CN108797353A - A kind of bridge construction protective device - Google Patents

A kind of bridge construction protective device Download PDF

Info

Publication number
CN108797353A
CN108797353A CN201810614209.5A CN201810614209A CN108797353A CN 108797353 A CN108797353 A CN 108797353A CN 201810614209 A CN201810614209 A CN 201810614209A CN 108797353 A CN108797353 A CN 108797353A
Authority
CN
China
Prior art keywords
fixed
link
fixed link
hook
bridge construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810614209.5A
Other languages
Chinese (zh)
Other versions
CN108797353B (en
Inventor
秦浩瀚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Yuanlian Technology Pioneer Park Management Co.,Ltd.
Original Assignee
秦浩瀚
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 秦浩瀚 filed Critical 秦浩瀚
Priority to CN201810614209.5A priority Critical patent/CN108797353B/en
Publication of CN108797353A publication Critical patent/CN108797353A/en
Application granted granted Critical
Publication of CN108797353B publication Critical patent/CN108797353B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The present invention relates to protective device more particularly to a kind of bridge construction protective devices.The technical problem to be solved in the present invention is to provide a kind of bridge construction protective devices for being readily transported, being easily installed.A kind of bridge construction protective device includes the first fixed link, the second fixed link, fixed mechanism, the first hook, second hook etc.;And output end and the second fixed link coordinate;Multiple equidistant first hooks are fixed in the first fixed link, one side of the second fixed link, multiple to be fixed in the first fixed link, second fixed link the other side with one-to-one second hook of the first hook;Multiple equidistant first links are fixed in one side of protection network ontology.The present invention reaches the effect for being readily transported, being easily installed.

Description

A kind of bridge construction protective device
Technical field
The present invention relates to protective device more particularly to a kind of bridge construction protective devices.
Background technology
Bridge refers generally to be erected in rivers,lakes and seas, the structures for making traffic etc. that can smoothly pass through, in bridge construction Scene in order to protect construction personnel safe, while facilitating erection workbench, it will usually build bridge and associated satellite field by laying bricks or stones Ground periphery erecting scaffold, scaffold can horizontally suspend the green net of construction in its periphery again after the completion of building, be used for security protection.
Chinese patent CN207376474U is low for the problem that existing protection effect, and inconvenience installation discloses a kind of bridge Beam construction protection network, the invention discloses a kind of bridge construction protection networks, including main fender rod, secondary bar a, protection network a, two Grade fender rod, secondary bar b, protection network b, warning sign, fixing device a and fixing device b, the main fender rod front end are set both sides up and down There are fixing device a, the main fender rod front center to be equipped with warning sign, the main fender rod lower end is equipped with connect base, described Protection network a is equipped in main fender rod inner cavity, the main fender rod is connect by protection network a with secondary bar a, the secondary bar a or more two Side is equipped with fixing device b, and the main protection rod rear end is equipped with two level fender rod, and the rear ends the secondary bar a are equipped with secondary bar b, and described two Grade fender rod is connect by protection network b with secondary bar b.The present invention, can be fast by main fender rod and secondary bar a and its front end fixing device Speed sets up scaffold periphery at the construction field (site) and is protected, and is easily installed and dismantles, more practical, is suitble to be widely popularized and make With, but since a kind of bridge construction protective net apparatus is excessive, to which inconvenient the shortcomings that transporting can be caused.
Third section:To sum up, it needs to research and develop a kind of bridge construction protective device for being readily transported, being easily installed at present, come The shortcomings that overcoming inconvenient transport in the prior art.
Invention content
The shortcomings that present invention is in order to overcome inconvenient transport in the prior art, the technical problem to be solved in the present invention is to provide one The bridge construction protective device that kind is readily transported, is easily installed.
The present invention is reached by technological means in detail below:
A kind of bridge construction protective device, include the first fixed link, the second fixed link, fixed mechanism, first hook, Second hook, protection network ontology, the first link and the second link;Second fixed link is positioned at the top of the first fixed link;Fixed machine Structure is fixed in the first fixed link side, and output end and the second fixed link coordinate;Multiple equidistant first hooks are fixed in the One fixed link, one side of the second fixed link, it is multiple to be fixed in the first fixed link, the with one-to-one second hook of the first hook Two fixed link the other sides;Multiple equidistant first links are fixed in one side of protection network ontology, multiple and the first link one One corresponding second link is fixed in protection network ontology the other side;Protection network ontology one end is placed in first by the first link On hook, the other end is placed in by the second link on the second hook.
Further, fixed mechanism includes that connecting rod, the first L-shaped fixed link, the first wing bolt, the second L-shaped are fixed Bar and the second wing bolt;It is provided with the first groove at the top of first fixed link;Connecting rod is fixed in the second bottom of fixed, and is located at In first groove;First L-shaped fixed link is fixed in one side of the first fixed link, and the second L-shaped fixed link is fixed in the first fixed link The other side;It is provided with the first threaded hole in first L-shaped fixed link, the second threaded hole is provided in the second L-shaped fixed link;Second fixes One side of bar is opened is provided with the second thread groove with the first thread groove, the other side;First wing bolt is through the first threaded hole and the One thread groove is spirally connected, and the second wing bolt is spirally connected through the first threaded hole with the second thread groove.
Further, which further includes having the first elastic component;First fixed link, the second fixed link It opens and multiple second grooves one side;Second hook one end is located in the second groove, and is slidably connected with the second groove;First bullet Property part one end is fixed in one side of the second hook, and the other end is fixed in one side wall in the second groove.
Further, which further includes having spill block and inserted link;It is solid that spill block is fixed in second One side of fixed pole is provided with through-hole on the second hook, and inserted link one end coordinates through through-hole and pitching pile at the top of spill block.
Further, which further includes having handle;Handle is fixed at the top of inserted link.
Further, which further includes having mounting plate;Mounting plate is fixed in the first fixed link bottom Portion is provided with multiple mounting holes on mounting plate.
Further, which further includes having hollow stem and the second elastic component;Hollow stem is fixed in At the top of mounting plate;First fixed link is located in hollow stem, and is slidably connected with hollow stem;Second elastic component one end is fixed in first Bottom of fixed, the other end are fixed in bottom in hollow stem.
Further, which further includes having third hook;Third hook is fixed in the second fixation Bar front.
Compared with prior art, the present invention has the advantages that:
The present invention completes to fix the effect of the second fixed link by fixed mechanism, passes through the effect of fixed mechanism so that the One fixed link, the second fixed link form supporting rod, are matched by the first link and the first hook cooperation, the second link and the second hook It closes, convenient for hanging protection network ontology, reaches the effect for being readily transported, being easily installed.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the main structure diagram of fixed mechanism of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the enlarged structure schematic diagram of A in Fig. 3 of the present invention.
Fig. 5 is the enlarged structure schematic diagram of B in Fig. 3 of the present invention.
Fig. 6 is the third main structure diagram of the present invention.
Fig. 7 is the first enlarged structure schematic diagram of C in Fig. 6 of the present invention.
Fig. 8 is second of enlarged structure schematic diagram of C in Fig. 6 of the present invention.
Fig. 9 is the 4th kind of main structure diagram of the present invention.
Figure 10 is the 5th kind of main structure diagram of the present invention.
Figure 11 is the left view structural representation of the present invention.
Label in attached drawing be:The first fixed links of 1-, the second fixed links of 2-, 3- fixed mechanisms, the first grooves of 31-, 32- connect Extension bar, 33- the first L-shaped fixed links, the first threaded holes of 34-, the first thread grooves of 35-, the first wing bolts of 36-, the second L-shaped of 37- Fixed link, the second threaded holes of 38-, the second thread grooves of 39-, the second wing bolts of 310-, 4- first are linked up with, and 5- second is linked up with, 6- Protection network ontology, the first links of 7-, the second links of 8-, the second grooves of 9-, the first elastic components of 10-, 11- spill blocks, 12- through-holes, 13- inserted links, 14- handles, 15- mounting plates, 16- mounting holes, 17- hollow stems, the second elastic components of 18-, 19- thirds hook.
Specific implementation mode
The present invention is described further below in conjunction with attached drawing:
Embodiment
A kind of bridge construction protective device includes the first fixed link 1, the second fixed link 2, consolidates as shown in figs. 1-11 Determine 4, second hook 5 of the hook of mechanism 3, first, protection network ontology 6, the first link 7 and the second link 8;Second fixed link 2 is placed In 1 top of the first fixed link;Fixed mechanism 3 is fixed in 1 side of the first fixed link, and output end and the second fixed link 2 coordinate;It is more A equidistant first hook 4 is fixed in the first fixed link 1,2 one side of the second fixed link, multiple a pair of with the first hook 4 one The second hook 5 answered is fixed in the first fixed link 1,2 the other side of the second fixed link;Multiple equidistant first links 7 are affixed It is multiple to be fixed in 6 other side of protection network ontology with 7 one-to-one second link 8 of the first link in 6 one side of protection network ontology Portion;6 one end of protection network ontology is placed in by the first link 7 on the first hook 4, and the other end is placed in by the second link 8 On two hooks 5.
When needing to set up protective device, extremely by the transport of more first fixed links 1, the second fixed link 2 and protection network ontology 6 Need to set up the place of protective device, then by the installation of the first fixed link 1, the second fixed link 2 and protection network ontology 6, be stitched together, Protective device can have been set up.
The second fixed link 2 is positioned over 1 top of the first fixed link first, the mechanism that is locked 3 is solid in order to fix second Fixed pole 2, then 1 bottom of the first fixed link is embedded in underground, according to the length of protection network ontology 6, so it is second first embedded Fixed link 1 passes through the effect of fixed mechanism 3 so that the first fixed link 1, the second fixed link 2 form supporting rod, by the first link 7 It being placed on the first hook 4 of first supporting rod, the second link 8 is placed on the second hook 5 of second supporting rod, Setting up for protective device is completed, in this way, reaching the effect for being readily transported, being easily installed.
Wherein, fixed mechanism 3 includes that connecting rod 32, the first L-shaped fixed link 33, the first wing bolt 36, the second L-shaped are solid Fixed pole 37 and the second wing bolt 310;First fixed link, 1 top is provided with the first groove 31;Connecting rod 32 is fixed in the second fixation 2 bottom of bar, and in the first groove 31;First L-shaped fixed link 33 is fixed in 1 one side of the first fixed link, and the second L-shaped is fixed Bar 37 is fixed in 1 the other side of the first fixed link;The first threaded hole 34, the second L-shaped fixed link are provided in first L-shaped fixed link 33 The second threaded hole 38 is provided on 37;Second fixed link, 2 one side open with the first thread groove 35, the other side is provided with the second thread groove 39;First wing bolt 36 is spirally connected through the first threaded hole 34 with the first thread groove 35, and the second wing bolt 310 runs through the first spiral shell Pit 34 is spirally connected with the second thread groove 39;When needing to fix the second fixed link 2, the second fixed link 2 is placed into the first fixed link 1 Top so that connecting rod 32 is located in the first groove 31, rotates the first wing bolt 36, it is made to be transferred in the first thread groove 35, The second wing bolt 310 is rotated, it is made to be transferred in the second thread groove 39, to just fixing the second fixed link 2, when need not make When with this protective device, the first wing bolt 36 is reversely rotated to be detached from the first thread groove 35, reversely rotates the second wing bolt 310 to be detached from the second thread groove 39, can go lower second fixed link 2, is easily installed and the second fixed link 2 of dismounting in this way, reaching.
Wherein, which further includes having the first elastic component 10;First fixed link 1, the second fixed link 2 It opens and multiple second grooves 9 one side;Second 5 one end of hook are located in the second groove 9, and are slidably connected with the second groove 9;The One elastic component, 10 one end is fixed in 5 one side of the second hook, and the other end is fixed in one side wall in the second groove 9;It is hung by second Hook 5 and the second groove 9 coordinate, and are moved to the left convenient for the second hook 5 so that the second link 8 is easier to be placed in the second hook 5 On, convenient for hanging for protection network ontology 6, since the first elastic component 10 is in tensional state, made by 10 elastic force of the first elastic component With so that the second hook 5 moves right, to tense protection network ontology 6.
Wherein, which further includes having spill block 11 and inserted link 13;Spill block 11 is fixed in second 2 one side of fixed link, second hook 5 on be provided with through-hole 12,13 one end of inserted link is matched through through-hole 12 with 11 top pitching pile of spill block It closes;Coordinated by inserted link 13 and 11 top of spill block, convenient for fixed inserted link 13, is coordinated by through-hole 12 and inserted link 13, convenient for solid Fixed second hook 5, prevents protection network ontology 6 from being collided by article, and protection network ontology 6 drives second to hang by the second link 8 Hook 5 is moved to the left so that the second link 8 is detached from the second hook 5, causes falling for protection network ontology 6, causes danger.
Wherein, which further includes having handle 14;Handle 14 is fixed in 13 top of inserted link;Pass through handle Hand 14 is convenient for extraction and is inserted into inserted link 13.
Wherein, which further includes having mounting plate 15;Mounting plate 15 is fixed in 1 bottom of the first fixed link Portion is provided with multiple mounting holes 16 on mounting plate 15;It is convenient for fixed mounting plate 15 by mounting hole 16, consequently facilitating it is solid to fix first Fixed pole 1.
Wherein, which further includes having hollow stem 17 and the second elastic component 18;Hollow stem 17 is affixed In 15 top of mounting plate;First fixed link 1 is located in hollow stem 17, and is slidably connected with hollow stem 17;Second elastic component 18 1 End is fixed in 1 bottom of the first fixed link, and the other end is fixed in bottom in hollow stem 17;Pass through hollow stem 17 and the second elastic component 18 Cooperation is completed, to the cushioning effect of the first fixed link 1, to prevent from being collided by article due to protection network ontology 6, to first Fixed link 1 and the second fixed link 2 cause to shake so that mounting plate 15 generates shaking, causes mounting plate 15 to install insecure, such as This, can improve the stability of mounting plate 15.
Wherein, which further includes having third to link up with 19;Third hook 19 is fixed in the second fixation 2 front of bar;19 are linked up with by third, convenient for hanging warning sign, improves warning function.
Using technical solution of the present invention or those skilled in the art under the inspiration of technical solution of the present invention, if Similar technical solution is counted out, and reaches above-mentioned technique effect, is to fall into protection scope of the present invention.

Claims (8)

1. a kind of bridge construction protective device, which is characterized in that include the first fixed link (1), the second fixed link (2), consolidate Determine mechanism (3), the first hook (4), the second hook (5), protection network ontology (6), the first link (7) and the second link (8);Second Fixed link (2) is positioned at the top of the first fixed link (1);Fixed mechanism (3) is fixed in the first fixed link (1) side, and output end Coordinate with the second fixed link (2);Multiple equidistant first hooks (4) are fixed in the first fixed link (1), the second fixed link (2) One side, it is multiple to be fixed in the first fixed link (1), the second fixed link with one-to-one second hook (5) of the first hook (4) (2) the other side;Multiple equidistant first links (7) are fixed in (6) one side of protection network ontology, multiple and the first link (7) one-to-one second link (8) is fixed in protection network ontology (6) the other side;Protection network ontology (6) one end passes through first Link (7) is placed on the first hook (4), and the other end is placed in by the second link (8) on the second hook (5).
2. a kind of bridge construction protective device according to claim 1, which is characterized in that fixed mechanism (3) includes Connecting rod (32), the first L-shaped fixed link (33), the first wing bolt (36), the second L-shaped fixed link (37) and the second wing bolt (310);It is provided with the first groove (31) at the top of first fixed link (1);Connecting rod (32) is fixed in the second fixed link (2) bottom, and In the first groove (31);First L-shaped fixed link (33) is fixed in (1) one side of the first fixed link, the second L-shaped fixed link (37) it is fixed in the first fixed link (1) the other side;It is provided with the first threaded hole (34), the second L-shaped in first L-shaped fixed link (33) The second threaded hole (38) is provided in fixed link (37);It opens and the first thread groove (35), the other side (2) one side of second fixed link It is provided with the second thread groove (39);First wing bolt (36) is spirally connected through the first threaded hole (34) with the first thread groove (35), the Two wing bolts (310) are spirally connected through the first threaded hole (34) with the second thread groove (39).
3. a kind of bridge construction protective device according to claim 2, which is characterized in that the bridge construction is filled with protection Set further includes having the first elastic component (10);First fixed link (1), (2) one side of the second fixed link are opened and multiple second grooves (9);Second hook (5) one end is located in the second groove (9), and is slidably connected with the second groove (9);First elastic component (10) one End is fixed in (5) one side of the second hook, and the other end is fixed in the second groove (9) interior one side wall.
4. a kind of bridge construction protective device according to claim 3, which is characterized in that the bridge construction is filled with protection Set further includes having spill block (11) and inserted link (13);Spill block (11) is fixed in (2) one side of the second fixed link, the second hook (5) through-hole (12) is provided on, inserted link (13) one end coordinates through through-hole (12) and pitching pile at the top of spill block (11).
5. a kind of bridge construction protective device according to claim 4, which is characterized in that the bridge construction is filled with protection Set further includes having handle (14);Handle (14) is fixed at the top of inserted link (13).
6. a kind of bridge construction protective device according to claim 5, which is characterized in that the bridge construction is filled with protection Set further includes having mounting plate (15);Mounting plate (15) is fixed in the first fixed link (1) bottom, and mounting plate is provided with multiple peaces on (15) It fills hole (16).
7. a kind of bridge construction protective device according to claim 6, which is characterized in that the bridge construction is filled with protection Set further includes having hollow stem (17) and the second elastic component (18);Hollow stem (17) is fixed at the top of mounting plate (15);First fixes Bar (1) is located in hollow stem (17), and is slidably connected with hollow stem (17);Second elastic component (18) one end is fixed in the first fixation Bar (1) bottom, the other end are fixed in hollow stem (17) interior bottom.
8. a kind of bridge construction protective device according to claim 7, which is characterized in that the bridge construction is filled with protection Set further includes having third to link up with (19);Third hook (19) is fixed in the second fixed link (2) front.
CN201810614209.5A 2018-06-14 2018-06-14 Protector is used in bridge construction Active CN108797353B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810614209.5A CN108797353B (en) 2018-06-14 2018-06-14 Protector is used in bridge construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810614209.5A CN108797353B (en) 2018-06-14 2018-06-14 Protector is used in bridge construction

Publications (2)

Publication Number Publication Date
CN108797353A true CN108797353A (en) 2018-11-13
CN108797353B CN108797353B (en) 2020-10-16

Family

ID=64086948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810614209.5A Active CN108797353B (en) 2018-06-14 2018-06-14 Protector is used in bridge construction

Country Status (1)

Country Link
CN (1) CN108797353B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111894784A (en) * 2020-07-27 2020-11-06 安徽青云峡旅游发展有限公司 Safe and reliable's big waterwheel
US20230160159A1 (en) * 2021-02-03 2023-05-25 Dalian University Of Technology Dangling net cloth device for suppressing flutter of sea-crossing bridge

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100995855B1 (en) * 2010-07-07 2010-11-22 동방엔지니어링 주식회사 Base support having moving rollers for manufacturing upper plate of a bridge
CN206655109U (en) * 2017-03-22 2017-11-21 宁波大学 A kind of bridge construction anti-drop device
CN206737567U (en) * 2017-05-04 2017-12-12 西安市政一路桥建设有限公司 A kind of road and bridge construction protection network

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100995855B1 (en) * 2010-07-07 2010-11-22 동방엔지니어링 주식회사 Base support having moving rollers for manufacturing upper plate of a bridge
CN206655109U (en) * 2017-03-22 2017-11-21 宁波大学 A kind of bridge construction anti-drop device
CN206737567U (en) * 2017-05-04 2017-12-12 西安市政一路桥建设有限公司 A kind of road and bridge construction protection network

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111894784A (en) * 2020-07-27 2020-11-06 安徽青云峡旅游发展有限公司 Safe and reliable's big waterwheel
US20230160159A1 (en) * 2021-02-03 2023-05-25 Dalian University Of Technology Dangling net cloth device for suppressing flutter of sea-crossing bridge

Also Published As

Publication number Publication date
CN108797353B (en) 2020-10-16

Similar Documents

Publication Publication Date Title
CN108797353A (en) A kind of bridge construction protective device
CN109715895A (en) Anchoring piece
CN207110683U (en) A kind of layer-stepping construction safety enclosing
CN206986907U (en) A kind of side slope down-the-hole drill drilling operation platform
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN103821136B (en) Hang single-row of scaffold and construction method thereof
CN210827475U (en) Safety protection net frame for pile foundation hole
CN208430425U (en) A kind of high-speed railway pier top protective device of installation easy to disassemble
CN206801072U (en) A kind of foundation ditch temporary guard rail
CN207513202U (en) Construction discharging platform
CN207110679U (en) A kind of architectural engineering protective stent
CN210262793U (en) Safety device for municipal building construction
CN215669585U (en) Slope safety protection construction equipment
CN205116215U (en) Support formula retaining wall structure
CN107419733A (en) A kind of side slope down-the-hole drill drilling operation platform
CN208899980U (en) A kind of civil engineering foldable cellular protective fence
CN107190968A (en) A kind of new corner aluminium alloy protection network
CN205712109U (en) Sinking steel protecting canister leading truck
CN207727578U (en) One kind can have enough to meet the need drilled pile construction protective platform
CN204940900U (en) A kind of building operations protection guardrail
CN215978415U (en) Support for building engineering construction
CN105735662A (en) Prefabricated assembled building casting net and mounting method
CN206238106U (en) A kind of deep water anti-stormy wave cultivation net cage sleeve fixing frame
CN219218695U (en) Safety device is used in cableway bridge floor construction
CN213869034U (en) Portable scalable regulation pothole protector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200922

Address after: No.959, Jiayuan Road, Yuanhe street, Xiangcheng District, Suzhou City, Jiangsu Province

Applicant after: Suzhou Yuanlian Technology Pioneer Park Management Co.,Ltd.

Address before: 510000 Tun Sheng Road, Desheng garden, Haizhuqu District, Guangzhou, Guangdong

Applicant before: Qin Haohan