CN208899693U - One plants case room wallboard installing structure - Google Patents
One plants case room wallboard installing structure Download PDFInfo
- Publication number
- CN208899693U CN208899693U CN201821551083.3U CN201821551083U CN208899693U CN 208899693 U CN208899693 U CN 208899693U CN 201821551083 U CN201821551083 U CN 201821551083U CN 208899693 U CN208899693 U CN 208899693U
- Authority
- CN
- China
- Prior art keywords
- wallboard
- mentioned
- card slot
- slot
- bottom beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model relates to building fields, in particular to a plants case room wallboard installing structure.The case room wallboard installing structure of the utility model includes top beam, bottom beam, wallboard and hanging part;The top beam and bottom beam are horizontally disposed strip beam body, and the top beam is arranged in parallel in the top of the bottom beam;The bottom beam upper end is fixed with card slot along its length, the lower end of the top beam is equipped with mounting slot, and the wallboard is vertically arranged, and lower end is protruded into and is fastened in the card slot, the upper end extends to the inside of the mounting slot, and is mounted by multiple spaced first hanging parts and the mounting slot.Advantage: structure design is simple, and wallboard installation is stablized, and dismounting combination is convenient, fast, the period is short.
Description
Technical field
The utility model relates to building fields, in particular to a plants case room wallboard installing structure.
Background technique
Currently, the wallboard in traditional case room generally is completed to assemble by the way of welding with top beam and bottom beam, directly weld
Wallboard cannot dismantle, simultaneously because welding capacity is larger, be mostly after factory's welding FCL transport and use ground, increase
Transportation cost.
In addition, there are also the scheme that can slightly move after a kind of installation of wallboard, although wallboard it is slight move solve it is above-mentioned
Problem, but due to being that simple blocking by steel plate is not fallen on the upside of wallboard, there is displacement in inward-outward direction in wallboard.Use one
After the section time, wallboard can have a steel plate due to being to be kept off fixing by steel plate, after a period of use and block on wallboard
Mark, influence the appearance of wallboard, there are certain influences to the secondary use of wallboard.
Utility model content
The technical problem to be solved by the utility model is to provide a plants case room wallboard installing structure, effectively overcome existing
There is the defect of technology.
The technical solution that the utility model solves above-mentioned technical problem is as follows: a plants case room wallboard installing structure, including top
Beam, bottom beam, wallboard and hanging part;
Above-mentioned top beam and bottom beam are horizontally disposed strip beam body, and above-mentioned top beam is arranged in parallel in above-mentioned bottom beam
Top;
Above-mentioned bottom beam upper end is fixed with card slot along its length, and the lower end of above-mentioned top beam is equipped with mounting slot, above-mentioned wallboard
It is vertically arranged, lower end is protruded into and is fastened in above-mentioned card slot, and the upper end extends to the inside of above-mentioned mounting slot, and passes through multiple
It is mounted every the first hanging part of setting and above-mentioned mounting slot.
The beneficial effects of the utility model are: structure design is simple, wallboard installation is stablized, and dismounting combination is convenient, fast, all
Phase is short.
Based on the above technical solution, the utility model can also do following improvement.
Further, the upper end of above-mentioned bottom beam is integrally formed along its length is equipped with protruding portion, and above-mentioned card slot is set to
The outside of above-mentioned protruding portion, and be located at the lower section on the inside of above-mentioned mounting slot, the top of cell wall is to its inside water on the inside of above-mentioned card slot
Flat to be extended with interconnecting piece, above-mentioned interconnecting piece is covered in above-mentioned protruding portion upper end, and above-mentioned wallboard lower end corresponds to the position of above-mentioned card slot
Female part is extended downwardly, the lower end of above-mentioned wallboard is covered in the upper end of above-mentioned interconnecting piece, and above-mentioned female part protrudes into and engages
In above-mentioned card slot.
Beneficial effect using above-mentioned further scheme is the firm installation that the design is conducive to card slot, meanwhile, wallboard and card
The abutting of the interconnecting piece of slot is also conducive to the preferable stress load-bearing of wallboard.
Further, there are abutting part, above-mentioned first mounting in the top of cell wall to its inside horizontal extension on the inside of above-mentioned mounting slot
Part covers on above-mentioned abutting part, and mounts with above-mentioned mounting slot, and above-mentioned first hanging part connect solid with the upper end of above-mentioned wallboard
It is fixed.
Beneficial effect using above-mentioned further scheme is that the design is conducive to steadily hanging for the first hanging part.
Further, the upper end end of above-mentioned wallboard is vertically-mounted bolt, and the screw rod of above-mentioned bolt is hung through above-mentioned first
Fitting, the position that above-mentioned first hanging part upper and lower side is located on above-mentioned screw rod is threaded with nut respectively, by above-mentioned first
Hanging part is fixed with above-mentioned screw rod.
Beneficial effect using above-mentioned further scheme is that the design is simple, ingenious, conducive to wallboard and the first hanging part
Fast assembling-disassembling combination.
It further, further include at least two reinforcing props, at least two above-mentioned reinforcing props run through above-mentioned wallboard vertically respectively, and
It being evenly distributed between above-mentioned wallboard both ends, the upper end of above-mentioned reinforcing prop is mounted by the second hanging part and above-mentioned mounting slot,
Lower end is detachably connected with above-mentioned bottom beam.
Beneficial effect using above-mentioned further scheme be the design of reinforcing prop so that entire wallboard and bottom beam and top beam it
Between connection it is more secured, structural strength is higher.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the case room wallboard installing structure of the utility model;
Fig. 2 is the structural representation that reinforcing prop and top beam and bottom beam cooperate in the case room wallboard installing structure of the utility model
Figure.
In attached drawing, parts list represented by the reference numerals are as follows:
1, top beam, 2, bottom beam, 3, wallboard, 5, card slot, the 6, first hanging part, 7, reinforcing prop, the 8, second hanging part, 11, extension
Access slot, 21, protruding portion, 51, interconnecting piece, 111, abutting part.
Specific embodiment
The principles of the present invention and feature are described below in conjunction with attached drawing, example is served only for explaining that this is practical
It is novel, it is not intended to limit the scope of the utility model.
Embodiment: as illustrated in fig. 1 and 2, the case room wallboard installing structure of the present embodiment includes top beam 1, bottom beam 2 and wallboard 3;
Above-mentioned top beam 1 and bottom beam 2 are horizontally disposed strip beam body, and above-mentioned top beam 1 is arranged in parallel in above-mentioned bottom
The top of beam 2;
Above-mentioned 2 upper end of bottom beam is fixed with card slot 5 along its length, and the lower end of above-mentioned top beam 1 is equipped with mounting slot 11, above-mentioned
Wallboard 3 is vertically arranged, and lower end is protruded into and is fastened in above-mentioned card slot 5, and the upper end extends to the inside of above-mentioned mounting slot 11, and leads to
Multiple spaced first hanging parts 6 are crossed to mount with above-mentioned mounting slot 11.
Entire mounting structure is cooperated by card slot 5 with the engaging of wallboard 3 and the mounting of the first hanging part 6 and mounting slot 11
Realize to the installation of the precise positioning of wallboard 3 and quickly dismounting combination, wallboard 3 no longer using the fixed installations such as welding by the way of,
Packaging technology faster, the period it is shorter, wallboard 3 is also more stable after installing, and is not susceptible to inside and outside shaking.
Preferably, the upper end of above-mentioned bottom beam 2 is integrally formed along its length to be equipped with protruding portion 21, above-mentioned card slot 5 is set
Be placed in the outside of above-mentioned protruding portion 21, and be located at the lower section of above-mentioned 11 inside of mounting slot, the top of above-mentioned 5 inside cell wall of card slot to
Its inside horizontal extension has interconnecting piece 51, and above-mentioned interconnecting piece 51 is covered in above-mentioned 21 upper end of protruding portion, and above-mentioned 3 lower end of wallboard is corresponding
The position of above-mentioned card slot 5 has extended downwardly female part 31, and the lower end of above-mentioned wallboard 3 is covered in the upper end of above-mentioned interconnecting piece 51, and
Above-mentioned female part 31 is protruded into and is fastened in above-mentioned card slot 5, on the one hand the design of the protruding portion 21 can play wallboard 3 preferably
Load-bearing effect, on the other hand make the installation of card slot 5 more stable, vulnerable to extraneous factor influence occur inward-outward direction shifting
It is dynamic, so that the entire installation of wallboard 3 is more firm.
It should be understood that top beam 1 and bottom beam 2 are steel stamping part, top beam 1 includes the upper bending of vertical portion and upper end
The mounting slot 11 that portion and lower end bending are formed, wherein the upper bending part of 1 upper end of top beam forms the groove profile knot of an opening upwards
Structure convenient for connect with case roof wall, and is conducive to entirety central drainage, the protruding portion 21 on bottom beam 2 by 2 upper end of bottom beam bending
Portion is stamped and formed out.
Preferably, there is an abutting part 111 on the top of above-mentioned 11 inside cell wall of mounting slot to its inside horizontal extension, above-mentioned first
Hanging part 6 covers on above-mentioned abutting part 111, and mounts with above-mentioned mounting slot 11, above-mentioned first hanging part 6 and above-mentioned wallboard 3
Upper end be connected and fixed, the design of abutting part 111 enable to the first mounting part 6 smoothly with mounting slot 11 mount, be not easy to send out
Raw displacement.
Preferably, the upper end end of above-mentioned wallboard 3 is vertically-mounted bolt, the screw rod of above-mentioned bolt is hung through above-mentioned first
Fitting 6, the position that above-mentioned first hanging part, 6 upper and lower side is located on above-mentioned screw rod are threaded with nut respectively, by above-mentioned the
One hanging part 6 is fixed with above-mentioned screw rod, and above-mentioned first hanging part 6 most preferably uses hook corner fittings for building, the screw rod upper end of bolt
After hooking corner fittings, fixed by screwing the nut on screw rod (nut, which is located at, hooks corner fittings upper end) with hook corner fittings.
It should be noted that: the upper end of above-mentioned wallboard 3 and inside and outside be coated with integrally formed metal hemming edge part,
The nut portion clamping of bolt is between 3 upper end end of bound edge part and wallboard, and screw portion is upward through bound edge part, to complete
Fixation to bolt is also coated with integrally formed metal hemming edge part, the wall inside and outside the lower end and lower end of above-mentioned wallboard 3
The metal hemming edge part of 3 lower end of plate can use by through 21 upper end of the bound edge part and interconnecting piece 51 and protruding portion bolt with
And it is arranged in 21 lower end of protruding portion, and the nut connecting with the bolt thread is fixed.
It in some embodiments, further include at least two reinforcing props 7, at least two above-mentioned reinforcing props 7 run through vertically respectively
Above-mentioned wallboard 3, and being evenly distributed between above-mentioned 3 both ends of wallboard, the upper end of above-mentioned reinforcing prop 7 by the second hanging part 8 with it is upper
It states mounting slot 11 to mount, lower end is detachably connected with above-mentioned bottom beam 2, and the design of reinforcing prop 7 is so that 3 entirety of wallboard and top beam 1
Bonding strength between bottom beam 2 is promoted, and also improves the structural strength of wallboard 3.
In general, reinforcing prop 7 is equipped with two, and wallboard 3 is distributed in close to the position at its both ends, it is ensured that the case after assembling
Four, room corner has preferable structural strength.
Above-mentioned 7 optimal design of reinforcing prop is screw rod or both ends have threaded metal round rod, and reinforcing prop 7 runs through wallboard 3, and
It is fixed with wallboard 3, it both ends or sets threaded both ends and leaks out outside 3 upper and lower side of wallboard, the upper end of reinforcing prop 7 is through being articulated in
The second hanging part 8 on mounting slot 11 is stated, and is revolved by clamping in the nut of above-mentioned second hanging part, 8 upper and lower side and with its screw thread
The nut of conjunction is fixed between each other, and the lower end of reinforcing prop 7 is existed behind the upper end of interconnecting piece 51 and protruding portion 21 by clamping
51 upper end of interconnecting piece and 21 lower part of protruding portion and the nut screwed with the lower thread of reinforcing prop is fixed between each other, dismounting
When, nut is removed in order, it is very convenient.
In use in view of later period case room, the surface of wallboard 3 has water flow in rainwater weather and flows downwardly to card slot 5
Interior, therefore, in the lower part of the outside cell wall of card slot 5, the position of close or corresponding bottom wall is provided with drainage hole, to be conducive in card slot 5
The discharge of the rainwater of entrance avoids prolonged stay rainwater in card slot 5 from causing serious corrosion and damage.
The above is only the preferred embodiment of the present invention, is not intended to limit the utility model, all practical at this
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the guarantor of the utility model
Within the scope of shield.
Claims (5)
1. a plants case room wallboard installing structure, it is characterised in that: including top beam (1), bottom beam (2) and wallboard (3);
The top beam (1) and bottom beam (2) are horizontally disposed strip beam body, and the top beam (1) be arranged in parallel in it is described
The top of bottom beam (2);
Bottom beam (2) upper end is fixed with card slot (5) along its length, and the lower end of the top beam (1) is equipped with mounting slot (11),
The wallboard (3) is vertically arranged, and lower end is protruded into and is fastened in the card slot (5), and the upper end extends to the mounting slot (11)
Inside, and by multiple spaced first hanging parts (6) and the mounting slot (11) mounting.
2. a plants case according to claim 1 room wallboard installing structure, it is characterised in that: the upper end edge of the bottom beam (2)
Its length direction is integrally formed to be equipped with protruding portion (21), and the card slot (5) is set to the outside of the protruding portion (21), and position
There is interconnecting piece on the top of lower section on the inside of mounting slot (11), card slot (5) inside cell wall to its inside horizontal extension
(51), the interconnecting piece (51) covers in the protruding portion (21) upper end, and wallboard (3) lower end corresponds to the card slot (5)
Position has extended downwardly female part (31), and the lower end of the wallboard (3) is covered in the upper end of the interconnecting piece (51), and described holds
Interpolating unit (31) is protruded into and is fastened in the card slot (5).
3. a plants case according to claim 2 room wallboard installing structure, it is characterised in that: mounting slot (11) inner side slot
The top of wall has abutting part (111) to its inside horizontal extension, and first hanging part (6) covers in the abutting part (111)
On, and mounted with the mounting slot (11), first hanging part (6) and the upper end of the wallboard (3) are connected and fixed.
4. a plants case according to claim 3 room wallboard installing structure, it is characterised in that: the upper end end of the wallboard (3)
Portion is vertically-mounted bolt, and the screw rod of the bolt runs through first hanging part (6), is located at described first on the screw rod and hangs
The position of fitting (6) upper and lower side is threaded with nut respectively, and first hanging part (6) is fixed with the screw rod.
5. according to claim 2 to 4 described in any item plants cases room wallboard installing structure, it is characterised in that: further include at least
Two reinforcing props (7), at least two reinforcing props (7) run through the wallboard (3) vertically respectively, and are evenly distributed on the wall
Between plate (3) both ends, the upper end of the reinforcing prop (7) is mounted by the second hanging part (8) and the mounting slot (11), lower end
It is detachably connected with the bottom beam (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821551083.3U CN208899693U (en) | 2018-09-21 | 2018-09-21 | One plants case room wallboard installing structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821551083.3U CN208899693U (en) | 2018-09-21 | 2018-09-21 | One plants case room wallboard installing structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208899693U true CN208899693U (en) | 2019-05-24 |
Family
ID=66573318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821551083.3U Active CN208899693U (en) | 2018-09-21 | 2018-09-21 | One plants case room wallboard installing structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208899693U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914665A (en) * | 2021-11-01 | 2022-01-11 | 中国人民解放军32181部队 | Splicing combined movable house |
-
2018
- 2018-09-21 CN CN201821551083.3U patent/CN208899693U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113914665A (en) * | 2021-11-01 | 2022-01-11 | 中国人民解放军32181部队 | Splicing combined movable house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208899693U (en) | One plants case room wallboard installing structure | |
CN205447185U (en) | Pole setting linkage of outdoor case | |
CN111636476A (en) | Piping lane fixing device for construction | |
CN209099513U (en) | A kind of preferable case room of drainage performance | |
CN207749850U (en) | A kind of level(l)ing device of elevator steel structure frame | |
CN105736923A (en) | Liquid crystal television mount with positioning and mounting convenience | |
CN209114611U (en) | A kind of modularization coloured silk steel assembly room | |
CN208884801U (en) | Metal plate curtain wall | |
CN202969647U (en) | Self balance point type curtain wall | |
CN207453290U (en) | A kind of laterally attached roofing bottom plate and roof board system | |
KR200457096Y1 (en) | Additional reinforcement is formed water retention mechanism | |
CN201635228U (en) | Novel flash rack ceiling system | |
CN207124586U (en) | A kind of novel high-strength is easy to position to fix solar energy aluminum frame | |
CN205116492U (en) | Switching device of installation siphon riser on bright frame glass curtain wall | |
CN220868543U (en) | Glass convenient installation structure of broken line curtain wall | |
CN204212317U (en) | The metal storehouse plate of a kind of anti-layered metal storehouse plate sheet material and formation thereof | |
CN110965681A (en) | Mounting structure of big specification aluminum plate curtain wall | |
CN215160095U (en) | B value adjustable construction elevator attaches wall member | |
CN204059749U (en) | A kind of tubing rod member of space structures framework | |
CN220285108U (en) | Aluminum plate curtain wall mounting structure | |
CN209620355U (en) | Glass curtain wall long-span beam connection structure | |
CN211533406U (en) | Express cabinet with ceiling | |
CN209556488U (en) | A kind of monitoring upright bar facilitating installation and equipment dilatation | |
CN218346597U (en) | Gutter installation component convenient to overhaul | |
CN219884687U (en) | Box drainage structure and container |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |