CN108797520A - A kind of method that eco-concrete administers falling zone - Google Patents
A kind of method that eco-concrete administers falling zone Download PDFInfo
- Publication number
- CN108797520A CN108797520A CN201810728103.8A CN201810728103A CN108797520A CN 108797520 A CN108797520 A CN 108797520A CN 201810728103 A CN201810728103 A CN 201810728103A CN 108797520 A CN108797520 A CN 108797520A
- Authority
- CN
- China
- Prior art keywords
- eco
- concrete
- falling zone
- water
- administers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/12—Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
-
- A—HUMAN NECESSITIES
- A01—AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
- A01G—HORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
- A01G9/00—Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
- A01G9/02—Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
-
- C—CHEMISTRY; METALLURGY
- C04—CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
- C04B—LIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
- C04B28/00—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
- C04B28/02—Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
- C04B28/04—Portland cements
Abstract
The invention discloses a kind of methods that eco-concrete administers falling zone, pour the eco-concrete of thickness 6-10cm on falling zone surface when reservoir water level is minimum, wherein eco-concrete be float stone, rubble, cement, flyash, water-reducing agent, iron tailings sand and water are mixed by certain mass percent, stir evenly after obtain.The light weight that the eco-concrete of preparation has, intensity is big, permeable, good permeability, be conducive to plant growth the advantages that.The present invention can effectively fix falling zone soil, improve ecological environment of reservoir areas, realize the purpose for environmentally friendly administering falling zone.
Description
Technical field
The present invention relates to ecological, environmental protective technical field, the method for specifically a kind of eco-concrete improvement falling zone.
Background technology
After Three Gorges Reservoir is built up, water level, which disappears, rises that opposite with the natural rhythm and pace of moving things and the duration is long, and reservoir area two sides generate large area
Falling zone, bio-diversity reduce, and ecological functions are degenerated.In recent years, Three Gorges Reservoir water pollution, soil regime is increasingly
Deteriorate, Eco-Environment Frangibility aggravation, as the zone of transition between reservoir water body and land, falling zone not only influences reservoir stability
Stability causes the serious destruction of Three Gorges scenic spot natural character, while also to the ecological safety of surrounding cities and sustainable development
Cause great threat.
The existing method for administering falling zone is mostly only to offset to fall band and repaired from structure or plant angle.But only from
Structural point administers falling zone, causes greatly to destroy to the natural land of reservoir area of Three Gorges;Falling zone only is administered from plant angle, by
In slopes by souring repeatedly, it is difficult to realize lasting falling zone restoration of the ecosystem.There is an urgent need to take plant measures and
The mode comprehensive treatment that engineering measure is combined carries out two river falling zone ecological barrier constructions, prevents erosion, prevent and subtract
Lack geological disaster, keep the stability of main city Riparian Zone, increase species diversity, improves Binjiang ecological environment.
Invention content
The object of the present invention is to provide a kind of methods that eco-concrete administers falling zone, which is characterized in that including following
Step:
1) when water level is minimum, the falling zone slope surface that meets water is cleared up, flattened and is tamped;
2) eco-concrete is configured;The eco-concrete composition and weight proportion are:
The preparation method of the eco-concrete is as follows:
2-1) prepare aggregate (rubble and float stone);
2-2) Hou Jiashui is stirred evenly in aggregate, stir water and aggregate 2~3 minutes, stirring to particles of aggregates surface wettability
?;
2-3) ready cement, iron tailings sand and flyash are poured on aggregate, carry out aggregate stirring, mixing time 5
~8 minutes, ensure that aggregate is wrapped by cement;
2-4) remaining water and water-reducing agent are poured into aggregate and cement and stirred, when aggregate is wrapped completely by cement cementitious material
After wrapping up in, surface is simultaneously general glossy, you can pours eco-concrete;
3) eco-concrete of thickness 6-10cm is poured on the falling zone surface of compacting;
3) eco-concrete covers Composite nutrient soil, and sow after certain curing time on eco-concrete
Grass-seed or planting plants.
4) before promoting water level, the plant that the grass-seed of sowing has all emerged or planted has been sent from new root.
Further, the pH value of the eco-concrete is 6.8~7.4.
Further, in the eco-concrete,
Rubble:Grain size is 4.75mm~9.50mm, apparent density 2500kg/m3, bulk density 1350kg/m3。
Float stone:Grain size is 4.75mm~9.5mm, apparent density 1700kg/m3, bulk density 850kg/m3, water absorption rate is
10.5%.
Flyash:Density is 2200kg/m3。
Cement:P.O42.5 grades of portland cements, density 3000kg/m3。
Iron tailings sand:Grain size is 0.075mm~0.16mm, apparent density 3005kg/m3, bulk density 1745kg/m3。
Water-reducing agent:Polycarboxylic acid series high efficiency water reducing agent, water-reducing rate reference data are 25%, density 1100kg/m3。
Further, the concrete curing time is 3~10 days.
Further, the Composite nutrient soil is by fertile land and decomposed dung mixed preparing.
Further, the grass-seed be Buffalo bur, sainfoin, coronilia varia and silphium perfoliatum L in one kind or
Person is several.Selected grass-seed should be wide adaptability, and cold-resistant high temperature resistant, resistance to water logging, resistant to diseases and insects are strong, saline-alkali tolerant, Gu soil is aqueous
The kind that ability is strong and survival rate is high.
Further, the plant is Nanchuan willow, mulberry tree, paspalum notatum, R. soongorica, Nitraria sibirica, camel hoof valve, sand
One or several kinds in wormwood artemisia, faenum graecum.Selected plant should be wide adaptability, cold-resistant and high temperature resistant, resistance to water logging, resistant to diseases and insects
By force, saline-alkali tolerant, Gu the soil kind that water holding capacity is strong and survival rate is high.
Further, the plant seeding or implantation time will be at least 35 days apart from the wet season.
The present invention can solve the defect that existing falling zone control measures are difficult to realize lasting restoration of the ecosystem, technology
Effect is unquestionable:
A. the physical and chemical performance of eco-concrete is increased dramatically.The eco-concrete has light weight, and intensity is big, thoroughly
Water, good permeability, be conducive to plant growth the advantages that, overcome the shortcomings that conventional concrete basicity height is unfavorable for plant growth, it is good
Good permeable, permeability ensures vegetation root system effective development in the gap of concrete.
B. the perfect adaptation of falling zone improvement and landscape planting is realized.A kind of eco-concrete proposed by the present invention is administered
The method of falling zone solves the defect that existing falling zone control measures are difficult to realize lasting restoration of the ecosystem, both ensure that and disappeared
The stability of band is fallen, and realizes the purpose of landscape planting.
Specific implementation mode
With reference to embodiment, the invention will be further described, but should not be construed the above-mentioned subject area of the present invention only
It is limited to following embodiments.Without departing from the idea case in the present invention described above, according to ordinary skill knowledge and used
With means, various replacements and change are made, should all include within the scope of the present invention.
Present embodiment discloses a kind of methods that eco-concrete administers falling zone, include the following steps:
1) when water level is minimum, the falling zone slope surface that meets water is cleared up, flattened and is tamped;
2) eco-concrete of thickness 8cm is poured on the falling zone surface of compacting, constituent is according to mass percent
For rubble:Float stone:Water:Flyash:Cement:Iron tailings sand:Water-reducing agent=1.000:0.600:0.480:0.200:0.100:
0.088:0.003;
3) prepare aggregate;Hou Jiashui is stirred evenly in aggregate, stirring water and aggregate keeps particles of aggregates surface wet in 2~3 minutes
Profit;Ready cement, iron tailings sand and flyash are poured on aggregate, aggregate stirring, 5~8 minutes left sides of mixing time are carried out
The right side ensures that aggregate is wrapped by cement;Prepare water-reducing agent and water;It remaining water, pours into aggregate and cement and stirs, when aggregate quilt
After cement cementitious material is fully wrapped around, surface is simultaneously general glossy, pours eco-concrete;
4) it after eco-concrete conserves 7 days, covers on eco-concrete and is mixed with decomposed dung by fertile land
The Composite nutrient soil of preparation, and plant Nanchuan willow and two kinds of plants of mulberry tree.
5) 40 days after planting plants, reservoir water level is allowed to be promoted.
It is worth noting that for those skilled in the art, before not departing from the principle of the invention
It puts, can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the guarantor of the claims in the present invention
It protects in range.
Claims (8)
1. a kind of method that eco-concrete administers falling zone, which is characterized in that include the following steps:
1) when the water level is minimum, the falling zone slope surface that meets water is cleared up, flattened and is tamped;
2) eco-concrete is configured;The eco-concrete composition and weight proportion are:
The preparation method of the eco-concrete is as follows:
2-1) prepare aggregate.
2-2) Hou Jiashui is stirred evenly in aggregate;
2-3) ready cement, iron tailings sand and flyash are poured on aggregate, carry out aggregate stirring;
2-4) remaining water and water-reducing agent are poured into aggregate and cement and stirred;
3) eco-concrete is poured on the falling zone surface of compacting;
3) eco-concrete covers Composite nutrient soil, and sow grass-seed after certain curing time on eco-concrete
Or planting plants.
4) before promoting water level, the plant that the grass-seed of sowing has all emerged or planted has been sent from new root.
2. the method that a kind of eco-concrete according to claim 1 administers falling zone, it is characterised in that:The ecology
The pH value of concrete is 6.8~7.4.
3. the method that a kind of eco-concrete according to claim 1 or 2 administers falling zone, it is characterised in that:The life
In state concrete,
Rubble:Grain size is 4.75mm~9.50mm, apparent density 2500kg/m3, bulk density 1350kg/m3。
Float stone:Grain size is 4.75mm~9.5mm, apparent density 1700kg/m3, bulk density 850kg/m3, water absorption rate is
10.5%.
Flyash:Density is 2200kg/m3。
Cement:P.O42.5 grades of portland cements, density 3000kg/m3。
Iron tailings sand:Grain size is 0.075mm~0.16mm, apparent density 3005kg/m3, bulk density 1745kg/m3。
Water-reducing agent:Polycarboxylic acid series high efficiency water reducing agent, density 1100kg/m3。
4. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described
The concrete curing time is 3~10 days.
5. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described
Composite nutrient soil is by fertile land and decomposed dung mixed preparing.
6. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described
Grass-seed is the one or several kinds in Buffalo bur, sainfoin, coronilia varia and silphium perfoliatum L.Selected grass-seed should be suitable
Ying Xingguang, and cold-resistant high temperature resistant, resistance to water logging, resistant to diseases and insects are strong, saline-alkali tolerant, Gu the soil product that water holding capacity is strong and survival rate is high
Kind.
7. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described
Plant be Nanchuan willow, mulberry tree, paspalum notatum, R. soongorica, Nitraria sibirica, camel hoof valve, sand sagebrush (Artemisia filifolia), one kind in faenum graecum or
It is several.Selected plant should be wide adaptability, and cold-resistant high temperature resistant, resistance to water logging, resistant to diseases and insects are strong, saline-alkali tolerant, Gu the aqueous energy of soil
The kind that power is strong and survival rate is high.
8. the method that a kind of eco-concrete according to claim 1 or 3 administers falling zone, it is characterised in that:Described
Plant seeding or implantation time will be at least 35 days apart from the wet season.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810728103.8A CN108797520A (en) | 2018-07-05 | 2018-07-05 | A kind of method that eco-concrete administers falling zone |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810728103.8A CN108797520A (en) | 2018-07-05 | 2018-07-05 | A kind of method that eco-concrete administers falling zone |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108797520A true CN108797520A (en) | 2018-11-13 |
Family
ID=64074897
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810728103.8A Pending CN108797520A (en) | 2018-07-05 | 2018-07-05 | A kind of method that eco-concrete administers falling zone |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108797520A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109761566A (en) * | 2019-03-28 | 2019-05-17 | 上海朗天环境科技有限公司 | A kind of environmentally friendly ecological afforestation concrete and its construction method |
CN113149568A (en) * | 2021-05-11 | 2021-07-23 | 长江大学 | Sprayed ecological concrete and preparation method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR9903820A (en) * | 1999-08-31 | 2001-04-24 | Paulo Aparecido Antoniol | Production process of ecological concrete |
CN102584127A (en) * | 2012-02-28 | 2012-07-18 | 江苏大学 | Regenerated aggregate type vegetation ecological concrete and preparation method thereof |
CN107572952A (en) * | 2017-08-30 | 2018-01-12 | 河北建筑工程学院 | A kind of plant-growing type eco-concrete and its preparation and application |
-
2018
- 2018-07-05 CN CN201810728103.8A patent/CN108797520A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BR9903820A (en) * | 1999-08-31 | 2001-04-24 | Paulo Aparecido Antoniol | Production process of ecological concrete |
CN102584127A (en) * | 2012-02-28 | 2012-07-18 | 江苏大学 | Regenerated aggregate type vegetation ecological concrete and preparation method thereof |
CN107572952A (en) * | 2017-08-30 | 2018-01-12 | 河北建筑工程学院 | A kind of plant-growing type eco-concrete and its preparation and application |
Non-Patent Citations (1)
Title |
---|
李建林主编: "《边坡工程》", 31 July 2013, 重庆大学出版社 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109761566A (en) * | 2019-03-28 | 2019-05-17 | 上海朗天环境科技有限公司 | A kind of environmentally friendly ecological afforestation concrete and its construction method |
CN113149568A (en) * | 2021-05-11 | 2021-07-23 | 长江大学 | Sprayed ecological concrete and preparation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103866776B (en) | A kind of building waste gabion wall ecological bank protecting method | |
CN107816048B (en) | A kind of substrate bricks of counterfort virescence and preparation method thereof | |
CN105646064A (en) | Engineering method for producing biochar soil from dredging sediment | |
CN105970979A (en) | Ecological slope protection method based on sludge solidification soil | |
CN101683033A (en) | Method for quickly desalting dredgerfill by using desulfurization gypsum (DSG) | |
CN107572952A (en) | A kind of plant-growing type eco-concrete and its preparation and application | |
Lyashenko et al. | Justification of environmental technologies and means for dust control of tailing dumps surfaces of hydrometallurgical production and concentrating plants. | |
CN107698213A (en) | Restoring vegetation concrete component and its preparation method and application | |
CN105778923A (en) | Soil stabilizer and preparation method thereof | |
CN110258447A (en) | A kind of ecological afforestation concrete cast-in-situ slope protection construction method | |
CN205444103U (en) | Ecological slope protection brick | |
CN109970205A (en) | A kind of the ventilation anti-seepage drowned flow artificial wet land and its operation method of efficient denitrification | |
CN108797520A (en) | A kind of method that eco-concrete administers falling zone | |
CN106747199A (en) | A kind of grass planting sand brick and preparation method thereof | |
CN103992075B (en) | Reinforced concrete and preparation method in plant growing type prepared by building waste | |
CN104148377A (en) | Method for producing greened structure soil from silt | |
CN107129208A (en) | A kind of bioactivity, porous gap coarse aggregate ecological revetment matrix engineering material | |
CN106277984A (en) | A kind of barren rock ecological brick for mine slope revegetation and preparation method thereof | |
CN110130368A (en) | Flinty slope original position ecological afforestation concrete remodeling method | |
JP3729160B2 (en) | Environmental improvement method and environmental improvement materials for underwater or beach | |
CN102649906B (en) | Soil body stabilizing agent, and preparation method and application thereof | |
CN105239532A (en) | Ecological concrete building block similar to sponge and preparation method thereof | |
JP3623718B2 (en) | Lightweight porous concrete material for greening | |
CN109056455A (en) | A kind of sponge urban construction permeable side walk slab and method for paving | |
CN109258252A (en) | A kind of raw substrate of plant for concrete for plant growth and its application method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181113 |