CN108797513A - A kind of normalized assembled pile foundation wharfs structure and its method of construction - Google Patents

A kind of normalized assembled pile foundation wharfs structure and its method of construction Download PDF

Info

Publication number
CN108797513A
CN108797513A CN201810599818.8A CN201810599818A CN108797513A CN 108797513 A CN108797513 A CN 108797513A CN 201810599818 A CN201810599818 A CN 201810599818A CN 108797513 A CN108797513 A CN 108797513A
Authority
CN
China
Prior art keywords
pile
pile foundation
prefabricated
panel part
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810599818.8A
Other languages
Chinese (zh)
Inventor
江义
程泽坤
范晔
刘亚男
洪丰
李明
顾祥奎
韩兴
吴志良
金晓博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Third Harbor Consultants
Original Assignee
CCCC Third Harbor Consultants
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Third Harbor Consultants filed Critical CCCC Third Harbor Consultants
Priority to CN201810599818.8A priority Critical patent/CN108797513A/en
Publication of CN108797513A publication Critical patent/CN108797513A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water

Abstract

The invention discloses a kind of normalized assembled pile foundation wharfs structures, including pile foundation, pile cover portion, stake core node, girder system portion, panel part and affiliated facility;The top of the pile foundation is mutually fixedly connected by stake core node with pile cover portion;The girder system portion is arranged between two neighboring pile cover portion, and panel part is provided at the top of girder system portion, affiliated facility is provided in panel part;The arrangement of pile foundation pattern of normalized assembled pile foundation wharfs of the present invention structure is flexible, it is easily achieved standardized designs construction, it is readily adapted to accommodate the trestle type of unilateral or bilateral berthing, full hall formula general layout pattern, can also realize the optimization of the lateral resistant ability of dock structure quickly through adjustment framed bent spacing, list Pin framed bents total amount of pile and Pile Diameter.

Description

A kind of normalized assembled pile foundation wharfs structure and its method of construction
Technical field
The present invention relates to port and pier technical field, especially a kind of normalized assembled pile foundation wharfs structure and its construction Method.
Background technology
High-piled slab & girder wharf is a kind of wharf structure being primarily suitable for soft soil foundation, and common foundation pile form includes Concrete square pile, concrete tubular pile, steel-pipe pile etc., superstructure are the board-like structure of beams of concrete.In recent years, especially high-strength mixed Solidifying soil pile for prestressed pipe, steel-pipe pile etc. are very universal in port and pier construction.
In port and pier construction, pile foundation wharfs structure is a kind of very common structural shape, and China's tradition pile foundation Harbour upper structure owner will be with the beam and slab type structural system based on cast-in-place pile cover and crossbeam, prefabricated longeron.Traditional pile foundation code Header structure is built work progress and is generally comprised:1. pile sinking, 2. erect waling clip pile, 3. pile covers and crossbeam end template and side form Plate, 4. assembling reinforcements, 5. cast concrete pile followers, crossbeam, the 6. prefabricated longerons (track girder) of installation, 7. installation prefabricated panels, 8. Complete cast-in-place longeron (track girder), the cast of crossbeam knead dough layer.Traditional pile foundation wharfs only realize the prefabricated peace of beams and slabs of part Dress is calculated according to a large amount of built pile foundation wharfs engineerings, and the concrete square amount assembly rate in traditional pile foundation wharfs is about 20~50%, side It is relatively low to measure prefabrication and assembly construction rate.In addition, there is still a need for clip pile waterborne and branching standing template, component standardization degree, dresses in traditional pile foundation wharfs It is needed to be further improved with change degree, construction efficiency.
Traditional pile foundation dock structure is various informative, and pile cover, crossbeam, longeron (track girder) knead dough plate gauge lattice are numerous, design mark Quasi-ization degree is very low, and then greatly limits site operation efficiency of construction.Traditional long piled wharf superstructure system one simultaneously As largely use cast-in-place concrete, cast-in-place pile cover or crossbeam cast often further relate to formwork support arrangement compared with low water level and remove operation Work, effective construction operation time is shorter, and the construction period is longer, and it is relatively low to build effect.Superstructure concrete is averagely converted Thickness indication is 1.5~1.8m3/m2, concrete amount is larger, and project cost is high.In addition, a large amount of artificial construction's operations waterborne, existing The quantity such as field worker, technology, administrative staff are more, and normative operation manages very difficult, the more difficult control of site safety, construction quality System.
Invention content
The shortcomings that in view of above-mentioned existing traditional high pile pier structure system, the purpose of the present invention is to provide a kind of standardization Assembled pile foundation wharfs structure and its method of construction, for overcoming the shortcomings that traditional long piled wharf design is with building.
Realize that the technical solution of the object of the invention is:
A kind of normalized assembled pile foundation wharfs structure, which is characterized in that including pile foundation, pile cover portion, stake core node, Girder system portion, panel part and affiliated facility;The top of the pile foundation is mutually fixedly connected by stake core node with pile cover portion;It is described Girder system portion is arranged between two neighboring pile cover portion, and panel part is provided at the top of girder system portion, attached set is provided in panel part It applies.
Preferably, the pile cover portion includes the prefabricated portion of casing and the cast-in-place portion of pile cover;The prefabricated portion of casing include bottom plate and The surrounding of side plate, bottom plate is both provided with side plate, and side plate surrounds a chamber, the cast-in-place portion of pile cover is provided in chamber;The bottom plate Center at be provided with through-hole, the through-hole stretches to the prefabricated portion of casing for pile foundation.
Preferably, the prefabricated portion of the casing and the cast-in-place portion of pile cover are internally provided with framework of steel reinforcement, and the framework of steel reinforcement is used for Resist pile cover institute's bending moment and shearing;Hangs muscle is provided at the top of the side plate, hangs muscle is used for the handling in the prefabricated portion of casing.
Preferably, the girder system portion includes overlapping crossbeam portion and overlapping track beam portion, overlaps the bottom absolute altitude ratio of track beam portion Overlap the crossbeam high 75~150mm in portion.
Preferably, the lower part in the overlapping crossbeam portion is using precast concrete and setting bracket, for shelving panel Subordinate portion, pre-erection span such as preferably use at the spans arrangement;The lower part of the overlapping track beam portion uses precast concrete knot Structure and pre-engineered span is equal.
Preferably, the panel part includes the prefabricated portion of the type of falling E and cast-in-place panel part, and the prefabricated portion of the type of falling E includes prefabricated Panel part, floor, end baffle;The bottom of the precast surface plate portion is evenly arranged with several floors, between several floors It is mutually parallel;Cast-in-place panel part is provided at the top of the precast surface plate portion, the both ends of precast surface plate portion are both provided with end gear Plate end baffle.
Preferably, it is provided with hangs muscle at the top of the precast surface plate portion, is provided in several between two neighboring floor Diaphragm plate.
Preferably, the affiliated facility includes rubber fender, mooring facility, front rail, rear rail and shield wheel bank.
Preferably, the pile foundation uses concrete pre-stress pipe pile foundation or steel pipe pile foundation, the pile cover portion to use Cap of single pile, double pile covers and three or more pile covers;The stake core node is molded using cast-in-place concrete one-time-concreting.
The method of construction of a kind of normalized assembled pile foundation wharfs structure, which is characterized in that include the following steps:
A. purchase prefabricated portion and the main affiliated facility of pile foundation, pile cover portion, girder system portion, panel part, and transported batchwise into Enter scene;
B. pile driving barge and crane barge waterborne are dispatched to engineering site, after pile driving barge reaches engineering site, it is heavy to carry out pile foundation Pile driving construction;
C. crane barge waterborne, the prefabricated portion in installation pile cover portion are used, and pours a core node in time, is considered as pressing from both sides when necessary Stake measure;
D. carry out simultaneously in process (a)~(c), prefabricated portion's installation in girder system portion is carried out using crane barge waterborne, and complete It is located at the local cast-in-place construction of crossbeam portion above pile cover portion, track girder lower part at girder system portion;
E. carry out simultaneously in process (a)~(d), prefabricated portion's installation of panel part is carried out using crane barge waterborne, then The reinforcing bar binding on crossbeam portion, track girder top and panel part top is carried out, and completes pouring construction;
F. the installation work of harbour affiliated facility and rail etc. is carried out, and carries out whole set equipment disembarkation and its debugging Wharf Construction is completed in work.
Compared with prior art, the present invention its remarkable advantage:
(1) normalized assembled pile foundation wharfs structure upper structural concrete of the present invention be averaged converting thickness index be 1.2 ~1.5m3/m2, concrete amount is smaller, and project cost advantage is big.It includes 10 that dock structure berthing ability, which is suitable for various ship types, Ten thousand DWT or more ships are stopped pool and are required.
(2) the arrangement of pile foundation pattern of normalized assembled pile foundation wharfs of the present invention structure is flexible, it is easy to accomplish standardization is set Meter is built, and is readily adapted to accommodate the trestle type of unilateral or bilateral berthing, full hall formula general layout pattern, can also be arranged quickly through adjustment Frame spacing, list Pin framed bents total amount of pile and Pile Diameter realize the optimization of the lateral resistant ability of dock structure.In addition, cloth under track girder Set double stakes, three arrangements can be effective against harbour top technique gantry crane, door machine superduty or heavy wheel load, save stake Base.Dock structure pile foundation uses full vertical pile structure system, and piling deviation is easily controllable, and structural seismic performance is preferable.Under track girder The double stakes of setting, three and more pile cover marginal quays are longitudinally arranged, and can effectively reduce track beam span, realize that superstructure stress is equal It is even reasonable.
(3) normalized assembled pile foundation wharfs of the present invention structure is using the precast spliced pattern assembly installation of primary structural component.Due to The prefabricated side amount of superstructure component obviously increases, and upper part organization plan assembly rate can be promoted to 60%~70%.It applies at it In work building course, without carrying out a large amount of Site Template processing and fabricatings, the prefabricated portion's bottom plate of pile cover casing, side plate and overlapping fall E The setting of the prefabricated panel and end plate baffle of template can avoid a large amount of formwork support arrangement and Demolition Construction processes waterborne, significantly improve Construction efficiency saves the duration, reduces cost.
(4) panel part of normalized assembled pile foundation wharfs of the present invention structure has selected self stability preferably to overlap E templates, π templates, circular hole or square-hole hollow plate, and prefabricated weight should be no more than pile foundation weight, do not increase lifting waterborne additionally and set Standby Capability Requirement, ship machine equipment mounting cost are low.
(5) normalized assembled pile foundation wharfs of the present invention structure be suitable for periphery execution conditions are poor, ship machine equipment ability not The area such as foot quickly creates various van containers, bulk cargo terminals integrate port area, and cost is with the obvious advantage.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is required attached drawing in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only the present invention Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is the structural schematic diagram of normalized assembled pile foundation wharfs of the present invention structure.
Fig. 2 is the structural schematic diagram of A-A in Fig. 1.
Fig. 3 is the vertical view of normalized assembled pile foundation wharfs of the present invention structure.
Fig. 4 is the pile cover arrangement mode schematic diagram (one) of normalized assembled pile foundation wharfs of the present invention structure.
Fig. 5 is the pile cover arrangement mode schematic diagram (two) of normalized assembled pile foundation wharfs of the present invention structure.
Fig. 6 is the pile cover arrangement mode schematic diagram (three) of normalized assembled pile foundation wharfs of the present invention structure.
Fig. 7 is the pile cover arrangement mode schematic diagram (four) of normalized assembled pile foundation wharfs of the present invention structure.
Fig. 8 is the structural schematic diagram of cap of single pile in the present invention.
Fig. 9 is the structural schematic diagram of double stake pile covers and three pile covers in the present invention.
Figure 10 is the structural schematic diagram in the prefabricated portion of the type of falling E in the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Embodiment 1:
Embodiment is with 10 10,000 tons container terminals, and harbour general layout is arranged using trestle type and only before harbour For stopping 100,000 DWT or more large ships of pool, as described in Fig. 1-10, which includes:
A kind of normalized assembled pile foundation wharfs structural system includes:Pile foundation 100, pile cover portion 200, stake core node 300, girder system portion 400, panel part 500, affiliated facility.Wherein, the present embodiment pile foundation 100 uses the pre-tensioning system of diameter 1200mm Prestressed pipe pile foundation.Partial precast cap of single pile 201, double pile covers 202 and three or more can be used in the pile cover portion 200 Pile cover 203.The stake core node 300 uses cast-in-place concrete one-pass molding.The girder system portion 400 includes mainly overlapping crossbeam Portion 401 and its cantilever end 401a and overlapping track beam portion 402.The panel part 500 includes mainly:Standard panel part 501 and its Corresponding cantilever end 501a, the special-shaped panel part 502 of 402 both sides of harbour track beam portion and its corresponding cantilever end 502a, harbour Special-shaped panel part 503 and its corresponding cantilever end 503a between frontal line 1001 and front rail 603.Wherein, special-shaped panel part 502, 503 and its corresponding cantilever end 502a, 503a can preferably adapt to track girder partial enlargement, and it is the windbreak anchoring of embedded gantry crane, anti- The built-in fitting of wind zipper and jacking facility.The affiliated facility includes mainly:Rubber fender 601, mooring facility 602, gantry crane or Rail 604, shield wheel bank 605 and other associated satellite facilities, repeat no more after door machine front rail 603, gantry crane or door machine.
For ease of realizing that standardized designs are built, the framed bent spacing for defining the assembled pile foundation wharfs structure list segmentation is The cantilever end length of 9.0m and structural segmented both sides is 3m, and embodiment standardizes the length L of pile foundation wharfs construction standard list segmentation =60.0m (=6*9+2*3), wherein framed bent number are 7.Dock structure list section length L=60m meets《Long piled wharf design with Job specfication (JTS 167-1-2010)》Specification provides that temperature stress effect influences dock structure small.Meanwhile definition is used for The equipment gantry crane of stevedoring, the gauge of door machine are B2=3.5m, and the distance of front rail 603 to wharf apron line 1001 is B1= 30m, after rear rail 604 to harbour along 1002 distance be B3=3.5m, standardization pile foundation wharfs construction standard list is segmented Width be B=37m.Above three parameter B1, B2 and B3 can meet 100,000 container terminals DWT and use functional requirement.
The arrangement of pile foundation pattern feature of the normalized assembled pile foundation wharfs organization plan of the present embodiment is installation rubber shield 602 framed bent end of the side of a ship 601 and mooring facility, shore approach structure side use three or more pile covers 203, pile foundation 100 all to use The easily controllable straight pile body system of piling deviation.Its arrangement of pile foundation pattern refers to Fig. 4-7.Single Pile is set in the middle part of dock structure framed bent Cap 201 or double pile covers 202.Three arrangements are arranged under track girder can be effective against harbour top technique gantry crane wheel load, Wherein 10 10,000 tons container dock bridge wheel load standard values belong to superduty wheel load generally in 80~110ton.Due to When the harbour general layout of the present embodiment uses trestle type arrangement and only 100,000 DWT or more large ships of berthing, wharf apron The rubber fender 601 and mooring facility 602 of line 1001 use arranged for interval.
The pile cover portion 200 of the present embodiment is made of the prefabricated portion 2001 of casing and the cast-in-place portion of pile cover 2002, and prefabricated in casing Portion 2001 be pile foundation 100 be arranged mounting hole position and reserve enough piling deviation d ', wait for cap of single pile 201, double pile covers 202, Or the prefabricated portion of casing 2001 of three or more pile covers 203 install it is in place after, it is cast-in-place that internal poured in place concrete forms pile cover Portion 2002, and be linked together with stake core node 300.Wherein, the prefabricated portion of the casing in pile cover portion 200 is by prefabricated pile cover bottom plate 2003, side plate 2004 and internal partition 2005 form, and wall thickness is respectively 500mm, 300 (400) mm and 600 (500) mm, and pile foundation is logical It crosses reserving hole at bottom plate and stretches into pile cover.The present embodiment pile cover portion uses the prefabricated portion of pile cover, is easy to standardize, and can be pre- by pile cover Assembly rate processed is improved to 50% or more, facilitates construction;And it is arranged three under track girder and also effectively reduces rail with more pile covers 203 Road beam span.
The girder system portion 400 of the present embodiment includes overlapping crossbeam portion 401 and overlaps forward and backward track girder 402, by superstructure beam System is connected as one, and overlaps the bottom absolute altitude of track girder 402 than 401 high 100mm of overlapping crossbeam portion.Further, overlapping crossbeam portion The lower part of 401 and its cantilever end 401a is using precast concrete and setting bracket, for shelving 500 lower part of panel part, Pre-erection span such as preferably uses at the spans arrangement.The lower part of the overlapping track beam portion 402 and its cantilever end 402a are using prefabricated Concrete structure and pre-engineered span is equal, rest part use cast-in-place concrete.The overlapping crossbeam portion 401, road beam portion 402 across Degree is equal respectively, it is easy to accomplish the positive hogging moment of beam is substantially suitable, and superstructure girder system portion stress is more uniform.
The panel part 500 of the present embodiment is directly held on 401 lower part of overlapping crossbeam portion using the overlapping template of falling E, and its Pre-erection weight is no more than pile foundation hoisting weight.Wherein the prefabricated portion of the overlapping type of falling E panel 500 is by prefabricated panel 5001, rib 5002 end baffle 5003 of plate and interior diaphragm plate 5004 are constituted, and it is horizontal to directly rest on overlapping for end set preparation joint baffle On the bracket of 401 prefabricated lower part of beam portion setting, it is linked together by cast-in-place concrete and 401 top of overlapping crossbeam portion.Overlap E Template can also use the replacements such as the preferable π templates of self stability, circular hole or square hole plate.
The affiliated facility of the present embodiment includes mainly rubber fender 601, mooring facility 602, front rail 603, rear rail 604 and shield Take turns bank 605.
As Figure 1-10 shows, the method for construction of normalized assembled pile foundation wharfs structure:
A. prefabricated portion and the main affiliated facility of pile foundation 100, pile cover portion 200, girder system portion 400, panel part 500 are purchased 600, and transported batchwise enters scene;
B. pile driving barge and crane barge waterborne are dispatched to engineering site, after pile driving barge reaches engineering site, carries out pile foundation 100 piling constructions;
C. crane barge waterborne, the prefabricated portion in installation pile cover portion 200 are used, and pours a core node 300 in time, is answered when necessary Consider clip pile measure;
D. carry out simultaneously in process (a)~(c), prefabricated portion's installation in girder system portion 400 is carried out using crane barge waterborne, and Complete the local cast-in-place construction that girder system portion 400 is located at the crossbeam portion 401 of 200 top of pile cover portion, 402 lower part of track girder.
E. carry out simultaneously in process (a)~(d), prefabricated portion's installation of panel part 500 is carried out using crane barge waterborne, so The reinforcing bar binding on crossbeam portion 401,500 top of 402 top of track beam portion and panel part is carried out afterwards, and completes pouring construction.
F. the installation work of harbour affiliated facility and rail etc. is carried out, and carries out whole set equipment disembarkation and its debugging Wharf Construction is completed in work.
The present embodiment normalized assembled pile foundation wharfs organization plan superstructure concrete is averaged converting thickness index about For 1.2~1.5m3/m2, concrete amount is smaller, and project cost advantage is big.Dock structure berthing ability is suitable for various ship type packets It includes 100,000 DWT or more ships and stops pool requirement.
The arrangement of pile foundation pattern of assembled pile foundation wharfs organization plan is flexible, it is easy to accomplish and standardized designs are built, Be readily adapted to accommodate the trestle type of unilateral or bilateral berthing, full hall formula general layout pattern, can also quickly through adjustment framed bent spacing, Single Pin framed bents total amount of pile and Pile Diameter realize the optimization of the lateral resistant ability of dock structure.In addition, be arranged under track girder double stakes, Three arrangements can be effective against harbour top technique gantry crane, door machine wheel load superduty wheel load.Dock structure pile foundation uses Full vertical pile structure system, piling deviation is easily controllable, and structural seismic performance is preferable.Be arranged under track girder double stakes, three and more Pile cover marginal quay is longitudinally arranged, and can effectively reduce track beam span, realizes that superstructure uniform force is reasonable.
Normalized assembled pile foundation wharfs structural system is using the precast spliced pattern assembly installation of primary structural component.Due to upper The prefabricated side amount of portion's structural elements obviously increases, and upper part organization plan assembly rate can be promoted to 60% or more.It is built in its construction During making, without carrying out a large amount of Site Template processing and fabricatings, the prefabricated portion's bottom plate of pile cover casing, side plate and the overlapping template of falling E Prefabricated panel and end plate baffle setting, can avoid a large amount of formwork support arrangement and Demolition Construction processes waterborne, significantly improve construction Efficiency saves the duration, reduces cost.
The panel part of assembled pile foundation wharfs organization plan has selected self stability preferably to overlap the template of falling E, π Template, circular hole or square-hole hollow plate, and prefabricated weight should be no more than pile foundation weight, do not increase lifting appliance ability waterborne additionally and want It asks.Maximum lifting appliance ability depends on pile foundation hoisting weight, and ship machine equipment mounting cost is low.Waterborne construction craft machine equipment only needs Configure pile driving barge, crane barge on miniature water.
Assembled pile foundation wharfs organization plan is suitable for the areas such as poor, the ship machine equipment scarce capacity of periphery execution conditions Various van containers, bulk cargo terminals synthesis port area are quickly created, cost is with the obvious advantage.

Claims (10)

1. a kind of normalized assembled pile foundation wharfs structure, which is characterized in that including pile foundation (100), pile cover portion (200), stake Core node (300), girder system portion (400), panel part (500) and affiliated facility;The top of the pile foundation (100) passes through stake core Node (300) is mutually fixedly connected with pile cover portion (200);The girder system portion (400) setting two neighboring pile cover portion (200) it Between, panel part (500) is provided at the top of girder system portion (400), panel part is provided with affiliated facility on (500).
2. normalized assembled pile foundation wharfs according to claim 1 structure, which is characterized in that the pile cover portion (200) Including the prefabricated portion of casing (2001) and the cast-in-place portion of pile cover (2002);The prefabricated portion of casing (2001) includes bottom plate (2003) and side The surrounding of plate (2004), bottom plate (2003) is both provided with side plate (2004), and side plate (2004) surrounds a chamber, is arranged in chamber There is the cast-in-place portion of pile cover (2002);Through-hole is provided at the center of the bottom plate (2003), the through-hole is stretched for pile foundation (100) Enter to the prefabricated portion of casing (2001).
3. normalized assembled pile foundation wharfs according to claim 2 structure, which is characterized in that the prefabricated portion of casing (2001) and the cast-in-place portion of pile cover (2002) is internally provided with framework of steel reinforcement, the framework of steel reinforcement for resist pile cover institute's bending moment and Shearing;Hangs muscle is provided at the top of the side plate (2004), hangs muscle is used for the handling in the prefabricated portion of casing (2001).
4. normalized assembled pile foundation wharfs according to claim 1 structure, which is characterized in that the girder system portion (400) Including overlapping crossbeam portion (401) and overlapping track beam portion (402), the bottom absolute altitude of overlapping track beam portion (402) is than overlapping crossbeam portion (401) high 75~150mm.
5. normalized assembled pile foundation wharfs according to claim 4 structure, which is characterized in that the overlapping crossbeam portion (401) lower part is using precast concrete and setting bracket, for shelving panel part (500) lower part, pre-erection across Degree such as preferably use to arrange at the spans;The lower part of the overlapping track beam portion (402) uses precast concrete and pre-engineered span phase Deng.
6. normalized assembled pile foundation wharfs according to claim 1 structure, which is characterized in that the panel part (500) Including the prefabricated portion of the type of falling E and cast-in-place panel part, the prefabricated portion of the type of falling E includes precast surface plate portion (5001), floor (5002), end Portion's baffle (5003);The bottom of the precast surface plate portion (5001) is evenly arranged with several floors (5002), several floors (5002) it is mutually parallel between;It is provided with cast-in-place panel part, precast surface plate portion at the top of the precast surface plate portion (5001) (5001) both ends are both provided with end baffle end baffle (5003).
7. normalized assembled pile foundation wharfs according to claim 6 structure, which is characterized in that the precast surface plate portion (5001) it is provided with hangs muscle at the top of, several interior diaphragm plates (5004) are provided between two neighboring floor (5002).
8. normalized assembled pile foundation wharfs according to claim 1 structure, which is characterized in that the affiliated facility includes Rubber fender (601), mooring facility (602), front rail (603), rear rail (604) and shield wheel bank (605).
9. normalized assembled pile foundation wharfs according to claim 1 structure, which is characterized in that the pile foundation (100) Using concrete pre-stress pipe pile foundation or steel pipe pile foundation, the pile cover portion (200) is using cap of single pile (201), double stakes Cap (202) and three or more pile covers (203);The stake core node (300) is molded using cast-in-place concrete one-time-concreting.
10. a kind of method of construction of normalized assembled pile foundation wharfs according to claim 1 structure, which is characterized in that Include the following steps:
A. purchase pile foundation (100), pile cover portion (200), girder system portion (400), panel part (500) prefabricated portion attached set with main It applies, and transported batchwise enters scene;
B. pile driving barge and crane barge waterborne are dispatched to engineering site, after pile driving barge reaches engineering site, carries out pile foundation (100) Piling construction;
C. crane barge waterborne is used, the prefabricated portion of pile cover portion (200) is installed, and pours a core node (300) in time, is answered when necessary Consider clip pile measure;
D. carry out simultaneously in process (a)~(c), prefabricated portion's installation of girder system portion (400) is carried out using crane barge waterborne, and complete It is located at the local cast-in-place construction of crossbeam portion (401) above pile cover portion (200), track girder (402) lower part at girder system portion (400);
E. carry out simultaneously in process (a)~(d), prefabricated portion's installation of panel part (500) is carried out using crane barge waterborne, then The reinforcing bar binding on crossbeam portion (401), track girder (402) top and panel part (500) top is carried out, and completes pouring construction;
F. the installation work of harbour affiliated facility and rail etc. is carried out, and carries out whole set equipment disembarkation and its debugging work Make, completes Wharf Construction.
CN201810599818.8A 2018-06-12 2018-06-12 A kind of normalized assembled pile foundation wharfs structure and its method of construction Pending CN108797513A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810599818.8A CN108797513A (en) 2018-06-12 2018-06-12 A kind of normalized assembled pile foundation wharfs structure and its method of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810599818.8A CN108797513A (en) 2018-06-12 2018-06-12 A kind of normalized assembled pile foundation wharfs structure and its method of construction

Publications (1)

Publication Number Publication Date
CN108797513A true CN108797513A (en) 2018-11-13

Family

ID=64085423

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810599818.8A Pending CN108797513A (en) 2018-06-12 2018-06-12 A kind of normalized assembled pile foundation wharfs structure and its method of construction

Country Status (1)

Country Link
CN (1) CN108797513A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930474A (en) * 2019-04-04 2019-06-25 中交第三航务工程勘察设计院有限公司 A kind of connected structure for pile foundation type trestle and barrel type basis
CN110485258A (en) * 2019-06-25 2019-11-22 中交第三航务工程勘察设计院有限公司 A kind of full assembling type steel structure access bridge and its construction method
CN111523170A (en) * 2020-04-27 2020-08-11 中交第三航务工程勘察设计院有限公司 BIM technology-based integrated design method for assembled pile foundation wharf structure
CN112982131A (en) * 2021-02-07 2021-06-18 中交第三航务工程勘察设计院有限公司 Offshore open type airport runway and construction method thereof
CN113481931A (en) * 2021-07-07 2021-10-08 中交第三航务工程勘察设计院有限公司 Modular assembly type high-pile wharf structure and construction method thereof
CN115897479A (en) * 2022-10-31 2023-04-04 中交第三航务工程局有限公司江苏分公司 Novel assembled wharf revetment structure based on cylinder foundation and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202157300U (en) * 2011-06-27 2012-03-07 河海大学 Arch type longitudinal beam wharf structure
CN202214705U (en) * 2011-08-29 2012-05-09 沈迪州 Vertical column type wharf structure
WO2014037824A1 (en) * 2012-09-05 2014-03-13 Uab "Hidrosfera" Gravity-based elevated hydro-technical structure
US20140224164A1 (en) * 2011-02-15 2014-08-14 Bellingham Marine Industries, Inc. Dock system including collapsible frame, and method for assembling dock system including collapsible frame
CN107034842A (en) * 2017-06-09 2017-08-11 中交第三航务工程勘察设计院有限公司 A kind of modular assembly formula pile foundation wharfs structural system and its construction method
CN107975059A (en) * 2018-01-12 2018-05-01 中交第三航务工程勘察设计院有限公司 A kind of assembled pile foundation wharfs structure and its construction method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20140224164A1 (en) * 2011-02-15 2014-08-14 Bellingham Marine Industries, Inc. Dock system including collapsible frame, and method for assembling dock system including collapsible frame
CN202157300U (en) * 2011-06-27 2012-03-07 河海大学 Arch type longitudinal beam wharf structure
CN202214705U (en) * 2011-08-29 2012-05-09 沈迪州 Vertical column type wharf structure
WO2014037824A1 (en) * 2012-09-05 2014-03-13 Uab "Hidrosfera" Gravity-based elevated hydro-technical structure
CN107034842A (en) * 2017-06-09 2017-08-11 中交第三航务工程勘察设计院有限公司 A kind of modular assembly formula pile foundation wharfs structural system and its construction method
CN107975059A (en) * 2018-01-12 2018-05-01 中交第三航务工程勘察设计院有限公司 A kind of assembled pile foundation wharfs structure and its construction method

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930474A (en) * 2019-04-04 2019-06-25 中交第三航务工程勘察设计院有限公司 A kind of connected structure for pile foundation type trestle and barrel type basis
CN110485258A (en) * 2019-06-25 2019-11-22 中交第三航务工程勘察设计院有限公司 A kind of full assembling type steel structure access bridge and its construction method
CN111523170A (en) * 2020-04-27 2020-08-11 中交第三航务工程勘察设计院有限公司 BIM technology-based integrated design method for assembled pile foundation wharf structure
CN112982131A (en) * 2021-02-07 2021-06-18 中交第三航务工程勘察设计院有限公司 Offshore open type airport runway and construction method thereof
CN113481931A (en) * 2021-07-07 2021-10-08 中交第三航务工程勘察设计院有限公司 Modular assembly type high-pile wharf structure and construction method thereof
CN113481931B (en) * 2021-07-07 2023-01-31 中交第三航务工程勘察设计院有限公司 Modular assembly type high-pile wharf structure and construction method thereof
CN115897479A (en) * 2022-10-31 2023-04-04 中交第三航务工程局有限公司江苏分公司 Novel assembled wharf revetment structure based on cylinder foundation and construction method
CN115897479B (en) * 2022-10-31 2023-10-27 中交第三航务工程局有限公司江苏分公司 Novel assembled wharf revetment structure based on barrel type foundation and construction method

Similar Documents

Publication Publication Date Title
CN108797513A (en) A kind of normalized assembled pile foundation wharfs structure and its method of construction
CN107975059A (en) A kind of assembled pile foundation wharfs structure and its construction method
CN101429752B (en) Pier column prefabrication splicing building technology
CN106012960B (en) A kind of assembled long piled wharf superstructure system and its construction method
CN102747677B (en) Bridge and construction method thereof
CN107245934A (en) A kind of assembled steel profiled sheet concrete combined board small box girder
CN202194317U (en) Guide rail structure for cast-in-site concrete slope surface
CN105714684A (en) Prestressed concrete variable cross-section fish-bellied type continuous box girder construction method
CN103924525B (en) Urban interchange industrialization short-term precast assembly construction method
CN110184950A (en) The construction method of bridge former address reorganization and expansion new bridge under a kind of guarantor's gating condition
CN107574762A (en) A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities
CN106012791B (en) Three across the antinode steel concretes of work beam shear wave three combine T-shaped continuous beam
CN103741577B (en) A kind of T-shaped beam bridge and construction method thereof that bottom lateral bracing is set
CN107034842A (en) A kind of modular assembly formula pile foundation wharfs structural system and its construction method
CN110409319A (en) A kind of cast-in-place floorings bracket of large span steel reinforced concrete combination beam and construction method
CN211849244U (en) Novel assembled high-pile beam-slab wharf structure
CN107100083A (en) A kind of T-shaped high pier Cast-in-place Bent Cap formwork erecting structure and construction method
CN102220741A (en) Steel-concrete composite girder construction technology striding current lines and being parallel to existing lines
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
DE112022001701T5 (en) Basket-shaped, large-span swallow-style steel box arch bridge with specially shaped arch ribs and its rapid construction method
CN102797223A (en) Construction method for cast-in-place of continuous beam at turnout junction for passenger transport line in seawall area by false work method
CN209585431U (en) Frame column formwork and exempt from template reinforced column
CN207919582U (en) A kind of assembled pile foundation wharfs structure
CN207597341U (en) A kind of modular assembly formula pile foundation wharfs structural system
CN209114299U (en) A kind of Single-box multi-chamber box beam bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181113