CN108798032A - A kind of hanging method of high-rise steel structure column - Google Patents

A kind of hanging method of high-rise steel structure column Download PDF

Info

Publication number
CN108798032A
CN108798032A CN201810595325.7A CN201810595325A CN108798032A CN 108798032 A CN108798032 A CN 108798032A CN 201810595325 A CN201810595325 A CN 201810595325A CN 108798032 A CN108798032 A CN 108798032A
Authority
CN
China
Prior art keywords
steel structure
structure column
steel
rise
hanging method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810595325.7A
Other languages
Chinese (zh)
Inventor
武士炯
丁美志
罗庆明
沈薇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai General Construction Engineering Co Ltd
Original Assignee
Shanghai General Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai General Construction Engineering Co Ltd filed Critical Shanghai General Construction Engineering Co Ltd
Priority to CN201810595325.7A priority Critical patent/CN108798032A/en
Publication of CN108798032A publication Critical patent/CN108798032A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses a kind of hanging methods of high-rise steel structure column, including:Preliminary examination is carried out to the length of steel structure column, section, lateral bending and the absolute altitude in bracket face;Steel cat ladder and operation steel platform are installed on steel structure column;It is fixedly connected with otic placode in four sides on steel structure column top;In place by steel structure column lifting;The inspection of verticality and displacement is carried out to steel structure column;By steel structure column butt welding, clamping plate and bolt is used in combination to tighten;Connection otic placode is cut off;Remove rigging.The present invention being capable of lifting that is convenient and efficient and accurately realizing high-rise steel structure column.

Description

A kind of hanging method of high-rise steel structure column
Technical field
The present invention relates to steel structure hoisting technical fields.
Background technology
Existing building much all uses steel construction, especially many workshops, because demand space is big and saves building cost Requirement, the mode of big more options structural steelwork built.Structural steelwork uses many steel parts, wherein steel knot Structure column is directly related to the quality of structural steelwork as an important part, the accuracy and convenience of lifting.But it is existing With the presence of steel structure column (especially high-rise steel structure column) lifting when be easy shaking, position cannot be accurately positioned, it is time-consuming and laborious The problems such as.
Invention content
It is convenient and efficient and accurately realize high-rise it is an object of the invention to a kind of hanging method of high-rise steel structure column The lifting of steel structure column.
Realizing the technical solution of above-mentioned purpose is:
A kind of hanging method of high-rise steel structure column, including:
Preliminary examination is carried out to the length of steel structure column, section, lateral bending and the absolute altitude in bracket face;
Steel cat ladder and operation steel platform are installed on steel structure column;
It is fixedly connected with otic placode in four sides on steel structure column top;
In place by steel structure column lifting;
The inspection of verticality and displacement is carried out to steel structure column;
By steel structure column butt welding, clamping plate and bolt is used in combination to tighten;
Connection otic placode is cut off;
Remove rigging.
In the hanging method of above-mentioned high-rise steel structure column, to the absolute altitude and axis of substructure before steel structure column installation It is reviewed.
In the hanging method of above-mentioned high-rise steel structure column, connection otic placode is cut off using the form of live gas cutting, is cut Except when connection otic placode on steel structure column reserve 10mm.
In the hanging method of above-mentioned high-rise steel structure column, label orientation and center line before steel structure column lifting.
In the hanging method of above-mentioned high-rise steel structure column, steel structure column lifting is 4 points of liftings, at four Snap ring is set in connection otic placode, and suspension hook slings four snap rings by steel wire rope.
In the hanging method of above-mentioned high-rise steel structure column, its lower end wood support pad when steel structure column initially lifts by crane.
The beneficial effects of the invention are as follows:The step that the present invention passes through the orderly science of verification etc. after pre-detection, pre-assembly, lifting Suddenly, the lifting of high-rise steel structure column is fast implemented.By way of interim connection otic placode and 4 points of liftings, when lifting, ensure that Steel structure column it is vertical, reduce shake, improve the accuracy of lifting.Also, by headblock effectively prevent it is cocked during Sliding and unnecessary overturning, avoid damage to component itself and cause security risk to surrounding.
Description of the drawings
Fig. 1 is the flow chart of the hanging method of the high-rise steel structure column of the present invention.
Specific implementation mode
The present invention will be further described with reference to the accompanying drawings.
Referring to Fig. 1, the hanging method of the high-rise steel structure column of the present invention, includes the following steps:
Step S1 carries out preliminary examination to the length of steel structure column, section, lateral bending and the absolute altitude in bracket face, pinpoints the problems i.e. Report, and take measures to be solved.Meanwhile the absolute altitude of substructure is reviewed with axis before steel structure column installation.
Step S2, installation steel cat ladder and operation steel platform.Before lifting, steel cat ladder etc. should be mounted on steel column on the ground, For operation of ascending a height.Outer is that should also be installed to steel column on the ground in the operation steel platform for docking node location setting with upper prop On.
Step S3 is fixedly connected with otic placode in four sides on steel structure column top.
Step S4, in place by steel structure column lifting.Specifically, the directionality of label steel structure column and center before lifting Line.It is lifted using 4 points, snap ring is set in four connection otic placodes, and suspension hook slings four snap rings by steel wire rope.Steel structure column Initially its lower end 100 support pad of wood when lifting prevents cocked sliding and unnecessary overturning in the process, avoids damage to component certainly Body and security risk is caused to surrounding.
Step S5 carries out steel structure column the inspection of verticality and displacement.
Steel structure column butt welding is used in combination clamping plate and bolt to tighten by step S6.
Step S7, cuts off connection otic placode.Connection otic placode is cut off using the form of live gas cutting, connection otic placode when cutting off 10mm is reserved on steel structure column, is permanently deposited on steel structure column, is forbidden to injure base material when gas cutting.
Step S8 removes rigging.It removes rigging and uses steel cat ladder.
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or modification, therefore all equivalent Technical solution should also belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of hanging method of high-rise steel structure column, which is characterized in that including:
Preliminary examination is carried out to the length of steel structure column, section, lateral bending and the absolute altitude in bracket face;
Steel cat ladder and operation steel platform are installed on steel structure column;
It is fixedly connected with otic placode in four sides on steel structure column top;
In place by steel structure column lifting;
The inspection of verticality and displacement is carried out to steel structure column;
By steel structure column butt welding, clamping plate and bolt is used in combination to tighten;
Connection otic placode is cut off;
Remove rigging.
2. the hanging method of high-rise steel structure column according to claim 1, which is characterized in that before steel structure column installation under The absolute altitude of portion's structure is reviewed with axis.
3. the hanging method of high-rise steel structure column according to claim 1, which is characterized in that using the form of live gas cutting Connection otic placode is cut off, connection otic placode reserves 10mm on steel structure column when cutting off.
4. the hanging method of high-rise steel structure column according to claim 1, which is characterized in that marked before steel structure column lifting Remember directionality and center line.
5. the hanging method of high-rise steel structure column according to claim 1, which is characterized in that the steel structure column lifting It is lifted for 4 points, snap ring is set in four connection otic placodes, and suspension hook slings four snap rings by steel wire rope.
6. the hanging method of high-rise steel structure column according to claim 5, which is characterized in that when steel structure column initially lifts by crane Its lower end wood support pad.
CN201810595325.7A 2018-06-11 2018-06-11 A kind of hanging method of high-rise steel structure column Pending CN108798032A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810595325.7A CN108798032A (en) 2018-06-11 2018-06-11 A kind of hanging method of high-rise steel structure column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810595325.7A CN108798032A (en) 2018-06-11 2018-06-11 A kind of hanging method of high-rise steel structure column

Publications (1)

Publication Number Publication Date
CN108798032A true CN108798032A (en) 2018-11-13

Family

ID=64088408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810595325.7A Pending CN108798032A (en) 2018-06-11 2018-06-11 A kind of hanging method of high-rise steel structure column

Country Status (1)

Country Link
CN (1) CN108798032A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114233009A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Station layer for transportation hub and method for hoisting lower steel column

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS528253Y2 (en) * 1971-12-24 1977-02-22
CN202299464U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Steel column rapid hoisting and in-position correcting device
CN105649348A (en) * 2016-03-23 2016-06-08 中冶建工集团有限公司 Method for hosting and mounting steel tube column casings
CN106760197A (en) * 2016-12-02 2017-05-31 江苏沪宁钢机股份有限公司 A kind of method that allowable error is installed in steel column structure and its control
CN108104482A (en) * 2017-12-29 2018-06-01 珠海十字门中央商务区建设控股有限公司 Batter post installation method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS528253Y2 (en) * 1971-12-24 1977-02-22
CN202299464U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Steel column rapid hoisting and in-position correcting device
CN105649348A (en) * 2016-03-23 2016-06-08 中冶建工集团有限公司 Method for hosting and mounting steel tube column casings
CN106760197A (en) * 2016-12-02 2017-05-31 江苏沪宁钢机股份有限公司 A kind of method that allowable error is installed in steel column structure and its control
CN108104482A (en) * 2017-12-29 2018-06-01 珠海十字门中央商务区建设控股有限公司 Batter post installation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114233009A (en) * 2021-12-31 2022-03-25 中铁五局集团有限公司 Station layer for transportation hub and method for hoisting lower steel column

Similar Documents

Publication Publication Date Title
CN105645248B (en) A kind of steel reinforcement cage lifting device and method
CN109231023B (en) Method for installing jib system of portal crane
CN215055170U (en) Hanging basket system
CN108798032A (en) A kind of hanging method of high-rise steel structure column
CN207566717U (en) A kind of I-shaped floor steel beam lifting structure
CN106315426A (en) Block form tower crane mounting and jacking method for assembled building
CN104234636B (en) Jack-up unit derrick installation method
US20130259609A1 (en) Truss lifter and stabilizer
CN103395689A (en) Horizontal hoisting clamp for wallboard
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN105952129B (en) A kind of elevator combined type entirety lifting operation platform and its construction method
CN203959697U (en) The equalizing bar of hoisting platform truss
CN204752012U (en) Wall -hanging miniature hoist
CN110745683A (en) Hoisting device and method for reinforcement cage of underground continuous wall
CN110040632A (en) A kind of segmental hoisting construction method of large span section steel beam
CN205590192U (en) Rotation type prefabricated plate lifting device
CN104030176A (en) Balance beam for lifting platform truss and lifting method thereof
CN204850435U (en) Case roof beam of using top die body system promotes anti -falling device
CN209536831U (en) A kind of Lift-on/Lift-off System
CN103058083B (en) Bolt sphere truss gig
CN205419531U (en) Portable prefabricated plate handling instrument
CN217126647U (en) Hoisting device for stably hoisting track beam
CN104711964A (en) Process for keeping ocean structure in upright or inclined state
CN110697564A (en) Hoisting device and hoisting method for precast concrete beam
CN205687389U (en) A kind of slipping tail suspension rod for the lifting of tower kind equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113

RJ01 Rejection of invention patent application after publication