismount the building enclosure.
Steps are as follows for the Specific construction of anti-bank structure:1, drain assembly 12 is fixed on by steel nail and the second fixing piece 15 On the floor 20;2, the second closeouts 132 are fixed on the floor 20;3, pass through tap bolt for the first closeouts 131 are connected and fixed with drain assembly 12 and the first fixing piece 14;4, the second closeouts 132 are passed through into tap bolt after adjustment height It is connect with railing;5, pass through the tap bolt hole in 1,323 second closeouts 132 of covering members.
By the above-mentioned balcony, by draining group by concave shape the sewage generated in construction operation is discharged, Blocking component is fixed in building enclosure and mutually abuts, make for sealing building enclosure, the first closeouts and the second closeouts Obtain the sealing effect of closeouts more preferably.In construction, balcony is set on 20 structure sheaf of balcony floor, eliminates the anti-bank of balcony Wet construction eliminates the anti-bank form erecting operation of balcony, reduces flitch usage amount, while also eliminating subsequent plastering and patch block Operation.Since the structure of balcony is simple, so that the installation speed of balcony is fast, improves work efficiency, reduce cost.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously Limitations on the scope of the patent of the present invention therefore cannot be interpreted as.It should be pointed out that for those of ordinary skill in the art For, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to guarantor of the invention Protect range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.

Claims (10)

1. a kind of balcony, which is characterized in that including building enclosure and anti-bank structure;
One end of the building enclosure is for being inserted in floor;
The anti-bank structure includes drain assembly and blocking component;
The drain assembly is for being mounted on the floor, and the drain assembly is adjacent with the building enclosure sets It sets;
The blocking component is set to the building enclosure close to the position of the floor, for blocking the building enclosure.
2. balcony according to claim 1, which is characterized in that the balcony further includes the first fixing piece, and described first blocks The other end of part is connect by first fixing piece with the floor.
3. balcony according to claim 1, which is characterized in that the anti-bank structure is aluminium alloy structure.
4. balcony according to claim 3, which is characterized in that the drain assembly and the blocking component are aluminium alloy Part.
5. balcony according to claim 1, which is characterized in that the height of the blocking component is according to the height of the building enclosure Degree setting.
6. balcony according to claim 1, which is characterized in that the building enclosure includes that coaming plate, railing or tool are parapeted Coaming plate.
7. according to claim 1 to balcony described in any one of 6, which is characterized in that the balcony further includes floor.
8. balcony according to claim 7, which is characterized in that the floor offers mounting groove, and the one of the building enclosure End is inserted in the mounting groove.
9. balcony according to claim 8, which is characterized in that the floor is provided with mounting plate, institute in the mounting groove The one end for stating building enclosure is inserted in the mounting groove and is fixed on the floor by the mounting plate.
10. balcony according to claim 9, which is characterized in that the floor is additionally provided with an at least setscrew, described to enclose One end of protection structure is inserted in the mounting groove and is fixed on the floor by the mounting plate and the setscrew.
CN201810556636.2A 2018-06-01 2018-06-01 A kind of balcony Pending CN108824630A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810556636.2A CN108824630A (en) 2018-06-01 2018-06-01 A kind of balcony

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810556636.2A CN108824630A (en) 2018-06-01 2018-06-01 A kind of balcony

Publications (1)

Publication Number Publication Date
CN108824630A true CN108824630A (en) 2018-11-16

Family

ID=64145753

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810556636.2A Pending CN108824630A (en) 2018-06-01 2018-06-01 A kind of balcony

Country Status (1)

Country Link
CN (1) CN108824630A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518800A (en) * 2018-12-04 2019-03-26 筑梦高科建筑有限公司 Balcony substrate and prefabricated balcony

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000038813A (en) * 1998-07-23 2000-02-08 Sekisui Chem Co Ltd Waterproof structure for gutter on roof floor
JP2002194859A (en) * 2000-12-25 2002-07-10 Takiron Co Ltd End structure of waterproof pan
JP2008240240A (en) * 2007-03-23 2008-10-09 Kumagai Gumi Co Ltd Support installation structure of balustrade
CN104389394A (en) * 2014-12-16 2015-03-04 中国建筑第六工程局有限公司 Fixing device for glass railing mounted on lateral border of wall body
CN205530676U (en) * 2016-03-26 2016-08-31 友力建设集团有限公司 Anti -wind balcony
CN206467926U (en) * 2017-01-21 2017-09-05 深圳唐彩装饰设计工程有限公司 The glass fitting structure of guardrail
CN206844347U (en) * 2017-04-18 2018-01-05 中国建筑第二工程局有限公司 Anti-bank structure of stagnant water

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000038813A (en) * 1998-07-23 2000-02-08 Sekisui Chem Co Ltd Waterproof structure for gutter on roof floor
JP2002194859A (en) * 2000-12-25 2002-07-10 Takiron Co Ltd End structure of waterproof pan
JP2008240240A (en) * 2007-03-23 2008-10-09 Kumagai Gumi Co Ltd Support installation structure of balustrade
CN104389394A (en) * 2014-12-16 2015-03-04 中国建筑第六工程局有限公司 Fixing device for glass railing mounted on lateral border of wall body
CN205530676U (en) * 2016-03-26 2016-08-31 友力建设集团有限公司 Anti -wind balcony
CN206467926U (en) * 2017-01-21 2017-09-05 深圳唐彩装饰设计工程有限公司 The glass fitting structure of guardrail
CN206844347U (en) * 2017-04-18 2018-01-05 中国建筑第二工程局有限公司 Anti-bank structure of stagnant water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518800A (en) * 2018-12-04 2019-03-26 筑梦高科建筑有限公司 Balcony substrate and prefabricated balcony

Similar Documents

Publication Publication Date Title
US20100281794A1 (en) Device for holding photovoltaic panels on a roof, including holding means allowing an air flow between a base plane and the photovoltaic panel
CN106801473A (en) Aluminium alloy structure house
CN104956011A (en) Embedment attachment system
US11987938B2 (en) Drainage device and methods for constructing and use
CN208594747U (en) Guide wall form board fixture and guide wall form board system
CN108824630A (en) A kind of balcony
KR101264529B1 (en) Drain pipe supporting device of bridge
CN208981469U (en) A kind of anti-bank structure
CN106149922A (en) A kind of dismantled and assembled stealthy partition wall system and assembly and disassembly methods thereof
CN215889098U (en) Assembled wall system with wall top closing structure
CN211473059U (en) Assembled house alloy aluminum upper middle beam
CN208899693U (en) One plants case room wallboard installing structure
KR20100002206U (en) Rayer roof drain system
JP2004003168A (en) Fixing metal fitting of concrete form
KR20200142352A (en) Anti-seismic reinforcing structure for preventing collapse of a masonry wall and a finishing structure for preventing collapse of the masonry wall having the same
JP3202889U (en) Support equipment for piping, etc.
JPH053622Y2 (en)
CN217027669U (en) Self-stabilizing member of prefabricated ribbed cavity floor for prefabricated building
CN208310194U (en) A kind of toilet drop plate internal corner formwork
CN221298242U (en) Novel embedded part and tool thereof
CN212641905U (en) U-shaped double-buckle edging middle hole nut external adjustment keel connecting pendant
CN213626742U (en) Dry-type building concrete connection structure
KR102250069B1 (en) Dry wall structure for bathroom
KR101131356B1 (en) Roof connector of sectional structure
KR101146002B1 (en) Roof connector of sectional structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190619

Address after: 528300 East Office, No. 11 Junye East Road, Beijiao Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Bozhilin Robot Co., Ltd.

Address before: 519031 Room 105-44144, No. 6 Baohua Road, Hengqin New District, Zhuhai City, Guangdong Province

Applicant before: Building dream high tech Construction Company Limited

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116

RJ01 Rejection of invention patent application after publication