A kind of building monitoring device installation grooving apparatus
Technical field
The present invention relates to a kind of grooving apparatus more particularly to a kind of building monitoring device installation grooving apparatus.
Background technology
From broadly, architecture is the subject of research building and its environment.Architecture is one across engineering technology
With the subject of humanities and art.The art of architecture and Building technology involved by architecture and the art of architecture as utility art
Included aesthetics and it is practical while, though they have specific different but maintain close ties with, and its component is with tool
Body situation and the difference of building and differ widely.
Monitoring is a verb, is interpreted as monitoring, detection.The meaning of supervision is monitored in prison, monitoring.It surveys, test measures test
The meaning.
Building monitoring device is a kind of monitoring device to data such as building settlement, inclinations, the installation building prison on metope
Before measurement equipment, it is necessary first to slot on metope, typically artificial electricity consumption, which is got on metope, at present slots, and is produced in grooving process
Raw dust can not carry out it depositing dust and can not be collected to waste material, thus there is an urgent need for research and develop a kind of dust-laying effect it is good, can be right
The building monitoring device installation grooving apparatus that waste material is collected.
Invention content
Slot to overcome artificial electricity consumption to get on metope, the dust generated in grooving process it can not be carried out depositing dust,
And the shortcomings that waste material can not being collected, therefore, technical problem of the invention is:There is provided a kind of dust-laying effect it is good, can be to useless
Expect the building monitoring device installation grooving apparatus being collected.
Technical solution:A kind of building monitoring device installation grooving apparatus includes pedestal, wheel, interior telescopic rod, overhanging
Contracting bar, link block, connecting plate, connecting rod, first motor, saw blade, sliding block, cylinder, rack, strut, the second motor and gear, bottom
Seat bottom surrounding is equipped with wheel, is connected with interior telescopic rod on the left of base top, slidingtype is connected with external extension on interior telescopic rod
Bar, external extension bar top are connected with link block, connecting plate are connected on the left of link block, the first sliding groove is provided on rear side of connecting plate, the
One sliding slot inner sliding type is equipped with sliding block, and rear side is connected with cylinder in the first sliding groove, is connect on rear side of the telescopic rod and sliding block of cylinder,
On the left of sliding block and connecting plate front left side is all connected with connecting rod, and first motor is mounted on the left of the inside of front and back connecting rod, the
It is connected with saw blade on the output shaft of one motor, is connected with rack on the right side of external extension bar, base top is connected with strut, and strut is located at
The right side of interior telescopic rod, strut top are connected with the second motor, and the output shaft of the second motor is equipped with gear, and wheel and rack is nibbled
It closes.
Preferably, further include have third motor, disk, oscillating rod, bearing block, connecting rod, shaft, roller bearing, crushing rod and
Lead ring, link block installed in front have third motor and oscillating rod, oscillating rod to be located at the lower front of third motor, oscillating rod left side
It is articulated connection with link block, is connected with disk on front side of third motor, eccentric position is equipped with bearing block, bearing block on disk
Interior is equipped with shaft, and connecting rod is hingedly connected on the right side of oscillating rod, and connecting rod top is U-shaped, is connect with connecting rod middle part on front side of shaft, even
Bar top U-shaped inner sliding type is connected with roller bearing, and roller bearing coordinates with connecting rod top, and crushing rod, link block top are connected on rear side of roller bearing
Portion is connected with lead ring, and lead ring is located on the outside of crushing rod, and crushing rod is located between two saw blades.
Preferably, further include having water tank, water pump, outlet pipe and nozzle, it is connected with water tank on the right side of base top, in water tank
Bottom right is connected with water pump, and outlet pipe is connected on water pump, and outlet pipe stretches out outside water tank, and outlet pipe tail end is connected with nozzle,
Nozzle is connect with lead ring.
Preferably, further including having the first telescopic rod, the first spring and collection frame, second is symmetrically provided with before and after chassis left side
Sliding slot, second sliding slot inner sliding type are equipped with the first telescopic rod, the first spring are connected on the right side of the first telescopic rod, the first spring
Tail end is connect with second sliding slot inner wall, and the first telescopic rod left end is connected with collection frame.
Preferably, further including having guide sleeve and second spring, it is connected with guide sleeve on the right side of link block, guide sleeve is located at outside outlet pipe
Side, interior telescopic rod top are connected with second spring, and the tail end of second spring is connect with external extension bar inner top.
When needing to slot on the wall, the present invention is pushed into designated position, cylinder is then controlled and elongates or shortens, after drive
The connecting rod of side is moved forward and backward, and the distance between two saw blades are adjusted.After regulating, control cylinder stops elongation or contracting
It is short.Operating personnel push the present invention mobile, and saw blade is made to be contacted with the wall slotted is needed.Then start first motor rotation, to wall
It is cut, at the same time, starts the second motor and slowly rotate forward, band carry-over bar moves up, and drives connecting plate and saw blade slow
Slowly it moves up, saw blade is made to cut wall.While cutting, manually beaten between two saw blade of hammer pair, into
Row fluting work.After fluting, first motor and the second motor are closed.
Because further including having third motor, disk, oscillating rod, bearing block, connecting rod, shaft, roller bearing, crushing rod and lead ring,
Link block installed in front has third motor and oscillating rod, oscillating rod to be located at the lower front of third motor, oscillating rod left side and company
It is articulated connection to connect block, is connected with disk on front side of third motor, and eccentric position is equipped with bearing block on disk, in bearing block
Equipped with shaft, connecting rod is hingedly connected on the right side of oscillating rod, connecting rod top is U-shaped, is connect with connecting rod middle part on front side of shaft, on connecting rod
Portion's U-shaped inner sliding type is connected with roller bearing, and roller bearing coordinates with connecting rod top, and crushing rod is connected on rear side of roller bearing, is connected at the top of link block
It is connected to lead ring, lead ring is located on the outside of crushing rod, and crushing rod is located between two saw blades.When saw blade is when cutting wall, open
Dynamic third motor rotation, it is disc-rotated, shaft rotation is driven, oscillating rod and connecting rod swing are driven, drives crushing rod or so
It is mobile, wall is beaten, fluting work is carried out.After fluting, third motor is closed.
It is connected with water tank because further including having water tank, water pump, outlet pipe and nozzle, on the right side of base top, bottom in water tank
Right side is connected with water pump, and outlet pipe is connected on water pump, and outlet pipe stretches out outside water tank, and outlet pipe tail end is connected with nozzle, nozzle
It is connect with lead ring.Operating personnel's topped up with water in water tank.When saw blade slots to wall, a large amount of dirt is will produce, therefore, behaviour
Make personnel and can control pump working, the water in water tank is extracted out, is sprayed from nozzle by outlet pipe, carry out depositing dust.Depositing dust finishes
Afterwards, it switches off the pump.
Because further including having the first telescopic rod, the first spring and collection frame, it is symmetrically provided with second sliding slot before and after chassis left side,
Second sliding slot inner sliding type is equipped with the first telescopic rod, and the first spring, the tail end of the first spring are connected on the right side of the first telescopic rod
It is connect with second sliding slot inner wall, the first telescopic rod left end is connected with collection frame.When saw blade contacts wall, collection frame and wall
Contact.Saw blade cut down it is useless it is miscellaneous fall in collection frame, prevent miscellaneous damage ground of giving up.When saw blade more to the left cuts wall
When cutting, framework moves right, and the first spring is compressed, and the first spring can be such that collection frame is contacted with wall always.
Because further including having guide sleeve and second spring, guide sleeve is connected on the right side of link block, guide sleeve is located on the outside of outlet pipe, interior
It is connected with second spring at the top of telescopic rod, the tail end of second spring is connect with external extension bar inner top.Guide sleeve carries out outlet pipe
It is oriented to, prevents outlet pipe from touching connecting rod.Second spring plays a supportive role.
The present invention by the second motor rotate drive link block move up or down, to drive first motor upwards or
It moves down, first motor drives saw blade rotation, to slot to wall, and depositing dust is carried out by water, to reach
The effect that dust-laying effect is good, work efficiency is high.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the overlooking structure diagram of saw blade of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the third main structure diagram of the present invention.
Figure label title:1, pedestal, 2, wheel, 3, interior telescopic rod, 4, external extension bar, 5, link block, 6, connecting plate, 7,
Connecting rod, 8, first motor, 9, saw blade, 10, the first sliding groove, 11, sliding block, 12, cylinder, 13, rack, 14, strut, 15, second
Motor, 16, gear, 17, third motor, 18, disk, 19, bearing block, 20, oscillating rod, 21, connecting rod, 22, shaft, 23, roller bearing,
24, crushing rod, 25, lead ring, 26, water tank, 27, water pump, 28, outlet pipe, 29, nozzle, 30, second sliding slot, 31, first is flexible
Bar, the 32, first spring, 33, collection frame, 34, guide sleeve, 35, second spring.
Specific implementation mode
As described below is only presently preferred embodiments of the present invention, is not intended to limit the scope of the present invention.
Embodiment 1
A kind of building monitoring device installation grooving apparatus includes as shown in Figs 1-4 pedestal 1, wheel 2, interior telescopic rod
3, external extension bar 4, link block 5, connecting plate 6, connecting rod 7, first motor 8, saw blade 9, sliding block 11, cylinder 12, rack 13, strut
14, the second motor 15 and gear 16,1 bottom surrounding of pedestal are equipped with wheel 2, and 1 top left side of pedestal is connected with interior telescopic rod 3,
Slidingtype is connected with external extension bar 4 on interior telescopic rod 3, and 4 top of external extension bar is connected with link block 5, and 5 left side of link block is connected with
Connecting plate 6, the rear side of connecting plate 6 are provided with the first sliding groove 10, and 10 inner sliding type of the first sliding groove is equipped with sliding block 11, in the first sliding groove 10
Rear side is connected with cylinder 12, and the telescopic rod of cylinder 12 is connect with 11 rear side of sliding block, and 11 left side of sliding block and 6 front left side of connecting plate all connect
It is connected to connecting rod 7, first motor 8 is mounted on the left of the inside of front and back connecting rod 7, is connected on the output shaft of first motor 8
Saw blade 9,4 right side of external extension bar are connected with rack 13, and 1 top of pedestal is connected with strut 14, and strut 14 is located at the right side of interior telescopic rod 3
Side, 14 top of strut are connected with the second motor 15, and the output shaft of the second motor 15 is equipped with gear 16, and gear 16 is nibbled with rack 13
It closes.
Embodiment 2
A kind of building monitoring device installation grooving apparatus includes as shown in Figs 1-4 pedestal 1, wheel 2, interior telescopic rod
3, external extension bar 4, link block 5, connecting plate 6, connecting rod 7, first motor 8, saw blade 9, sliding block 11, cylinder 12, rack 13, strut
14, the second motor 15 and gear 16,1 bottom surrounding of pedestal are equipped with wheel 2, and 1 top left side of pedestal is connected with interior telescopic rod 3,
Slidingtype is connected with external extension bar 4 on interior telescopic rod 3, and 4 top of external extension bar is connected with link block 5, and 5 left side of link block is connected with
Connecting plate 6, the rear side of connecting plate 6 are provided with the first sliding groove 10, and 10 inner sliding type of the first sliding groove is equipped with sliding block 11, in the first sliding groove 10
Rear side is connected with cylinder 12, and the telescopic rod of cylinder 12 is connect with 11 rear side of sliding block, and 11 left side of sliding block and 6 front left side of connecting plate all connect
It is connected to connecting rod 7, first motor 8 is mounted on the left of the inside of front and back connecting rod 7, is connected on the output shaft of first motor 8
Saw blade 9,4 right side of external extension bar are connected with rack 13, and 1 top of pedestal is connected with strut 14, and strut 14 is located at the right side of interior telescopic rod 3
Side, 14 top of strut are connected with the second motor 15, and the output shaft of the second motor 15 is equipped with gear 16, and gear 16 is nibbled with rack 13
It closes.
Further include having third motor 17, disk 18, oscillating rod 20, bearing block 19, connecting rod 21, shaft 22, roller bearing 23, being crushed
Bar 24 and lead ring 25, before 5 installed in front of link block has third motor 17 and oscillating rod 20, oscillating rod 20 to be located at third motor 17
Side lower part, the left side of oscillating rod 20 and link block 5 are articulated connection, and the front side of third motor 17 is connected with disk 18, on disk 18
Eccentric position is equipped with bearing block 19, is equipped with shaft 22 in bearing block 19,20 right side of oscillating rod is hingedly connected with connecting rod 21, even
21 top of bar is U-shaped, and 22 front side of shaft is connect with 21 middle part of connecting rod, and 21 top U-shaped inner sliding type of connecting rod is connected with roller bearing 23, rolling
Axis 23 coordinates with 21 top of connecting rod, and 23 rear side of roller bearing is connected with crushing rod 24, and 5 top of link block is connected with lead ring 25, lead ring 25
Positioned at 24 outside of crushing rod, crushing rod 24 is located between two saw blades 9.
Embodiment 3
A kind of building monitoring device installation grooving apparatus includes as shown in Figs 1-4 pedestal 1, wheel 2, interior telescopic rod
3, external extension bar 4, link block 5, connecting plate 6, connecting rod 7, first motor 8, saw blade 9, sliding block 11, cylinder 12, rack 13, strut
14, the second motor 15 and gear 16,1 bottom surrounding of pedestal are equipped with wheel 2, and 1 top left side of pedestal is connected with interior telescopic rod 3,
Slidingtype is connected with external extension bar 4 on interior telescopic rod 3, and 4 top of external extension bar is connected with link block 5, and 5 left side of link block is connected with
Connecting plate 6, the rear side of connecting plate 6 are provided with the first sliding groove 10, and 10 inner sliding type of the first sliding groove is equipped with sliding block 11, in the first sliding groove 10
Rear side is connected with cylinder 12, and the telescopic rod of cylinder 12 is connect with 11 rear side of sliding block, and 11 left side of sliding block and 6 front left side of connecting plate all connect
It is connected to connecting rod 7, first motor 8 is mounted on the left of the inside of front and back connecting rod 7, is connected on the output shaft of first motor 8
Saw blade 9,4 right side of external extension bar are connected with rack 13, and 1 top of pedestal is connected with strut 14, and strut 14 is located at the right side of interior telescopic rod 3
Side, 14 top of strut are connected with the second motor 15, and the output shaft of the second motor 15 is equipped with gear 16, and gear 16 is nibbled with rack 13
It closes.
Further include having third motor 17, disk 18, oscillating rod 20, bearing block 19, connecting rod 21, shaft 22, roller bearing 23, being crushed
Bar 24 and lead ring 25, before 5 installed in front of link block has third motor 17 and oscillating rod 20, oscillating rod 20 to be located at third motor 17
Side lower part, the left side of oscillating rod 20 and link block 5 are articulated connection, and the front side of third motor 17 is connected with disk 18, on disk 18
Eccentric position is equipped with bearing block 19, is equipped with shaft 22 in bearing block 19,20 right side of oscillating rod is hingedly connected with connecting rod 21, even
21 top of bar is U-shaped, and 22 front side of shaft is connect with 21 middle part of connecting rod, and 21 top U-shaped inner sliding type of connecting rod is connected with roller bearing 23, rolling
Axis 23 coordinates with 21 top of connecting rod, and 23 rear side of roller bearing is connected with crushing rod 24, and 5 top of link block is connected with lead ring 25, lead ring 25
Positioned at 24 outside of crushing rod, crushing rod 24 is located between two saw blades 9.
Further include having water tank 26, water pump 27, outlet pipe 28 and nozzle 29,1 top right side of pedestal is connected with water tank 26, water tank
Bottom right is connected with water pump 27 in 26, and outlet pipe 28 is connected on water pump 27, and outlet pipe 28 stretches out outside water tank 26, outlet pipe 28
Tail end is connected with nozzle 29, and nozzle 29 is connect with lead ring 25.
Embodiment 4
A kind of building monitoring device installation grooving apparatus includes as shown in Figs 1-4 pedestal 1, wheel 2, interior telescopic rod
3, external extension bar 4, link block 5, connecting plate 6, connecting rod 7, first motor 8, saw blade 9, sliding block 11, cylinder 12, rack 13, strut
14, the second motor 15 and gear 16,1 bottom surrounding of pedestal are equipped with wheel 2, and 1 top left side of pedestal is connected with interior telescopic rod 3,
Slidingtype is connected with external extension bar 4 on interior telescopic rod 3, and 4 top of external extension bar is connected with link block 5, and 5 left side of link block is connected with
Connecting plate 6, the rear side of connecting plate 6 are provided with the first sliding groove 10, and 10 inner sliding type of the first sliding groove is equipped with sliding block 11, in the first sliding groove 10
Rear side is connected with cylinder 12, and the telescopic rod of cylinder 12 is connect with 11 rear side of sliding block, and 11 left side of sliding block and 6 front left side of connecting plate all connect
It is connected to connecting rod 7, first motor 8 is mounted on the left of the inside of front and back connecting rod 7, is connected on the output shaft of first motor 8
Saw blade 9,4 right side of external extension bar are connected with rack 13, and 1 top of pedestal is connected with strut 14, and strut 14 is located at the right side of interior telescopic rod 3
Side, 14 top of strut are connected with the second motor 15, and the output shaft of the second motor 15 is equipped with gear 16, and gear 16 is nibbled with rack 13
It closes.
Further include having third motor 17, disk 18, oscillating rod 20, bearing block 19, connecting rod 21, shaft 22, roller bearing 23, being crushed
Bar 24 and lead ring 25, before 5 installed in front of link block has third motor 17 and oscillating rod 20, oscillating rod 20 to be located at third motor 17
Side lower part, the left side of oscillating rod 20 and link block 5 are articulated connection, and the front side of third motor 17 is connected with disk 18, on disk 18
Eccentric position is equipped with bearing block 19, is equipped with shaft 22 in bearing block 19,20 right side of oscillating rod is hingedly connected with connecting rod 21, even
21 top of bar is U-shaped, and 22 front side of shaft is connect with 21 middle part of connecting rod, and 21 top U-shaped inner sliding type of connecting rod is connected with roller bearing 23, rolling
Axis 23 coordinates with 21 top of connecting rod, and 23 rear side of roller bearing is connected with crushing rod 24, and 5 top of link block is connected with lead ring 25, lead ring 25
Positioned at 24 outside of crushing rod, crushing rod 24 is located between two saw blades 9.
Further include having water tank 26, water pump 27, outlet pipe 28 and nozzle 29,1 top right side of pedestal is connected with water tank 26, water tank
Bottom right is connected with water pump 27 in 26, and outlet pipe 28 is connected on water pump 27, and outlet pipe 28 stretches out outside water tank 26, outlet pipe 28
Tail end is connected with nozzle 29, and nozzle 29 is connect with lead ring 25.
Further include having the first telescopic rod 31, the first spring 32 and collection frame 33, pedestal is symmetrically provided with the second cunning before and after 1 left side
Slot 30,30 inner sliding type of second sliding slot are equipped with the first telescopic rod 31, and 31 right side of the first telescopic rod is connected with the first spring 32, the
The tail end of one spring 32 is connect with 30 inner wall of second sliding slot, and 31 left end of the first telescopic rod is connected with collection frame 33.
Further include having guide sleeve 34 and second spring 35,5 right side of link block is connected with guide sleeve 34, and guide sleeve 34 is located at outlet pipe 28
Outside, 3 top of interior telescopic rod are connected with second spring 35, and the tail end of second spring 35 is connect with 4 inner top of external extension bar.
When needing to slot on the wall, the present invention is pushed into designated position, cylinder 12 is then controlled and elongates or shortens, drive
The connecting rod 7 of rear side is moved forward and backward, and the distance between two saw blades 9 are adjusted.After regulating, control cylinder 12 stops elongation
Or shorten.Operating personnel push the present invention mobile, and saw blade 9 is made to be contacted with the wall slotted is needed.Then start 8 turns of first motor
It is dynamic, wall is cut, at the same time, starts the second motor 15 and slowly rotates forward, band carry-over bar 13 moves up, and drives connection
Plate 6 and saw blade 9 slowly move up, and saw blade 9 is made to cut wall.Cutting while, manually with two saw blade 9 of hammer pair it
Between beaten, carry out fluting work.After fluting, first motor 8 and the second motor 15 are closed.
Because further include have third motor 17, disk 18, oscillating rod 20, bearing block 19, connecting rod 21, shaft 22, roller bearing 23,
Crushing rod 24 and lead ring 25,5 installed in front of link block have third motor 17 and oscillating rod 20, oscillating rod 20 to be located at third motor 17
Lower front, the left side of oscillating rod 20 and link block 5 are articulated connection, and the front side of third motor 17 is connected with disk 18, disk
Eccentric position is equipped with bearing block 19 on 18, is equipped with shaft 22 in bearing block 19,20 right side of oscillating rod is hingedly connected with connecting rod
21,21 top of connecting rod is U-shaped, and 22 front side of shaft is connect with 21 middle part of connecting rod, and 21 top U-shaped inner sliding type of connecting rod is connected with roller bearing
23, roller bearing 23 coordinates with 21 top of connecting rod, and 23 rear side of roller bearing is connected with crushing rod 24, and 5 top of link block is connected with lead ring 25, leads
Ring 25 is located at 24 outside of crushing rod, and crushing rod 24 is located between two saw blades 9.When saw blade 9 is when cutting wall, start the
Three motors 17 rotate, and disk 18 is driven to rotate, and shaft 22 is driven to rotate, and oscillating rod 20 and connecting rod 21 is driven to swing, and drive broken
Bar 24 moves left and right, and is beaten to wall, carries out fluting work.After fluting, third motor 17 is closed.
Because further including having water tank 26, water pump 27, outlet pipe 28 and nozzle 29,1 top right side of pedestal is connected with water tank 26,
Bottom right is connected with water pump 27 in water tank 26, and outlet pipe 28 is connected on water pump 27, and outlet pipe 28 stretches out outside water tank 26, water outlet
28 tail end of pipe is connected with nozzle 29, and nozzle 29 is connect with lead ring 25.Operating personnel's topped up with water in water tank 26.When saw blade 9 is to wall
When being slotted, a large amount of dirt is will produce, therefore, operating personnel can control water pump 27 to work, and the water in water tank 26 is extracted out, lead to
It crosses outlet pipe 28 to spray from nozzle 29, carries out depositing dust.After depositing dust, 27 are switched off the pump.
Because further including having the first telescopic rod 31, the first spring 32 and collection frame 33, the is symmetrically provided with before and after the left side of pedestal 1
Two sliding slots 30,30 inner sliding type of second sliding slot are equipped with the first telescopic rod 31, and 31 right side of the first telescopic rod is connected with the first spring
32, the tail end of the first spring 32 is connect with 30 inner wall of second sliding slot, and 31 left end of the first telescopic rod is connected with collection frame 33.Work as saw blade
When 9 pairs of wall contacts, collection frame 33 is contacted with wall.Saw blade 9 cut down it is useless it is miscellaneous fall in collection frame 33, prevent miscellaneous damage of giving up
Bad ground.When saw blade 9 more to the left cuts wall, framework moves right, and the first spring 32 is compressed, the first spring 32
Collection frame 33 can be made to be contacted with wall always.
Because further including having guide sleeve 34 and second spring 35,5 right side of link block is connected with guide sleeve 34, and guide sleeve 34 is located at water outlet
28 outside of pipe, 3 top of interior telescopic rod are connected with second spring 35, and the tail end of second spring 35 is connect with 4 inner top of external extension bar.
Guide sleeve 34 is oriented to outlet pipe 28, prevents outlet pipe 28 from touching connecting rod 21.Second spring 35 plays a supportive role.
Although the disclosure, art technology has shown and described with reference to the certain exemplary embodiments of the disclosure
Personnel it should be understood that in the case of the spirit and scope of the present disclosure limited without departing substantially from the following claims and their equivalents,
A variety of changes in form and details can be carried out to the disclosure.Therefore, the scope of the present disclosure should not necessarily be limited by above-described embodiment,
But should be not only determined by appended claims, also it is defined by the equivalent of appended claims.