CN108824277A - A kind of municipal works remove cobweb equipment with building - Google Patents

A kind of municipal works remove cobweb equipment with building Download PDF

Info

Publication number
CN108824277A
CN108824277A CN201810599871.8A CN201810599871A CN108824277A CN 108824277 A CN108824277 A CN 108824277A CN 201810599871 A CN201810599871 A CN 201810599871A CN 108824277 A CN108824277 A CN 108824277A
Authority
CN
China
Prior art keywords
block
bracing wire
fixed pulley
sliding block
sliding rail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810599871.8A
Other languages
Chinese (zh)
Inventor
李�荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810599871.8A priority Critical patent/CN108824277A/en
Publication of CN108824277A publication Critical patent/CN108824277A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01HSTREET CLEANING; CLEANING OF PERMANENT WAYS; CLEANING BEACHES; DISPERSING OR PREVENTING FOG IN GENERAL CLEANING STREET OR RAILWAY FURNITURE OR TUNNEL WALLS
    • E01H1/00Removing undesirable matter from roads or like surfaces, with or without moistening of the surface
    • E01H1/005Mobile installations, particularly for upkeeping in situ road or railway furniture, for instance road barricades, traffic signs; Mobile installations particularly for upkeeping tunnel walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Transmission Devices (AREA)

Abstract

The present invention relates to a kind of municipal works fields more particularly to a kind of municipal works to remove cobweb equipment with building.Technical problems to be solved:There is provided that a kind of cleaning spider net spee is fast, the highly-safe municipal works of when cleaning remove cobweb equipment with building.Technical solution is:A kind of municipal works remove cobweb equipment with building, include pedestal, wheel, the first sliding rail, the first sliding block, bearing block etc.;It is equipped with wheel at left and right sides of base bottom, the first sliding rail is embedded among base top, slidingtype is equipped with the first sliding block on the first sliding rail, and the first slider top is equipped with bearing block.The present invention moves down pull rod by user, moving left and right for brush is realized under the cooperation of the first bracing wire, to be cleaned to the cobweb of building, in brush during moving left and right, the cooperation of wheel and rack is so that brush can not only be moved left and right cleans to building, and can also clean cleaner to building by rotation, increase the working efficiency of people.

Description

A kind of municipal works remove cobweb equipment with building
Technical field
The present invention relates to a kind of municipal works fields more particularly to a kind of municipal works to remove cobweb equipment with building.
Background technique
It unavoidably needs to sweep cobweb in the cleaning of municipal works building, cobweb usually extends in the corner on roof In, people are usually to take a root long rod, and one is tied up above long rod for clean object, then constantly to the cobweb of eminence It is cleaned, but many times, since the height of top of building is different or the height of spider netting is different, the length of long rod It is difficult to hold, needs to constantly change the rod of different length also sometimes to adapt to the height of building, reduce the work of people Make efficiency, moreover, needing to look at always above building to hold when people clean top of building with long rod Angle is cleaned, thus easily causes people due to dizzy or neck aches above looking at for a long time, it can also be because of double Mesh is upward for a long time, and the dust of whereabouts enters in people's eyes, and safety is not high.
Therefore need to research and develop that a kind of cleaning spider net spee is fast, the highly-safe municipal works of when cleaning remove spider with building Spider web equipment.
Summary of the invention
The rod of cleaning is needed replacing to adapt to depth of building when cleaning cobweb in the prior art to overcome, and is reduced People's working efficiency, and the dust flown are easily accessible in people's eyes, and the low disadvantage of safety, the technology to be solved is asked Topic:There is provided that a kind of cleaning spider net spee is fast, the highly-safe municipal works of when cleaning remove cobweb equipment with building.
Technical solution is:A kind of municipal works remove cobweb equipment with building, include pedestal, wheel, the first sliding rail, First sliding block, telescopic rod, gear, brush, strut, rack gear, the first fixed pulley, the first link block, the first spring, pushes away bearing block Hand, the second sliding rail, the second sliding block, pull rod, the second fixed pulley, third fixed pulley and the first bracing wire, the base bottom left and right sides is Equipped with wheel, the first sliding rail is embedded among base top, slidingtype is equipped with the first sliding block on the first sliding rail, and the first slider top is set There is bearing block, interference is connected with telescopic rod in bearing block, and telescopic rod lower part is equipped with gear, and telescopic rod top end is connected with brush, bottom The seat top left and right sides is respectively connected with strut, and rack gear, rack and pinion engagement, right side are connected between the strut top of the left and right sides Strut back lower is equipped with the first fixed pulley, and left part is connected with the first link block on the upside of the first sliding rail, and the first link block is located at the The left of one sliding block is connected with the first spring, is connected with pushing hands on the left of base top, pushes away between the first link block and the first sliding block Hand left lower is embedded with the second sliding rail, and slidingtype is equipped with the second sliding block on the second sliding rail, is connected with pull rod on the left of the second sliding block, pushes away Through-hole is provided at the top of hand, pushing hands lower right side is connected with the second fixed pulley, and pushing hands top right side is equipped with third fixed pulley, pull rod top Portion is connected with the first bracing wire, and first is drawstring through through-hole, and the first bracing wire bypasses third fixed pulley, and the first bracing wire is fixed sliding around second Wheel, the first bracing wire bypass the first fixed pulley, and the first bracing wire is connect with the first sliding block.
It further, further include having first connecting rod, trapezoid block, the first guide sleeve, the first guide rod, the second connecting rod, second Spring, notch plate, roller and kelly, the first sliding block front side are connected with first connecting rod, and first connecting rod front end is connected with trapezoidal Block, pedestal front side right part are connected with the first guide sleeve, and the first guide sleeve inner sliding type is equipped with the first guide rod, and the first guide rod passes through first and leads Set, the first guide rod top are connected with the second connecting rod, the second connecting rod bottom left and right sides and the left and right sides at the top of the first guide sleeve Between be respectively connected with second spring, the second connecting rod right end is connected with notch plate, and the second connecting rod top right side is connected with roller, Right-hand wheel leading flank is uniformly provided with kelly, and kelly and notch plate cooperate.
It further, further include having bracket, third sliding rail, third sliding block, the second link block, third spring, baffle, the 4th Fixed pulley and the second bracing wire, base top right side are connected with bracket, and cantilever tip is connected with third sliding rail, slides on third sliding rail Formula is equipped with third sliding block, and third sliding rail top left side is connected with the second link block, and the second link block is located at third sliding block left, the Third spring is connected between two link blocks and third sliding block, third sliding block top is connected with baffle, and baffle left part is provided with a word Hole, telescopic rod pass through a word hole, and third sliding rail top left side is equipped with the 4th fixed pulley, is connected with the second bracing wire at the top of pull rod, the Two are drawstring through through-hole, and the second bracing wire bypasses the 4th fixed pulley, and the second bracing wire is connect with third sliding block.
It further, further include having the 5th fixed pulley, the second guide sleeve, third bracing wire and handle, chassis left side face is connected with 5th fixed pulley, pushing hands lower front are connected with the second guide sleeve, and pull rod bottom is connected with third bracing wire, and third bracing wire bypasses the 5th Fixed pulley, third are drawstring through the second guide sleeve, and third bracing wire is connected with handle.
Further, further include having electric pushrod and cushion block, be connected with electric pushrod, electric pushrod bottom on the right side of base bottom End is connected with cushion block.
When user needs to carry out the cleaning of cobweb to building using this equipment, this equipment is pushed to needs by user The position of cobweb is cleaned, user regulates the length of telescopic rod to adapt to the height of building, and user moves down pull rod, draws Bar drives the first sliding block and its upper-part to move right by the first bracing wire, so that brush is driven to move right, the first spring quilt It stretches, when user's releasing lever, the first spring retraction, the first spring drives the first sliding block and its upper-part to be moved to the left, thus It drives brush to be moved to the left, so in cycles, it is clear can to realize that brush in the lateral direction carries out the cobweb on building Clean, when brush is during moving left and right, under the cooperation of wheel and rack, gear drives telescopic rod rotation, to drive Brush is rotated while moving left and right and cleaning cobweb, to more thoroughly clean cobweb.When user will build The cobweb beaten on object cleans up, and telescopic rod is adjusted go back to original position by user.
When user is when carrying out the cleaning of cobweb using this equipment, this equipment is in the cobweb to certain in order to prevent It is moved left and right when being cleaned, kelly is directed at notch plate by user, and for user when the first sliding block moves right, first is sliding Block by first connecting rod drive trapezoid block move right, when the protruding parts of trapezoid block move right to roller contact, rolling Subband moves the second connecting rod and its upper-part moves down, so that notch plate be driven to move down, second spring is compressed, when recessed Shape plate, which is moved downward to, blocks kelly, and just this equipment is fixed, at the same the good trapezoid block of user's control move left and right into Journey can clean building while fixing this equipment, and when user needs to move this equipment, user, which unclamps, to be drawn Bar, under the action of the first spring, the first sliding block drives trapezoid block to be moved to the left, when trapezoid block is moved to the left original position, second Spring reset, second spring drives the second connecting rod and its upper-part to move up, so that notch plate be driven to be moved upward to original Position.
When user is when carrying out the cleaning of cobweb to building using this equipment, user moves down pull rod, and pull rod is logical Crossing the second bracing wire drives third sliding block and its upper-part to be moved to the left, and from driving baffle to be moved to the left, third spring is compressed, gear The setting of plate, which realizes user, can block the object falls such as dust to user's when carrying out the cleaning of cobweb to building Inside eyes, safety when cleaning cobweb is increased, when user's releasing lever, third spring reset, third spring is driven Third sliding block and its upper-part move right, so that baffle be driven to move right to original position, user can continue to check other positions It sets and is cleared up with the presence or absence of cobweb.
Third bracing wire is from the cooperation of pull rod so that the user of different heights uses this equipment with can be convenient, when height is shorter User use this equipment when, user can move down pull rod, when the higher user of height use this equipment when, user By pulling up handle, the cleaning of cobweb is realized under the action of third bracing wire.
When user need by kelly be aligned notch plate when, user's control electric pushrod extends downwardly, thus drive cushion block to Under be moved to and face contact and then jacked up the wheel on the right side of this equipment to vacant state with ground, user can rotate right-hand wheel, So that kelly is directed at notch plate, user is retracted upwards in control electric pushrod, the wheel on right side is put back on ground.Electricity The setting of dynamic push rod facilitates user and kelly is directed at notch plate, directly lifts this equipment with hand without user and goes for kelly to be aligned Notch plate.
Beneficial effect:The present invention moves down pull rod by user, and a left side for brush is realized under the cooperation of the first bracing wire It moves right, so that the cobweb to building cleans, in brush during moving left and right, the cooperation of wheel and rack Building is cleaned so that brush can not only move left and right, but also can also clean more dry to building by rotation Only, increase the working efficiency of people, meanwhile, user when pulling downward on pull rod, the second bracing wire drive third sliding block and Component is moved to the left thereon, so that baffle be driven to be moved to the left, is prevented the dust to fall from entering eyes of user, is realized to user Eyes protection.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is second of schematic view of the front view of the invention.
Fig. 3 is the third schematic view of the front view of the invention.
Fig. 4 is that the 4th kind of portion of the invention regards structural schematic diagram.
Fig. 5 is the 5th kind of schematic view of the front view of the invention.
Drawing reference numeral:1 pedestal, 2 wheels, 3 first sliding rails, 4 first sliding blocks, 5 bearing blocks, 6 telescopic rods, 7 teeth Wheel, 8 brushes, 9 struts, 10 rack gears, 11 first fixed pulleys, 12 first link blocks, 13 first springs, 14 pushing hands, 15 Second sliding rail, 16 second sliding blocks, 17 pull rods, 18 through-holes, 19 second fixed pulleys, 20 third fixed pulleys, 21 first bracing wires, 22 first connecting rods, 23 trapezoid blocks, 24 first guide sleeves, 25 first guide rods, 26 second connecting rods, 27 second springs, 28 Notch plate, 29 rollers, 30 kellies, 31 brackets, 32 third sliding rails, 33 third sliding blocks, 34 second link blocks, 35 thirds Spring, 36 baffles, 37 1 word holes, 38 the 4th fixed pulleys, 39 second bracing wires, 40 the 5th fixed pulleys, 41 second guide sleeves, 42 Third bracing wire, 43 handles, 44 electric pushrods, 45 cushion blocks.
Specific embodiment
Below in conjunction with the drawings and specific embodiments, present invention is further described in detail, but does not limit guarantor of the invention Protect range and application range.
Embodiment 1
A kind of municipal works remove cobweb equipment with building, as shown in Figs. 1-5, include pedestal 1, wheel 2, the first sliding rail 3, First sliding block 4, bearing block 5, telescopic rod 6, gear 7, brush 8, strut 9, rack gear 10, the first fixed pulley 11, the first link block 12, First spring 13, pushing hands 14, the second sliding rail 15, the second sliding block 16, pull rod 17, the second fixed pulley 19, third fixed pulley 20 and One bracing wire 21, is equipped with wheel 2 at left and right sides of 1 bottom of pedestal, and 1 top center of pedestal is embedded with the first sliding rail 3, on the first sliding rail 3 Slidingtype is equipped with the first sliding block 4, is equipped with bearing block 5 at the top of the first sliding block 4, and interference is connected with telescopic rod 6 in bearing block 5, stretches 6 lower part of bar is equipped with gear 7, and 6 top of telescopic rod is connected with brush 8, and the 1 top left and right sides of pedestal is respectively connected with strut 9, left and right two Rack gear 10 is connected between 9 top of side strut, rack gear 10 is engaged with gear 7, and strut 9 back lower in right side is equipped with the first fixed pulley 11,3 upside left part of the first sliding rail is connected with the first link block 12, and the first link block 12 is located at the left of the first sliding block 4, and first connects It connects and is connected with the first spring 13 between block 12 and the first sliding block 4,1 top left side of pedestal is connected with pushing hands 14, under 14 left side of pushing hands Portion is embedded with the second sliding rail 15, and slidingtype is equipped with the second sliding block 16 on the second sliding rail 15, is connected with pull rod 17 on the left of the second sliding block 16, Through-hole 18 is provided at the top of pushing hands 14,14 lower right side of pushing hands is connected with the second fixed pulley 19, and 14 top right side of pushing hands is equipped with third Fixed pulley 20 is connected with the first bracing wire 21 at the top of pull rod 17, and the first bracing wire 21 passes through through-hole 18, and the first bracing wire 21 is fixed around third Pulley 20, the first bracing wire 21 bypass the second fixed pulley 19, and the first bracing wire 21 bypasses the first fixed pulley 11, the first bracing wire 21 and first Sliding block 4 connects.
Embodiment 2
A kind of municipal works remove cobweb equipment with building, as shown in Figs. 1-5, include pedestal 1, wheel 2, the first sliding rail 3, First sliding block 4, bearing block 5, telescopic rod 6, gear 7, brush 8, strut 9, rack gear 10, the first fixed pulley 11, the first link block 12, First spring 13, pushing hands 14, the second sliding rail 15, the second sliding block 16, pull rod 17, the second fixed pulley 19, third fixed pulley 20 and One bracing wire 21, is equipped with wheel 2 at left and right sides of 1 bottom of pedestal, and 1 top center of pedestal is embedded with the first sliding rail 3, on the first sliding rail 3 Slidingtype is equipped with the first sliding block 4, is equipped with bearing block 5 at the top of the first sliding block 4, and interference is connected with telescopic rod 6 in bearing block 5, stretches 6 lower part of bar is equipped with gear 7, and 6 top of telescopic rod is connected with brush 8, and the 1 top left and right sides of pedestal is respectively connected with strut 9, left and right two Rack gear 10 is connected between 9 top of side strut, rack gear 10 is engaged with gear 7, and strut 9 back lower in right side is equipped with the first fixed pulley 11,3 upside left part of the first sliding rail is connected with the first link block 12, and the first link block 12 is located at the left of the first sliding block 4, and first connects It connects and is connected with the first spring 13 between block 12 and the first sliding block 4,1 top left side of pedestal is connected with pushing hands 14, under 14 left side of pushing hands Portion is embedded with the second sliding rail 15, and slidingtype is equipped with the second sliding block 16 on the second sliding rail 15, is connected with pull rod 17 on the left of the second sliding block 16, Through-hole 18 is provided at the top of pushing hands 14,14 lower right side of pushing hands is connected with the second fixed pulley 19, and 14 top right side of pushing hands is equipped with third Fixed pulley 20 is connected with the first bracing wire 21 at the top of pull rod 17, and the first bracing wire 21 passes through through-hole 18, and the first bracing wire 21 is fixed around third Pulley 20, the first bracing wire 21 bypass the second fixed pulley 19, and the first bracing wire 21 bypasses the first fixed pulley 11, the first bracing wire 21 and first Sliding block 4 connects.
It further include having first connecting rod 22, trapezoid block 23, the first guide sleeve 24, the first guide rod 25, the second connecting rod 26, second Spring 27, notch plate 28, roller 29 and kelly 30, are connected with first connecting rod 22 on front side of the first sliding block 4, before first connecting rod 22 End is connected with trapezoid block 23, and 1 front side right part of pedestal is connected with the first guide sleeve 24, and 24 inner sliding type of the first guide sleeve is equipped with the first guide rod 25, the first guide rod 25 passes through the first guide sleeve 24, and 25 top of the first guide rod is connected with the second connecting rod 26,26 bottom of the second connecting rod The left and right sides and the first guide sleeve are respectively connected with second spring 27 between the 24 top left and right sides, and 26 right end of the second connecting rod is connected with Notch plate 28,26 top right side of the second connecting rod are connected with roller 29, and 2 leading flank of right-hand wheel is uniformly provided with kelly 30, kelly 30 cooperate with notch plate 28.
Embodiment 3
A kind of municipal works remove cobweb equipment with building, as shown in Figs. 1-5, include pedestal 1, wheel 2, the first sliding rail 3, First sliding block 4, bearing block 5, telescopic rod 6, gear 7, brush 8, strut 9, rack gear 10, the first fixed pulley 11, the first link block 12, First spring 13, pushing hands 14, the second sliding rail 15, the second sliding block 16, pull rod 17, the second fixed pulley 19, third fixed pulley 20 and One bracing wire 21, is equipped with wheel 2 at left and right sides of 1 bottom of pedestal, and 1 top center of pedestal is embedded with the first sliding rail 3, on the first sliding rail 3 Slidingtype is equipped with the first sliding block 4, is equipped with bearing block 5 at the top of the first sliding block 4, and interference is connected with telescopic rod 6 in bearing block 5, stretches 6 lower part of bar is equipped with gear 7, and 6 top of telescopic rod is connected with brush 8, and the 1 top left and right sides of pedestal is respectively connected with strut 9, left and right two Rack gear 10 is connected between 9 top of side strut, rack gear 10 is engaged with gear 7, and strut 9 back lower in right side is equipped with the first fixed pulley 11,3 upside left part of the first sliding rail is connected with the first link block 12, and the first link block 12 is located at the left of the first sliding block 4, and first connects It connects and is connected with the first spring 13 between block 12 and the first sliding block 4,1 top left side of pedestal is connected with pushing hands 14, under 14 left side of pushing hands Portion is embedded with the second sliding rail 15, and slidingtype is equipped with the second sliding block 16 on the second sliding rail 15, is connected with pull rod 17 on the left of the second sliding block 16, Through-hole 18 is provided at the top of pushing hands 14,14 lower right side of pushing hands is connected with the second fixed pulley 19, and 14 top right side of pushing hands is equipped with third Fixed pulley 20 is connected with the first bracing wire 21 at the top of pull rod 17, and the first bracing wire 21 passes through through-hole 18, and the first bracing wire 21 is fixed around third Pulley 20, the first bracing wire 21 bypass the second fixed pulley 19, and the first bracing wire 21 bypasses the first fixed pulley 11, the first bracing wire 21 and first Sliding block 4 connects.
It further include having first connecting rod 22, trapezoid block 23, the first guide sleeve 24, the first guide rod 25, the second connecting rod 26, second Spring 27, notch plate 28, roller 29 and kelly 30, are connected with first connecting rod 22 on front side of the first sliding block 4, before first connecting rod 22 End is connected with trapezoid block 23, and 1 front side right part of pedestal is connected with the first guide sleeve 24, and 24 inner sliding type of the first guide sleeve is equipped with the first guide rod 25, the first guide rod 25 passes through the first guide sleeve 24, and 25 top of the first guide rod is connected with the second connecting rod 26,26 bottom of the second connecting rod The left and right sides and the first guide sleeve are respectively connected with second spring 27 between the 24 top left and right sides, and 26 right end of the second connecting rod is connected with Notch plate 28,26 top right side of the second connecting rod are connected with roller 29, and 2 leading flank of right-hand wheel is uniformly provided with kelly 30, kelly 30 cooperate with notch plate 28.
Further include have bracket 31, third sliding rail 32, third sliding block 33, the second link block 34, third spring 35, baffle 36, 4th fixed pulley 38 and the second bracing wire 39,1 top right side of pedestal are connected with bracket 31, and 31 top of bracket is connected with third sliding rail 32, slidingtype is equipped with third sliding block 33 on third sliding rail 32, and 32 top left side of third sliding rail is connected with the second link block 34, and second Link block 34 is located at 33 left of third sliding block, is connected with third spring 35, third between the second link block 34 and third sliding block 33 33 top of sliding block is connected with baffle 36, and 36 left part of baffle is provided with a word hole 37, and telescopic rod 6 passes through a word hole 37, third sliding rail 32 Top left side is equipped with the 4th fixed pulley 38, is connected with the second bracing wire 39 at the top of pull rod 17, and the second bracing wire 39 passes through through-hole 18, and second Bracing wire 39 bypasses the 4th fixed pulley 38, and the second bracing wire 39 is connect with third sliding block 33.
Embodiment 4
A kind of municipal works remove cobweb equipment with building, as shown in Figs. 1-5, include pedestal 1, wheel 2, the first sliding rail 3, First sliding block 4, bearing block 5, telescopic rod 6, gear 7, brush 8, strut 9, rack gear 10, the first fixed pulley 11, the first link block 12, First spring 13, pushing hands 14, the second sliding rail 15, the second sliding block 16, pull rod 17, the second fixed pulley 19, third fixed pulley 20 and One bracing wire 21, is equipped with wheel 2 at left and right sides of 1 bottom of pedestal, and 1 top center of pedestal is embedded with the first sliding rail 3, on the first sliding rail 3 Slidingtype is equipped with the first sliding block 4, is equipped with bearing block 5 at the top of the first sliding block 4, and interference is connected with telescopic rod 6 in bearing block 5, stretches 6 lower part of bar is equipped with gear 7, and 6 top of telescopic rod is connected with brush 8, and the 1 top left and right sides of pedestal is respectively connected with strut 9, left and right two Rack gear 10 is connected between 9 top of side strut, rack gear 10 is engaged with gear 7, and strut 9 back lower in right side is equipped with the first fixed pulley 11,3 upside left part of the first sliding rail is connected with the first link block 12, and the first link block 12 is located at the left of the first sliding block 4, and first connects It connects and is connected with the first spring 13 between block 12 and the first sliding block 4,1 top left side of pedestal is connected with pushing hands 14, under 14 left side of pushing hands Portion is embedded with the second sliding rail 15, and slidingtype is equipped with the second sliding block 16 on the second sliding rail 15, is connected with pull rod 17 on the left of the second sliding block 16, Through-hole 18 is provided at the top of pushing hands 14,14 lower right side of pushing hands is connected with the second fixed pulley 19, and 14 top right side of pushing hands is equipped with third Fixed pulley 20 is connected with the first bracing wire 21 at the top of pull rod 17, and the first bracing wire 21 passes through through-hole 18, and the first bracing wire 21 is fixed around third Pulley 20, the first bracing wire 21 bypass the second fixed pulley 19, and the first bracing wire 21 bypasses the first fixed pulley 11, the first bracing wire 21 and first Sliding block 4 connects.
It further include having first connecting rod 22, trapezoid block 23, the first guide sleeve 24, the first guide rod 25, the second connecting rod 26, second Spring 27, notch plate 28, roller 29 and kelly 30, are connected with first connecting rod 22 on front side of the first sliding block 4, before first connecting rod 22 End is connected with trapezoid block 23, and 1 front side right part of pedestal is connected with the first guide sleeve 24, and 24 inner sliding type of the first guide sleeve is equipped with the first guide rod 25, the first guide rod 25 passes through the first guide sleeve 24, and 25 top of the first guide rod is connected with the second connecting rod 26,26 bottom of the second connecting rod The left and right sides and the first guide sleeve are respectively connected with second spring 27 between the 24 top left and right sides, and 26 right end of the second connecting rod is connected with Notch plate 28,26 top right side of the second connecting rod are connected with roller 29, and 2 leading flank of right-hand wheel is uniformly provided with kelly 30, kelly 30 cooperate with notch plate 28.
Further include have bracket 31, third sliding rail 32, third sliding block 33, the second link block 34, third spring 35, baffle 36, 4th fixed pulley 38 and the second bracing wire 39,1 top right side of pedestal are connected with bracket 31, and 31 top of bracket is connected with third sliding rail 32, slidingtype is equipped with third sliding block 33 on third sliding rail 32, and 32 top left side of third sliding rail is connected with the second link block 34, and second Link block 34 is located at 33 left of third sliding block, is connected with third spring 35, third between the second link block 34 and third sliding block 33 33 top of sliding block is connected with baffle 36, and 36 left part of baffle is provided with a word hole 37, and telescopic rod 6 passes through a word hole 37, third sliding rail 32 Top left side is equipped with the 4th fixed pulley 38, is connected with the second bracing wire 39 at the top of pull rod 17, and the second bracing wire 39 passes through through-hole 18, and second Bracing wire 39 bypasses the 4th fixed pulley 38, and the second bracing wire 39 is connect with third sliding block 33.
It further include having the 5th fixed pulley 40, the second guide sleeve 41, third bracing wire 42 and handle 43,1 left side of pedestal is connected with 5th fixed pulley 40,14 lower front of pushing hands are connected with the second guide sleeve 41, and 17 bottom of pull rod is connected with third bracing wire 42, and third is drawn Line 42 bypasses the 5th fixed pulley 40, and third bracing wire 42 passes through the second guide sleeve 41, and third bracing wire 42 is connected with handle 43.
Embodiment 5
A kind of municipal works remove cobweb equipment with building, as shown in Figs. 1-5, include pedestal 1, wheel 2, the first sliding rail 3, First sliding block 4, bearing block 5, telescopic rod 6, gear 7, brush 8, strut 9, rack gear 10, the first fixed pulley 11, the first link block 12, First spring 13, pushing hands 14, the second sliding rail 15, the second sliding block 16, pull rod 17, the second fixed pulley 19, third fixed pulley 20 and One bracing wire 21, is equipped with wheel 2 at left and right sides of 1 bottom of pedestal, and 1 top center of pedestal is embedded with the first sliding rail 3, on the first sliding rail 3 Slidingtype is equipped with the first sliding block 4, is equipped with bearing block 5 at the top of the first sliding block 4, and interference is connected with telescopic rod 6 in bearing block 5, stretches 6 lower part of bar is equipped with gear 7, and 6 top of telescopic rod is connected with brush 8, and the 1 top left and right sides of pedestal is respectively connected with strut 9, left and right two Rack gear 10 is connected between 9 top of side strut, rack gear 10 is engaged with gear 7, and strut 9 back lower in right side is equipped with the first fixed pulley 11,3 upside left part of the first sliding rail is connected with the first link block 12, and the first link block 12 is located at the left of the first sliding block 4, and first connects It connects and is connected with the first spring 13 between block 12 and the first sliding block 4,1 top left side of pedestal is connected with pushing hands 14, under 14 left side of pushing hands Portion is embedded with the second sliding rail 15, and slidingtype is equipped with the second sliding block 16 on the second sliding rail 15, is connected with pull rod 17 on the left of the second sliding block 16, Through-hole 18 is provided at the top of pushing hands 14,14 lower right side of pushing hands is connected with the second fixed pulley 19, and 14 top right side of pushing hands is equipped with third Fixed pulley 20 is connected with the first bracing wire 21 at the top of pull rod 17, and the first bracing wire 21 passes through through-hole 18, and the first bracing wire 21 is fixed around third Pulley 20, the first bracing wire 21 bypass the second fixed pulley 19, and the first bracing wire 21 bypasses the first fixed pulley 11, the first bracing wire 21 and first Sliding block 4 connects.
It further include having first connecting rod 22, trapezoid block 23, the first guide sleeve 24, the first guide rod 25, the second connecting rod 26, second Spring 27, notch plate 28, roller 29 and kelly 30, are connected with first connecting rod 22 on front side of the first sliding block 4, before first connecting rod 22 End is connected with trapezoid block 23, and 1 front side right part of pedestal is connected with the first guide sleeve 24, and 24 inner sliding type of the first guide sleeve is equipped with the first guide rod 25, the first guide rod 25 passes through the first guide sleeve 24, and 25 top of the first guide rod is connected with the second connecting rod 26,26 bottom of the second connecting rod The left and right sides and the first guide sleeve are respectively connected with second spring 27 between the 24 top left and right sides, and 26 right end of the second connecting rod is connected with Notch plate 28,26 top right side of the second connecting rod are connected with roller 29, and 2 leading flank of right-hand wheel is uniformly provided with kelly 30, kelly 30 cooperate with notch plate 28.
Further include have bracket 31, third sliding rail 32, third sliding block 33, the second link block 34, third spring 35, baffle 36, 4th fixed pulley 38 and the second bracing wire 39,1 top right side of pedestal are connected with bracket 31, and 31 top of bracket is connected with third sliding rail 32, slidingtype is equipped with third sliding block 33 on third sliding rail 32, and 32 top left side of third sliding rail is connected with the second link block 34, and second Link block 34 is located at 33 left of third sliding block, is connected with third spring 35, third between the second link block 34 and third sliding block 33 33 top of sliding block is connected with baffle 36, and 36 left part of baffle is provided with a word hole 37, and telescopic rod 6 passes through a word hole 37, third sliding rail 32 Top left side is equipped with the 4th fixed pulley 38, is connected with the second bracing wire 39 at the top of pull rod 17, and the second bracing wire 39 passes through through-hole 18, and second Bracing wire 39 bypasses the 4th fixed pulley 38, and the second bracing wire 39 is connect with third sliding block 33.
It further include having the 5th fixed pulley 40, the second guide sleeve 41, third bracing wire 42 and handle 43,1 left side of pedestal is connected with 5th fixed pulley 40,14 lower front of pushing hands are connected with the second guide sleeve 41, and 17 bottom of pull rod is connected with third bracing wire 42, and third is drawn Line 42 bypasses the 5th fixed pulley 40, and third bracing wire 42 passes through the second guide sleeve 41, and third bracing wire 42 is connected with handle 43.
It further include having electric pushrod 44 and cushion block 45,1 bottom right of pedestal is connected with electric pushrod 44,44 bottom of electric pushrod End is connected with cushion block 45.
When user needs to carry out the cleaning of cobweb to building using this equipment, this equipment is pushed to needs by user The position of cobweb is cleaned, user regulates the length of telescopic rod 6 to adapt to the height of building, and user moves down pull rod 17, pull rod 17 drives the first sliding block 4 and its upper-part to move right by the first bracing wire 21, so that brush 8 is driven to move right, First spring 13 is stretched, when user's releasing lever 17, the first spring 13 retraction, the first spring 13 drive the first sliding block 4 and its Upper-part is moved to the left, so that brush 8 be driven to be moved to the left, so in cycles, can realize brush 8 in the lateral direction to building The cobweb built on object is cleaned, when brush 8 is during moving left and right, under the cooperation of gear 7 and rack gear 10, and gear 7 drive telescopic rod 6 to rotate, to drive brush 8 to be rotated while moving left and right and cleaning cobweb, thus more thoroughly Ground cleans cobweb.When user cleans up the cobweb beaten on building, telescopic rod 6 is adjusted go back to original position by user.
When user is when carrying out the cleaning of cobweb using this equipment, this equipment is in the cobweb to certain in order to prevent Moved left and right when being cleaned, user by kelly 30 be aligned notch plate 28, user when the first sliding block 4 is moved right, First sliding block 4 by first connecting rod 22 drive trapezoid block 23 move right, when the protruding parts of trapezoid block 23 move right to It is contacted with roller 29, roller 29 drives the second connecting rod 26 and its upper-part to move down, to drive notch plate 28 to moving down Dynamic, second spring 27 is compressed, and is blocked kelly 30 when notch plate 28 is moved downward to, just this equipment is fixed, simultaneously The good trapezoid block 23 of user's control moves left and right process, can clean while fixing this equipment to building, when When user needs to move this equipment, user's releasing lever 17, under the action of the first spring 13, the first sliding block 4 drives trapezoid block 23 are moved to the left, and when trapezoid block 23 is moved to the left original position, second spring 27 resets, and second spring 27 drives the second connecting rod 26 And its upper-part moves up, so that notch plate 28 be driven to be moved upward to original position.
When user is when carrying out the cleaning of cobweb to building using this equipment, user moves down pull rod 17, pull rod 17 drive third sliding block 33 and its upper-part to be moved to the left by the second bracing wire 39, are moved to the left from drive baffle 36, third bullet Spring 35 is compressed, and the setting of baffle 36, which realizes user, can block the objects such as dust when carrying out the cleaning of cobweb to building Body is fallen to inside the eyes of user, safety when cleaning cobweb is increased, when user's releasing lever 17, third spring 35 It resetting, third spring 35 drives third sliding block 33 and its upper-part to move right, so that baffle 36 is driven to move right to original position, User can continue to check that other positions are cleared up with the presence or absence of cobweb.
The cooperation of third bracing wire 42 and pull rod 17 so that the user of different heights can be convenient use this equipment, work as height When shorter user uses this equipment, user can move down pull rod 17, when the higher user of height uses this equipment, use Family can realize the cleaning of cobweb by pulling up handle 43 under the action of third bracing wire 42.
When user needs kelly 30 being directed at notch plate 28, user's control electric pushrod 44 is extended downwardly, to drive Then cushion block 45 is moved downward to be jacked up the wheel 2 on the right side of this equipment to vacant state with ground face contact, user can rotate Right-hand wheel 2, so that kelly 30 is directed at notch plate 28, user is retracted upwards in control electric pushrod 44, the wheel 2 on right side is put It returns on ground.The setting of electric pushrod 44 facilitates user and kelly 30 is directed at notch plate 28, directly uses without user Hand lifts this equipment and goes kelly 30 being directed at notch plate 28.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (5)

1. a kind of municipal works remove cobweb equipment with building, which is characterized in that include pedestal(1), wheel(2), first Sliding rail(3), the first sliding block(4), bearing block(5), telescopic rod(6), gear(7), brush(8), strut(9), rack gear(10), first Fixed pulley(11), the first link block(12), the first spring(13), pushing hands(14), the second sliding rail(15), the second sliding block(16), draw Bar(17), the second fixed pulley(19), third fixed pulley(20)With the first bracing wire(21), pedestal(1)It is equipped at left and right sides of bottom Wheel(2), pedestal(1)Top center is embedded with the first sliding rail(3), the first sliding rail(3)Upper slidingtype is equipped with the first sliding block(4), the One sliding block(4)Top is equipped with bearing block(5), bearing block(5)Interior interference is connected with telescopic rod(6), telescopic rod(6)Lower part is equipped with tooth Wheel(7), telescopic rod(6)Top is connected with brush(8), pedestal(1)Strut is respectively connected at left and right sides of top(9), the left and right sides Strut(9)Rack gear is connected between top(10), rack gear(10)With gear(7)Engagement, right side strut(9)Back lower is equipped with the One fixed pulley(11), the first sliding rail(3)Upside left part is connected with the first link block(12), the first link block(12)It is sliding positioned at first Block(4)Left, the first link block(12)With the first sliding block(4)Between be connected with the first spring(13), pedestal(1)Top left side It is connected with pushing hands(14), pushing hands(14)Left lower is embedded with the second sliding rail(15), the second sliding rail(15)Upper slidingtype is equipped with second Sliding block(16), the second sliding block(16)Left side is connected with pull rod(17), pushing hands(14)Top is provided with through-hole(18), pushing hands(14)Right side Lower part is connected with the second fixed pulley(19), pushing hands(14)Top right side is equipped with third fixed pulley(20), pull rod(17)Top connection There is the first bracing wire(21), the first bracing wire(21)Across through-hole(18), the first bracing wire(21)Around third fixed pulley(20), first draws Line(21)Around the second fixed pulley(19), the first bracing wire(21)Around the first fixed pulley(11), the first bracing wire(21)It is sliding with first Block(4)Connection.
2. a kind of municipal works according to claim 1 remove cobweb equipment with building, which is characterized in that further include having First connecting rod(22), trapezoid block(23), the first guide sleeve(24), the first guide rod(25), the second connecting rod(26), second spring (27), notch plate(28), roller(29)And kelly(30), the first sliding block(4)Front side is connected with first connecting rod(22), first connects Extension bar(22)Front end is connected with trapezoid block(23), pedestal(1)Front side right part is connected with the first guide sleeve(24), the first guide sleeve(24)It is interior Slidingtype is equipped with the first guide rod(25), the first guide rod(25)Across the first guide sleeve(24), the first guide rod(25)Top is connected with Two connecting rods(26), the second connecting rod(26)The bottom left and right sides and the first guide sleeve(24)It is respectively connected between at left and right sides of top Second spring(27), the second connecting rod(26)Right end is connected with notch plate(28), the second connecting rod(26)Top right side is connected with Roller(29), right-hand wheel(2)Leading flank is uniformly provided with kelly(30), kelly(30)With notch plate(28)Cooperation.
3. a kind of municipal works according to claim 2 remove cobweb equipment with building, which is characterized in that further include having Bracket(31), third sliding rail(32), third sliding block(33), the second link block(34), third spring(35), baffle(36), the 4th Fixed pulley(38)With the second bracing wire(39), pedestal(1)Top right side is connected with bracket(31), bracket(31)Top is connected with third Sliding rail(32), third sliding rail(32)Upper slidingtype is equipped with third sliding block(33), third sliding rail(32)Top left side is connected with second Link block(34), the second link block(34)Positioned at third sliding block(33)Left, the second link block(34)With third sliding block(33)It Between be connected with third spring(35), third sliding block(33)Top is connected with baffle(36), baffle(36)Left part is provided with a word hole (37), telescopic rod(6)Across a word hole(37), third sliding rail(32)Top left side is equipped with the 4th fixed pulley(38), pull rod(17) Top is connected with the second bracing wire(39), the second bracing wire(39)Across through-hole(18), the second bracing wire(39)Around the 4th fixed pulley (38), the second bracing wire(39)With third sliding block(33)Connection.
4. a kind of municipal works according to claim 3 remove cobweb equipment with building, which is characterized in that further include having 5th fixed pulley(40), the second guide sleeve(41), third bracing wire(42)And handle(43), pedestal(1)It is fixed that left side is connected with the 5th Pulley(40), pushing hands(14)Lower front is connected with the second guide sleeve(41), pull rod(17)Bottom is connected with third bracing wire(42), the Three bracing wires(42)Around the 5th fixed pulley(40), third bracing wire(42)Across the second guide sleeve(41), third bracing wire(42)It is connected with Handle(43).
5. a kind of municipal works according to claim 4 remove cobweb equipment with building, which is characterized in that further include having Electric pushrod(44)And cushion block(45), pedestal(1)Bottom right is connected with electric pushrod(44), electric pushrod(44)Bottom end connection There is cushion block(45).
CN201810599871.8A 2018-06-12 2018-06-12 A kind of municipal works remove cobweb equipment with building Pending CN108824277A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810599871.8A CN108824277A (en) 2018-06-12 2018-06-12 A kind of municipal works remove cobweb equipment with building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810599871.8A CN108824277A (en) 2018-06-12 2018-06-12 A kind of municipal works remove cobweb equipment with building

Publications (1)

Publication Number Publication Date
CN108824277A true CN108824277A (en) 2018-11-16

Family

ID=64145216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810599871.8A Pending CN108824277A (en) 2018-06-12 2018-06-12 A kind of municipal works remove cobweb equipment with building

Country Status (1)

Country Link
CN (1) CN108824277A (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4278703B1 (en) * 2008-09-25 2009-06-17 藤雄 中山 Tennis court line cleaner
CN205683038U (en) * 2016-05-03 2016-11-16 南安达泰卫浴有限公司 A kind of house decoration Aranea rapid cleaning device
CN108056713A (en) * 2016-11-08 2018-05-22 盐城蓝松家居用品实业有限公司 Cobweb cleaner

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4278703B1 (en) * 2008-09-25 2009-06-17 藤雄 中山 Tennis court line cleaner
CN205683038U (en) * 2016-05-03 2016-11-16 南安达泰卫浴有限公司 A kind of house decoration Aranea rapid cleaning device
CN108056713A (en) * 2016-11-08 2018-05-22 盐城蓝松家居用品实业有限公司 Cobweb cleaner

Similar Documents

Publication Publication Date Title
CN109013416A (en) A kind of energy-saving and environment-friendly retail shop advertisement board cleaning device
CN106513351A (en) Special cleaning device for electric vehicle charging station and cleaning method thereof
CN110027515A (en) A kind of automobile tire outer surface cleaning equipment
CN110410810B (en) Environment-friendly chimney with filtering capability
CN111570354A (en) Turnover automobile accessory cleaning device
CN108824277A (en) A kind of municipal works remove cobweb equipment with building
CN210313076U (en) Safety light curtain for elevator
CN206261577U (en) A kind of fluorescent tube deduster
CN110788098B (en) Garbage bin belt cleaning device
CN210813649U (en) Fire hose winding device
CN104958042A (en) Ultraviolet sterilization mite-killing dust collector
CN209006883U (en) A kind of greeting card laser hollow out equipment
CN204199794U (en) A kind of ascending/decending stage rubbish self-cleaning device
CN207755218U (en) A kind of automatic mopping device of remote control
CN203409633U (en) Steel pipe outer wall rust remover
CN215583999U (en) Window cleaning machine is wiped window and is used collision buffer
CN109674407A (en) A kind of adjustable building Green Machine people of lifting
CN208626843U (en) A kind of air conditioner filter screen backwash cleaning device
CN2523524Y (en) Separated outer wall cleaning devices
CN108814059A (en) A kind of beach chair of automated cleaning
CN109173197B (en) Table tennis cleaning equipment based on grid washing and overturning filtering
CN207325373U (en) A kind of gear cleaning device
CN207913405U (en) Weaving dust removal device
CN107960944A (en) High-altitude cleaning robot cleaning systems with class manual work pattern
CN209441333U (en) A kind of carwash pond

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116

RJ01 Rejection of invention patent application after publication