CN103074831B - Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area - Google Patents

Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area Download PDF

Info

Publication number
CN103074831B
CN103074831B CN201310046062.1A CN201310046062A CN103074831B CN 103074831 B CN103074831 B CN 103074831B CN 201310046062 A CN201310046062 A CN 201310046062A CN 103074831 B CN103074831 B CN 103074831B
Authority
CN
China
Prior art keywords
concrete
cold
crack
carrying track
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310046062.1A
Other languages
Chinese (zh)
Other versions
CN103074831A (en
Inventor
魏勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Original Assignee
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group filed Critical Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority to CN201310046062.1A priority Critical patent/CN103074831B/en
Publication of CN103074831A publication Critical patent/CN103074831A/en
Application granted granted Critical
Publication of CN103074831B publication Critical patent/CN103074831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a method for controlling converter transformer site and transport track cracks in high-cold and high-altitude areas. The method comprises the following construction steps of: 1) arranging a linking layer between a pavement and a road base; 2) taking water drainage measures: arranging drainage ditches with drainage gradient being harmonized with a track gradient for a transport track; 3) arranging contraction joints with clearance of 3-5m in the concrete surface layer of the transport track, and adding fine-diameter dense anti-cracking steel reinforcing meshes in the concrete base of the transport track; 4) adding anti-cracking fibers in the concrete surface layer of the transport track according to 1.2kg/m<3>; and 5) using circular steel plates with diameter of 1000-1200mm as foundation traction hole buried steel plates of the transport track, and drilling circular holes with diameter of 350-400mm. By using the control method provided by the invention, the harm caused by the environment to a converter transformer site and the transport track can be controlled within a certain range to guarantee engineering quality; and the problems that the converter transformer site and transport track cracks seriously affect the engineering quality and the overall appearance of the site after construction is not attractive are solved.

Description

High and cold, high altitude localities change of current variable field ground and carrying track method for controlling crack
Technical field
The present invention relates to a kind ofly in engineering construction process, the control method to cracks in reinforced concrete, relates in particular to the control method in a kind of high and cold, high altitude localities change of current variable field ground and carrying track crack.
Background technology
High and cold, high altitude localities refers to that mean sea level surpasses 4000 m, 0 ℃ of following area of temperature on average.Because mean sea level is high, geographical environment is special, the impact of the specific condition such as complex geologic conditions and climate variability, make construction high and cold, high altitude localities road need to overcome certain difficulty.
The complex genesis in high and cold, high altitude localities change of current variable field ground and carrying track crack and various, the engineering problem that crack becomes a ubiquity and is difficult to solve.In high and cold, high altitude localities engineering, what change of current variable field ground and carrying track adopted is the reinforced concrete structure that area is large, length is long, and the origin cause of formation in its crack is mainly external load, temperature, shrinkage, plasticity, depression and chemical reaction.Such as: once foundation soil immersion high and cold, high altitude localities will cause inhomogeneous soil settlement, particularly in the winter time, temperature is for a long time in lower state, after thawing, frozen soil will produce differential settlement, cause the layer of concrete of laying on it to produce crack, this type of crack mostly is to be entered or penetrability crack deeply, and its trend is relevant with depression situation, generally along perpendicular to the ground or be 30 °-45° angle future development; And larger crack due to settlement, often has certain dislocation, crack width is acted upon by temperature changes less, but often proportional with settling amount.In addition, usually also can there is thin and shallow crack in concrete pavement surface, track square, and wherein great majority belong to shrinkage crack, although this crack is generally all more shallow, it still has a certain impact to the structural strength of layer of concrete and durability.In addition, in high altitude localities, because the reasons such as dry, evaporation often cause moisture loss, thereby postpone or hinder the aquation of cement, surperficial concrete the most easily and is directly subject to the impact of this unfavorable conditions, occurs crack.
Therefore, in high and cold, high altitude localities, be badly in need of a kind of method that can effectively solve change of current variable field ground and carrying track crack and occur, to solve the technical problem that has crack in the construction of high and cold, place, high altitude localities, road construction at present.
Summary of the invention
The object of the invention is to: the area that the present invention be directed to high and cold, high altitude localities change of current variable field ground and carrying track is large, length is long, easily produce crack, a kind of high and cold, high altitude localities change of current variable field ground and carrying track method for controlling crack are provided, solve high and cold, high altitude localities at present, impact due to natural environment, make change of current variable field ground and carrying track produce crack and affect the technical problem of workmanship, thereby can effectively solve above-mentioned problems of the prior art.
The object of the invention realizes by following technical proposals: a kind of high and cold, high altitude localities change of current variable field ground and carrying track method for controlling crack, comprise following construction method:
One, between road surface and roadbase, establish binder course: binder course thickness is that 130-150mm, 5% cement stabilized grading crushed stones form semi-rigid layer;
Two, drainage measure: carrying track is established the gutter of drainage grade and track grade coordination, that is, the carrying track that is parallel to orbiting valve Room direction is not established gutter, establishes drainage grade be not more than 0.3% gutter perpendicular to the track grade of orbiting valve Room direction;
Three, the shrinkage joint that setting space is 3-5m in carrying track concrete pavement, and in concrete base layer, increase the cracking resistance steel mesh reinforcement that diameter is thin, spacing is close, the longitudinal reinforcement of described cracking resistance steel mesh reinforcement is located under surface layer end face in 1/3 thickness, and transverse reinforcement is positioned under longitudinal reinforcement;
Four, in carrying track concrete pavement, press 1.2kg/m 3mix anti-crack fiber;
Five, carrying track foundation towing pad steel buried plate adopts the circular steel plate that diameter is 1000-1200mm, and opens the circular hole that diameter is 350-400mm.
Preferably, to inhomogeneous ground, binder course adopts the mattress layer that thickness is 300mm as a kind of, and its material selection particle diameter is less than one or more mixing in the medium sand, coarse sand, graded sand and stone of 20mm.
As further preferred, the cracking resistance steel mesh reinforcement that described diameter is thin, spacing is close refers to that adopting two-way concrete slab diameter and spacing is the steel mesh reinforcement that Ф 4100mm-Ф 6100mm, protective layer thickness are 15mm~25mm.
As further preferred, described anti-crack fiber is selected polypropylene fibre.
As further preferably, to building complete concrete, before concrete final set, start to adopt curing agent insulated curing, by the even spary of curing agent at concrete external surface.
As further preferably, in winter construction process, at maintaining test block with same condition intensity record, reach regulation and require time then form removal.
As further preferred, the curing time of winter construction is greater than 14 days.
Compared with prior art, beneficial effect of the present invention: the present invention has proposed a kind of effectively preventing control method to high and cold, high altitude localities change of current variable field ground and carrying track crack, within the extent of injury can being controlled to certain scope by this effective control method, thereby guarantee workmanship; Solve the problem that change of current variable field ground and carrying track crack have a strong impact on workmanship and the rear place of construction overall aesthetics.
The specific embodiment
In order to make object of the present invention, technical scheme and advantage clearer, below in conjunction with embodiment, the present invention is further elaborated.Should be appreciated that specific embodiment described herein, only in order to explain the present invention, is not intended to limit the present invention.
Disclosed all features in this manual, or the step in disclosed all methods or process, except the speciality and/or step of mutual repulsion, all can combine by any way, unless narration especially, all can be replaced by other equivalences or the alternative features with similar object,, unless narration especially, an embodiment in a series of equivalences of each feature or similar characteristics.
High and cold, high altitude localities change of current variable field ground and a carrying track method for controlling crack, comprise following construction method:
One, between road surface and roadbase, establish binder course: binder course thickness is that 130-150mm, 5% cement stabilized grading crushed stones form semi-rigid layer;
Two, drainage measure: carrying track is established the gutter of drainage grade and track grade coordination, that is, the carrying track that is parallel to orbiting valve Room direction is not established gutter, establishes drainage grade be not more than 0.3% gutter perpendicular to the track grade of orbiting valve Room direction;
Three, the shrinkage joint that setting space is 3-5m in carrying track concrete pavement, and in concrete base layer, increase the cracking resistance steel mesh reinforcement that diameter is thin, spacing is close, the longitudinal reinforcement of described cracking resistance steel mesh reinforcement is located under surface layer end face in 1/3 thickness, and transverse reinforcement is positioned under longitudinal reinforcement;
Four, in carrying track concrete pavement, press 1.2kg/m 3mix anti-crack fiber;
Five, carrying track foundation towing pad steel buried plate adopts the circular steel plate that diameter is 1000-1200mm, and opens the circular hole that diameter is 350-400mm.
In addition: to inhomogeneous ground, binder course adopts the mattress layer that thickness is 300mm, its material selection particle diameter is less than one or more mixing in the medium sand, coarse sand, graded sand and stone of 20mm.
The cracking resistance steel mesh reinforcement that described diameter is thin, spacing is close refers to that adopting two-way concrete slab diameter and spacing is the steel mesh reinforcement that Ф 4100mm-Ф 6100mm, protective layer thickness are 15mm~25mm.
Described anti-crack fiber is selected polypropylene fibre.
To building complete concrete, before concrete final set, start to adopt curing agent insulated curing, by the even spary of curing agent at concrete external surface.
In winter construction process, at maintaining test block with same condition intensity record, reach regulation and require time then form removal.
The curing time of winter construction is greater than 14 days.
embodiment:
The morning and evening temperature difference on high and cold, Converter Station at High Altitude change of current variable field ground is large, takes following engineering measure in the design of change of current variable field ground and carrying track and construction:
One, between road surface and roadbase, establish binder course: binder course is that 150mm is thick, 5% cement stabilized grading crushed stones semi-rigid layer; Semi-rigid layer can discharge surface layer shrinkage stress, and inhomogeneous ground is adopted to mattress, and square basic unit avoids basis to cross macrorelief, the desirable 300mm of mattress layer thickness, and its material can be selected medium sand, coarse sand, graded sand and stone etc., and maximum particle diameter is 20mm.
Two, the drainage measure on track square adopts the gutter that drainage grade and track grade are coordinated, and avoids the erosion of rainwater to ground.
Three, the shrinkage joint that in the concrete pavement of track square, setting space is 3-5m, improves constraints, and concrete pavement can be stretched, and overcomes excessive thermal stresses.In the concrete base layer of change of current change square, increase cracking resistance steel mesh reinforcement and reduce crack.
Four, in the concrete pavement of track square, mix anti-crack fiber, in the present embodiment, adopt polypropylene fibre.
Five, carrying track foundation towing pad steel buried plate adopts circular steel plate and opens circular hole, and its effect can be eliminated buried plate distress in concrete around.
In addition, if meet winter construction, also need to take following winter construction measure:
1, stipulate rational striking time;
2, the proper extension concrete heat-insulating cover time:
From thermal stresses viewpoint, concrete heat-insulating should reach following requirement:
Prevent concrete inside and outside temperature difference and concrete surface gradient, prevent external crack;
Prevent concrete supercool, manage to make concrete construction period minimum temperature to be not less than the equilibrium temperature of concrete operating period as far as possible.
Prevent that old concrete is excessively cold, to reduce the constraint between New-old concrete.
3, brushing curing agent maintenance.
engineering construction example:
The most regional height above sea level in Lhasa surpasses 4000 meters, is one of city that height above sea level is the highest in the world, belongs to the semiarid monsoon climate in temperate zone, plateau, and day and night temperature is large, 28 ° of C of the highest temperature, the subzero 14 ° of C of the lowest temperature.Therefore, at Construction in Lhasa current conversion station, will exist on high and cold, high altitude localities change of current variable field ground and the problem in carrying track crack.
The change of current of Lhasa ± 400kV current conversion station becomes high and cold, high altitude localities, and sooner or later the temperature difference is large, therefore, need in the design of change of current variable field ground and carrying track and construction, take following engineering measure:
First, between road surface and roadbase, establish binder course.Concrete measure is: binder course is 150mm, thick 5% cement stabilized grading crushed stones semi-rigid layer, and semi-rigid layer can discharge surface layer shrinkage stress.The change of current becomes under carrying track foundation, in case of inhomogeneous ground all adopts mattress layer, regulates the differential settlement on basis between different ground situations, and total settlement and differential settlement are controlled in an allowed band, avoids the generation of crack due to settlement.
Secondly, drainage measure is taked on track square, avoids the erosion of rainwater to ground; Specifically, the carrying track that is parallel to the valve Room, track square direction is not established slope, perpendicular to the track grade of the valve Room, track square direction, is not more than 0.3%; Track square drainage grade and track grade are coordinated, and have both met water vent and have met the needs that the change of current becomes carrying track installation planeness.
For underground structure concrete, backfill, reduces the generation in crack as early as possible.
The 3rd, the shrinkage joint that in the concrete pavement of track square, setting space is 4.2m, improve constraints, and, in the concrete base layer of change of current change square, increase cracking resistance steel mesh reinforcement and reduce crack, cracking resistance steel mesh reinforcement adopts two-way Ф 4100~Ф 6100, and cracking resistance steel mesh reinforcement protective layer thickness is 15mm~25mm; And, being set to of steel mesh reinforcement: longitudinal reinforcement is located under surface layer end face in 1/3 thickness range, and transverse reinforcement is positioned under longitudinal reinforcement.
Because track square and the concrete reinforcement ratio of carrying track are extremely low, reinforcement is very little on concrete thermal stresses impact, in temperature, under the not too high and condition of stress lower than yield limit, the properties of steel is stable, and irrelevant with stress state, time and temperature.In addition, the linear expansion coefficient of steel and concrete linear expansion coefficient differ very little, and very little internal stress only occurs between the two when variations in temperature.Because the modulus of elasticity of steel is modulus of elasticity of concrete 7 ~ 15 times, when inner concrete stress reaches tensile strength and ftractures, the stress of reinforcing bar will be no more than 100 ~ 200kg/cm 2, therefore, the appearance of wanting to utilize reinforcing bar to prevent fine cracks in concrete is very difficult; But the crack after reinforcement in structure generally just becomes, and number is many, spacing is little, hierarchy structure is less, when the thin and spacing of the diameter of reinforcing bar is close, better to improving the effect of cracking of reinforced concrete.
In addition, in the concrete pavement of track square, mix anti-crack fiber.Usually can there is thin and shallow crack in concrete pavement surface, track square; wherein great majority belong to shrinkage crack; although this crack is generally all more shallow; but it still has a certain impact to the intensity of structure and durability; therefore; in Practical Project, at surface layer, mix anti-crack fiber and can avoid preferably surperficial microscopic checks.
In addition, carrying track foundation towing pad steel buried plate adopts circular steel plate and opens circular hole.Engineering practice proof towing pad steel buried plate adopts circular steel plate, adopts square plate at four jiaos of stress crackings that produce before can avoiding.
Finally, if meet while constructing in the winter time, need to conscientiously take winter construction measure, stipulate rational striking time, proper extension concrete heat-insulating cover time, and the maintenance of brushing curing agent.
To high and cold, high altitude localities concrete brushing curing agent maintenance, main purpose is the temperature and humidity condition that keeps suitable, to reach the effect of two aspects, makes on the one hand concrete avoid the invasion and attack of unfavorable temperature, humidity distortion, prevents harmful shrinkage and drying shrinkage.On the one hand cement aquation is carried out smoothly, to reaching intensity and the anti-crack ability of design, suitable temperature and humidity conditions is to be mutually related, and concrete Insulation has the effect of moisturizing.Take, after above measure, can prevent the generation in crack.
Up to the present,, there is not obvious crack in complete 2 years so far of current conversion station square, Lhasa, track construction.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any modifications of doing within the spirit and principles in the present invention, be equal to and replace and improvement etc., within all should being included in protection scope of the present invention.

Claims (6)

1. high and cold, high altitude localities change of current variable field ground and a carrying track method for controlling crack, is characterized in that: comprise following construction method:
One, between road surface and roadbase, establish binder course: binder course thickness is 130-150mm, by 5% cement stabilized grading crushed stones, forms semi-rigid layer;
Two, drainage measure: carrying track is established the gutter of drainage grade and track grade coordination, that is, the carrying track that is parallel to orbiting valve Room direction is not established gutter, establishes drainage grade be not more than 0.3% gutter perpendicular to the track of orbiting valve Room direction;
Three, the shrinkage joint that setting space is 3-5m in carrying track concrete pavement, and in concrete base layer, increase to adopt two-way concrete slab diameter and spacing be the cracking resistance steel mesh reinforcement that Ф 4100mm-Ф 6100mm, protective layer thickness are 15mm~25mm, the longitudinal reinforcement of described cracking resistance steel mesh reinforcement is located under surface layer end face in 1/3 thickness, and transverse reinforcement is positioned under longitudinal reinforcement;
Four, in carrying track concrete pavement, press 1.2kg/m 3mix anti-crack fiber;
Five, carrying track foundation towing pad steel buried plate adopts the circular steel plate that diameter is 1000-1200mm, and opens the circular hole that diameter is 350-400mm.
2. high and cold, high altitude localities change of current variable field as claimed in claim 1 ground and carrying track method for controlling crack, it is characterized in that: to inhomogeneous ground, binder course adopts the mattress layer that thickness is 300mm, and its material selection particle diameter is less than one or more mixing in the medium sand, coarse sand, graded sand and stone of 20mm.
3. high and cold, high altitude localities change of current variable field as claimed in claim 1 ground and carrying track method for controlling crack, is characterized in that: described anti-crack fiber is selected polypropylene fibre.
4. high and cold, high altitude localities change of current variable field as claimed in claim 3 ground and carrying track method for controlling crack, it is characterized in that: to building complete concrete, before concrete final set, start to adopt curing agent insulated curing, by the even spary of curing agent at concrete external surface.
5. high and cold, high altitude localities change of current variable field as claimed in claim 4 ground and carrying track method for controlling crack, is characterized in that: in winter construction process, reach regulation require time then form removal at maintaining test block with same condition intensity record.
6. high and cold, high altitude localities change of current variable field as claimed in claim 5 ground and carrying track method for controlling crack, is characterized in that: the curing time of winter construction is greater than 14 days.
CN201310046062.1A 2013-02-06 2013-02-06 Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area Active CN103074831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310046062.1A CN103074831B (en) 2013-02-06 2013-02-06 Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310046062.1A CN103074831B (en) 2013-02-06 2013-02-06 Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area

Publications (2)

Publication Number Publication Date
CN103074831A CN103074831A (en) 2013-05-01
CN103074831B true CN103074831B (en) 2014-11-05

Family

ID=48151522

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310046062.1A Active CN103074831B (en) 2013-02-06 2013-02-06 Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area

Country Status (1)

Country Link
CN (1) CN103074831B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109082968A (en) * 2018-09-11 2018-12-25 台山市河朗新型环保建材有限公司 A kind of municipal works road paving builds structure
CN110130559A (en) * 2019-06-20 2019-08-16 宁波路宝科技实业集团有限公司 A kind of resin concrete anti-cracking structure and its implementation method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09143912A (en) * 1995-11-24 1997-06-03 Nippon Steel Corp Paving structure
CN101148856A (en) * 2007-11-12 2008-03-26 徐培华 Asphalt macadam stress absorption layer and construction method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101017991B1 (en) * 2008-12-24 2011-03-03 최문선 Concrete pavement method of a road by using modified sulfur binder

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09143912A (en) * 1995-11-24 1997-06-03 Nippon Steel Corp Paving structure
CN101148856A (en) * 2007-11-12 2008-03-26 徐培华 Asphalt macadam stress absorption layer and construction method thereof

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
华新换流站设计特点和经验总结;苏炜等;《电力建设》;20071130;第28卷(第11期);第17-21页 *
国外沥青混凝土路面裂缝控制工作介绍;杨丽敏;《交通标准化》;20050531(第总141期);第46-49页 *
杨丽敏.国外沥青混凝土路面裂缝控制工作介绍.《交通标准化》.2005,(第总141期),第46-49页. *
苏炜等.华新换流站设计特点和经验总结.《电力建设》.2007,第28卷(第11期),第17-21页. *

Also Published As

Publication number Publication date
CN103074831A (en) 2013-05-01

Similar Documents

Publication Publication Date Title
CN102084064B (en) Method for protecting roadbeds in frozen soil area and pavement structure
CN104775833A (en) Cold region tunnel anti-freezing insulation system and anti-freezing insulation construction method
CN104314097B (en) A kind of electric power line pole tower gradient anti-corrosion concrete basis
CN110748358A (en) Cold region tunnel entrance to a cave two-sided heat preservation system
CN104230274A (en) Material and construction technology for repairing historic building wall
CN103255694B (en) Frozen ground regions non-fragment orbit cutting bed of rapid transit railway structure
CN103774800A (en) Method for building ecological roof system and ecological roof system structure
CN101259995A (en) Roadbed surface water-proof asphalt mixture
CN103074831B (en) Method for controlling converter transformer site and transport track crack in high-cold and high-altitude area
CN206428709U (en) A kind of highway slope protection
CN103485354A (en) Frame-aeration cooling anchor pipe structure for keeping frozen soil slope stable and construction method
CN111074717A (en) Perennial frozen soil area airport runway structure and construction method thereof
CN205348697U (en) Prevent aproll that ftractures
CN205617177U (en) Compound cold -storage roadbed structure suitable for permafrost region road engineering
CN203320370U (en) Ballastless track high-speed railway embankment foundation bed structure for seasonally frozen ground area
CN204691792U (en) A kind of tunnel in cold area anti-freezing and heat-insulating system
CN109944467B (en) Reconstruction and reinforcement construction method for rock wool prefabricated house
CN205617176U (en) Roadbed structure of whole balanced cooling cold -storage
CN110284385B (en) Anti-freeze soil road
CN207017545U (en) Foam concrete heat-preserving roofing optimizes architectural construction and local structure
CN203284814U (en) Transformer substation prefabricated concrete water-scattering device
CN210563030U (en) Inverted beam green plant roof structure
CN205205599U (en) A zone of heating road surface for in cold areas
CN212533592U (en) Perennial frozen ground area airport runway structure
CN203320371U (en) Ballastless track high-speed railway cutting foundation bed structure for a seasonally frozen ground area

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP SOUTHWEST

Free format text: FORMER NAME: SOUTHWEST ELECTRIC POWER DESIGN INSTITUTE OF CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.

Patentee after: China Power Engineering Consulting Group Southwest Electric Power Design Institute Co., Ltd.

Address before: 610021 Dongfeng Road, Chengdu, Sichuan, No. 18, No.