CN208899693U - One plants case room wallboard installing structure - Google Patents

One plants case room wallboard installing structure Download PDF

Info

Publication number
CN208899693U
CN208899693U CN201821551083.3U CN201821551083U CN208899693U CN 208899693 U CN208899693 U CN 208899693U CN 201821551083 U CN201821551083 U CN 201821551083U CN 208899693 U CN208899693 U CN 208899693U
Authority
CN
China
Prior art keywords
wallboard
mentioned
card slot
slot
bottom beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821551083.3U
Other languages
Chinese (zh)
Inventor
崔雅新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Haoshi Integrated Housing Co Ltd
Original Assignee
Beijing Haoshi Integrated Housing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Haoshi Integrated Housing Co Ltd filed Critical Beijing Haoshi Integrated Housing Co Ltd
Priority to CN201821551083.3U priority Critical patent/CN208899693U/en
Application granted granted Critical
Publication of CN208899693U publication Critical patent/CN208899693U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to building fields, in particular to a plants case room wallboard installing structure.The case room wallboard installing structure of the utility model includes top beam, bottom beam, wallboard and hanging part;The top beam and bottom beam are horizontally disposed strip beam body, and the top beam is arranged in parallel in the top of the bottom beam;The bottom beam upper end is fixed with card slot along its length, the lower end of the top beam is equipped with mounting slot, and the wallboard is vertically arranged, and lower end is protruded into and is fastened in the card slot, the upper end extends to the inside of the mounting slot, and is mounted by multiple spaced first hanging parts and the mounting slot.Advantage: structure design is simple, and wallboard installation is stablized, and dismounting combination is convenient, fast, the period is short.

Description

One plants case room wallboard installing structure
Technical field
The utility model relates to building fields, in particular to a plants case room wallboard installing structure.
Background technique
Currently, the wallboard in traditional case room generally is completed to assemble by the way of welding with top beam and bottom beam, directly weld Wallboard cannot dismantle, simultaneously because welding capacity is larger, be mostly after factory's welding FCL transport and use ground, increase Transportation cost.
In addition, there are also the scheme that can slightly move after a kind of installation of wallboard, although wallboard it is slight move solve it is above-mentioned Problem, but due to being that simple blocking by steel plate is not fallen on the upside of wallboard, there is displacement in inward-outward direction in wallboard.Use one After the section time, wallboard can have a steel plate due to being to be kept off fixing by steel plate, after a period of use and block on wallboard Mark, influence the appearance of wallboard, there are certain influences to the secondary use of wallboard.
Utility model content
The technical problem to be solved by the utility model is to provide a plants case room wallboard installing structure, effectively overcome existing There is the defect of technology.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a plants case room wallboard installing structure, including top Beam, bottom beam, wallboard and hanging part;
Above-mentioned top beam and bottom beam are horizontally disposed strip beam body, and above-mentioned top beam is arranged in parallel in above-mentioned bottom beam Top;
Above-mentioned bottom beam upper end is fixed with card slot along its length, and the lower end of above-mentioned top beam is equipped with mounting slot, above-mentioned wallboard It is vertically arranged, lower end is protruded into and is fastened in above-mentioned card slot, and the upper end extends to the inside of above-mentioned mounting slot, and passes through multiple It is mounted every the first hanging part of setting and above-mentioned mounting slot.
The beneficial effects of the utility model are: structure design is simple, wallboard installation is stablized, and dismounting combination is convenient, fast, all Phase is short.
Based on the above technical solution, the utility model can also do following improvement.
Further, the upper end of above-mentioned bottom beam is integrally formed along its length is equipped with protruding portion, and above-mentioned card slot is set to The outside of above-mentioned protruding portion, and be located at the lower section on the inside of above-mentioned mounting slot, the top of cell wall is to its inside water on the inside of above-mentioned card slot Flat to be extended with interconnecting piece, above-mentioned interconnecting piece is covered in above-mentioned protruding portion upper end, and above-mentioned wallboard lower end corresponds to the position of above-mentioned card slot Female part is extended downwardly, the lower end of above-mentioned wallboard is covered in the upper end of above-mentioned interconnecting piece, and above-mentioned female part protrudes into and engages In above-mentioned card slot.
Beneficial effect using above-mentioned further scheme is the firm installation that the design is conducive to card slot, meanwhile, wallboard and card The abutting of the interconnecting piece of slot is also conducive to the preferable stress load-bearing of wallboard.
Further, there are abutting part, above-mentioned first mounting in the top of cell wall to its inside horizontal extension on the inside of above-mentioned mounting slot Part covers on above-mentioned abutting part, and mounts with above-mentioned mounting slot, and above-mentioned first hanging part connect solid with the upper end of above-mentioned wallboard It is fixed.
Beneficial effect using above-mentioned further scheme is that the design is conducive to steadily hanging for the first hanging part.
Further, the upper end end of above-mentioned wallboard is vertically-mounted bolt, and the screw rod of above-mentioned bolt is hung through above-mentioned first Fitting, the position that above-mentioned first hanging part upper and lower side is located on above-mentioned screw rod is threaded with nut respectively, by above-mentioned first Hanging part is fixed with above-mentioned screw rod.
Beneficial effect using above-mentioned further scheme is that the design is simple, ingenious, conducive to wallboard and the first hanging part Fast assembling-disassembling combination.
It further, further include at least two reinforcing props, at least two above-mentioned reinforcing props run through above-mentioned wallboard vertically respectively, and It being evenly distributed between above-mentioned wallboard both ends, the upper end of above-mentioned reinforcing prop is mounted by the second hanging part and above-mentioned mounting slot, Lower end is detachably connected with above-mentioned bottom beam.
Beneficial effect using above-mentioned further scheme be the design of reinforcing prop so that entire wallboard and bottom beam and top beam it Between connection it is more secured, structural strength is higher.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the case room wallboard installing structure of the utility model;
Fig. 2 is the structural representation that reinforcing prop and top beam and bottom beam cooperate in the case room wallboard installing structure of the utility model Figure.
In attached drawing, parts list represented by the reference numerals are as follows:
1, top beam, 2, bottom beam, 3, wallboard, 5, card slot, the 6, first hanging part, 7, reinforcing prop, the 8, second hanging part, 11, extension Access slot, 21, protruding portion, 51, interconnecting piece, 111, abutting part.
Specific embodiment
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining that this is practical It is novel, it is not intended to limit the scope of the utility model.
Embodiment: as illustrated in fig. 1 and 2, the case room wallboard installing structure of the present embodiment includes top beam 1, bottom beam 2 and wallboard 3;
Above-mentioned top beam 1 and bottom beam 2 are horizontally disposed strip beam body, and above-mentioned top beam 1 is arranged in parallel in above-mentioned bottom The top of beam 2;
Above-mentioned 2 upper end of bottom beam is fixed with card slot 5 along its length, and the lower end of above-mentioned top beam 1 is equipped with mounting slot 11, above-mentioned Wallboard 3 is vertically arranged, and lower end is protruded into and is fastened in above-mentioned card slot 5, and the upper end extends to the inside of above-mentioned mounting slot 11, and leads to Multiple spaced first hanging parts 6 are crossed to mount with above-mentioned mounting slot 11.
Entire mounting structure is cooperated by card slot 5 with the engaging of wallboard 3 and the mounting of the first hanging part 6 and mounting slot 11 Realize to the installation of the precise positioning of wallboard 3 and quickly dismounting combination, wallboard 3 no longer using the fixed installations such as welding by the way of, Packaging technology faster, the period it is shorter, wallboard 3 is also more stable after installing, and is not susceptible to inside and outside shaking.
Preferably, the upper end of above-mentioned bottom beam 2 is integrally formed along its length to be equipped with protruding portion 21, above-mentioned card slot 5 is set Be placed in the outside of above-mentioned protruding portion 21, and be located at the lower section of above-mentioned 11 inside of mounting slot, the top of above-mentioned 5 inside cell wall of card slot to Its inside horizontal extension has interconnecting piece 51, and above-mentioned interconnecting piece 51 is covered in above-mentioned 21 upper end of protruding portion, and above-mentioned 3 lower end of wallboard is corresponding The position of above-mentioned card slot 5 has extended downwardly female part 31, and the lower end of above-mentioned wallboard 3 is covered in the upper end of above-mentioned interconnecting piece 51, and Above-mentioned female part 31 is protruded into and is fastened in above-mentioned card slot 5, on the one hand the design of the protruding portion 21 can play wallboard 3 preferably Load-bearing effect, on the other hand make the installation of card slot 5 more stable, vulnerable to extraneous factor influence occur inward-outward direction shifting It is dynamic, so that the entire installation of wallboard 3 is more firm.
It should be understood that top beam 1 and bottom beam 2 are steel stamping part, top beam 1 includes the upper bending of vertical portion and upper end The mounting slot 11 that portion and lower end bending are formed, wherein the upper bending part of 1 upper end of top beam forms the groove profile knot of an opening upwards Structure convenient for connect with case roof wall, and is conducive to entirety central drainage, the protruding portion 21 on bottom beam 2 by 2 upper end of bottom beam bending Portion is stamped and formed out.
Preferably, there is an abutting part 111 on the top of above-mentioned 11 inside cell wall of mounting slot to its inside horizontal extension, above-mentioned first Hanging part 6 covers on above-mentioned abutting part 111, and mounts with above-mentioned mounting slot 11, above-mentioned first hanging part 6 and above-mentioned wallboard 3 Upper end be connected and fixed, the design of abutting part 111 enable to the first mounting part 6 smoothly with mounting slot 11 mount, be not easy to send out Raw displacement.
Preferably, the upper end end of above-mentioned wallboard 3 is vertically-mounted bolt, the screw rod of above-mentioned bolt is hung through above-mentioned first Fitting 6, the position that above-mentioned first hanging part, 6 upper and lower side is located on above-mentioned screw rod are threaded with nut respectively, by above-mentioned the One hanging part 6 is fixed with above-mentioned screw rod, and above-mentioned first hanging part 6 most preferably uses hook corner fittings for building, the screw rod upper end of bolt After hooking corner fittings, fixed by screwing the nut on screw rod (nut, which is located at, hooks corner fittings upper end) with hook corner fittings.
It should be noted that: the upper end of above-mentioned wallboard 3 and inside and outside be coated with integrally formed metal hemming edge part, The nut portion clamping of bolt is between 3 upper end end of bound edge part and wallboard, and screw portion is upward through bound edge part, to complete Fixation to bolt is also coated with integrally formed metal hemming edge part, the wall inside and outside the lower end and lower end of above-mentioned wallboard 3 The metal hemming edge part of 3 lower end of plate can use by through 21 upper end of the bound edge part and interconnecting piece 51 and protruding portion bolt with And it is arranged in 21 lower end of protruding portion, and the nut connecting with the bolt thread is fixed.
It in some embodiments, further include at least two reinforcing props 7, at least two above-mentioned reinforcing props 7 run through vertically respectively Above-mentioned wallboard 3, and being evenly distributed between above-mentioned 3 both ends of wallboard, the upper end of above-mentioned reinforcing prop 7 by the second hanging part 8 with it is upper It states mounting slot 11 to mount, lower end is detachably connected with above-mentioned bottom beam 2, and the design of reinforcing prop 7 is so that 3 entirety of wallboard and top beam 1 Bonding strength between bottom beam 2 is promoted, and also improves the structural strength of wallboard 3.
In general, reinforcing prop 7 is equipped with two, and wallboard 3 is distributed in close to the position at its both ends, it is ensured that the case after assembling Four, room corner has preferable structural strength.
Above-mentioned 7 optimal design of reinforcing prop is screw rod or both ends have threaded metal round rod, and reinforcing prop 7 runs through wallboard 3, and It is fixed with wallboard 3, it both ends or sets threaded both ends and leaks out outside 3 upper and lower side of wallboard, the upper end of reinforcing prop 7 is through being articulated in The second hanging part 8 on mounting slot 11 is stated, and is revolved by clamping in the nut of above-mentioned second hanging part, 8 upper and lower side and with its screw thread The nut of conjunction is fixed between each other, and the lower end of reinforcing prop 7 is existed behind the upper end of interconnecting piece 51 and protruding portion 21 by clamping 51 upper end of interconnecting piece and 21 lower part of protruding portion and the nut screwed with the lower thread of reinforcing prop is fixed between each other, dismounting When, nut is removed in order, it is very convenient.
In use in view of later period case room, the surface of wallboard 3 has water flow in rainwater weather and flows downwardly to card slot 5 Interior, therefore, in the lower part of the outside cell wall of card slot 5, the position of close or corresponding bottom wall is provided with drainage hole, to be conducive in card slot 5 The discharge of the rainwater of entrance avoids prolonged stay rainwater in card slot 5 from causing serious corrosion and damage.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model Within the scope of shield.

Claims (5)

1. a plants case room wallboard installing structure, it is characterised in that: including top beam (1), bottom beam (2) and wallboard (3);
The top beam (1) and bottom beam (2) are horizontally disposed strip beam body, and the top beam (1) be arranged in parallel in it is described The top of bottom beam (2);
Bottom beam (2) upper end is fixed with card slot (5) along its length, and the lower end of the top beam (1) is equipped with mounting slot (11), The wallboard (3) is vertically arranged, and lower end is protruded into and is fastened in the card slot (5), and the upper end extends to the mounting slot (11) Inside, and by multiple spaced first hanging parts (6) and the mounting slot (11) mounting.
2. a plants case according to claim 1 room wallboard installing structure, it is characterised in that: the upper end edge of the bottom beam (2) Its length direction is integrally formed to be equipped with protruding portion (21), and the card slot (5) is set to the outside of the protruding portion (21), and position There is interconnecting piece on the top of lower section on the inside of mounting slot (11), card slot (5) inside cell wall to its inside horizontal extension (51), the interconnecting piece (51) covers in the protruding portion (21) upper end, and wallboard (3) lower end corresponds to the card slot (5) Position has extended downwardly female part (31), and the lower end of the wallboard (3) is covered in the upper end of the interconnecting piece (51), and described holds Interpolating unit (31) is protruded into and is fastened in the card slot (5).
3. a plants case according to claim 2 room wallboard installing structure, it is characterised in that: mounting slot (11) inner side slot The top of wall has abutting part (111) to its inside horizontal extension, and first hanging part (6) covers in the abutting part (111) On, and mounted with the mounting slot (11), first hanging part (6) and the upper end of the wallboard (3) are connected and fixed.
4. a plants case according to claim 3 room wallboard installing structure, it is characterised in that: the upper end end of the wallboard (3) Portion is vertically-mounted bolt, and the screw rod of the bolt runs through first hanging part (6), is located at described first on the screw rod and hangs The position of fitting (6) upper and lower side is threaded with nut respectively, and first hanging part (6) is fixed with the screw rod.
5. according to claim 2 to 4 described in any item plants cases room wallboard installing structure, it is characterised in that: further include at least Two reinforcing props (7), at least two reinforcing props (7) run through the wallboard (3) vertically respectively, and are evenly distributed on the wall Between plate (3) both ends, the upper end of the reinforcing prop (7) is mounted by the second hanging part (8) and the mounting slot (11), lower end It is detachably connected with the bottom beam (2).
CN201821551083.3U 2018-09-21 2018-09-21 One plants case room wallboard installing structure Active CN208899693U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821551083.3U CN208899693U (en) 2018-09-21 2018-09-21 One plants case room wallboard installing structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821551083.3U CN208899693U (en) 2018-09-21 2018-09-21 One plants case room wallboard installing structure

Publications (1)

Publication Number Publication Date
CN208899693U true CN208899693U (en) 2019-05-24

Family

ID=66573318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821551083.3U Active CN208899693U (en) 2018-09-21 2018-09-21 One plants case room wallboard installing structure

Country Status (1)

Country Link
CN (1) CN208899693U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914665A (en) * 2021-11-01 2022-01-11 中国人民解放军32181部队 Splicing combined movable house

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113914665A (en) * 2021-11-01 2022-01-11 中国人民解放军32181部队 Splicing combined movable house

Similar Documents

Publication Publication Date Title
CN208899693U (en) One plants case room wallboard installing structure
CN205447185U (en) Pole setting linkage of outdoor case
CN111636476A (en) Piping lane fixing device for construction
CN209099513U (en) A kind of preferable case room of drainage performance
CN207749850U (en) A kind of level(l)ing device of elevator steel structure frame
CN105736923A (en) Liquid crystal television mount with positioning and mounting convenience
CN209114611U (en) A kind of modularization coloured silk steel assembly room
CN208884801U (en) Metal plate curtain wall
CN202969647U (en) Self balance point type curtain wall
CN207453290U (en) A kind of laterally attached roofing bottom plate and roof board system
KR200457096Y1 (en) Additional reinforcement is formed water retention mechanism
CN201635228U (en) Novel flash rack ceiling system
CN207124586U (en) A kind of novel high-strength is easy to position to fix solar energy aluminum frame
CN205116492U (en) Switching device of installation siphon riser on bright frame glass curtain wall
CN220868543U (en) Glass convenient installation structure of broken line curtain wall
CN204212317U (en) The metal storehouse plate of a kind of anti-layered metal storehouse plate sheet material and formation thereof
CN110965681A (en) Mounting structure of big specification aluminum plate curtain wall
CN215160095U (en) B value adjustable construction elevator attaches wall member
CN204059749U (en) A kind of tubing rod member of space structures framework
CN220285108U (en) Aluminum plate curtain wall mounting structure
CN209620355U (en) Glass curtain wall long-span beam connection structure
CN211533406U (en) Express cabinet with ceiling
CN209556488U (en) A kind of monitoring upright bar facilitating installation and equipment dilatation
CN218346597U (en) Gutter installation component convenient to overhaul
CN219884687U (en) Box drainage structure and container

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant