CN108798728A - Tunnel in cold regions heat insulating construction method - Google Patents

Tunnel in cold regions heat insulating construction method Download PDF

Info

Publication number
CN108798728A
CN108798728A CN201810887251.4A CN201810887251A CN108798728A CN 108798728 A CN108798728 A CN 108798728A CN 201810887251 A CN201810887251 A CN 201810887251A CN 108798728 A CN108798728 A CN 108798728A
Authority
CN
China
Prior art keywords
tunnel
thermal insulation
insulation board
fire
heat insulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810887251.4A
Other languages
Chinese (zh)
Inventor
徐少平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
5th Engineering Co Ltd of MBEC
Original Assignee
Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical Fifth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN201810887251.4A priority Critical patent/CN108798728A/en
Publication of CN108798728A publication Critical patent/CN108798728A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F5/00Means or methods for preventing, binding, depositing, or removing dust; Preventing explosions or fires

Abstract

The invention discloses tunnel in cold regions heat insulating construction methods to set expansion bolt, thermal insulation board plate is made to be fixed on the surface of secondary lining, then lay fire-proof plate and sprayed fire proofing coating after secondary lining headroom, surface smoothness and infiltration situation passed examination.The beneficial effects of the invention are as follows:Working procedure is simple, and construction equipment is few, effective to shorten the construction period, to operating environment without particular/special requirement, and to small to environmental pollution, effectively reducing construction cost;The infiltration that the effective prevention spring melts phase appearance causes various freeze injuries, ensures the temperature and traffic safety of structure.

Description

Tunnel in cold regions heat insulating construction method
Technical field
The present invention relates to tunnel insulation fireprotection layer technical field of construction, are tunnel in cold regions heat preservation constructions specifically Method.
Background technology
With the fast development of China's communication, in particular with development of the West Regions and rejuvenating the northeast economic policy into One step is implemented, and will be had a large amount of tunnel to build successively in the High aititude in western part and northern high latitude cold district, and be trembled with fear with previous The tunnel of cryogenic region is compared, and scale meeting bigger, the technology in these tunnels require higher, and weather conditions are more severe.
It is the effectively measure to the prevention frost damage of Tunnel Engineering in the prior art;Therefore, current Tunnel Engineering is badly in need of Effectively preventing Freezing.
Invention content
The purpose of the present invention is to provide tunnel in cold regions heat insulating construction methods, and working procedure is simple, and construction equipment is few, It is effective to shorten the construction period, to operating environment without particular/special requirement, and to small to environmental pollution, effectively reducing and being constructed into This;The infiltration that the effective prevention spring melts phase appearance causes various freeze injuries, ensures the temperature and traffic safety of structure.
The present invention is achieved through the following technical solutions:
Tunnel in cold regions heat insulating construction method is beaten after secondary lining headroom, surface smoothness and infiltration situation passed examination If expansion bolt, thermal insulation board plate is made to be fixed on the surface of secondary lining, then lays fire-proof plate and sprayed fire proofing coating.
Further, in order to preferably realize the present invention,
Specifically include following steps:
Step S1:Preparation of construction;
Step S2:Insulated fire layer is constructed;
Step S22:Punch pre-buried expansion bolt;
Step S23:Mounting and adjusting U-shaped card part;
Step S24:Thermal insulation board is installed;
Step S25:Fire-proof plate is installed;
Step S26:Sprayed fire proofing coating;
Step S27:Cable trough insulating layer is constructed;Construction finishes.
Further, in order to preferably realize that the present invention, the step S2 further include step S21:Construction layout;Specifically Refer to:According to tunnel head fall, insulating layer setting height, insulating layer width and lightgage steel joist spacing in secondary lining surface ink Line setting-out.
Further, in order to preferably realize that the present invention, the step S24 specifically include:
Step S241:Thermal insulation board is penetrated by U-shaped card part, the gap between thermal insulation board is blocked using cranny filler of polyurethane foam, Make thermal insulation board that secondary lining surface be completely covered;
Step S242:Fixed lightgage steel joist;It specifically refers to:U-shaped card part fixes U-shaped lightgage steel joist after penetrating thermal insulation board and bending On U-shaped card part;The U-shaped lightgage steel joist extending direction is consistent with tunnel longitudinal direction.
Further, in order to preferably realize that the present invention, the step S25 specifically include following steps:
Step S251:Fire-proof plate is fixed on the keel shoe that U-shaped lightgage steel joist is formed;
Step S252:By the gap sealing between fire-proof plate.
Further, in order to preferably realize that the present invention, the step S6 include the following steps:
Step S261:It sprays for the first time;Base is sprayed using flush coater, is carried out from tunnel waist to top;
Step S262:After the first spraying parches, carries out second and spray;The time interval of spraying and second of spraying for the first time At least 24 hours;
Step S263:Manual grinding, finishing.
Further, in order to preferably realize that the present invention, the step S27 specifically include following steps:
Step S271:In cable trough the plug-in thermal insulation board of expansion bolt is used close to the side of secondary lining;
Step S272:After the completion of step S271, the plug-in steel wire of thermal insulation board, and smear fire-proof cement mortar.
Compared with prior art, the present invention haing the following advantages and advantageous effect:
Working procedure of the present invention is simple, and construction equipment is few, effective to shorten the construction period, to operating environment without particular/special requirement, and To with small to environmental pollution, effectively reducing construction cost;The infiltration that the effective prevention spring melts phase appearance causes various freeze injuries, protects Demonstrate,prove the temperature and traffic safety of structure.
Specific implementation mode
The present invention is described in further detail with reference to embodiment, embodiments of the present invention are not limited thereto.
Embodiment 1:
The present invention is achieved through the following technical solutions, tunnel in cold regions heat insulating construction method, flat on secondary lining headroom, surface After whole degree and infiltration situation passed examination, expansion bolt is set, so that thermal insulation board plate is fixed on the surface of secondary lining, then lays Fire-proof plate and sprayed fire proofing coating.
It should be noted that by above-mentioned improvement, working procedure is simple, and construction equipment is few, effective to shorten the construction period, To operating environment without particular/special requirement, and to small to environmental pollution, effectively reducing construction cost;The effective prevention phase of melting in spring goes out Existing infiltration causes various freeze injuries, ensures the temperature and traffic safety of structure.
The other parts of the present embodiment are same as the previously described embodiments, and so it will not be repeated.
Embodiment 2:
The present embodiment advanced optimizes on the basis of the above embodiments, specifically includes following steps:
Step S1:Preparation of construction;
Step S2:Insulated fire layer is constructed;
Step S22:Punch pre-buried expansion bolt;
Step S23:Mounting and adjusting U-shaped card part;
Step S24:Thermal insulation board is installed;
Step S25:Fire-proof plate is installed;
Step S26:Sprayed fire proofing coating;
Step S27:Cable trough insulating layer is constructed;Construction finishes.
It should be noted that by above-mentioned improvement, preparation of construction specifically refers to:For the floating ash in Tunnel Second Lining surface, The impurity such as greasy dirt, soil are first located clearly;Specifically use following technological means:First with clearly washing away, to uneven or office It is repaired in the place of portion's faulting of slab ends, it is ensured that base face is smooth, needs advanced whereabouts water mending-leakage if the place for having leak.
The other parts of the present embodiment are same as the previously described embodiments, and so it will not be repeated.
Embodiment 3:
The present embodiment advanced optimizes on the basis of the above embodiments, and the step S24 is specifically included:
Step S241:Thermal insulation board is penetrated by U-shaped card part, the gap between thermal insulation board is blocked using cranny filler of polyurethane foam, Thermal insulation board is set to be completely covered secondary lining surface, it must not there are gaps between thermal insulation board.
Step S242:Fixed lightgage steel joist;It specifically refers to:U-shaped card part penetrates U-shaped lightgage steel joist after thermal insulation board and bending It is fixed on U-shaped card part;The U-shaped lightgage steel joist extending direction is consistent with tunnel longitudinal direction;U-shaped lightgage steel joist is needed When lengthening the connection between U-shaped lightgage steel joist is carried out using extension piece.
The other parts of the present embodiment are same as the previously described embodiments, and so it will not be repeated.
Embodiment 4:
The present embodiment advanced optimizes on the basis of the above embodiments, and the step S25 specifically includes following steps:
Step S251:Fire-proof plate is fixed on the keel shoe that U-shaped lightgage steel joist is formed;
Step S252:By the gap sealing between fire-proof plate;Gap sealing using Special seal putty and guipure by fire-proof plate it Between gap sealing, after each gap closing is complete, then polish flat, it is ensured that filleting line width is uniform, specious so that whole A construction surface forms nature arc with tunnel.
The other parts of the present embodiment are same as the previously described embodiments, and so it will not be repeated.
Embodiment 5:
The present embodiment advanced optimizes on the basis of the above embodiments, and the step S6 includes the following steps:
Step S261:It sprays for the first time;Base using flush coater spray, from tunnel waist to top carry out, i.e., from below to up into Row;
Step S262:After the first spraying parches, carries out second and spray;The time interval of spraying and second of spraying for the first time At least 24 hours;
Step S263:Manual grinding, finishing so that its thickness meets design thickness requirement.
The other parts of the present embodiment are same as the previously described embodiments, and so it will not be repeated.
Embodiment 6:
The present embodiment is highly preferred embodiment of the present invention:
Tunnel in cold regions heat insulating construction method, specifically includes following steps:
Step S1:Preparation of construction;The impurity such as ash, greasy dirt, soil are floated for Tunnel Second Lining surface first to be located clearly;Specifically adopt With following technological means:It first with clearly washing away, is repaired in the place to uneven or local faulting of slab ends, it is ensured that base face is flat It is whole, need advanced whereabouts water mending-leakage if the place for having leak;It must test, examine for material involved in construction It can come into operation after qualification.
Step S2:Insulated fire layer is constructed;
Step S21:Construction layout;It specifically refers to:According to tunnel head fall, insulating layer setting height, insulating layer width and light Steel joist spacing is in the line of ink marker setting-out of secondary lining surface.
Step S22:Punch pre-buried expansion bolt;The expansion bolt depth of burying is not less than 5cm;
Step S23:Mounting and adjusting U-shaped card part;
Step S24:Thermal insulation board is installed;
Step S241:Thermal insulation board is penetrated by U-shaped card part, the gap between thermal insulation board is blocked using cranny filler of polyurethane foam, Thermal insulation board is set to be completely covered secondary lining surface, it must not there are gaps between thermal insulation board.
Step S242:Fixed lightgage steel joist;It specifically refers to:U-shaped card part penetrates U-shaped lightgage steel joist after thermal insulation board and bending It is fixed on U-shaped card part;The U-shaped lightgage steel joist extending direction is consistent with tunnel longitudinal direction;U-shaped lightgage steel joist is needed When lengthening the connection between U-shaped lightgage steel joist is carried out using extension piece.
Step S25:Fire-proof plate is installed;The step S25 specifically includes following steps:
Step S251:Fire-proof plate is fixed on the keel shoe that U-shaped lightgage steel joist is formed using double tapping screw;It is fixed suitable Sequence is m- other side edge in fire shield edges-by fixation.
Step S252:By the gap sealing between fire-proof plate;Gap sealing will be prevented fires using Special seal putty and guipure Gap sealing between plate after each gap closing is complete, then polishes flat, it is ensured that filleting line width is uniform, specious, makes It obtains entire construction surface and forms nature arc with tunnel.
Step S26:Sprayed fire proofing coating;The step S6 includes the following steps:
Step S261:It sprays for the first time;Base using flush coater spray, from tunnel waist to top carry out, i.e., from below to up into Row;
Step S262:After the first spraying parches, carries out second and spray;The time interval of spraying and second of spraying for the first time At least 24 hours;
Step S263:Manual grinding, finishing so that its thickness meets design thickness requirement.
Step S27:Cable trough insulating layer is constructed;Construction finishes.The step S27 specifically includes following steps:
Step S271:The thermal insulation board of the plug-in 5cm thickness of expansion bolt is used close to the side of secondary lining in cable trough;
Step S272:After the completion of step S271, the plug-in steel wire of thermal insulation board, and smear the fire-proof cement mortar of 1cm thickness.
Thermal insulation board employed in the present embodiment is prefabricated F13-1PU hard polyurethane foam boards;Fire-proof plate uses silicon Sour calcium fire-proof plate.
The other parts of the present embodiment are same as the previously described embodiments, and so it will not be repeated.
The above is only presently preferred embodiments of the present invention, not does limitation in any form to the present invention, it is every according to According to the technical spirit of the present invention to any simple modification, equivalent variations made by above example, the protection of the present invention is each fallen within Within the scope of.

Claims (7)

1. tunnel in cold regions heat insulating construction method, it is characterised in that:In secondary lining headroom, surface smoothness and infiltration situation After passed examination, expansion bolt is set, thermal insulation board plate is made to be fixed on the surface of secondary lining, then lay fire-proof plate and is sprayed anti- Fiery coating.
2. tunnel in cold regions heat insulating construction method according to claim 1, it is characterised in that:Specifically include following step Suddenly:
Step S1:Preparation of construction;
Step S2:Insulated fire layer is constructed;
Step S22:Punch pre-buried expansion bolt;
Step S23:Mounting and adjusting U-shaped card part;
Step S24:Thermal insulation board is installed;
Step S25:Fire-proof plate is installed;
Step S26:Sprayed fire proofing coating;
Step S27:Cable trough insulating layer is constructed;Construction finishes.
3. tunnel in cold regions heat insulating construction method according to claim 2, it is characterised in that:The step S2 further includes Step S21:Construction layout;It specifically refers to:According to tunnel head fall, insulating layer setting height, insulating layer width and light steel dragon Bone spacing is in the line of ink marker setting-out of secondary lining surface.
4. tunnel in cold regions heat insulating construction method according to claim 2, it is characterised in that:The step S24 is specific Including:
Step S241:Thermal insulation board is penetrated by U-shaped card part, the gap between thermal insulation board is blocked using cranny filler of polyurethane foam, Make thermal insulation board that secondary lining surface be completely covered;
Step S242:Fixed lightgage steel joist;It specifically refers to:U-shaped card part fixes U-shaped lightgage steel joist after penetrating thermal insulation board and bending On U-shaped card part;The U-shaped lightgage steel joist extending direction is consistent with tunnel longitudinal direction.
5. tunnel in cold regions heat insulating construction method according to claim 4, it is characterised in that:The step S25 is specific Include the following steps:
Step S251:Fire-proof plate is fixed on the keel shoe that U-shaped lightgage steel joist is formed;
Step S252:By the gap sealing between fire-proof plate.
6. tunnel in cold regions heat insulating construction method according to claim 5, it is characterised in that:The step S6 include with Lower step:
Step S261:It sprays for the first time;Base is sprayed using flush coater, is carried out from tunnel waist to top;
Step S262:After the first spraying parches, carries out second and spray;The time interval of spraying and second of spraying for the first time At least 24 hours;
Step S263:Manual grinding, finishing.
7. tunnel in cold regions heat insulating construction method according to claim 6, it is characterised in that:The step S27 is specific Include the following steps:
Step S271:In cable trough the plug-in thermal insulation board of expansion bolt is used close to the side of secondary lining;
Step S272:After the completion of step S271, the plug-in steel wire of thermal insulation board, and smear fire-proof cement mortar.
CN201810887251.4A 2018-08-06 2018-08-06 Tunnel in cold regions heat insulating construction method Pending CN108798728A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810887251.4A CN108798728A (en) 2018-08-06 2018-08-06 Tunnel in cold regions heat insulating construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810887251.4A CN108798728A (en) 2018-08-06 2018-08-06 Tunnel in cold regions heat insulating construction method

Publications (1)

Publication Number Publication Date
CN108798728A true CN108798728A (en) 2018-11-13

Family

ID=64079340

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810887251.4A Pending CN108798728A (en) 2018-08-06 2018-08-06 Tunnel in cold regions heat insulating construction method

Country Status (1)

Country Link
CN (1) CN108798728A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638990A (en) * 2009-08-28 2010-02-03 长沙威特消防新材料科技有限公司 Fireproof thermal-insulation layer of tunnel and construction method thereof
CN103643974A (en) * 2013-12-16 2014-03-19 中铁二十三局集团第四工程有限公司 Construction method for freeze-proof thermal-insulating layer of high and cold tunnel
CN206028014U (en) * 2016-09-12 2017-03-22 重庆交通大学 A equipment for being directed at tunnel lateral wall carries out spraying
CN107587881A (en) * 2017-10-30 2018-01-16 中铁五局集团第五工程有限责任公司 A kind of composite lining structure and construction technology for permafrost tunnel
CN207419739U (en) * 2018-02-06 2018-05-29 河北诺华宇诚节能科技有限公司 A kind of New compound heated board

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101638990A (en) * 2009-08-28 2010-02-03 长沙威特消防新材料科技有限公司 Fireproof thermal-insulation layer of tunnel and construction method thereof
CN103643974A (en) * 2013-12-16 2014-03-19 中铁二十三局集团第四工程有限公司 Construction method for freeze-proof thermal-insulating layer of high and cold tunnel
CN206028014U (en) * 2016-09-12 2017-03-22 重庆交通大学 A equipment for being directed at tunnel lateral wall carries out spraying
CN107587881A (en) * 2017-10-30 2018-01-16 中铁五局集团第五工程有限责任公司 A kind of composite lining structure and construction technology for permafrost tunnel
CN207419739U (en) * 2018-02-06 2018-05-29 河北诺华宇诚节能科技有限公司 A kind of New compound heated board

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中国公路学会隧道工程分会 青海省交通厅 遍: "《2012年高寒地区公路隧道建设技术研讨会论文集》", 31 August 2012, 重庆大学出版社 *
建设部工程质量安全监督与行业发展司: "《土木建筑国家级工法汇编 2003-2004年度》", 31 January 2007, 中国计划出版社 *

Similar Documents

Publication Publication Date Title
CN106702850B (en) Prevent antifreeze road icy on road and its construction method
CN106978886A (en) Protect concrete waterproof system and its construction method
Won et al. Basic applicability of an insulated gang form for concrete building construction in cold weather
CN108798728A (en) Tunnel in cold regions heat insulating construction method
CN105647157A (en) Waterproofing material for buildings
Christodoulou et al. Cathodic protection on the UK's Midland Links motorway viaducts
Polder Cathodic Protection of Reinforced Concrete Structures in The Netherlands—Experience and Developments
US4668541A (en) Corrosion-proof concrete
KR19990084102A (en) Method for restoring construction of polymer cement mortar section with spray manner
CN102140922B (en) Novel tunnel anti-freezing and heat-insulating layer
CN202047831U (en) Novel anti-freezing thermal insulation layer for tunnel
CN207620232U (en) A kind of flat roof waterproof system
CN104805805A (en) Method for enhancing thermal insulation, moisture retention and anti-cracking performances of dam
JPH0948961A (en) Deicer
CN109578028B (en) Method for preventing and controlling freezing injury of tunnel in cold region
CN103074831B (en) Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area
CN109057062A (en) A kind of vapor barrier layer construction method of freezer
CN220336260U (en) Novel roofing spraying polyurethane heat preservation waterproof construction
CN109811969A (en) A kind of building body top of the slope structurally waterproof heat insulation house surface surface layer anti-crack construction technique
Sinenko et al. Experience of Concrete Works Execution by the Means of Air-Placed Concreting
CN113774957B (en) Open-cut cast-in-place tunnel main structure concrete anti-cracking construction method
Taguchi et al. Study on Maintenance System for Cut and Cover Tunnels Showed Signs of Deterioration by Chloride Attack
CN109749401A (en) A kind of train waterproof material
Lemieux et al. How to protect hollow-core slabs in parking structures from deicing salts
Coni et al. Thermal performance of ultrathin multi-functional overlay

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113

RJ01 Rejection of invention patent application after publication