CN108798758A - Along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique - Google Patents

Along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique Download PDF

Info

Publication number
CN108798758A
CN108798758A CN201710290755.3A CN201710290755A CN108798758A CN 108798758 A CN108798758 A CN 108798758A CN 201710290755 A CN201710290755 A CN 201710290755A CN 108798758 A CN108798758 A CN 108798758A
Authority
CN
China
Prior art keywords
gas
upper corner
goaf
protection casing
mining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710290755.3A
Other languages
Chinese (zh)
Other versions
CN108798758B (en
Inventor
张兴华
张柏林
年军
王军
王岩
王海东
黄玉玺
谯永刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Research Institute Co Ltd of CCTEG
Original Assignee
CCTEG China Coal Technology and Engineering Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCTEG China Coal Technology and Engineering Group Corp filed Critical CCTEG China Coal Technology and Engineering Group Corp
Priority to CN201710290755.3A priority Critical patent/CN108798758B/en
Publication of CN108798758A publication Critical patent/CN108798758A/en
Application granted granted Critical
Publication of CN108798758B publication Critical patent/CN108798758B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F7/00Methods or devices for drawing- off gases with or without subsequent use of the gas for any purpose

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Earth Drilling (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

It is along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, feature the present invention relates to a kind of:Including a coal seam high position drill site of constructing out of air return lane, 1. after long range large diameter borehole of being constructed respectively forwardly and backward along mining direction in drill site with track-mounted electric drilling machine, the protection casing with sieve pore of the certain length processed is headed into large diameter borehole after exiting drilling tool, sealing of hole is carried out to large diameter borehole, 2. in main entry or in going up a hill by with sieve pore protection casing and corresponding extraction pipeline connect and extraction carried out to goaf and gas at upper corner.It is reduced than high-order drill site sector arrangement drilling construction amount nearly by 50%, it is at low cost, large diameter borehole is constructed in coal seam, faster than formation pore speed of application, and part coal is produced when construction, save mining costs, mash gas extraction flow is big, and protection casing is equipped in large diameter borehole, is not easy collapse hole, mash gas extraction effect is more preferable, also effectively prevents gas exceeding limit function in tunnel.

Description

Along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique
Technical field
It is the present invention relates to hole pumping and mining goaf and gas at upper corner technique, more particularly to a kind of to be bored along top major diameter concordant Hole extraction goaf and gas at upper corner technique.
Background technology
Gas is the main hazard source during coal production.Raising with coal working face production capacity and working face The quickening of fltting speed, necessarily causes gas emission to increase.High-order drill site sector arranges hole pumping and mining technology due to its extraction Time is long, and extraction system is simple, it has also become solves the problems, such as the main method of the easy spontaneous combustion super high seam gas exceeding limit of high methane.For High gas face, high-order drill site sector arrangement hole pumping and mining method are both solve goaf and Gas Emissions of Adjacent Layers effective The feasible measure of approach and control face gas exceeding limit.But the shortcomings that high position drill site sector arrangement hole pumping and mining technology Have:High-order drill site generally will be from construction to top plate in the air return lane in this coal seam, and the construction gradient is steep, and rock drill site cost is high;It is high Fan-shaped arrangement boring aperture in the drill site of position is generally 94mm-133mm, and boring aperture is small, and flow is small, and extracting result is undesirable, There is collapse hole phenomenon, extracting result can be seriously affected;General 50-100 meters of high-order drill site is constructed one, the drill site number in crossheading compared with It is more, it is of high cost;It lays extraction pipeline in air return lane with the extraction borehole in drill site to be connected, pipeline laying is of high cost;This method is not Can extraction to gas at upper corner.
Invention content
It is taken out along top major diameter concordant drilling in view of the defects and deficiencies of the prior art, the present invention intends to provide a kind of Goaf and gas at upper corner technique are adopted, high-order drill site sector arranges hole pumping and mining goaf gas work in can effectively replace top plate Skill.
The technical solution adopted by the present invention to solve the technical problems is:It is a kind of mined out along top major diameter concordant hole pumping and mining Area and gas at upper corner technique, feature are:Including a coal seam high position drill site of constructing out of air return lane, track-mounted electric is 1. used Drilling machine respectively forwardly and is backward constructed in drill site along mining direction after long range large diameter borehole, will be processed after exiting drilling tool The protection casing with sieve pore of good certain length heads into large diameter borehole, sealing of hole is carried out to large diameter borehole, 2. big Lane or go up a hill the middle protection casing by with sieve pore and corresponding extraction pipeline connect to goaf and gas at upper corner into Row extraction.
Wherein:3. when needing long length large diameter borehole, at interval of one coal seam of certain distance construction out of air return lane 1. high-order drill site repeats step in all coal seam high position drill sites, a connecting leg of constructing between two coal seam high position drill sites is small The protection casing that sieve pore is carried between former and later two coal seam high position drill sites is connected, repeats step 2. by drill site.
Wherein:Protection casing with sieve pore is provided at both ends with connection-peg variable-diameter structure, protection casing PVC or made of metal At.
Wherein:Large diameter borehole trend corresponds to gas at upper corner stream.
Wherein:With the propulsion of stope, directly top and old top is constantly caving, and the protection casing with sieve pore is continuous Fall in goaf, so that goaf and gas at upper corner stream is obtained extraction.
The beneficial effects of the invention are as follows:It is nearlyr by 50% than the arrangement drilling construction amount reduction of high-order drill site sector, it is at low cost, it is big straight Diameter drilling 6 is all constructed in coal seam 1, faster than formation pore speed of application, and construction produces part coal simultaneously, saving coal mining at This, mash gas extraction flow is big, and the protection casing 15 with sieve pore is set in large diameter borehole 6, is not easy collapse hole, mash gas extraction effect is more It is good, also effectively prevent gas exceeding limit function in tunnel.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples.
Fig. 1 present invention construction horizontal layout schematic diagram;
Fig. 2 present invention construction A-A diagrammatic cross-sections;
Fig. 3 Construction Arrangement diagrammatic cross-sections of the present invention.
1. coal seam in figure, 3. stopes, 4. top plates, 5. coal seam high position drill sites, 6. large diameter boreholes, 7. air return lanes, 8. goaf, 9. Gas-Flows, 10. upper corners, 11. track-mounted electric drilling machines, 13. old tops, 14. directly push up, 15. protection casings, 16. the small drill site of connecting leg.
Specific implementation mode
First embodiment, it is a kind of along top major diameter concordant hole pumping and mining goaf 8 and upper corner referring to Fig. 1, Fig. 2, Fig. 3 Gas technique, feature are:Including a coal seam high position drill site 5 of constructing out of air return lane 7,1. existed with track-mounted electric drilling machine 11 Along mining direction, construction 500-1000 millimeters of major diameter of 100-200 meter of long range drills after 6 respectively forwardly and backward in drill site, The protection casing 15 with sieve pore of the 1-2 processed rice length is headed into large diameter borehole 6 after exiting drilling tool, to major diameter Drilling 6 carries out sealing of holes, 2. in main entry or in going up a hill by with sieve pore protection casing 15 and corresponding extraction pipeline connect Extraction is carried out to goaf and 10 gas of upper corner.
It effectively substitutes high-order drill site sector in top plate 4 and arranges hole pumping and mining goaf gas technique.
Second embodiment, it is a kind of along top major diameter concordant hole pumping and mining goaf 8 and upper corner referring to Fig. 1, Fig. 2, Fig. 3 Gas technique, feature are:Including a coal seam high position drill site 5 of constructing out of air return lane 7,1. existed with track-mounted electric drilling machine 11 Along mining direction, construction 500-1000 millimeters of major diameter of 100-200 meter of long range drills after 6 respectively forwardly and backward in drill site, The protection casing 15 with sieve pore of the 1-2 processed rice length is headed into large diameter borehole 6 after exiting drilling tool, to major diameter Drilling 6 carries out sealing of holes, 2. in main entry or in going up a hill by with sieve pore protection casing 15 and corresponding extraction pipeline connect Extraction is carried out to goaf and 10 gas of upper corner.
Wherein:3. interior at interval of 200-400 meters of distance constructions one from air return lane 7 when needing long length large diameter borehole 6 1. a coal seam high position drill site 5 repeats step, constructs between two coal seam high position drill sites 5 in all coal seam high position drill sites 5 The protection casing 15 that sieve pore is carried between former and later two coal seam high position drill sites 5 is connected, is repeated by the small drill site 16 of one connecting leg Step is 2..
It effectively substitutes high-order drill site sector in top plate 4 and arranges hole pumping and mining goaf gas technique.
3rd embodiment, it is a kind of along top major diameter concordant hole pumping and mining goaf 8 and upper corner referring to Fig. 1, Fig. 2, Fig. 3 Gas technique, feature are:Including a coal seam high position drill site 5 of constructing out of air return lane 7,1. existed with track-mounted electric drilling machine 11 Along mining direction, construction 500-1000 millimeters of major diameter of 100-200 meter of long range drills after 6 respectively forwardly and backward in drill site, The protection casing 15 with sieve pore of the 1-2 processed rice length is headed into large diameter borehole 6 after exiting drilling tool, to major diameter Drilling 6 carries out sealing of holes, 2. in main entry or in going up a hill by with sieve pore protection casing 15 and corresponding extraction pipeline connect Extraction is carried out to goaf and 10 gas of upper corner.
Wherein:3. interior at interval of 200-400 meters of distance constructions one from air return lane 7 when needing long length large diameter borehole 6 1. a coal seam high position drill site 5 repeats step, constructs between two coal seam high position drill sites 5 in all coal seam high position drill sites 5 The protection casing 15 that sieve pore is carried between former and later two coal seam high position drill sites 5 is connected, is repeated by the small drill site 16 of one connecting leg Step is 2..
Wherein:Protection casing 15 with sieve pore is provided at both ends with connection-peg variable-diameter structure, protection casing 15 PVC or gold Category is made.
It effectively substitutes high-order drill site sector in top plate 4 and arranges hole pumping and mining goaf gas technique.
Fourth embodiment, it is a kind of along top major diameter concordant hole pumping and mining goaf 8 and upper corner referring to Fig. 1, Fig. 2, Fig. 3 Gas technique, feature are:Including a coal seam high position drill site 5 of constructing out of air return lane 7,1. existed with track-mounted electric drilling machine 11 Along mining direction, construction 500-1000 millimeters of major diameter of 100-200 meter of long range drills after 6 respectively forwardly and backward in drill site, The protection casing 15 with sieve pore of the 1-2 processed rice length is headed into large diameter borehole 6 after exiting drilling tool, to major diameter Drilling 6 carries out sealing of holes, 2. in main entry or in going up a hill by with sieve pore protection casing 15 and corresponding extraction pipeline connect Extraction is carried out to goaf and 10 gas of upper corner.
Wherein:3. interior at interval of 200-400 meters of distance constructions one from air return lane 7 when needing long length large diameter borehole 6 1. a coal seam high position drill site 5 repeats step, constructs between two coal seam high position drill sites 5 in all coal seam high position drill sites 5 The protection casing 15 that sieve pore is carried between former and later two coal seam high position drill sites 5 is connected, is repeated by the small drill site 16 of one connecting leg Step is 2..
Wherein:Protection casing 15 with sieve pore is provided at both ends with connection-peg variable-diameter structure, protection casing 15 PVC or gold Category is made.
Wherein:The trend of large diameter borehole 6 corresponds to gas at upper corner stream 9.
It effectively substitutes high-order drill site sector in top plate 4 and arranges hole pumping and mining goaf gas technique.
5th embodiment, it is a kind of along top major diameter concordant hole pumping and mining goaf 8 and upper corner referring to Fig. 1, Fig. 2, Fig. 3 Gas technique, feature are:Including a coal seam high position drill site 5 of constructing out of air return lane 7,1. existed with track-mounted electric drilling machine 11 Along mining direction, construction 500-1000 millimeters of major diameter of 100-200 meter of long range drills after 6 respectively forwardly and backward in drill site, The protection casing 15 with sieve pore of the 1-2 processed rice length is headed into large diameter borehole 6 after exiting drilling tool, to major diameter Drilling 6 carries out sealing of holes, 2. in main entry or in going up a hill by with sieve pore protection casing 15 and corresponding extraction pipeline connect Extraction is carried out to goaf and 10 gas of upper corner.
Wherein:3. interior at interval of 200-400 meters of distance constructions one from air return lane 7 when needing long length large diameter borehole 6 1. a coal seam high position drill site 5 repeats step, constructs between two coal seam high position drill sites 5 in all coal seam high position drill sites 5 The protection casing 15 that sieve pore is carried between former and later two coal seam high position drill sites 5 is connected, is repeated by the small drill site 16 of one connecting leg Step is 2..
Wherein:Protection casing 15 with sieve pore is provided at both ends with connection-peg variable-diameter structure, protection casing 15 PVC or gold Category is made.
Wherein:The trend of large diameter borehole 6 corresponds to gas at upper corner stream 9.
Wherein:With the propulsion of stope 3, directly top 14 and old top 13 is constantly caving, and carries the retaining wall set of sieve pore Pipe 15 is constantly fallen in goaf 8, and goaf 8 and 10 Gas-Flow 9 of upper corner is made to obtain extraction.
It effectively substitutes high-order drill site sector in top plate 4 and arranges hole pumping and mining goaf gas technique.

Claims (8)

1. it is a kind of along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, it is characterized in that:Including from air return lane One coal seam high position drill site of interior construction, 1. respectively forwardly and is backward applied in drill site along mining direction with track-mounted electric drilling machine Section chief heads into the protection casing with sieve pore of the certain length processed greatly directly after exiting drilling tool after large diameter borehole In diameter drilling, sealing of hole is carried out to large diameter borehole, is 2. taken out with corresponding in main entry or by the protection casing with sieve pore in going up a hill Piping connection is adopted to get up to goaf and gas at upper corner progress extraction.
2. it is according to claim 1 a kind of along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, it is special Sign is:3. when needing long length large diameter borehole, bored at interval of one coal seam high position of certain distance construction out of air return lane , in all coal seam high position drill sites, repeat step 1., a small drill site of connecting leg of constructing between two coal seam high position drill sites, The protection casing for carrying sieve pore between former and later two coal seam high position drill sites is connected, repeats step 2..
3. it is according to claim 1 a kind of along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, it is special Sign is:Protection casing with sieve pore is provided at both ends with connection-peg variable-diameter structure, and protection casing is made of PVC or metal.
4. it is according to claim 1 a kind of along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, it is special Sign is:Large diameter borehole trend corresponds to gas at upper corner stream.
5. it is according to claim 2 a kind of along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, it is special Sign is:Protection casing with sieve pore is provided at both ends with connection-peg variable-diameter structure, and protection casing is made of PVC or metal.
6. it is according to claim 3 a kind of along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, it is special Sign is:Large diameter borehole trend corresponds to gas at upper corner stream.
7. it is according to claim 5 a kind of along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique, it is special Sign is:Large diameter borehole trend corresponds to gas at upper corner stream.
8. a kind of along top major diameter concordant hole pumping and mining goaf and upper corner watt according to any one of claim 1-7 This technique, is characterized in that:With the propulsion of stope, directly top and old top is constantly caving, and carries the protection casing of sieve pore It constantly falls in goaf, goaf and gas at upper corner stream is made to obtain extraction.
CN201710290755.3A 2017-04-28 2017-04-28 Process for extracting gas from goaf and upper corner along top large-diameter bedding drill hole Active CN108798758B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710290755.3A CN108798758B (en) 2017-04-28 2017-04-28 Process for extracting gas from goaf and upper corner along top large-diameter bedding drill hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710290755.3A CN108798758B (en) 2017-04-28 2017-04-28 Process for extracting gas from goaf and upper corner along top large-diameter bedding drill hole

Publications (2)

Publication Number Publication Date
CN108798758A true CN108798758A (en) 2018-11-13
CN108798758B CN108798758B (en) 2020-02-04

Family

ID=64069799

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710290755.3A Active CN108798758B (en) 2017-04-28 2017-04-28 Process for extracting gas from goaf and upper corner along top large-diameter bedding drill hole

Country Status (1)

Country Link
CN (1) CN108798758B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173295A (en) * 2019-07-13 2019-08-27 中国矿业大学(北京) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN110486079A (en) * 2019-09-26 2019-11-22 中煤科工集团重庆研究院有限公司 A kind of gas pumping method of super high seam separate zone production
CN113446051A (en) * 2021-07-30 2021-09-28 太原理工大学 Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process
CN113513360A (en) * 2021-08-09 2021-10-19 太原理工大学 Gas extraction method for single thick coal seam fully mechanized caving mining goaf

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280687A (en) * 2008-05-27 2008-10-08 河南理工大学 Projecting coal bed edge top drill construction technique and method for eliminating pumping blind zone
RU2379520C1 (en) * 2008-07-18 2010-01-20 Учреждение Российской академии наук Институт проблем комплексного освоения недр РАН (УРАН ИПКОН РАН) Extraction method of methane from coal bed
CN102635389A (en) * 2012-03-26 2012-08-15 山东科技大学 Method for gas drainage from high-position roadway coal seam containing shielded soft rock
CN103016047A (en) * 2012-12-20 2013-04-03 大同煤矿集团有限责任公司 Method of draining gas in gob through long drill hole in roof trend on fully mechanized caving face
CN104481540A (en) * 2014-10-08 2015-04-01 六盘水师范学院 Method for controlling multiple coal mining hazards by high level borehole grouting
CN204941596U (en) * 2015-06-30 2016-01-06 陕西建新煤化有限责任公司 Coal mine gas extraction hole structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101280687A (en) * 2008-05-27 2008-10-08 河南理工大学 Projecting coal bed edge top drill construction technique and method for eliminating pumping blind zone
RU2379520C1 (en) * 2008-07-18 2010-01-20 Учреждение Российской академии наук Институт проблем комплексного освоения недр РАН (УРАН ИПКОН РАН) Extraction method of methane from coal bed
CN102635389A (en) * 2012-03-26 2012-08-15 山东科技大学 Method for gas drainage from high-position roadway coal seam containing shielded soft rock
CN103016047A (en) * 2012-12-20 2013-04-03 大同煤矿集团有限责任公司 Method of draining gas in gob through long drill hole in roof trend on fully mechanized caving face
CN104481540A (en) * 2014-10-08 2015-04-01 六盘水师范学院 Method for controlling multiple coal mining hazards by high level borehole grouting
CN204941596U (en) * 2015-06-30 2016-01-06 陕西建新煤化有限责任公司 Coal mine gas extraction hole structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
董艳军等: "松软煤层大直径长钻孔成孔与护孔瓦斯抽采技术的应用", 《中州煤炭》 *
谭永福等: "单一煤层综采工作面瓦斯综合治理技术", 《煤矿安全》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110173295A (en) * 2019-07-13 2019-08-27 中国矿业大学(北京) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN110486079A (en) * 2019-09-26 2019-11-22 中煤科工集团重庆研究院有限公司 A kind of gas pumping method of super high seam separate zone production
CN113446051A (en) * 2021-07-30 2021-09-28 太原理工大学 Goaf ultrahigh-position drill hole gas extraction method under roof cutting and roadway retaining process
CN113513360A (en) * 2021-08-09 2021-10-19 太原理工大学 Gas extraction method for single thick coal seam fully mechanized caving mining goaf

Also Published As

Publication number Publication date
CN108798758B (en) 2020-02-04

Similar Documents

Publication Publication Date Title
WO2018171255A1 (en) Networked preferential gas migration passage construction and gas diversion drainage method
Sang et al. Stress relief coalbed methane drainage by surface vertical wells in China
CN108798758A (en) Along top major diameter concordant hole pumping and mining goaf and gas at upper corner technique
CN107905834A (en) A kind of hypotonic high prominent coal seam architecture gas production method
CN106194244A (en) Lower permeability seam liquid phase CO2phase transformation fracturing is anti-reflection grid type gas pumping method
WO2015103861A1 (en) Method for extracting gas by drilling hole in gob-side entry retaining y-type ventilation high-position return airway
CN104100244A (en) Well spacing method for coal bed gas communication well groups and application of well spacing method in fracturing yield increase
CN103899348A (en) Method for fast extracting gas on coalface
CN103147734A (en) Method for multi-section hydraulic fracture along coal layer of underground coal mine
CN112240221B (en) Gas extraction method based on directional long drill hole
CN107559008A (en) A kind of method combined second mining super high seam and stop adopting line coal column
CN109869152B (en) Mining method for reserved roadway of coal and gas outburst coal seam
CN109505606B (en) Pre-roof-control mechanized sublevel open stoping subsequent filling mining method
CN110173295A (en) A method of utilizing concordant directional drilling mash gas extraction and fire extinguishing
CN112377241B (en) Roof extraction roadway cross-layer drilling and presplitting blasting combined multi-branch directional hole extraction method
CN109915197A (en) A kind of method that rock gangway km directional long borehole substitution middle part bottom pumping rock gangway is taken out at bottom
CN111237006A (en) Method for preventing and controlling rock burst and gas emission in linkage manner of high-length and short-distance drilling
CN108180035A (en) Gas extraction method for combined operation of drilling and permeability increasing of high-gas low-permeability coal seam
Li et al. Trial of small gateroad pillar in top coal caving longwall mining of large mining height
CN107503790B (en) Fast extraction fully mechanized coal face comprehensive gas drainage arranges administering method
CN102635389B (en) Method for gas drainage from high-position roadway coal seam containing shielded soft rock
CN115680653A (en) Hydraulic fracturing and permeability increasing extraction method for coal seam roof of coal roadway driving face
CN108505999A (en) A kind of high prominent more lane method for arranging of working face of coal seam
CN109578058B (en) Method for improving gas extraction concentration of extraction borehole through auxiliary drilling
CN114837555A (en) Feather-shaped multifunctional directional drilling hole arrangement method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 113122 No.11 Binhe Road, Shenfu demonstration area, Fushun City, Liaoning Province

Patentee after: Shenyang Research Institute Co.,Ltd.

Address before: 113122, Binhe Road, Fushun Economic Development Zone, Liaoning, Fushun, 11

Patentee before: CCTEG (China Coal Technology and Engineering Group Corp.)

CP03 Change of name, title or address