CN108817610A - A kind of 12Cr1MoVG path Thick Wall Tube Welding method - Google Patents

A kind of 12Cr1MoVG path Thick Wall Tube Welding method Download PDF

Info

Publication number
CN108817610A
CN108817610A CN201811045967.6A CN201811045967A CN108817610A CN 108817610 A CN108817610 A CN 108817610A CN 201811045967 A CN201811045967 A CN 201811045967A CN 108817610 A CN108817610 A CN 108817610A
Authority
CN
China
Prior art keywords
welding
weld
12cr1movg
welding method
thick wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811045967.6A
Other languages
Chinese (zh)
Inventor
傅求华
陈鹏
毛旭东
征德伏
余新海
吴立峰
冯庆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Original Assignee
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Anhui Electric Power Construction First Engineering Co Ltd filed Critical Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority to CN201811045967.6A priority Critical patent/CN108817610A/en
Publication of CN108817610A publication Critical patent/CN108817610A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/0026Arc welding or cutting specially adapted for particular articles or work
    • B23K9/0052Welding of pipe panels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • B23K9/167Arc welding or cutting making use of shielding gas and of a non-consumable electrode
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The invention discloses a kind of 12Cr1MoVG path Thick Wall Tube Welding methods, include the following steps:Step S1, retaining wall on slope and cleaning;Step S2, weldment group pair;Step S3, positioning welding, using hand tungsten argon arc welding method positioning welding;Step S4, weld preheating;Step S5, bottom welding carries out bottom welding using the hand tungsten argon arc welding welding method of molten bath small volume, energy Relatively centralized;Step S6, interlayer temperature measurement and control;Step S7, welding electrode arc welding filling, cover welding;Step S8, postheating;Step S9, welding point cleaning and inspection.The present invention fills the combined welding method of capping by using argon tungsten-arc welding bottoming and welding electrode arc welding, cancel post weld heat treatment technical process, improve welding procedure benefit, using weld preheating, control interlayer temperature, control one-pass weld thickness and postheating technological measure, welding point weld hardness and residual stress are reduced, the comprehensive mechanical properties such as impact toughness of welded joint are improved.

Description

A kind of 12Cr1MoVG path Thick Wall Tube Welding method
Technical field
The invention belongs to high-pressure boiler tube production technical fields, and in particular, to a kind of 12Cr1MoVG path heavy wall Pipe welding method.
Background technique
With the raising of China's Fossil Fueled Power Plant Project unit capacity, parameter, the 12Cr1MoVG path of wall thickness 8mm~13mm Pipe is widely used to super (super-) critical heating surface tubes in boilers, especially in 1000MW ultra supercritical tower boiler, double reheat It is more widely applied in ultra-supercritical boiler heating surface tube.According to statistics, Shanghai Boiler Plant 1000MW ultra supercritical tower boiler There are about 4600, for Harbin Boiler Plant 1000MW ultra supercritical π type boiler there are about 7400, Beijing boiler factory Ba Wei 1000MW is super Overcritical π type boiler is there are about 5900, and Dongfang Boiler Factory 1000MW ultra supercritical π type boiler is there are about 7300, Dongfang Boiler Factory There are about 13800 for 660MW double reheat ultra-supercritical boiler.If the 12Cr1MoVG small diameter tube that wall thickness is no more than 13mm can be cancelled The post weld heat treatment technique of weld bond, it will boiler erection construction efficiency is greatly improved, shortens the construction period, reduce construction cost, It is beneficial to energy conservation emission reduction simultaneously.
Summary of the invention
The purpose of the present invention is to provide a kind of 12Cr1MoVG path Thick Wall Tube Welding methods, by using tungsten argon arc The combined welding method for welding bottoming and welding electrode arc welding filling capping, cancels post weld heat treatment technical process, improves welding procedure Benefit is connect using weld preheating, control interlayer temperature, control one-pass weld thickness and postheating technological measure, reduction Head weld hardness and residual stress improve the comprehensive mechanical properties such as impact toughness of welded joint.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of 12Cr1MoVG path Thick Wall Tube Welding method, includes the following steps:
Step S1, retaining wall on slope and cleaning
Banjo fixing butt jointing slope type is V-type, and bevel angle is 30 ° -35 °;By outer surface 10mm-15mm range in groove Paint, dirt, rust, burr, flash removal on interior base material is clean, until issuing metallic luster;
Step S2, weldment group pair
Weldment group clock synchronization accomplishes that inner wall flushes, and group is 1mm-2mm to gap;
Step S3, positioning welding
It using hand tungsten argon arc welding method positioning welding, is gone through after positioning, determines flawless defect, discovery welding Defect must use mechanical means removal of defects and relocate welding;
Step S4, weld preheating
Adopt oxygenation, acetylene torch heating carries out weld preheating, preheating temperature is 150 DEG C -200 when hand tungsten argon arc welding ℃;
Step S5, bottom welding
Bottom welding is carried out using the hand tungsten argon arc welding welding method of molten bath small volume, energy Relatively centralized, is subtracted Small welding point root is lack of penetration, the welding defect of incomplete fusion, indent, protrusion generates, and root weld quality is effectively ensured;
Step S6, interlayer temperature measurement and control
Interlayer temperature is measured using infrared thermometer, interlayer temperature control range is 200 DEG C -300 DEG C, and interlayer temperature is low Should be heated to 200 DEG C using flame when 200 DEG C can continue to weld, and interlayer temperature should suspend welding when being higher than 300 DEG C and wait for, temperature Degree is down to 300 DEG C or less and can continue welding;
Step S7, welding electrode arc welding filling, cover welding
It is filled using welding rod arc soldering method, cover welding, using low current, string(er) bead, thin layer, fast welding Small heat input welding procedure, control one-pass weld degree thickness guarantee lower layer's welding bead to the tempering of last time welding bead;
Step S8, postheating
Slow cooling is wrapped up using heat-preservation cotton immediately after the completion of welding;
Step S9, welding point cleaning and inspection
Connector to be welded carries out connector cleaning after being cooled to environment temperature and checks, all weld bond capping layers answer round and smooth mistake It crosses, it must not fluted, rugged defect.
Further, weldment group clock synchronization described in step S2 has mismatch, and following limit value is not to be exceeded in mismatch value:It is no more than The 10% of wall thickness, and it is not more than 1mm.
Further, the welding wire trade mark selects TIG-R31 in step S5, and gage of wire is Φ 2.5mm, and electric power polarity is direct current It just connects, welding current 115A-125A, weldingvoltage 12V-13V.
Further, type of electrode selects R317 in step S7, and core diameter selects Φ 2.5mm, Φ 3.2mm, power supply pole Property is DC reverse connection, when core diameter is Φ 2.5mm welding current be 70A-85A, weldingvoltage 23V-24V, core diameter When for Φ 3.2mm welding current be 95A-115A, weldingvoltage 27V-28V.
Further, when step S9 is defective, reconditioning is carried out with angular mill.
Beneficial effects of the present invention:
(1) present invention is using hand tungsten argon arc welding bottoming, the combined welding method of welding electrode arc welding filling capping, cancellation Post weld heat treatment technical process;Using the hand tungsten argon arc welding welding method bottoming of molten bath small volume, energy Relatively centralized, Reduce the welding defects such as lack of penetration welding point root, incomplete fusion, indent, protrusion to generate, root weld quality is effectively ensured;It adopts Cover welding method is filled with welding electrode arc welding, speed of welding is fast, is conducive to improve construction benefit, reduces construction cost;Cancel Post weld heat treatment technical process improves construction benefit, reduces construction cost, and is beneficial to energy conservation emission reduction;
(2) present invention is strictly welded using the small heat input welding procedure of low current, string(er) bead, thin layer, fast welding Preceding preheating, interlayer temperature control and postheating, control one-pass weld degree thickness guarantee tempering of lower layer's welding bead to last time welding bead Processing;Using the small heat input welding procedure of low current, string(er) bead, thin layer, fast welding, it is hard that welding point weld seam is effectively reduced Degree, residual stress;It is stringent to carry out weld preheating, interlayer temperature control and postheating, under control one-pass weld degree thickness guarantees Tempering of the layer welding bead to last time welding bead, the comprehensive mechanical property for improving impact toughness of welded joint, guaranteeing welding point.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with embodiment, it is clear that described reality Applying example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general Logical technical staff all other embodiment obtained without creative efforts belongs to what the present invention protected Range.
A kind of 12Cr1MoVG path Thick Wall Tube Welding method, includes the following steps:
Step S1, retaining wall on slope and cleaning
Banjo fixing butt jointing slope type is V-type, and bevel angle is 30 ° -35 °;By outer surface 10mm-15mm range in groove Paint, dirt, rust, burr, flash removal on interior base material is clean, until issuing metallic luster;
Step S2, weldment group pair
Weldment group clock synchronization accomplishes that inner wall (root) flushes, and if any mismatch, following limit value is not to be exceeded in mismatch value:It is no more than The 10% of wall thickness, and it is not more than 1mm;Group is 1mm-2mm to gap;
Step S3, positioning welding
Using hand tungsten argon arc welding method positioning welding, the defects of going through after positioning, determine flawless, such as find Welding defect must use mechanical means removal of defects and relocate welding;
Step S4, weld preheating
Adopt oxygenation, acetylene torch heating carries out weld preheating, preheating temperature is 150 DEG C -200 when hand tungsten argon arc welding ℃;
Step S5, bottom welding
Bottom welding is carried out using the hand tungsten argon arc welding welding method of molten bath small volume, energy Relatively centralized, is subtracted Small welding point root is lack of penetration, the welding defect of incomplete fusion, indent, protrusion generates, and root weld quality is effectively ensured;Welding wire The trade mark selects TIG-R31, and gage of wire is Φ 2.5mm, and electric power polarity is straight polarity direct current, welding current 115A-125A, welding Voltage is 12V-13V;
Step S6, interlayer temperature measurement and control
Interlayer temperature is measured using infrared thermometer, interlayer temperature control range is 200 DEG C -300 DEG C, and interlayer temperature is low Should be heated to 200 DEG C using flame when 200 DEG C can continue to weld, and interlayer temperature should suspend welding when being higher than 300 DEG C and wait for, temperature Degree is down to 300 DEG C or less and can continue welding;
Step S7, welding electrode arc welding filling, cover welding
It is filled using welding rod arc soldering method, cover welding, using low current, string(er) bead, thin layer, fast welding Small heat input welding procedure, control one-pass weld degree thickness guarantee lower layer's welding bead to the tempering of last time welding bead;Type of electrode R317 is selected, core diameter selects Φ 2.5mm, Φ 3.2mm, and electric power polarity is DC reverse connection, and core diameter welds when being Φ 2.5mm Connect electric current be 70A-85A, weldingvoltage 23V-24V, when core diameter is Φ 3.2mm welding current be 95A-115A, welding Voltage is 27V-28V;
Step S8, postheating
Slow cooling is wrapped up using heat-preservation cotton immediately after the completion of welding;
Step S9, welding point cleaning and inspection
Connector to be welded carries out connector cleaning after being cooled to environment temperature and checks, all weld bond capping layers answer round and smooth mistake Cross, must not fluted, rugged defect, can be used angular mill to carry out reconditioning when necessary.
Non-standard sample is taken the lead using 5mm × 10mm × 120mm, by GB/T 2651-2008 " welding point tension test Method ", carries out tension test on CMT5105 type electronic universal tester, and crosshead displacement rate is 2mm/min;
Table 1 lists as-welded and PWHT state 12Cr1MoVG welding point flat specimen mechanical properties, surrender by force Degree, elongation percentage and fracture position
It is found that as-welded and PWHT state welding point temperature tensile mechanical property meets DL/T 868-2014《Welder Skill evaluates regulation》And NB/T 47014-2011《Bearing device welding qualification》The requirement of standard.PWHT state 12Cr1MoVG welding Yield strength, the tensile strength of connector are more as-welded to decrease, but elongation percentage increases, and sample stretching fracture position is one Side base material is in dimple aggregation Fracture Characteristics;
Using 10mm × 10mm × 55mm Charpy notch standard sample, notch opens up position and accords in weld seam, heat affected area Close GB/T 2650《Welding point impact test method》Requirement.The room temperature impact of joint samples is tested in NI300C type instrument Change and is carried out on metal pendulum bob impact testing, test result is as follows table:
The average impact toughness of the as-welded and steel welded joint sample heat affected area PWHT state 12Cr1MoVG and weld metal zone difference For 220.4J/cm2、43.5J/cm2And 259.2J/cm2, 105.7J/cm2;As-welded and PWHT state 12Cr1MoVG steel connects The impact flexibility of head sample commissure meets DL/T 868-2014《Qualification of welding procedure regulation》And NB/T 47014-2011《It holds Press equipment welding qualification》The requirement of standard;The heat affected area of PWHT state 12Cr1MoVG welding point and the impact flexibility of commissure More as-welded to increase, especially the impact flexibility of commissure improves the most obvious;
Using 2.2mm × 15mm × 185mm drawing by high temperature rectangle proportional test bar, by GB/T 4338《Metal Materials At High Temperature is drawn Stretch experimental method》, respectively at 300 DEG C, 400 DEG C, 500 DEG C and 600 on Shimadzu AG-X PLUS type microcomputer control universal testing machine High temperature tension test is carried out under DEG C state, crosshead displacement rate is 2mm/min, and test result is as follows shown in table:
The high temperature tensile properties of as-welded 12Cr1MoVG welding point:
The high temperature tensile properties of PWHT state 12Cr1MoVG welding point:
In 300-600 DEG C of Range of measuring temp, the elevated temperature strength and plasticity of as-welded connector are above PWHT state connector.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (5)

1. a kind of 12Cr1MoVG path Thick Wall Tube Welding method, which is characterized in that include the following steps:
Step S1, retaining wall on slope and cleaning
Banjo fixing butt jointing slope type is V-type, and bevel angle is 30 ° -35 °;By in groove within the scope of outer surface 10mm-15mm it is female Paint, dirt, rust, burr, flash removal on material is clean, until issuing metallic luster;
Step S2, weldment group pair
Weldment group clock synchronization accomplishes that inner wall flushes, and group is 1mm-2mm to gap;
Step S3, positioning welding
It using hand tungsten argon arc welding method positioning welding, is gone through after positioning, determines flawless defect, find welding defect Using mechanical means removal of defects and welding must be relocated;
Step S4, weld preheating
Adopt oxygenation, acetylene torch heating carries out weld preheating, preheating temperature is 150 DEG C -200 DEG C when hand tungsten argon arc welding;
Step S5, bottom welding
Bottom welding is carried out using the hand tungsten argon arc welding welding method of molten bath small volume, energy Relatively centralized, reduces weldering The welding defect generation for connecing the lack of penetration root of joint, incomplete fusion, indent, protrusion, is effectively ensured root weld quality;
Step S6, interlayer temperature measurement and control
Interlayer temperature is measured using infrared thermometer, interlayer temperature control range is 200 DEG C -300 DEG C, and interlayer temperature is lower than Should be heated to 200 DEG C using flame at 200 DEG C can continue to weld, and interlayer temperature should suspend welding when being higher than 300 DEG C and wait for, temperature Being down to 300 DEG C or less can continue welding;
Step S7, welding electrode arc welding filling, cover welding
Be filled using welding rod arc soldering method, cover welding, using low current, string(er) bead, thin layer, fast welding small line Energy welding procedure, control one-pass weld degree thickness guarantee lower layer's welding bead to the tempering of last time welding bead;
Step S8, postheating
Slow cooling is wrapped up using heat-preservation cotton immediately after the completion of welding;
Step S9, welding point cleaning and inspection
Connector to be welded carries out connector cleaning after being cooled to environment temperature and checks, all weld bond capping layers answer rounding off, no Obtain fluted, rugged defect.
2. a kind of 12Cr1MoVG path Thick Wall Tube Welding method according to claim 1, which is characterized in that in step S2 The weldment group clock synchronization has mismatch, and following limit value is not to be exceeded in mismatch value:No more than the 10% of wall thickness, and it is not more than 1mm.
3. a kind of 12Cr1MoVG path Thick Wall Tube Welding method according to claim 1, which is characterized in that in step S5 The welding wire trade mark selects TIG-R31, and gage of wire is Φ 2.5mm, and electric power polarity is straight polarity direct current, welding current 115A-125A, Weldingvoltage is 12V-13V.
4. a kind of 12Cr1MoVG path Thick Wall Tube Welding method according to claim 1, which is characterized in that in step S7 Type of electrode selects R317, and core diameter selects Φ 2.5mm, Φ 3.2mm, and electric power polarity is DC reverse connection, core diameter Φ When 2.5mm welding current be 70A-85A, weldingvoltage 23V-24V, welding current is 95A- when core diameter is Φ 3.2mm 115A, weldingvoltage 27V-28V.
5. a kind of 12Cr1MoVG path Thick Wall Tube Welding method according to claim 1, which is characterized in that step S9 has When defect, reconditioning is carried out with angular mill.
CN201811045967.6A 2018-09-07 2018-09-07 A kind of 12Cr1MoVG path Thick Wall Tube Welding method Pending CN108817610A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811045967.6A CN108817610A (en) 2018-09-07 2018-09-07 A kind of 12Cr1MoVG path Thick Wall Tube Welding method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811045967.6A CN108817610A (en) 2018-09-07 2018-09-07 A kind of 12Cr1MoVG path Thick Wall Tube Welding method

Publications (1)

Publication Number Publication Date
CN108817610A true CN108817610A (en) 2018-11-16

Family

ID=64149656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811045967.6A Pending CN108817610A (en) 2018-09-07 2018-09-07 A kind of 12Cr1MoVG path Thick Wall Tube Welding method

Country Status (1)

Country Link
CN (1) CN108817610A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109454349A (en) * 2018-11-23 2019-03-12 安徽应流集团霍山铸造有限公司 A kind of heat treatment method reducing steel-casting machined surface weld hardness
CN109794668A (en) * 2018-11-28 2019-05-24 华电电力科学研究院有限公司 A kind of martensite heat-resistant steel container closes up seam welding method
CN109909581A (en) * 2019-04-09 2019-06-21 安徽马钢设备检修有限公司 A kind of ring rolling mill large size cross roll axis surface defect online process for welding repair by hand
CN110331273A (en) * 2019-05-23 2019-10-15 山东电力建设第三工程有限公司 A kind of weld bond heat treatment method of soft alloy pipeline
CN110548945A (en) * 2019-08-08 2019-12-10 上海振华重工启东海洋工程股份有限公司 Welding process for reamer head wrapping plate of cutter suction dredger
CN110744180A (en) * 2019-09-29 2020-02-04 山东临工工程机械有限公司 Welding method for effectively inhibiting weld toe defects of annular weld joint of medium plate
CN112705867A (en) * 2019-10-24 2021-04-27 青岛九合重工机械有限公司 Method for welding T-shaped joint of pump truck
CN112935479A (en) * 2021-03-25 2021-06-11 安徽马钢设备检修有限公司 Welding device and repairing process for large wheel fixing table base fracture
CN114247960A (en) * 2021-12-14 2022-03-29 北京城建集团有限责任公司 Welding process for steel pipe in snow making system
CN114346380A (en) * 2022-02-18 2022-04-15 上海绿地建设(集团)有限公司 Welding process of high-strength steel structure
CN115533259A (en) * 2022-11-09 2022-12-30 郑州煤矿机械集团股份有限公司 Method for restraining lack of narrow gap welding seam of oil cylinder of coal mine hydraulic support
CN116660492A (en) * 2023-05-30 2023-08-29 中国电力建设工程咨询有限公司 Method and system for butt joint selective welding process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814387A (en) * 2006-02-24 2006-08-09 中国有色金属工业第六冶金建设公司金属结构厂 12Cr1MoV alloy steel pipe welding method
CN101850460A (en) * 2010-05-21 2010-10-06 中国石化集团第五建设公司 Welding process of 12Cr1MoV high-pressure pipeline CO2 semiautomatic or automatic gas shielded welding
CN102756218A (en) * 2011-04-27 2012-10-31 五冶集团上海有限公司 Benzene hydrogenation engineering heat resistant steel pipeline welding method
CN103061333A (en) * 2013-01-07 2013-04-24 广东保威新能源有限公司 Split screw pile and welding method thereof
CN105750705A (en) * 2014-12-15 2016-07-13 重庆市佳佳机械制造有限公司 Heat-resisting steel pipe welding technology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1814387A (en) * 2006-02-24 2006-08-09 中国有色金属工业第六冶金建设公司金属结构厂 12Cr1MoV alloy steel pipe welding method
CN101850460A (en) * 2010-05-21 2010-10-06 中国石化集团第五建设公司 Welding process of 12Cr1MoV high-pressure pipeline CO2 semiautomatic or automatic gas shielded welding
CN102756218A (en) * 2011-04-27 2012-10-31 五冶集团上海有限公司 Benzene hydrogenation engineering heat resistant steel pipeline welding method
CN103061333A (en) * 2013-01-07 2013-04-24 广东保威新能源有限公司 Split screw pile and welding method thereof
CN105750705A (en) * 2014-12-15 2016-07-13 重庆市佳佳机械制造有限公司 Heat-resisting steel pipe welding technology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
丁成钢: "12Cr1MoV钢小直径管取消焊后热处理的焊接", 《金属加工(热加工)》 *
戚华山: "12Cr1MoV焊后免热处理焊接工艺", 《道客巴巴》 *
邹增大: "《焊接材料、工艺及设备手册》", 31 August 2001, 化学工业出版社 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109454349A (en) * 2018-11-23 2019-03-12 安徽应流集团霍山铸造有限公司 A kind of heat treatment method reducing steel-casting machined surface weld hardness
CN109794668A (en) * 2018-11-28 2019-05-24 华电电力科学研究院有限公司 A kind of martensite heat-resistant steel container closes up seam welding method
CN109794668B (en) * 2018-11-28 2021-01-01 华电电力科学研究院有限公司 Method for welding closure seam of martensite heat-resistant steel container
CN109909581A (en) * 2019-04-09 2019-06-21 安徽马钢设备检修有限公司 A kind of ring rolling mill large size cross roll axis surface defect online process for welding repair by hand
CN110331273A (en) * 2019-05-23 2019-10-15 山东电力建设第三工程有限公司 A kind of weld bond heat treatment method of soft alloy pipeline
CN110548945A (en) * 2019-08-08 2019-12-10 上海振华重工启东海洋工程股份有限公司 Welding process for reamer head wrapping plate of cutter suction dredger
CN110744180B (en) * 2019-09-29 2021-08-03 山东临工工程机械有限公司 Welding method for effectively inhibiting weld toe defects of annular weld joint of medium plate
CN110744180A (en) * 2019-09-29 2020-02-04 山东临工工程机械有限公司 Welding method for effectively inhibiting weld toe defects of annular weld joint of medium plate
CN112705867A (en) * 2019-10-24 2021-04-27 青岛九合重工机械有限公司 Method for welding T-shaped joint of pump truck
CN112935479A (en) * 2021-03-25 2021-06-11 安徽马钢设备检修有限公司 Welding device and repairing process for large wheel fixing table base fracture
CN114247960A (en) * 2021-12-14 2022-03-29 北京城建集团有限责任公司 Welding process for steel pipe in snow making system
CN114346380A (en) * 2022-02-18 2022-04-15 上海绿地建设(集团)有限公司 Welding process of high-strength steel structure
CN114346380B (en) * 2022-02-18 2022-10-28 上海绿地建设(集团)有限公司 Welding process of high-strength steel structure
CN115533259A (en) * 2022-11-09 2022-12-30 郑州煤矿机械集团股份有限公司 Method for restraining lack of narrow gap welding seam of oil cylinder of coal mine hydraulic support
CN115533259B (en) * 2022-11-09 2023-08-22 郑州煤矿机械集团股份有限公司 Narrow-gap weld defect suppression method for hydraulic support cylinder of coal mine
CN116660492A (en) * 2023-05-30 2023-08-29 中国电力建设工程咨询有限公司 Method and system for butt joint selective welding process

Similar Documents

Publication Publication Date Title
CN108817610A (en) A kind of 12Cr1MoVG path Thick Wall Tube Welding method
CN101700599B (en) Submerged automatic arc welding method of SA335P91 steel
CN102528238B (en) Manual argon-arc welding process of tungsten electrode
CN102528237B (en) Welding process for carbon steel process pipeline
CN101433990B (en) Overlaying welding method of large area carbide alloy of workpiece wear layer
CN104874896B (en) A kind of welding method of the truss jib Q690 high strength steel pipe of large-scale sea work loop wheel machine
CN105665898B (en) A kind of pearlitic heat resistant steel composite board Lincoln weld welding method
CN105945393B (en) One kind is used for nuclear power voltage-stablizer safe end dissimilar metal pipeline built-up welding method for maintaining
CN109865955B (en) Welding method combining manual tungsten electrode argon arc welding and shielded metal arc welding for G115 large-diameter pipe
CN107984105A (en) The welding procedure of wind power tower S355NL steel
CN103769728A (en) Process for repair-welding steel casting through flux-cored wire CO2 gas shielded welding
CN109277672B (en) Correcting process for butt welding bending deformation of stainless steel small-diameter thin-walled tube
CN106964881A (en) Supercritical CFB Boiler high temperature pendant superheater stainless steel buried arc welding method
CN107617803A (en) Nuclear power steel containment vessel circumferential weld automatic submerged arc horizontal welding technique
CN105057844A (en) Welding repair method for cracks on furnace shell of blast furnace
CN103894702B (en) A kind of rotor web crackle welding repair method
CN108080773A (en) All-position ultra-narrow gap high-frequency hot wire TIG welding method for composite pipe
CN110270745A (en) A kind of welding method for P690QL1 steel flux-cored wire gas metal-arc welding
CN109794668A (en) A kind of martensite heat-resistant steel container closes up seam welding method
CN106903405A (en) A kind of low thermal weld stress method of improvement P92 pipeline welding performances
CN107052703A (en) It is super(It is super)The dissimilar metal weld restorative procedure of criticality benchmark high pressure steam guiding tube
CN106270952A (en) A kind of welding method of building structural steel Q345GJB
CN111774692A (en) Large-barrel-cladding nickel-based surfacing process
CN105195866B (en) A kind of full-automatic root bead method of the pipe end of composite bimetal pipe
CN101670477B (en) Welding method of sulfureted hydrogen resistant underground heat-insulated oil pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116

RJ01 Rejection of invention patent application after publication