- CN108797651A CN108797651A CN201810615817.8A CN201810615817A CN108797651A CN 108797651 A CN108797651 A CN 108797651A CN 201810615817 A CN201810615817 A CN 201810615817A CN 108797651 A CN108797651 A CN 108797651A
- Authority
- CN
- China
- Prior art keywords
- water
- parts
- bottom board
- basement bottom
- brushing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/06—Aluminous cements
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/14—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing calcium sulfate cements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D15/00—Handling building or like materials for hydraulic engineering or foundations
- E02D15/02—Handling of bulk concrete specially for foundation or hydraulic engineering purposes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
- E02D31/04—Watertight packings for use under hydraulic pressure
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Inorganic Chemistry (AREA)
- Environmental & Geological Engineering (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Curing Cements, Concrete, And Artificial Stone (AREA)
- Sealing Material Composition (AREA)
Abstract
The present invention provides a kind of basement bottom board percolating water repairerment system, and step is:Basement bottom board bed course is knocked out to structure sheaf;Processing groove is dug out at repairing position;The pre-buried slip casting syringe needle grouting of processing groove;Brush base's interfacial agents;Structural strengthening floating is carried out using mending mortar;Brushing water-proof acrylic acid paint;The mylar of water-proof acrylic acid paint was impregnated in paving;Brushing water-proof acrylic acid paint;It is whole to brush base's interfacial agents;Whole brushing high resiliency cement-base waterproof coating;Whole brushing polyurethane water-proof paint;Whole paving modified asphalt waterproof coiled material;The integrally levelling protection of impervious mortar;Rhone is made using channel steel;It is laid at drain bar to gutter;Casting concrete;Surface construction layer restores.Multiple material, kinds of processes is generally taken to be combined, system solves basement leakage water problems.
Description
Technical field
The present invention relates to building engineering fields, and more particularly to a kind of basement bottom board percolating water repairs system.
Background technology
With the continuous development of construction industry and the quickening of urbanization process, the type and quantity of basement continue to increase.By
In concrete expand with heat and contract with cold the crackle of generation, the dealing with improperly of waterproof material lap-joint, outdoor water immerses outside basement side wall
Soil and the different influence of ground water pressure height, cause basement bottom board that infiltration water phenomenon occurs, leakage cause is mainly concentrated
In following several respects:
(1) since uneven settlement of foundation causes concrete floor, side wall cracking phenomena;
(2) in casting concrete, leakiness of vibrating causes concrete honeycomb occur;
(3) waterproofing design, not in place, waterproof material of constructing are not inconsistent standardization;
(4) concrete floor top crushed stone concrete bed course cracking hollowing, forms water passage and causes channeling water phenomenon.
Basement bottom board once permeates, and results in the service life for seriously affecting basement, causes when leaking serious
Basement is unusable.Existing groundwater seepage repair mostly uses brushing water-repellent paint, the method for paving waterproof roll carries out
Waterproof, but the waterproof construction is easy because the problems such as ground water pressure variation generates bulge, falls off, leads to waterproof failure.
Invention content
The purpose of the present invention is to provide a kind of basement bottom board percolating waters to repair system, this technique can be to basement bottom
The percolating water of plate carries out system reparation.
The present invention solves its technical problem using following technical scheme to realize.
The present invention proposes that a kind of basement bottom board percolating water repairs system, and the construction procedure of the repairerment system includes:
S1 knocks out basement bottom board crushed stone concrete bed course to concrete;
S2 digs out processing groove at repairing position, and the repairing position includes cracking position or honeycomb position, cracking position
Processing groove is " V " shape slot, and the processing groove at honeycomb position is "u"-shaped groove;
S3, the pre-buried slip casting syringe needle grouting in repairing position, grouting material is polyurethane grouting liquid;
S4 removes slip casting syringe needle after injection slurry all foaming;
S5 is brushed base's interfacial agents in the processing groove dug out, and is carried out using polysulfide waterproof gasket cement at " V " shape groove depth
It blocks;
S6 carries out structural strengthening floating using mending mortar to processing groove;
S7 repairs position brushing water-proof acrylic acid paint;
S8 will impregnate the mylar of water-proof acrylic acid paint, smooth to be pasted onto repairing position;
S9, in mylar surface brushing water-proof acrylic acid paint again;
S10, it is whole to brush base's interfacial agents;
S11, whole brushing high resiliency cement-base waterproof coating;
S12, whole brushing polyurethane water-proof paint;
S13 is protected using modified asphalt waterproof coiled material entirety paving;
S14 using the integrally levelling protection of impervious mortar, and forms certain drainage grade;
S15 produces rhone in gutter position using channel steel, segmentation cutting is carried out to the channel steel bottom, is formed
Water outlet;
S16 is laid at drain bar to gutter, and mutually overlap joint forms an entirety between multiple drain bars;
S17, the casting concrete on drain bar;The concrete is built-in with two-way concrete slab net;
S18, surface construction layer restore.
Preferably, base's interfacial agents include mass ratio 1:3~4 liquid material and powder, in parts by weight,
Preferably, in parts by weight, the polysulfide waterproof gasket cement includes:
Preferably, in parts by weight, the mending mortar includes:
Preferably, in parts by weight, the water-proof acrylic acid paint includes:
Preferably, in parts by weight, the high resiliency cement-base waterproof coating includes:
Preferably, in parts by weight, the impervious mortar includes:
The advantageous effect that the basement bottom board percolating water of the embodiment of the present invention repairs system is:
Waterproof itself is mainly that structure is certainly anti-, percolating water occurs and illustrates that structure has been destroyed, and waterproof also fails, to water
Into structure sheaf, if do not repaired in time to structure, structure long-time soaking water, internal reinforcing bars rusting causes coagulation
Soil explosion, increases security risk, and maintenance cost in the future is higher.
The present invention solves the structure problem of core first, not only to the reinforcing of original structure, but also reaches new construction protection and prevents
The function of leakage can increase service life, reduce security risk.For concrete bottom plank split as movement joint processing, application is soft
Property material handles seam living, occurs displacement leak again to prevent the later stage.Grouting for water plugging and flexible sealing, draining combination and rigid protective
A variety of methods determine corresponding leakage stoppage scheme according to different parts, various new quality material, kinds of processes are taken mutually to tie
It closes, system solves its leakage problem.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be to needed in the embodiment attached
Figure is briefly described, it should be understood that the following drawings illustrates only certain embodiments of the present invention, therefore is not construed as pair
The restriction of range for those of ordinary skill in the art without creative efforts, can also be according to this
A little attached drawings obtain other relevant attached drawings.
Fig. 1 is the repairerment structural schematic diagram of the cracking position of the embodiment of the present invention 1;
Fig. 2 is the close-up schematic view of Fig. 1;
Fig. 3 is the repairerment structural schematic diagram of gutter position in the embodiment of the present invention 1;
Fig. 4 is the repairerment structural schematic diagram under another visual angle of gutter position in the embodiment of the present invention 1.
Icon:A- concretes;1- cracking position " V " shape slots;2- bases interfacial agents;3- polysulfide waterproof gasket cements;
4- mending mortars;5- water-proof acrylic acid paints;6- mylars;7- high resiliency cement-base waterproof coatings;8- polyurethane water-proof paints;
9- modified asphalt waterproof coiled materials;The impervious mortars of 10-;The gutters 11-;12- rhones;13-L shape angle steel;14-12# channel steels;15-
Drain bar;16- drainage channels;17- concrete.
Specific implementation mode
It in order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below will be in the embodiment of the present invention
Technical solution be clearly and completely described.The person that is not specified actual conditions in embodiment, builds according to normal condition or manufacturer
The condition of view carries out.Reagents or instruments used without specified manufacturer is the conventional production that can be obtained by commercially available purchase
Product.
System is repaired to basement bottom board percolating water of the embodiment of the present invention below to be specifically described.
Referring to Fig.1 shown in-Fig. 4, the embodiment of the present invention provides a kind of basement bottom board percolating water repairerment system, the repairerment system
The construction procedure of system includes:
S1 knocks out basement bottom board crushed stone concrete bed course to concrete A.
S2 digs out processing groove at repairing position.The repairing position is the structural weak position of bottom plate, including cracking position
With honeycomb position.Cracking position digs out " V " shape slot 1, such as wide 80mm depths 30mm, as Fig. 1 shows the repairerment knot of cracking position
Composition.Honeycomb position integrally digs depth, such as chisel depth 30mm.
S3, the pre-buried slip casting syringe needle grouting of repairing position (such as cracking position " V " shape slot 1), grouting material fill for polyurethane
Slurries.Polyurethane grouting liquid passes through commercially available acquisition.
S4 removes slip casting syringe needle after injection slurry all foaming.
S5 brushes base's interfacial agents 2 in the processing groove (such as cracking position " V " shape slot 1) dug out.At cracking position " V "
1 depths of shape slot carries out closure sealing using polysulfide waterproof gasket cement 3, and honeycomb position is then sealed without having to polysulfide waterproof gasket cement
It is stifled.The effect for brushing interface waterproofing agent 2 is, not only plays waterproof action, but also plays and reinforce concrete and polysulfide waterproof
Cementation between fluid sealant and mending mortar avoids generating hollowing phenomenon.
Preferably, base's interfacial agents 2 include mass ratio 1:3~4 liquid material and powder, in parts by weight, liquid material packet
It includes:380-420 parts of water-proof emulsion;2-5 parts of preservative;2-5 parts of antifoaming agent;590-610 parts of water.Powder includes:Cement 320-380
Part;420-460 parts of sand;150-180 parts of coarse whiting;3-6 parts of porous silicon carbide;12-16 parts of zeolite molecular sieve;160-180 parts of gypsum;
1-3 parts of cellulose ether.Above-mentioned each raw material can be obtained from city's mid-sales.For example, water-proof emulsion selects the anti-water and milk of BASF PS608
Liquid, sand select 70-140 graded sands, coarse whiting that the 700CC of wide Fujian material company, antifoaming agent is selected to use the W086 of this company of hamming.
Using the gelatification and porous silicon carbide of gypsum and the drainage of zeolite molecular sieve, waterproof effect can be further increased,
And strengthen hardness.It is further preferable that pressing 1:3 ratio addition liquid material and powder, can obtain compression strength 0.8MPa base
Interfacial agents.
Preferably, polysulfide waterproof gasket cement 3 includes:120~140 parts of liquid polysulfide rubber;0.5-1 parts of silane coupling agent;
16-20 parts of manganese dioxide;8-10 parts of carbon black;3-5 parts of acrylic resin;20-30 parts of diethanol amine;4-8 parts of D-sorbite;Dispersion
3-5 parts of agent;4-8 parts of levelling agent.Above-mentioned each raw material component can be obtained from city's mid-sales.This polysulfide waterproof gasket cement and grass-roots sector
Face agent compatibility is preferable, can generate preferable cementation between the two.And carbon black improves the mechanical property of fluid sealant, diethyl
The addition of hydramine destroys the hydrogen bond between polysulfide rubber macromolecular, increases intermolecular distance, assigns good coating construction performance.
S6 carries out structural strengthening floating using mending mortar 4 to processing groove.Preferably, in parts by weight, sand is repaired
Starching 4 includes:200-300 parts of sulphate aluminium cement;200-300 parts of portland cement;500-600 parts of quartz sand;Antifoaming agent 1-2
Part;2-4 parts of cellulose ether;1-2 parts of water-reducing agent;16-20 parts of flyash;1-2 parts of early strength agent.Above-mentioned each raw material component can be from
City's mid-sales obtains.Such as RSAC52.5 grades of sulphate aluminium cements of sulphate aluminium cement, antifoaming agent is tributyl phosphate.Silicate
Cement is one kind in PO42.5 portland cements or PO52.5 portland cements.Water-reducing agent is poly carboxylic acid series water reducer, early strong
Agent is one kind in anhydrous calcium chloride, anhydrous sodium sulfate, lithium carbonate or sodium carbonate.Flyash, which is added, can reduce the basicity of system
And the heat of hydration so that the micro-crack of complex cementitious system hardenite is reduced, and can be improved the durability of system, be passed through hydration reaction
Progress, flyash can further increase the intensity and compactness of mending mortar, improve wearability, reduce dry shrink.
S7, repairing position brushing water-proof acrylic acid paint 5.In the present embodiment, brushing thickness is 1mm.Polyacrylic water-proof applies
Expect that 5 are:350-450 parts of acrylic emulsion;0.5-1.5 parts of pH adjusting agent;0.5-1.5 parts of wetting agent;2-4 parts of antifoaming agent;Anti-corrosion
2-4 parts of agent;2-4 parts of dispersant;7-12 parts of coalescents;14-18 parts of propylene glycol antifreeze;46-52 parts of rutile titanium white;Coarse whiting
280-340 parts;22-28 parts of calcined kaolin;160-200 parts of water.Above-mentioned each raw material component can be obtained from city's mid-sales.Such as
Commercially available Ah's Kerma (unit of kinetic energy) ENCOR5181 may be used in styrene-acrylic emulsion;PH adjusting agent may be used the modest MA-95pH of commercially available moral and adjust
Agent;Commercially available Tao Shi x-405 wetting agents may be used in wetting agent;Commercially available Yi Siman coalescents may be used in coalescents
texanol;Antifoaming agent uses the W086 of this company of hamming.
S8 will impregnate the mylar 6 of water-proof acrylic acid paint, smooth to be pasted onto repairing position.Mylar can increase
The stabilization and tensile strength of structure.Mylar 6 has stronger stretching force, can increase tensile strength and the extension of waterproof construction
Power.And the mylar for impregnating water-proof acrylic acid paint can form more slurry adhesive linkages, adhesive force is stronger.
S9, in mylar surface brushing water-proof acrylic acid paint 5 again, it is preferable that thickness 1mm.It is complete by above step
The structure repair at repairing position in pairs, after the not permeable leak of structure, whole base is rinsed well with clear water.
S10, it is whole to brush base's interfacial agents 2, increase base and adhere to bonding force with material, avoids generating hollowing phenomenon.
S11, whole brushing high resiliency cement-base waterproof coating 7, it is preferable that coating is 2.0mm thick.Preferably, according to weight
Number meter is measured, high resiliency cement-base waterproof coating includes:760-820 parts of water-proof emulsion;4-6 parts of thickener;1-3 parts of antifoaming agent;
1-3 parts of preservative;180-200 parts of water;480-520 parts of portland cement;280-320 parts of sand;1-3 parts of dispersant;Coarse whiting 190-
210 parts;2-6 parts of polyvinyl alcohol.Above-mentioned each raw material component can be obtained from city's mid-sales.Preferably, water-proof emulsion selects Bath
Husband's PS608 water-proof emulsions, thickener select alumina silicate, and polyvinyl alcohol and alumina silicate is added, and have super plasticized, efficient diminishing and increasing
The functions such as strong, can effectively enhance the compactness of film.
S12, whole brushing polyurethane water-proof paint 8, preferably coating are 1.5mm thick.Polyurethane water-proof paint selects city
Sell product, polyurethane water-proof paint be by isocyanates, polyethers etc. through made of polyaddition reaction containing the pre- of isocyanate group
Aggressiveness is equipped with catalyst, anhydrous auxiliary agent, anhydrous filler, solvent etc., the mono-component polyurethane being processed into through processes such as mixing
Water-repellent paint.Have the characteristics that intensity is high, elongation percentage is big, water resistance is good, to the adaptable of base's deformation.
S13, using the whole paving of modified asphalt waterproof coiled material 9, it is preferable that coiled material is 1.5mm thick.Such as SBS is selected to change
Property asphalt water-proof coiled material, have high elongation rate and stronger puncture-resistant ability, tear-resistant ability.
S14, the impervious mortar 10 of one-piece casting are protected with the floor leveling that do not construct, pour the impervious mortar to be formed and row
Ditch forms certain drainage grade.In the present embodiment, the gradient of impervious mortar is 1.5%.By forming certain row with gutter
Water is oriented to gutter by the water gradient, and waterproof effect is more preferable.Preferably, in parts by weight, impervious mortar includes:Silicate
380-420 parts of cement;560-620 parts of sand;1-3 parts of dispersant;1-3 parts of water-reducing agent;0.5-1 parts of hydrophober;Organosiloxane 5-8
Part;10-20 parts of polymer glue powder;1-3 parts of sodium methyl silicate;1-3 parts of cellulose ether.Above-mentioned each raw material component can be from commercially available
In obtain.Such as it is ethylene-vinyl acetate copolymer that polymer glue powder, which selects main component, hydrophober selects De Kewei companies
The hydrophober of production.Addition polymer glue powder can improve the air content and water retention of mortar, add sodium methyl silicate and cement
Aquation precipitate chemically reacts, and generates gelinite and crystalline solid, fills up tiny hole, prevents moisture diffusion.And organosilicon
Oxygen alkane makes a kind of hydrophobic material, and impervious mortar can be made to form a hydrophobic body, inhibits moisture to spreading inside mortar.
S15 is please referred to shown in Fig. 3 and Fig. 4, rhone 12 is produced in 11 position of gutter using channel steel, to channel steel bottom
Portion carries out segmentation cutting, forms water outlet.Preferably, using 14 formwork of L-shaped angle steel 13 and 12# channel steels, L-shaped angle steel 13 is the bottom of at
Portion, 12# slots 14 are supported on 13 side of L-shaped angle steel.
S16 is laid at drain bar 15 to gutter 11, and mutually overlap joint forms an entirety between multiple drain bars.Drain bar
15 convex foot is laid with downwards, and drainage channel 16 is formed between the convex foot of drain bar.Drain bar 15 is smooth to be layed on structure base slab,
Start to be laid with along draining limes marginis, the contact edge of adjacent drainage channel plate 15 is linked closely by snap fastener.When drain bar is constructed on drain bar
It is laid with one layer of plank, people or car is avoided directly to contact friction destruction drain bar with drain bar.
S17 pours crushed stone concrete 17, the first hollow recess in drain bar before crushed stone concrete pours on drain bar
Middle filling and repairing mortar, avoids crushed stone concrete grain size that from can not being filled into groove greatly.Crushed stone concrete is built-in with two-way concrete slab
Net.In the present embodiment, crushed stone concrete thickness is 100mm.8@of φ, 150 single-layer bidirectional bar-mat reinforcements are selected as in two-way concrete slab network optimization,
Pay attention to vibrating when pouring crushed stone concrete, drain bar can neither be destroyed again drain bar must be filled closely knit, concrete surface is primary
Troweling press finishing.Further, apply abrasion-resistant powder, such as MONOTOP8 abrasion-resistant powders on concrete topping.Concrete construction
In, according to column away from joint-cutting, joint-cutting depth 15mm, width 5mm is arranged in corresponding position in column.
S18, surface construction layer restore.Construction finish coat is formed as required.
In conclusion basement bottom board percolating water provided by the invention repairs system grouting for water plugging and flexible sealing, draining
In conjunction with and a variety of methods of rigid protective, determine corresponding leakage stoppage scheme according to different parts, take various new good material
Material, kinds of processes are combined, and system solves its leakage problem.Systematically solves leakage problem so that it can reach
10 years or more waterproof effects.
Embodiments described above is a part of the embodiment of the present invention, instead of all the embodiments.The reality of the present invention
The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of the selected implementation of the present invention
Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts
Every other embodiment, shall fall within the protection scope of the present invention.
Claims (7)
1. a kind of basement bottom board percolating water repairs service system, which is characterized in that the construction procedure of the system includes:
S1 knocks out basement bottom board crushed stone concrete bed course to concrete;
S2 digs out processing groove at repairing position, and the repairing position includes cracking position or honeycomb position, the processing of cracking position
Slot is " V " shape slot, and the processing groove at honeycomb position is "u"-shaped groove;
S3, the pre-buried slip casting syringe needle grouting in repairing position, grouting material is polyurethane grouting liquid;
S4 removes slip casting syringe needle after injection slurry all foaming;
S5 is brushed base's interfacial agents in the processing groove dug out, and is sealed using polysulfide waterproof gasket cement at " V " shape groove depth
It is stifled;
S6 carries out structural strengthening floating using mending mortar to processing groove;
S7 repairs position brushing water-proof acrylic acid paint;
S8 will impregnate the mylar of water-proof acrylic acid paint, smooth to be pasted onto repairing position;
S9, in mylar surface brushing water-proof acrylic acid paint again;
S10, it is whole to brush base's interfacial agents;
S11, whole brushing high resiliency cement-base waterproof coating;
S12, whole brushing polyurethane water-proof paint;
S13 is protected using modified asphalt waterproof coiled material entirety paving;
S14 using the integrally levelling protection of impervious mortar, and forms certain drainage grade;
S15 produces rhone using channel steel in gutter position, carries out segmentation cutting to the channel steel bottom, forms water outlet
Mouthful;
S16 is laid at drain bar to gutter, and mutually overlap joint forms an entirety between multiple drain bars;
S17, the casting concrete on drain bar;The concrete is built-in with two-way concrete slab net;
S18, surface construction layer restore.
2. basement bottom board percolating water according to claim 1 repairs system, which is characterized in that base's interfacial agents packet
Include mass ratio 1:3~4 liquid material and powder, in parts by weight,
3. basement bottom board percolating water according to claim 1 repairs system, which is characterized in that in parts by weight,
The polysulfide waterproof gasket cement includes:
4. basement bottom board percolating water according to claim 1 repairs system, which is characterized in that in parts by weight,
The mending mortar includes:
5. basement bottom board percolating water according to claim 1 repairs system, which is characterized in that in parts by weight,
The water-proof acrylic acid paint includes:
6. basement bottom board percolating water according to claim 1 repairs system, which is characterized in that in parts by weight,
The high resiliency cement-base waterproof coating includes:
7. basement bottom board percolating water according to claim 1 repairs system, which is characterized in that in parts by weight,
The impervious mortar includes:
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810615817.8A CN108797651B (en) | 2018-06-14 | 2018-06-14 | Construction method of basement bottom plate leakage water repairing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810615817.8A CN108797651B (en) | 2018-06-14 | 2018-06-14 | Construction method of basement bottom plate leakage water repairing system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108797651A true CN108797651A (en) | 2018-11-13 |
CN108797651B CN108797651B (en) | 2020-09-18 |
Family
ID=64086896
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810615817.8A Active CN108797651B (en) | 2018-06-14 | 2018-06-14 | Construction method of basement bottom plate leakage water repairing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108797651B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110195444A (en) * | 2019-04-23 | 2019-09-03 | 浙江绿城房屋服务系统有限公司 | Basement leakage back side processing method |
JP2020186644A (en) * | 2019-05-08 | 2020-11-19 | 株式会社大阪防水建設社 | Water sealing injection agent |
CN112144673A (en) * | 2020-08-29 | 2020-12-29 | 大昌建设集团有限公司 | Basement waterproof structure and construction method |
CN112854272A (en) * | 2021-01-26 | 2021-05-28 | 西南科技大学 | Preparation method of underground engineering wall ground seepage drainage system |
CN112878728A (en) * | 2021-02-23 | 2021-06-01 | 安徽墨砂工程修缮技术有限公司 | Repairing method for basement leakage |
CN115135623A (en) * | 2020-02-20 | 2022-09-30 | Made特殊防水株式会社 | Water-proof method using acrylic acid injection material |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19602794C1 (en) * | 1996-01-26 | 1997-07-17 | Walter Eberhardt | Support for upper layer of double plank floor |
CN201695408U (en) * | 2010-02-02 | 2011-01-05 | 中国建筑第四工程局有限公司 | Basement baseplate integrating water-proofing and drainage functions |
CN102720217A (en) * | 2012-06-12 | 2012-10-10 | 浙江城建建设集团有限公司 | Basement watertightness structure and construction method thereof |
CN202787329U (en) * | 2012-08-17 | 2013-03-13 | 浙江省东海建设有限公司 | Large leakage treatment structure for underground continuous wall |
KR20130050717A (en) * | 2011-11-08 | 2013-05-16 | 송현기 | Drain board for base floor of construction |
KR20150049866A (en) * | 2013-10-31 | 2015-05-08 | 대림산업 주식회사 | Insulated Drain Board Assembly To Prevent Condensation Using Air Space, and Underground Base Using Such Board |
CN205444257U (en) * | 2016-03-08 | 2016-08-10 | 中国建筑第二工程局有限公司 | Novel drainage system is prevented to bottom plate |
KR20160140122A (en) * | 2015-05-29 | 2016-12-07 | 이장원 | Conduit trench for draining water of the underground building structure |
-
2018
- 2018-06-14 CN CN201810615817.8A patent/CN108797651B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19602794C1 (en) * | 1996-01-26 | 1997-07-17 | Walter Eberhardt | Support for upper layer of double plank floor |
CN201695408U (en) * | 2010-02-02 | 2011-01-05 | 中国建筑第四工程局有限公司 | Basement baseplate integrating water-proofing and drainage functions |
KR20130050717A (en) * | 2011-11-08 | 2013-05-16 | 송현기 | Drain board for base floor of construction |
CN102720217A (en) * | 2012-06-12 | 2012-10-10 | 浙江城建建设集团有限公司 | Basement watertightness structure and construction method thereof |
CN202787329U (en) * | 2012-08-17 | 2013-03-13 | 浙江省东海建设有限公司 | Large leakage treatment structure for underground continuous wall |
KR20150049866A (en) * | 2013-10-31 | 2015-05-08 | 대림산업 주식회사 | Insulated Drain Board Assembly To Prevent Condensation Using Air Space, and Underground Base Using Such Board |
KR20160140122A (en) * | 2015-05-29 | 2016-12-07 | 이장원 | Conduit trench for draining water of the underground building structure |
CN205444257U (en) * | 2016-03-08 | 2016-08-10 | 中国建筑第二工程局有限公司 | Novel drainage system is prevented to bottom plate |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110195444A (en) * | 2019-04-23 | 2019-09-03 | 浙江绿城房屋服务系统有限公司 | Basement leakage back side processing method |
JP2020186644A (en) * | 2019-05-08 | 2020-11-19 | 株式会社大阪防水建設社 | Water sealing injection agent |
CN115135623A (en) * | 2020-02-20 | 2022-09-30 | Made特殊防水株式会社 | Water-proof method using acrylic acid injection material |
CN115135623B (en) * | 2020-02-20 | 2023-10-24 | Made特殊防水株式会社 | Waterproof method using acrylic injection material |
CN112144673A (en) * | 2020-08-29 | 2020-12-29 | 大昌建设集团有限公司 | Basement waterproof structure and construction method |
CN112144673B (en) * | 2020-08-29 | 2022-02-22 | 大昌建设集团有限公司 | Basement waterproof structure and construction method |
CN112854272A (en) * | 2021-01-26 | 2021-05-28 | 西南科技大学 | Preparation method of underground engineering wall ground seepage drainage system |
CN112854272B (en) * | 2021-01-26 | 2022-06-07 | 西南科技大学 | Preparation method of underground engineering wall ground seepage drainage system |
CN112878728A (en) * | 2021-02-23 | 2021-06-01 | 安徽墨砂工程修缮技术有限公司 | Repairing method for basement leakage |
Also Published As
Publication number | Publication date |
---|---|
CN108797651B (en) | 2020-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108797651A (en) | A kind of basement bottom board percolating water repairerment system | |
CN207987983U (en) | A kind of waterproof construction being used for underground engineering main body construction seam and post-cast strip | |
CN107190844A (en) | The waterproof and water drainage system and construction method of a kind of basement bottom board and exterior wall | |
CN208949929U (en) | A kind of basement bottom board percolating water repairerment system | |
CN102776897B (en) | Wash apron anti-settling anti-cracking construction method and structure | |
CN109336531A (en) | A kind of two-component penetrant crystalline distress in concrete waterproof repair liquid and construction method | |
CN108252530A (en) | A kind of parapet percolating water repairs technique | |
CN108868176A (en) | A kind of kitchen and toilet percolating water repairerment system | |
CN112144581B (en) | Large integral underground space waterproof construction structure and construction method thereof | |
CN101768908A (en) | Construction method of steel fiber reinforced concrete floor | |
CN108457485A (en) | A kind of concrete floor cracking percolating water repairerment technique | |
CN109505314A (en) | A kind of waterproof and dampproof paving structure of underground garage and its construction technology | |
CN107165434B (en) | A kind of high-pressure slip-casting blocking method for toilet floor | |
CN103306439B (en) | Roof construction layer pouring technology implanted by a kind of high impervious cracking resistance topping | |
CN109706925A (en) | A kind of tencel muscle anti-float anchor rod anchoring process | |
KR101742919B1 (en) | A waterproofing concrete wall using tile constructing methode thereof | |
CN211228082U (en) | Bridge expansion joint structure | |
CN104831820A (en) | Waterproofing system of kitchen structure | |
CN208056489U (en) | A kind of parapet percolating water repairerment system | |
CN108868186B (en) | Piping shaft and ventilating shaft seepage water repairing system | |
CN110593090A (en) | Method for repairing bridge expansion joint | |
KR101752214B1 (en) | Hybrid water proofing structure using infiltrative liquid waterproofing agent, asphalt and reinforce grid laminate and the method of its construction | |
CN209760313U (en) | Underground totally-enclosed pile head waterproof structure | |
CN106436517A (en) | Construction method of soft soil anti-collapse concrete road surface | |
CN208251134U (en) | A kind of foundation structure of acid-resistance infiltration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220406 Address after: 361000 3f-a634, Zone C, innovation building, software park, torch high tech Zone, Xiamen, Fujian Patentee after: Xiamen Dingchao building repair Research Institute Co.,Ltd. Address before: 361000 room 2105, 21 tower, 166 East Tower Road, Siming District, Xiamen, Fujian. Patentee before: XIAMEN DR.WATERPROOF BUILDING ENGINEERING CO.,LTD. |