CN108797520A - A kind of method that eco-concrete administers falling zone - Google Patents

A kind of method that eco-concrete administers falling zone Download PDF

Info

Publication number
CN108797520A
CN108797520A CN201810728103.8A CN201810728103A CN108797520A CN 108797520 A CN108797520 A CN 108797520A CN 201810728103 A CN201810728103 A CN 201810728103A CN 108797520 A CN108797520 A CN 108797520A
Authority
CN
China
Prior art keywords
eco
concrete
falling zone
water
administers
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810728103.8A
Other languages
Chinese (zh)
Inventor
仉文岗
刘汉龙
韩亮
巫崇智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Institute Of Industrial Technology Chongqing University
Original Assignee
Institute Of Industrial Technology Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Institute Of Industrial Technology Chongqing University filed Critical Institute Of Industrial Technology Chongqing University
Priority to CN201810728103.8A priority Critical patent/CN108797520A/en
Publication of CN108797520A publication Critical patent/CN108797520A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements

Abstract

The invention discloses a kind of methods that eco-concrete administers falling zone, pour the eco-concrete of thickness 6-10cm on falling zone surface when reservoir water level is minimum, wherein eco-concrete be float stone, rubble, cement, flyash, water-reducing agent, iron tailings sand and water are mixed by certain mass percent, stir evenly after obtain.The light weight that the eco-concrete of preparation has, intensity is big, permeable, good permeability, be conducive to plant growth the advantages that.The present invention can effectively fix falling zone soil, improve ecological environment of reservoir areas, realize the purpose for environmentally friendly administering falling zone.

Description

A kind of method that eco-concrete administers falling zone
Technical field
The present invention relates to ecological, environmental protective technical field, the method for specifically a kind of eco-concrete improvement falling zone.
Background technology
After Three Gorges Reservoir is built up, water level, which disappears, rises that opposite with the natural rhythm and pace of moving things and the duration is long, and reservoir area two sides generate large area Falling zone, bio-diversity reduce, and ecological functions are degenerated.In recent years, Three Gorges Reservoir water pollution, soil regime is increasingly Deteriorate, Eco-Environment Frangibility aggravation, as the zone of transition between reservoir water body and land, falling zone not only influences reservoir stability Stability causes the serious destruction of Three Gorges scenic spot natural character, while also to the ecological safety of surrounding cities and sustainable development Cause great threat.
The existing method for administering falling zone is mostly only to offset to fall band and repaired from structure or plant angle.But only from Structural point administers falling zone, causes greatly to destroy to the natural land of reservoir area of Three Gorges;Falling zone only is administered from plant angle, by In slopes by souring repeatedly, it is difficult to realize lasting falling zone restoration of the ecosystem.There is an urgent need to take plant measures and The mode comprehensive treatment that engineering measure is combined carries out two river falling zone ecological barrier constructions, prevents erosion, prevent and subtract Lack geological disaster, keep the stability of main city Riparian Zone, increase species diversity, improves Binjiang ecological environment.
Invention content
The object of the present invention is to provide a kind of methods that eco-concrete administers falling zone, which is characterized in that including following Step:
1) when water level is minimum, the falling zone slope surface that meets water is cleared up, flattened and is tamped;
2) eco-concrete is configured;The eco-concrete composition and weight proportion are:
The preparation method of the eco-concrete is as follows:
2-1) prepare aggregate (rubble and float stone);
2-2) Hou Jiashui is stirred evenly in aggregate, stir water and aggregate 2~3 minutes, stirring to particles of aggregates surface wettability ?;
2-3) ready cement, iron tailings sand and flyash are poured on aggregate, carry out aggregate stirring, mixing time 5 ~8 minutes, ensure that aggregate is wrapped by cement;
2-4) remaining water and water-reducing agent are poured into aggregate and cement and stirred, when aggregate is wrapped completely by cement cementitious material After wrapping up in, surface is simultaneously general glossy, you can pours eco-concrete;
3) eco-concrete of thickness 6-10cm is poured on the falling zone surface of compacting;
3) eco-concrete covers Composite nutrient soil, and sow after certain curing time on eco-concrete Grass-seed or planting plants.
4) before promoting water level, the plant that the grass-seed of sowing has all emerged or planted has been sent from new root.
Further, the pH value of the eco-concrete is 6.8~7.4.
Further, in the eco-concrete,
Rubble:Grain size is 4.75mm~9.50mm, apparent density 2500kg/m3, bulk density 1350kg/m3
Float stone:Grain size is 4.75mm~9.5mm, apparent density 1700kg/m3, bulk density 850kg/m3, water absorption rate is 10.5%.
Flyash:Density is 2200kg/m3
Cement:P.O42.5 grades of portland cements, density 3000kg/m3
Iron tailings sand:Grain size is 0.075mm~0.16mm, apparent density 3005kg/m3, bulk density 1745kg/m3
Water-reducing agent:Polycarboxylic acid series high efficiency water reducing agent, water-reducing rate reference data are 25%, density 1100kg/m3
Further, the concrete curing time is 3~10 days.
Further, the Composite nutrient soil is by fertile land and decomposed dung mixed preparing.
Further, the grass-seed be Buffalo bur, sainfoin, coronilia varia and silphium perfoliatum L in one kind or Person is several.Selected grass-seed should be wide adaptability, and cold-resistant high temperature resistant, resistance to water logging, resistant to diseases and insects are strong, saline-alkali tolerant, Gu soil is aqueous The kind that ability is strong and survival rate is high.
Further, the plant is Nanchuan willow, mulberry tree, paspalum notatum, R. soongorica, Nitraria sibirica, camel hoof valve, sand One or several kinds in wormwood artemisia, faenum graecum.Selected plant should be wide adaptability, cold-resistant and high temperature resistant, resistance to water logging, resistant to diseases and insects By force, saline-alkali tolerant, Gu the soil kind that water holding capacity is strong and survival rate is high.
Further, the plant seeding or implantation time will be at least 35 days apart from the wet season.
The present invention can solve the defect that existing falling zone control measures are difficult to realize lasting restoration of the ecosystem, technology Effect is unquestionable:
A. the physical and chemical performance of eco-concrete is increased dramatically.The eco-concrete has light weight, and intensity is big, thoroughly Water, good permeability, be conducive to plant growth the advantages that, overcome the shortcomings that conventional concrete basicity height is unfavorable for plant growth, it is good Good permeable, permeability ensures vegetation root system effective development in the gap of concrete.
B. the perfect adaptation of falling zone improvement and landscape planting is realized.A kind of eco-concrete proposed by the present invention is administered The method of falling zone solves the defect that existing falling zone control measures are difficult to realize lasting restoration of the ecosystem, both ensure that and disappeared The stability of band is fallen, and realizes the purpose of landscape planting.
Specific implementation mode
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used With means, various replacements and change are made, should all include within the scope of the present invention.
Present embodiment discloses a kind of methods that eco-concrete administers falling zone, include the following steps:
1) when water level is minimum, the falling zone slope surface that meets water is cleared up, flattened and is tamped;
2) eco-concrete of thickness 8cm is poured on the falling zone surface of compacting, constituent is according to mass percent For rubble:Float stone:Water:Flyash:Cement:Iron tailings sand:Water-reducing agent=1.000:0.600:0.480:0.200:0.100: 0.088:0.003;
3) prepare aggregate;Hou Jiashui is stirred evenly in aggregate, stirring water and aggregate keeps particles of aggregates surface wet in 2~3 minutes Profit;Ready cement, iron tailings sand and flyash are poured on aggregate, aggregate stirring, 5~8 minutes left sides of mixing time are carried out The right side ensures that aggregate is wrapped by cement;Prepare water-reducing agent and water;It remaining water, pours into aggregate and cement and stirs, when aggregate quilt After cement cementitious material is fully wrapped around, surface is simultaneously general glossy, pours eco-concrete;
4) it after eco-concrete conserves 7 days, covers on eco-concrete and is mixed with decomposed dung by fertile land The Composite nutrient soil of preparation, and plant Nanchuan willow and two kinds of plants of mulberry tree.
5) 40 days after planting plants, reservoir water level is allowed to be promoted.
It is worth noting that for those skilled in the art, before not departing from the principle of the invention It puts, can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the guarantor of the claims in the present invention It protects in range.

Claims (8)

1. a kind of method that eco-concrete administers falling zone, which is characterized in that include the following steps:
1) when the water level is minimum, the falling zone slope surface that meets water is cleared up, flattened and is tamped;
2) eco-concrete is configured;The eco-concrete composition and weight proportion are:
The preparation method of the eco-concrete is as follows:
2-1) prepare aggregate.
2-2) Hou Jiashui is stirred evenly in aggregate;
2-3) ready cement, iron tailings sand and flyash are poured on aggregate, carry out aggregate stirring;
2-4) remaining water and water-reducing agent are poured into aggregate and cement and stirred;
3) eco-concrete is poured on the falling zone surface of compacting;
3) eco-concrete covers Composite nutrient soil, and sow grass-seed after certain curing time on eco-concrete Or planting plants.
4) before promoting water level, the plant that the grass-seed of sowing has all emerged or planted has been sent from new root.
2. the method that a kind of eco-concrete according to claim 1 administers falling zone, it is characterised in that:The ecology The pH value of concrete is 6.8~7.4.
3. the method that a kind of eco-concrete according to claim 1 or 2 administers falling zone, it is characterised in that:The life In state concrete,
Rubble:Grain size is 4.75mm~9.50mm, apparent density 2500kg/m3, bulk density 1350kg/m3
Float stone:Grain size is 4.75mm~9.5mm, apparent density 1700kg/m3, bulk density 850kg/m3, water absorption rate is 10.5%.
Flyash:Density is 2200kg/m3
Cement:P.O42.5 grades of portland cements, density 3000kg/m3
Iron tailings sand:Grain size is 0.075mm~0.16mm, apparent density 3005kg/m3, bulk density 1745kg/m3
Water-reducing agent:Polycarboxylic acid series high efficiency water reducing agent, density 1100kg/m3
4. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described The concrete curing time is 3~10 days.
5. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described Composite nutrient soil is by fertile land and decomposed dung mixed preparing.
6. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described Grass-seed is the one or several kinds in Buffalo bur, sainfoin, coronilia varia and silphium perfoliatum L.Selected grass-seed should be suitable Ying Xingguang, and cold-resistant high temperature resistant, resistance to water logging, resistant to diseases and insects are strong, saline-alkali tolerant, Gu the soil product that water holding capacity is strong and survival rate is high Kind.
7. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described Plant be Nanchuan willow, mulberry tree, paspalum notatum, R. soongorica, Nitraria sibirica, camel hoof valve, sand sagebrush (Artemisia filifolia), one kind in faenum graecum or It is several.Selected plant should be wide adaptability, and cold-resistant high temperature resistant, resistance to water logging, resistant to diseases and insects are strong, saline-alkali tolerant, Gu the aqueous energy of soil The kind that power is strong and survival rate is high.
8. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described Plant seeding or implantation time will be at least 35 days apart from the wet season.
CN201810728103.8A 2018-07-05 2018-07-05 A kind of method that eco-concrete administers falling zone Pending CN108797520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810728103.8A CN108797520A (en) 2018-07-05 2018-07-05 A kind of method that eco-concrete administers falling zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810728103.8A CN108797520A (en) 2018-07-05 2018-07-05 A kind of method that eco-concrete administers falling zone

Publications (1)

Publication Number Publication Date
CN108797520A true CN108797520A (en) 2018-11-13

Family

ID=64074897

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810728103.8A Pending CN108797520A (en) 2018-07-05 2018-07-05 A kind of method that eco-concrete administers falling zone

Country Status (1)

Country Link
CN (1) CN108797520A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109761566A (en) * 2019-03-28 2019-05-17 上海朗天环境科技有限公司 A kind of environmentally friendly ecological afforestation concrete and its construction method
CN113149568A (en) * 2021-05-11 2021-07-23 长江大学 Sprayed ecological concrete and preparation method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR9903820A (en) * 1999-08-31 2001-04-24 Paulo Aparecido Antoniol Production process of ecological concrete
CN102584127A (en) * 2012-02-28 2012-07-18 江苏大学 Regenerated aggregate type vegetation ecological concrete and preparation method thereof
CN107572952A (en) * 2017-08-30 2018-01-12 河北建筑工程学院 A kind of plant-growing type eco-concrete and its preparation and application

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BR9903820A (en) * 1999-08-31 2001-04-24 Paulo Aparecido Antoniol Production process of ecological concrete
CN102584127A (en) * 2012-02-28 2012-07-18 江苏大学 Regenerated aggregate type vegetation ecological concrete and preparation method thereof
CN107572952A (en) * 2017-08-30 2018-01-12 河北建筑工程学院 A kind of plant-growing type eco-concrete and its preparation and application

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李建林主编: "《边坡工程》", 31 July 2013, 重庆大学出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109761566A (en) * 2019-03-28 2019-05-17 上海朗天环境科技有限公司 A kind of environmentally friendly ecological afforestation concrete and its construction method
CN113149568A (en) * 2021-05-11 2021-07-23 长江大学 Sprayed ecological concrete and preparation method thereof

Similar Documents

Publication Publication Date Title
CN103866776B (en) A kind of building waste gabion wall ecological bank protecting method
CN107816048B (en) A kind of substrate bricks of counterfort virescence and preparation method thereof
CN105646064A (en) Engineering method for producing biochar soil from dredging sediment
CN105970979A (en) Ecological slope protection method based on sludge solidification soil
CN101683033A (en) Method for quickly desalting dredgerfill by using desulfurization gypsum (DSG)
CN107572952A (en) A kind of plant-growing type eco-concrete and its preparation and application
Lyashenko et al. Justification of environmental technologies and means for dust control of tailing dumps surfaces of hydrometallurgical production and concentrating plants.
CN107698213A (en) Restoring vegetation concrete component and its preparation method and application
CN105778923A (en) Soil stabilizer and preparation method thereof
CN110258447A (en) A kind of ecological afforestation concrete cast-in-situ slope protection construction method
CN205444103U (en) Ecological slope protection brick
CN109970205A (en) A kind of the ventilation anti-seepage drowned flow artificial wet land and its operation method of efficient denitrification
CN108797520A (en) A kind of method that eco-concrete administers falling zone
CN106747199A (en) A kind of grass planting sand brick and preparation method thereof
CN103992075B (en) Reinforced concrete and preparation method in plant growing type prepared by building waste
CN104148377A (en) Method for producing greened structure soil from silt
CN107129208A (en) A kind of bioactivity, porous gap coarse aggregate ecological revetment matrix engineering material
CN106277984A (en) A kind of barren rock ecological brick for mine slope revegetation and preparation method thereof
CN110130368A (en) Flinty slope original position ecological afforestation concrete remodeling method
JP3729160B2 (en) Environmental improvement method and environmental improvement materials for underwater or beach
CN102649906B (en) Soil body stabilizing agent, and preparation method and application thereof
CN105239532A (en) Ecological concrete building block similar to sponge and preparation method thereof
JP3623718B2 (en) Lightweight porous concrete material for greening
CN109056455A (en) A kind of sponge urban construction permeable side walk slab and method for paving
CN109258252A (en) A kind of raw substrate of plant for concrete for plant growth and its application method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113