CN213626742U - Dry-type building concrete connection structure - Google Patents

Dry-type building concrete connection structure Download PDF

Info

Publication number
CN213626742U
CN213626742U CN202021699949.2U CN202021699949U CN213626742U CN 213626742 U CN213626742 U CN 213626742U CN 202021699949 U CN202021699949 U CN 202021699949U CN 213626742 U CN213626742 U CN 213626742U
Authority
CN
China
Prior art keywords
bolt
plate
bottom plate
roof
diaphragm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021699949.2U
Other languages
Chinese (zh)
Inventor
江冰清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Mingyang Construction Group Co ltd
Original Assignee
Suichang Jiangrui Machinery Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suichang Jiangrui Machinery Design Co ltd filed Critical Suichang Jiangrui Machinery Design Co ltd
Priority to CN202021699949.2U priority Critical patent/CN213626742U/en
Application granted granted Critical
Publication of CN213626742U publication Critical patent/CN213626742U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model relates to a civil engineering technical field just discloses a dry-type building concrete connection structure, include the bottom plate and be located the roof of bottom plate top, the inside both sides fixed mounting of bottom plate has first diaphragm, first diaphragm has the fixed plate that is located the roof both sides through third bolt movable mounting, the equal screw thread in both ends of third bolt has cup jointed first nut, the roof passes through fourth bolt and two fixed plate movable mounting, the equal screw thread in both ends of fourth bolt has cup jointed the fourth nut. This dry-type building concrete connection structure, through using fourth bolt fastening fixed plate and roof, the fourth bolt passes the riser that inserts in the roof, and the bottom of fixed plate is fixed well through first bolt, second bolt, third bolt with the diaphragm for roof and bottom plate keep perpendicular, the effectual position of fixing the roof, this dry-type building concrete connection structure possesses the beneficial effect of effective fixed and support wall body.

Description

Dry-type building concrete connection structure
Technical Field
The utility model relates to a civil engineering technical field specifically is a dry-type building concrete connection structure.
Background
The fabricated technology has become a powerful support for the green development of the construction industry as a rapidly developing technology in recent years, and dry-type connection structures, including dry-type construction concrete connection structures, have been developed in addition to the fabricated technology.
When the existing dry type building concrete connecting structure is used for assembling a wall body, the gravity center can shift to one side due to possible irregularity of the wall body, after the assembly is completed, a large force is often applied to the supporting structure, and the connecting structure cannot be effectively fixed and supported, so that the wall body cannot be well kept horizontal or vertical.
When the existing dry type building concrete connecting structure is used for assembling a wall body, when the connecting structure is simple, the wall body cannot be fixed and supported well, and when the connecting structure is complex, the efficiency is reduced due to the troublesome assembly.
SUMMERY OF THE UTILITY MODEL
The utility model provides a dry type building concrete connection structure possesses effective fixed and support wall body, and stable connection and easy operation's advantage has solved the problem that above-mentioned background art provided.
The utility model provides a following technical scheme: the utility model provides a dry-type building concrete connection structure, includes the bottom plate and is located the roof of bottom plate top, the inside both sides fixed mounting of bottom plate has first diaphragm, and first diaphragm is for fixing in the inside of bottom plate promptly when producing the bottom plate, and first bolt, second bolt, third bolt bury in the bottom plate promptly when producing the bottom plate and fix for it can with first diaphragm and the inseparable connection of clamp plate, first diaphragm has the fixed plate that is located the roof both sides through third bolt movable mounting, the equal screw thread in both ends of third bolt has cup jointed first nut, the roof passes through fourth bolt and two fixed plate movable mounting, the equal screw thread in both ends of fourth bolt has cup jointed the fourth nut.
Preferably, the first transverse plate is movably sleeved with a second bolt located on the outer side of the third bolt, the top end of the second bolt penetrates through the fixed plate and is movably sleeved with the pressing plate, the two ends of the second bolt are respectively sleeved with a second nut in a threaded manner, and the second bolt and the second nut can enable the bottom plate and the fixed plate to be fixed more stably.
Preferably, the middle part fixed mounting of bottom plate has the second diaphragm, the equal fixed mounting in the left middle and right sides of second diaphragm top surface has the riser, and is three the riser all passes the bottom plate and extends to the top of the inside fourth bolt of roof, and three riser makes when the assembly, with the opening one-to-one of riser and roof bottom, makes the roof keep vertical more.
Preferably, the upper surface of the bottom plate is provided with a groove, the fixing plates are of an L-shaped structure, the heights of two sides of the groove are matched with the bottoms of the fixing plates, the width of the middle of the groove of the bottom plate is matched with the width of the top plate, so that the two fixing plates and the top plate can be accurately placed into the groove and can be kept horizontal or vertical, and the heights of the two fixing plates and the bottom plate are kept consistent in the horizontal direction after the fixing plates are placed into the groove.
Preferably, the middle part of the first transverse plate is movably sleeved with a first bolt located on the outer side of the second bolt, the top end of the first bolt penetrates through the bottom plate and the pressing plate, third nuts are arranged at the two ends of the first bolt in a threaded mode, and the first bolt enables the connection between the bottom plate and the fixing plate to be more stable.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this dry-type building concrete connection structure places the both sides at the roof through the fixed plate with two L types, uses fourth bolt fastening to fix fixed plate and roof, and the fourth bolt passes the riser that inserts in the roof, and the bottom of fixed plate is fixed through first bolt, second bolt, third bolt with the diaphragm for roof and bottom plate keep perpendicular, the effectual position of having fixed the roof, this dry-type building concrete connection structure possesses the beneficial effect of effective fixed and support wall body.
2. This dry construction concrete connection structure through pre-buried first diaphragm, first bolt, second bolt, the third bolt in the bottom plate when production, as for to aim at the riser with the bottom of roof and insert, the bolt of fixing each position after placing fixed plate and clamp plate one by one can make it fixed, this dry construction concrete connection structure possesses the stable and easy operation's of connection beneficial effect.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a side view of the present invention;
fig. 3 is a schematic structural view of the second horizontal plate and the vertical plate of the present invention.
In the figure: 1. a base plate; 2. a first transverse plate; 3. a first bolt; 4. a second bolt; 5. a third bolt; 6. a second transverse plate; 7. a first nut; 8. a second nut; 9. a third nut; 10. pressing a plate; 11. a fourth nut; 12. a top plate; 13. a vertical plate; 14. a fourth bolt; 15. and (7) fixing the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a dry type building concrete connection structure includes a bottom plate 1 and a top plate 12 located above the bottom plate 1, wherein first horizontal plates 2 are fixedly installed on two sides inside the bottom plate 1, the first horizontal plates 2 are fixed inside the bottom plate 1 when the bottom plate 1 is produced, first bolts 3, second bolts 4, and third bolts 5 are fixed by being embedded in the bottom plate 1 when the bottom plate 1 is produced, so that the first horizontal plates 2 and a pressing plate 10 can be tightly connected, fixing plates 15 located on two sides of the top plate 12 are movably installed on the first horizontal plates 2 through the third bolts 5, first nuts 7 are respectively screwed on two ends of the third bolts 5, the top plate 12 is movably installed on the two fixing plates 15 through the fourth bolts 14, and fourth nuts 11 are respectively screwed on two ends of the fourth bolts 14.
Wherein, the second bolt 4 that is located the third bolt 5 outside is cup jointed in the activity of first diaphragm 2, and the top of second bolt 4 passes fixed plate 15 and the activity is cup jointed clamp plate 10, the equal screw thread in both ends of second bolt 4 has cup jointed second nut 8, and second bolt 4 and second nut can make the fixed of bottom plate 1 and fixed plate 15 more stable.
Wherein, the middle part fixed mounting of bottom plate 1 has second diaphragm 6, and the equal fixed mounting in the left middle and right sides of the 6 top surfaces of second diaphragm has riser 13, and three riser 13 all passes bottom plate 1 and extends to the top of the inside fourth bolt 14 of roof 12, and three riser 13 makes when the assembly, with riser 13 and the opening one-to-one in roof 12 bottom, makes roof 12 keep vertical more.
Wherein, the upper surface of bottom plate 1 is seted up flutedly, and fixed plate 15 is L type structure, the height of recess both sides and the bottom looks adaptation of fixed plate 15, the width at 1 recess middle part of bottom plate and the width looks adaptation of roof 12 for two fixed plates 15 and roof 12 can be accurate put into the recess and can keep level or vertical, and fixed plate 15 puts into the back and highly keep unanimous with bottom plate 1 in the horizontal direction.
Wherein, first diaphragm 2 then middle part activity cup joints the first bolt 3 that is located the second bolt 4 outside, bottom plate 1 and clamp plate 10 are passed on the top of first bolt 3, and the equal screw thread in both ends of first bolt 3 has third nut 9, and first bolt 3 makes the connection between bottom plate 1 and the fixed plate 15 more stable.
The working principle is as follows:
with first diaphragm 2 and second diaphragm 6, and first bolt 3, second bolt 4, third bolt 5 is pre-buried promptly when producing bottom plate 1, riser 13 of connecting on the second diaphragm 6 passes bottom plate 1, the staff only needs to aim at the lower extreme of roof riser 13 and insert downwards, then put fixed plate 15, insert fourth bolt 14 and rotate first nut 7 and fourth nut 11 and tentatively fix fixed plate 15, place clamp plate 10 between the bottom surface of bottom plate 1 and fixed plate 15 afterwards, and pass first bolt 3 and second bolt 4, it can fix to rotate second nut 8 and third nut 9.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A dry construction concrete connection structure, comprising a bottom plate (1) and a top plate (12) located above the bottom plate (1), characterized in that: the novel bottom plate is characterized in that first transverse plates (2) are fixedly mounted on two sides of the inner portion of the bottom plate (1), fixing plates (15) located on two sides of the top plate (12) are movably mounted on the first transverse plates (2) through third bolts (5), first nuts (7) are sleeved on two ends of the third bolts (5) in a threaded mode, the top plate (12) is movably mounted on the two fixing plates (15) through fourth bolts (14), and fourth nuts (11) are sleeved on two ends of the fourth bolts (14) in a threaded mode.
2. A dry construction concrete connecting structure according to claim 1, wherein: the second bolt (4) located on the outer side of the third bolt (5) is movably sleeved on the first transverse plate (2), the top end of the second bolt (4) penetrates through the fixing plate (15) and is movably sleeved with the pressing plate (10), and the second nuts (8) are sleeved on the two ends of the second bolt (4) in a threaded manner.
3. A dry construction concrete connecting structure according to claim 1, wherein: the middle part fixed mounting of bottom plate (1) has second diaphragm (6), the equal fixed mounting in the left and right sides of second diaphragm (6) top surface has riser (13), and is three riser (13) all pass bottom plate (1) and extend to the top of the inside fourth bolt (14) of roof (12).
4. A dry construction concrete connecting structure according to claim 1, wherein: the upper surface of the bottom plate (1) is provided with a groove, the fixing plate (15) is of an L-shaped structure, the heights of two sides of the groove are matched with the bottom of the fixing plate (15), and the width of the middle of the groove of the bottom plate (1) is matched with the width of the top plate (12).
5. A dry construction concrete connecting structure according to claim 2, wherein: first bolt (3) that are located second bolt (4) outside is then cup jointed in the activity of first diaphragm (2) middle part, bottom plate (1) and clamp plate (10) are passed on the top of first bolt (3), the equal screw thread in both ends of first bolt (3) has third nut (9).
CN202021699949.2U 2020-08-15 2020-08-15 Dry-type building concrete connection structure Active CN213626742U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021699949.2U CN213626742U (en) 2020-08-15 2020-08-15 Dry-type building concrete connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021699949.2U CN213626742U (en) 2020-08-15 2020-08-15 Dry-type building concrete connection structure

Publications (1)

Publication Number Publication Date
CN213626742U true CN213626742U (en) 2021-07-06

Family

ID=76644261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021699949.2U Active CN213626742U (en) 2020-08-15 2020-08-15 Dry-type building concrete connection structure

Country Status (1)

Country Link
CN (1) CN213626742U (en)

Similar Documents

Publication Publication Date Title
TWI532962B (en) Photovoltaic panel system, photovoltaic panel fastener, and method of installing photovoltaic panel system
CN101638920A (en) Cave mouth structure on bearing wall and method for forming cave mouth thereon
CN208486648U (en) A kind of power tower stable base
CN206245469U (en) Assembled beam frame structure
CN213626742U (en) Dry-type building concrete connection structure
CN109403639B (en) Method for installing large-area roof truss stress conversion layer
CN209817099U (en) Large-span steel house room bearing structure
CN219732331U (en) Steel beam connecting device for assembled building
CN209907574U (en) Light steel structure assembled house
CN212642117U (en) Tool type supporting device for laminated bottom plate supporting system
CN214941017U (en) Steel structure supporting beam convenient to mount
CN213897646U (en) Assembled building side fascia perps connected node
CN210507901U (en) Assembled wall module
CN207159938U (en) A kind of temporary support moulding bed for making Large Steel cylinder
WO2020211182A1 (en) Aquatic floating member and aquatic frame applicable to solar panel
CN214301723U (en) Novel environmental protection concrete pipe pile
CN210724638U (en) Device convenient to solar panel roof installation
CN217268749U (en) A handling frame that is used for lamps and lanterns installation on I-steel roof beam
CN220267021U (en) Steel structure box column for building
CN213062382U (en) Connection structure of assembled multilayer steel structure building
CN210622285U (en) Scaffold frame that facade was reformed transform and is used even wall device
CN214941383U (en) Combined type safe energy-saving steel structure unit curtain wall
CN220113580U (en) Box girder prefabricated inner formwork gap bridge bracket capable of flexibly adjusting pulley block spacing
CN210342644U (en) Anti-skidding building steel fastener
CN215291139U (en) Assembled basic unit's plate structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221018

Address after: 529500 shop 1, floor 1-2, building 2, Zhaohui Yayuan, No. 262, Xinjiang East Road, Jiangcheng District, Yangjiang City, Guangdong Province

Patentee after: Guangdong Mingyang Construction Group Co.,Ltd.

Address before: 323300 2-201, No.10, Lane 1, South Miaogo street, Suichang County, Lishui City, Zhejiang Province

Patentee before: Suichang jiangrui Machinery Design Co.,Ltd.