CN108788440A - Band line ultrasonic bonding marking equipment - Google Patents

Band line ultrasonic bonding marking equipment Download PDF

Info

Publication number
CN108788440A
CN108788440A CN201810698616.9A CN201810698616A CN108788440A CN 108788440 A CN108788440 A CN 108788440A CN 201810698616 A CN201810698616 A CN 201810698616A CN 108788440 A CN108788440 A CN 108788440A
Authority
CN
China
Prior art keywords
charging wire
jig
band
pending
conveyer belt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810698616.9A
Other languages
Chinese (zh)
Other versions
CN108788440B (en
Inventor
李辉清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Yipin Science And Technology Co Ltd
Original Assignee
Huizhou Yipin Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Yipin Science And Technology Co Ltd filed Critical Huizhou Yipin Science And Technology Co Ltd
Priority to CN201810698616.9A priority Critical patent/CN108788440B/en
Publication of CN108788440A publication Critical patent/CN108788440A/en
Application granted granted Critical
Publication of CN108788440B publication Critical patent/CN108788440B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/10Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating making use of vibrations, e.g. ultrasonic welding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K20/00Non-electric welding by applying impact or other pressure, with or without the application of heat, e.g. cladding or plating
    • B23K20/26Auxiliary equipment
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K26/00Working by laser beam, e.g. welding, cutting or boring
    • B23K26/36Removing material
    • B23K26/361Removing material for deburring or mechanical trimming
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K26/00Working by laser beam, e.g. welding, cutting or boring
    • B23K26/70Auxiliary operations or equipment
    • B23K26/702Auxiliary equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Plasma & Fusion (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Abstract

The present invention relates to a kind of band line ultrasonic bonding marking equipments, including:Band line jig, inspection material conveyer belt, power-on test device, plug driver-extractor, ultrasonic brazing unit, lead screw transfer assembly, discharging jig, discharge belt, marking device and accessible pass through component.Above-mentioned band line ultrasonic bonding marking equipment is used to carry out laser mark processing to the pending band charging wire product being positioned on discharging jig, to complete to complete welding and mark operation together on same production line by marking device;The charging wire with charging wire product that keeps this pending is used for from the discharge end of inspection material conveyer belt to being passed unopposed through between the discharge end of discharge belt without card line obstacle by component by accessible, so that also processing can be soldered through automatic production line, with charging wire product to improve the production efficiency that the automated ultrasonic with line product welds mark operation.

Description

Band line ultrasonic bonding marking equipment
Technical field
The present invention relates to automatic welding manufacturing technology fields, are set more particularly to a kind of band line ultrasonic bonding mark It is standby.
Background technology
Currently, the equipment for carrying out welding production operation using automation equipment is varied on the market.Welding production is made Industry is to utilize ripe ultrasonic bonding principle that two parts welding assemblies of product together, are formed the whole of firm stable Body.
However, existing ultrasonic wave automatic welding equipment can only often handle the single product of contour structures, work as product It is replaced by the way of human weld when with harness, the serious production efficiency for reducing product.
Invention content
Based on this, it is necessary to the technical issues of for how to improve production efficiency, provide a kind of band line supersonic welding and take Marking device.
A kind of band line ultrasonic bonding marking equipment, including:Band line jig, inspection material conveyer belt, power-on test device, plug Driver-extractor, ultrasonic brazing unit, lead screw transfer assembly, discharging jig, discharge belt, marking device and accessible pass through Component, the band line jig is set on the inspection material conveyer belt and places pending band charging wire product, described to wait locating The plug of the charging wire with charging wire product of reason is inserted on the socket with line jig;The power-on test device setting In inspection material conveyer belt side, for carrying out energization survey to the pending band charging wire product with line jig Examination;The plug driver-extractor is set to the inspection material conveyer belt side and is located at the power-on test device and the ultrasonic wave Between welder, it to be used for plug of the plug on the socket with line jig;The ultrasonic brazing unit is neighbouring The discharge end setting of the inspection material conveyer belt, for band charging wire product pending described in soldering;The lead screw transmission Component is respectively adjacent to discharge end and the ultrasonic brazing unit setting of the inspection material conveyer belt, the lead screw transfer assembly For the pending band charging wire product for being located at the discharge end of the inspection material conveyer belt to be removed and placed in the ultrasound Wave soldering connection device, the lead screw transfer assembly is additionally operable to will to complete to weld and described in the ultrasonic brazing unit is waited for Processing is removed and placed in charging wire product on the discharging jig of the feeding end positioned at the discharge belt;It is described to beat Device for mark is set to inspection material conveyer belt side, for charging to the pending band being positioned on the discharging jig Line product carries out laser marking processing;It is described it is accessible by component for making the pending charging with charging wire product Line passes unopposed through between the feeding end of the inspection material conveyer belt and the discharge end of the discharge belt, and the inspection material passes It send between the discharge end of band and the ultrasonic brazing unit, the feeding end of the discharge belt is hinged with the supersonic welding Between the setting and side of the discharge belt, which is respectively arranged with, described accessible passes through component.
Further include clamp device in one of the embodiments, the clamp device be set to the plug driver-extractor with And between the lead screw transfer assembly, the clamp device is used to take out through the pending band that test is defective products that is powered Charging wire product.
Described in one of the embodiments, with line jig includes being set on the inspection material conveyer belt and the production that is connected Product placing piece and test block, the pending band charging wire product are positioned on the product placing piece, the test block With socket, the plug of the charging wire is inserted on the socket.
The power-on test device includes jig for pressing, the first measurement jig and second in one of the embodiments, Measurement jig, the jig for pressing are used for the pressing pending band charging wire product before the test that is powered, and described first surveys Jig is tried to be used to be used for and the test with the pending electric connection with charging wire product, second measurement jig Part is electrically connected, and first measurement jig and second measurement jig are formed with test loop.
It is made of flexible material that the jig for pressing, which has press head, the press head, in one of the embodiments, Block, the press head are used to abut with the pending band charging wire product in pressing.
Further include film rolling device in one of the embodiments, the film rolling device connects with the ultrasonic brazing unit It connects, the film rolling device is used to carry out surface coating processing to the pending band charging wire product, so that the ultrasonic wave Welder is across band charging wire product pending described in protective film soldering.
In one of the embodiments, it is described it is accessible by component include first it is accessible by part, it is second accessible Pass through part by the way that part and third are accessible;Described first it is accessible by part be set to it is described inspection material conveyer belt discharge end with Between the ultrasonic brazing unit, described second it is accessible by part be set to the feeding end of the discharge belt with it is described Between ultrasonic brazing unit, the accessible side that the discharge belt is set to by part of the third.
In one of the embodiments, described first it is accessible the ultrasonic brazing unit is fixed on by part one end, Discharge end of the other end adjacent to the inspection material conveyer belt.
In one of the embodiments, described second it is accessible the ultrasonic brazing unit is fixed on by part one end, The other end is adjacent to the accessible end by part of the third.
In one of the embodiments, described first it is accessible by part, it is described second accessible by part and described Third is accessible to be located along the same line by part.
Above-mentioned band line ultrasonic bonding marking equipment carries pending band charging wire production by being used to weld with line jig Product, the i.e. pending band charging wire product have charging wire;By power-on test device for coordinating the band line jig to this Pending band charging wire product carries out energization test, and through being powered, pending band charging wire product that test is defective products can be with It is removed after plug driver-extractor so that it is into ultrasonic brazing unit is all non-defective unit, and then improves welding efficiency; It is used to carry out laser mark processing to the pending band charging wire product being positioned on discharging jig by marking device, To complete to complete welding and mark operation together on same production line;It is used to keep this pending by component by accessible The charging wire with charging wire product can from inspection material conveyer belt discharge end between the discharge end of discharge belt without barrier By without card line obstacle so that band charging wire product also can be soldered processing through automatic production line, to improve The production efficiency of automated ultrasonic welding mark operation with line product.
Description of the drawings
Fig. 1 is the structural schematic diagram with line ultrasonic bonding marking equipment in one embodiment;
Fig. 2 is the structural schematic diagram at another visual angle in embodiment illustrated in fig. 1;
Fig. 3 is the structural schematic diagram at another visual angle in embodiment illustrated in fig. 1;
Fig. 4 is the structure enlargement diagram of the part A in embodiment illustrated in fig. 1;
Fig. 5 is the part-structure schematic diagram with line ultrasonic bonding marking equipment in one embodiment;
Fig. 6 is the part-structure schematic diagram with line ultrasonic bonding marking equipment in one embodiment;
Fig. 7 is the part-structure schematic diagram with line ultrasonic bonding marking equipment in one embodiment;
Fig. 8 is the part-structure schematic diagram with line ultrasonic bonding marking equipment in one embodiment;
Fig. 9 is the part-structure schematic diagram with line ultrasonic bonding marking equipment in one embodiment;
Figure 10 is the part-structure schematic diagram with line ultrasonic bonding marking equipment in one embodiment;
Figure 11 is the part-structure schematic diagram with line ultrasonic bonding marking equipment in one embodiment.
Specific implementation mode
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, below in conjunction with the accompanying drawings to the present invention Specific implementation mode be described in detail.Many details are elaborated in the following description in order to fully understand this hair It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not Similar improvement is done in the case of violating intension of the present invention, therefore the present invention is not limited by following public specific embodiment.
In the description of the present invention, it is to be understood that, term "center", " longitudinal direction ", " transverse direction ", " length ", " width ", " thickness ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside", " up time The orientation or positional relationship of the instructions such as needle ", " counterclockwise ", " axial direction ", " radial direction ", " circumferential direction " be orientation based on ... shown in the drawings or Position relationship is merely for convenience of description of the present invention and simplification of the description, and does not indicate or imply the indicated device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
In addition, term " first ", " second " are used for description purposes only, it is not understood to indicate or imply relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the present invention, the meaning of " plurality " is at least two, such as two, three It is a etc., unless otherwise specifically defined.
In the present invention unless specifically defined or limited otherwise, term " installation ", " connected ", " connection ", " fixation " etc. Term shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or integral.Can be that machinery connects It connects, can also be electrical connection.It can be directly connected, can also can be indirectly connected through an intermediary in two elements The interaction relationship of the connection in portion or two elements, unless otherwise restricted clearly.For those of ordinary skill in the art For, the specific meanings of the above terms in the present invention can be understood according to specific conditions.
In the present invention unless specifically defined or limited otherwise, fisrt feature can be with "above" or "below" second feature It is that the first and second features are in direct contact or the first and second features pass through intermediary mediate contact.Moreover, fisrt feature exists Second feature " on ", " top " and " above " but fisrt feature be directly above or diagonally above the second feature, or be merely representative of Fisrt feature level height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " can be One feature is directly under or diagonally below the second feature, or is merely representative of fisrt feature level height and is less than second feature.
It should be noted that when element is referred to as " being fixed on " or " being set to " another element, it can be directly another On one element or there may also be elements placed in the middle.When an element is considered as " connection " another element, it can be with It is directly to another element or may be simultaneously present centering elements.Term as used herein " vertically ", " level ", "upper", "lower", "left", "right" and similar statement for illustrative purposes only, be not offered as being uniquely to implement Mode.
Also referring to Fig. 1, Fig. 2 and Fig. 3, band line ultrasonic bonding marking equipment 10 includes:Band line jig 100, inspection material Conveyer belt 200, power-on test device 300, plug driver-extractor 400, ultrasonic brazing unit 500, lead screw transfer assembly 600 and It is accessible to pass through component 700.
Band line jig 100 is set on inspection material conveyer belt 200 and places pending band charging wire product 90, pending The plug of the charging wire with charging wire product be inserted on the socket with line jig 100.That is, being set to line jig On inspection material conveyer belt and for placing pending band charging wire product, the socket with line jig is filled for plugging pending band The plug of the charging wire of wire products.
Pending is placed on by the feeding end of inspection material conveyer belt 200 on band line jig 100 with charging wire product 90, with Inspection material conveyer belt 200 work operation, the pending band charging wire product 90 be sent to successively power-on test device 300 and Plug driver-extractor 400, and taken out by lead screw transfer assembly 600 in the discharge end of inspection material conveyer belt 200 and be sent into supersonic welding tipping Set 500.
Power-on test device 300 is set to 200 side of inspection material conveyer belt, for the pending band with line jig 100 Charging wire product carries out energization test.
Plug driver-extractor 400 is set to inspection material 200 side of conveyer belt and is located at power-on test device 300 and supersonic welding Between connection device 500, it to be used for plug of the plug on the socket with line jig 100.
The discharge end setting of the neighbouring inspection material conveyer belt 200 of ultrasonic brazing unit 500, the band pending for soldering Charging wire product.
Lead screw transfer assembly 600 is respectively adjacent to the discharge end of inspection material conveyer belt 200 and ultrasonic brazing unit 500 is set It sets, the pending band charging wire product of discharge end of the lead screw transfer assembly 600 for that will be located at inspection material conveyer belt 200 takes out simultaneously It is put into ultrasonic brazing unit 500, lead screw transfer assembly 600 is additionally operable to complete to weld and is located at ultrasonic brazing unit 500 In pending band charging wire product take out.
It is accessible to be set to by component 700 between the discharge end and ultrasonic brazing unit 500 of inspection material conveyer belt 200, For making the pending charging wire with charging wire product in the feeding end and ultrasonic brazing unit 500 of inspection material conveyer belt 200 Between pass unopposed through.
Above-mentioned band line ultrasonic bonding marking equipment 10 is filled by being used to weld the pending band of carrying with line jig 100 Wire products, the i.e. pending band charging wire product have charging wire.By power-on test device 300 for coordinating the band line Jig 100 carries out energization test to the pending band charging wire product, and through being powered, the pending band that test is defective products fills Wire products can be removed after plug driver-extractor 400 so that and what it is into ultrasonic brazing unit 500 is all non-defective unit, And then improve welding efficiency.It is used to keep this pending the charging wire with charging wire product by component 700 by accessible Can successfully ultrasonic brazing unit 500 be entered without card line obstacle from the discharge end of inspection material conveyer belt 200 so that band fills Wire products also can be soldered processing through automatic production line, make to improve the automated ultrasonic with line product and weld The production efficiency of industry.
Referring to Fig. 3, in an embodiment, band line jig 100 includes product placing piece 110 and test block 120, and product is put It sets part 110 and test block 120 is connected.Product placing piece 110 and test block 120 may be contained on inspection material conveyer belt 200. Further, band line jig 100 further includes connecting plate 130, and product placing piece 110 and test block 120 are respectively arranged at connection The both sides of plate 130, connecting plate 130 are set on inspection material conveyer belt 200.Pending band charging wire product 90 is positioned over product and puts It sets on part 110.There is test block 120 socket 121, the plug 91 of charging wire (not shown) to be inserted on socket 121.It needs to illustrate It is the present embodiment clock, band line jig 100 places pending band charging wire product 90.Pending band charging wire product 90 Including product ontology 92 and the charging wire (not shown) being connect with product ontology 92, charging wire (not shown) is equipped with plug 91, inserts First 91 are inserted on the socket 121 with line jig 100.It should be noted that in order to indicate convenient, saved in embodiment illustrated in fig. 3 Charging wire is omited, which is connected between plug 91 and product ontology 92.It is appreciated that the band line jig in the present embodiment 100 can be used for the product with charging wire, to realize ultrasonic wave automatic welding.It, can be by replacing band in other embodiment Line jig 100 and the ultrasonic wave automatic welding for realizing other products.
Referring to Fig. 1, Fig. 2, Fig. 3 and Fig. 5, in an embodiment, band line ultrasonic bonding marking equipment is additionally provided with Ultrasonic wave Installation cabinet 80, inspection material conveyer belt 200 and ultrasonic brazing unit 500 are fixed on ultrasonic wave Installation cabinet 80 respectively On.Band line jig 100 is set on inspection material conveyer belt 200, and the drive lower edge with line jig 100 in inspection material conveyer belt 200 examines material The transporting direction of conveyer belt 200 is towards 500 shuttling movement of ultrasonic brazing unit.It is appreciated that complete mass ultrasonic wave certainly Dynamicization weld job, the quantity with line jig 100 have multiple.Multiple evenly spaced settings of band line jig 100 are in inspection material transmission On band 200.The inspection material cycle operation under the driving of motor of conveyer belt 200, can recycle constantly expect conveyer belt 200 from inspection in this way Pending band charging wire product 90 is inputted to ultrasonic brazing unit 500, to complete mass ultrasonic wave automatic welding Operation.
Referring to Fig. 1, Fig. 4 and Fig. 5, in an embodiment, power-on test device 300 includes jig for pressing 310, first Measurement jig 320 and the second measurement jig 330, jig for pressing 310 are used for the pending band charging of the pressing before the test that is powered Line product.First measurement jig 320 is used to be electrically connected with pending band charging wire product.Second measurement jig 330 is used for It is electrically connected with test block 120.First measurement jig 320 and the second measurement jig 330 are formed with test loop.The present embodiment In, jig for pressing 310 presses product ontology 92 before the test that is powered, and the first measurement jig 320 is electrically connected with product ontology 92, Second measurement jig 330 is electrically connected with test block 120, and the first measurement jig 320 and the second measurement jig 330 are formed with survey Circuit is tried, i.e., test loop is collectively formed in described first measurement jig and second measurement jig.The test loop is used for Measure whether pending band charging wire product is non-defective unit according to test program;Such as when the first measurement jig 320 and second When the test loop that measurement jig 330 is formed is access, which is non-defective unit, is otherwise substandard products.
Further, the first measurement jig 320 is electrically connected with product ontology 92, and specifically, the first measurement jig 320 is set It is equipped with the first tested cylinder 321 and first test thimble pair 322, the first test pushing away in the first tested cylinder 321 of thimble pair 322 Action in lower push-in placing piece 110 and with the stitch of product ontology 92 to abutting and realizing respectively that the electrical of positive and negative electrode connects It connects.Similarly, the second measurement jig 330 is electrically connected with test block 120, and specifically, the second measurement jig 330 is provided with the second survey Gas testing cylinder 331 and second test thimble pair 332, second test thimble pair 332 under the impetus of the second tested cylinder 331 with The test pin 121 of test block 120 abuts and realizes the electric connection of positive and negative electrode respectively.It is appreciated that due to product ontology 92 are placed on product placing piece 110 by gravity, the first test thimble pair 322 and product sheet of the first measurement jig 320 It is possible to push up inclined product ontology 92 when the stitch of body 92 is to abutting, it is possible to make product ontology 92 leave product placing piece 110, be This, jig for pressing 310 presses product ontology 92 before the test that is powered, and product ontology 92 can be made to be firmly secured at product and put It sets on part 110, can make entire energization test process that the stabilization of product ontology 92 be kept to be placed on product placing piece 110 in this way On, to improve testing efficiency, and convenient for the follow-up soldering product ontology 92.
To prevent embossing damage product ontology 92, further, jig for pressing 310 is provided with press head 311, press head 311 be block made of flexible material, and press head 311 is used to abut with pending band charging wire product in pressing, have Body, press head 311 is used to abut with product ontology 92 in pressing.In one embodiment, press head 311 is silica gel block or soft Property rubber block.The press head 311 made of flexible material presses product ontology 92 in this way, to prevent from being embossed or damage Bad product ontology 92.
Referring to Fig. 1, Fig. 2, Fig. 4 and Fig. 6, in an embodiment, plug driver-extractor 400 is set to inspection material conveyer belt 200 sides.Plug driver-extractor 400 has included pulling out cylinder 410 and playing plug 420, pulls out cylinder 410 and is fixed on inspection material conveyer belt 200 side.It rises and pulls out cylinder 410 and connect with a plug 420 is played, rise in the insertion test block 120 of a plug 420, pulling out cylinder 410 Under drive, play plug 420 and be lifted test block 120 vertically so that be inserted in plug 91 on the socket 121 of test block 120 from Socket 121 falls off, to complete the process of unplugg 91.It is appreciated that being provided with spring in test block 120, which makes Plug 420 must be played by after test block 120 vertically lifting, after a plug 420 leaves, test block 120 can set back, and in this way may be used So that the product test for continuing as next round with line jig 100 is prepared.
Also referring to Fig. 1, Fig. 3, Fig. 4, Fig. 5 and Fig. 7, in an embodiment, ultrasonic brazing unit 500 is fixed on ultrasound In wave Installation cabinet 80.Ultrasonic brazing unit 500 includes ultrasonic wave holder 510, ultrasonic bonding ontology 520, welding fixture 530 And jig 540 is accepted, ultrasonic wave holder 510 is fixed in ultrasonic wave Installation cabinet 80, and ultrasonic bonding ontology 520, welding are controlled Tool 530 and undertaking jig 540 are separately fixed on ultrasonic wave holder 510.Wherein, the neighbouring inspection material conveyer belt of welding fixture 530 200, jig 540 is accepted adjacent to welding fixture 530.Welding fixture 530 and the structure and product placing piece for accepting jig 540 110 structure is identical, is used to place product ontology 92.The plumb joint 521 of ultrasonic bonding ontology 520 is located at welding fixture 530 top.When ultrasonic bonding, plumb joint 521 is moved down abutted with product ontology 92 after, using supersonic welding principle by product The lid up and down of ontology 92 is welded into a whole.In the present embodiment, inspection material conveyer belt 200, welding fixture 530 and undertaking jig 540 are disposed adjacent successively, and under the action of lead screw transfer assembly 600, product ontology 92, product are taken out from inspection material conveyer belt 200 Ontology 92 after ultrasonic bonding, is removed and is placed on from welding fixture 530 and accept on jig 540 in welding fixture 530, Again from accept jig 540 take out to outside recycle be packaged processing or take out enter next laser marking processing unit in carry out it is next Step processing.In this way, completing the soldering of product easily and fast.
Further, to protect the outer surface of product ontology 92 from damage, also referring to Fig. 1, Fig. 3, Fig. 4, Fig. 5, Fig. 7 and Fig. 8, in an embodiment, band line ultrasonic bonding marking equipment further includes film rolling device 550, film rolling device 550 and ultrasound Wave soldering connection device 500 connects, and film rolling device 550 is used to carry out surface coating processing to pending band charging wire product, that is, rolls up Film device 550 is for filling pending band before the pending product with charging wire of 500 soldering of ultrasonic brazing unit Wire products carry out coating processing, so that ultrasonic brazing unit 500 is across the pending band charging wire of protective film soldering Product.Specifically, film rolling device 550 includes membrane machine 551, goes out deflector roll 552, film collecting roller 553 and film gatherer 554, membrane machine 551 and film gatherer 554 be set to the both sides of ultrasonic bonding ontology 520, go out deflector roll 552 and film collecting roller 553 be respectively adjacent to welding First 521, protection film roll (not shown) is provided in membrane machine 551, protect the protective film of film roll from membrane machine 551 pull after successively It is sent into film gatherer 554 along deflector roll 552, plumb joint 521 and film collecting roller 553 is gone out.When ultrasonic bonding, when plumb joint 521 pushes Protection film roll is driven to push, protective film carries out surface coating processing to product ontology 92, that is, protects membrane cover in product ontology 92 On surface so that plumb joint 521 carries out ultrasonic welding across protective film to product ontology 92, to protect the outer of product ontology 92 Surface is from damage.It is appreciated that entire band line ultrasonic bonding marking equipment concentrates same control under the same controller When running, therefore plumb joint 521 can control to push each time, film gatherer 554 works the used protection of 521 lower section of plumb joint Film is changed to not used protective film, to protect the outer surface of product ontology 92 from damage.
Also referring to Fig. 1, Fig. 3, Fig. 4, Fig. 5, Fig. 7 and Fig. 9, in an embodiment, lead screw transfer assembly 600 is respectively adjacent to The discharge end and ultrasonic brazing unit 500 of inspection material conveyer belt 200 are arranged, and lead screw transfer assembly 600 will be for that will be located at inspection material The pending band charging wire product of the discharge end of conveyer belt 200 is removed and placed in ultrasonic brazing unit 500, lead screw transmission group Part 600 is additionally operable to complete to weld and the pending band charging wire product in ultrasonic brazing unit 500 takes out.Specifically , lead screw transfer assembly 600 includes the first screw component 610, the second screw component 620, third screw component 630 and lead screw Power plant 640, lead screw power plant 640 are fixed in ultrasonic wave Installation cabinet 80.First screw component 610, the second lead screw group Part 620, third screw component 630 are connect with lead screw power plant 640 respectively, and lead screw power plant 640 is uniformly controlled first Bar assembly 610, the second screw component 620, third screw component 630 are run so that the first screw component 610, the second lead screw group Part 620, third screw component 630 synchronously take out product ontology 92 from inspection material conveyer belt 200, take out and produce from welding fixture 530 Product ontology 92 and from accept jig 540 take out product ontology 92.
Also referring to Fig. 1, Fig. 3, Fig. 4, Fig. 5, Fig. 7, Fig. 9 and Figure 10, in an embodiment, band line ultrasonic bonding mark Equipment further includes clamp device 650, and clamp device 650 is set between plug driver-extractor 400 and lead screw transfer assembly 600, Clamp device 650 is used to take out through the pending band charging wire product that test is defective products that is powered.In the present embodiment, gripping dress Set 650 sides for being fixed on inspection material conveyer belt 200.Further, clamp device 650 includes gripping holder 651, horizontal gripping gas Cylinder 652, vertical gripping cylinder 653 and gripping fixture 654, gripping holder 651 are such as fixed on inspection material and pass for being fixed on outside Send the side of band 200.Level gripping cylinder 652 is connect with gripping holder 651, vertical to grip cylinder 653 and horizontal gripping cylinder 652 connections, gripping fixture 654 are connect with vertical gripping cylinder 653, and gripping fixture 654 is through the test that is powered for controlled take out The pending band charging wire product of defective products, specifically, horizontal gripping cylinder 652 can realize the movement of horizontal direction, vertically Gripping cylinder 653 can realize that the movement of vertical direction, i.e., horizontal gripping cylinder 652 and vertical gripping cylinder 653 form a class Like the movement road strength of reference axis so that gripping fixture 654 can move in the horizontal and vertical directions.In this way, gripping fixture 654 will The pending band charging wire product that test is defective products that is powered takes out in time, it is made not enter ultrasonic brazing unit 500, Soldering efficiency has also been correspondingly improved while saving welding resource.
Further, gripping fixture includes scene 2 feed collet pawl, and scene 2 feed collet pawl is oppositely arranged, and scene 2 feed collet pawl is for controlled It is common to take out through the pending band charging wire product that test is defective products that is powered.Further, gripping fixture further includes two folders Sub- rubber cushion, each clip rubber cushion are correspondingly arranged on a discharging clamping jaw, and two clip rubber cushions are oppositely arranged.In this way, by two Rubber cushion is arranged in the clamping jaw that discharges, and can cause to damage to avoid the outer surface with charging wire product for treating processing, makes it can be into one Put into production line again after step reparation.
The be powered pending band charging wire product that test is defective products, further, band are placed for ease of unified collect Line ultrasonic bonding marking equipment further includes collecting basin, the neighbouring gripping fixture setting of basin is collected, for collecting from gripping fixture Through be powered test be defective products pending band charging wire product.In this way, in the case where the unified collection for collecting basin is handled, it can be with Row is uniformly processed again after collecting basin and filling, and improves efficiency.
Also referring to Fig. 1, Fig. 3, Fig. 4, Fig. 9, Figure 10 and Figure 11, in an embodiment, band line ultrasonic bonding mark is set It is standby to further include:Discharge jig 810, discharge belt 820 and marking device 830, and lead screw transfer assembly 600 is respectively adjacent to inspection material The discharge end and ultrasonic brazing unit 500 of conveyer belt 200 are arranged, and lead screw transfer assembly 600 will be for that will be located at inspection material transmission Pending band charging wire product with 200 discharge end is removed and placed in ultrasonic brazing unit 500, lead screw transfer assembly 600 are additionally operable to the pending band charging wire product for completing to weld and be located in ultrasonic brazing unit 500 being removed and placed in On the discharging jig 810 of the feeding end of discharge belt 820.Marking device 830 is set to 200 side of inspection material conveyer belt, For carrying out laser marking processing to the pending band charging wire product being positioned on discharging jig 810.It is accessible to pass through group Part 700 is used to make the pending charging wire with charging wire product in the feeding end and discharge belt 820 of inspection material conveyer belt 200 Discharge end between pass unopposed through, inspection material conveyer belt 200 discharge end and ultrasonic brazing unit 500 between, discharging pass Send between the feeding end of band 820 and ultrasonic brazing unit 500 and the side of discharge belt 820 be respectively arranged with it is accessible Pass through component 700.
In this way, carrying pending band charging wire product by being used to weld with line jig 100, i.e. the pending band fills Wire products have charging wire.It is used to coordinate this to charge to the pending band with line jig 100 by power-on test device 300 Line product carries out energization test, and through being powered, the pending band charging wire product that test is defective products can be pulled out being risen by plug It is removed after device 400 so that it is into ultrasonic brazing unit 500 is all non-defective unit, and then improves welding efficiency.Pass through mark Device 830 is used to carry out laser mark processing to the pending band charging wire product being positioned on discharging jig 810, from And it completes to complete welding and mark operation together on same production line.It by component 700 is used to that this to be made to wait locating by accessible The charging wire with charging wire product of reason can expect the discharge end of conveyer belt 200 between the discharge end of discharge belt 820 from inspection It passing unopposed through without card line obstacle so that band charging wire product also can be soldered processing through automatic production line, To improve the production efficiency that the automated ultrasonic with line product welds mark operation.
Discharging jig 810 is set on discharge belt 820.The similar band line jig 100 of structure of discharging jig 810, The difference is that discharging jig 810 only includes the structure of the product placing piece 110 with line jig 100.The structure of discharge belt 820 Expect conveyer belt 200 similar to inspection.In the present embodiment, band line ultrasonic bonding marking equipment is additionally provided with laser Installation cabinet 70, goes out Material conveyer belt 820 and marking device 830 are respectively mounted and are fixed in laser Installation cabinet 70.Laser Installation cabinet 70 is installed with ultrasonic wave Cabinet 80 is disposed adjacent.In this way, under the action of lead screw transfer assembly 600, synchronously product ontology is taken out from inspection material conveyer belt 200 92, it takes out product ontology 92 from welding fixture 530 and takes out product ontology 92 from jig 540 is accepted, that is, synchronize product sheet Body 92 is put into ultrasonic brazing unit 500 from the inspection material taking-up of conveyer belt 200, and is put into out from the taking-up of ultrasonic brazing unit 500 Expect in the discharging jig 810 on conveyer belt 820.
To avoid the charging wire (not shown) card to fall off from test block 120 from influencing the weld of product in the production line Reason, in an embodiment, it is accessible by component 700 include first it is accessible by part 710, second it is accessible by part 720 with And third is accessible passes through part 730.The first accessible discharge end and ultrasonic wave that inspection material conveyer belt 200 is set to by part 710 Between welder 500, the second accessible feeding end and supersonic welding tipping that discharge belt 820 is set to by part 720 Between setting 500, the accessible side that discharge belt 820 is set to by part 730 of third.First accessible passes through 710 He of part Second it is accessible by part 720 be platy structure.First it is accessible by part 710 and with it is second accessible equal by part 720 It is fixed in ultrasonic wave Installation cabinet 80.Further, first accessible is fixed on ultrasonic brazing unit by 710 one end of part 500, the discharge end of the neighbouring inspection material conveyer belt 200 of the other end.Further, second it is accessible be fixed on by 720 one end of part it is super Sound wave welder 500, the other end is adjacent to the accessible end by part 730 of third.Further, first accessible passes through part 710, it second accessible is located along the same line by part 730 by the way that part 720 and third are accessible.In this way, passing through the first nothing Obstacle can make band charging wire product by the way that part 720 and third are accessible by the way that part 710, second is accessible by part 730 90 can successfully between the discharge end and ultrasonic brazing unit 500 of inspection material conveyer belt 200, discharge belt 820 enters Expect between end and ultrasonic brazing unit 500 and the side of discharge belt 820 is moved without being stuck, to improve weldering Connect the efficiency of processing and the efficiency of laser marking processing.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of band line ultrasonic bonding marking equipment, which is characterized in that including:Band line jig, inspection material conveyer belt, be powered test Device, plug driver-extractor, ultrasonic brazing unit, lead screw transfer assembly, discharging jig, discharge belt, marking device and It is accessible by component,
It is described to be set on the inspection material conveyer belt with line jig and for placing pending band charging wire product, the band line The socket of jig is used to plug the plug of the pending charging wire with charging wire product;
The power-on test device is set to inspection material conveyer belt side, is used for described with the described pending of line jig Band charging wire product carries out energization test;
The plug driver-extractor is set to the inspection material conveyer belt side and is located at the power-on test device and the ultrasound Between wave soldering connection device, it to be used for plug of the plug on the socket with line jig;
The ultrasonic brazing unit is used for pending described in soldering adjacent to the discharge end setting of the inspection material conveyer belt Band charging wire product;
The lead screw transfer assembly is respectively adjacent to discharge end and the ultrasonic brazing unit setting of the inspection material conveyer belt, The lead screw transfer assembly is used to be located at the inspection and expects that the pending band charging wire product of the discharge end of conveyer belt takes Go out and be put into the ultrasonic brazing unit, the lead screw transfer assembly is additionally operable to complete to weld and is located at the supersonic welding Described in connection device pending is removed and placed in charging wire product described in the feeding end positioned at the discharge belt It discharges on jig;
The marking device is set to the side of the inspection material conveyer belt, for waiting for described in being positioned on the discharging jig The band charging wire product of processing carries out laser marking processing;
It is described it is accessible by component for make the pending charging wire with charging wire product the inspection material conveyer belt Feeding end and the discharge belt discharge end between pass unopposed through, it is described inspection material conveyer belt discharge end with it is described Between ultrasonic brazing unit, between the feeding end of the discharge belt and the ultrasonic brazing unit and the discharging The side of conveyer belt, which is respectively arranged with, described accessible passes through component.
2. band line ultrasonic bonding marking equipment according to claim 1, which is characterized in that further include clamp device, institute It states clamp device to be set between the plug driver-extractor and the lead screw transfer assembly, the clamp device is passed through for taking out Be powered the pending band charging wire product that test is defective products.
3. band line ultrasonic bonding marking equipment according to claim 1, which is characterized in that the band line jig includes setting It is placed in the product placing piece and test block on the inspection material conveyer belt and being connected, the pending band charging wire product is put It is placed on the product placing piece, there is the test block socket, the plug of the charging wire to be inserted on the socket.
4. band line ultrasonic bonding marking equipment according to claim 3, which is characterized in that the power-on test device packet Jig for pressing, the first measurement jig and the second measurement jig are included, the jig for pressing is used for before the test that is powered described in pressing Pending band charging wire product, first measurement jig are used for and pending electrically the connecting with charging wire product It connects, second measurement jig is used to be electrically connected with the test block, first measurement jig and second test Test loop is collectively formed in jig.
5. band line ultrasonic bonding marking equipment according to claim 4, which is characterized in that the jig for pressing, which has, to be pressed Pressure head, the press head are block made of flexible material, and the press head is used in pressing and the pending band Charging wire product abuts.
6. band line ultrasonic bonding marking equipment according to claim 1, which is characterized in that further include film rolling device, institute It states film rolling device to connect with the ultrasonic brazing unit, the film rolling device is used for the pending band charging wire product Surface coating processing is carried out, so that the ultrasonic brazing unit is across band charging wire pending described in protective film soldering Product.
7. band line ultrasonic bonding marking equipment according to any one of claim 1 to 6, which is characterized in that the nothing Obstacle includes first accessible accessible passing through part by the way that part and third are accessible by part, second by component;Described One it is accessible by part be set to it is described inspection material conveyer belt discharge end and the ultrasonic brazing unit between, second nothing Obstacle is set to by part between the feeding end of the discharge belt and the ultrasonic brazing unit, and the third is accessible The side of the discharge belt is set to by part.
8. band line ultrasonic bonding marking equipment according to claim 7, which is characterized in that described first accessible passes through The ultrasonic brazing unit, discharge end of the other end adjacent to the inspection material conveyer belt are fixed in part one end.
9. band line ultrasonic bonding marking equipment according to claim 8, which is characterized in that described second accessible passes through The ultrasonic brazing unit is fixed in part one end, and the other end is adjacent to the accessible end by part of the third.
10. band line ultrasonic bonding marking equipment according to claim 9, which is characterized in that described first is accessible logical Cross part, described second accessible by part and the third is accessible is located along the same line by part.
CN201810698616.9A 2018-06-29 2018-06-29 Ultrasonic welding marking device with wires Active CN108788440B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810698616.9A CN108788440B (en) 2018-06-29 2018-06-29 Ultrasonic welding marking device with wires

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810698616.9A CN108788440B (en) 2018-06-29 2018-06-29 Ultrasonic welding marking device with wires

Publications (2)

Publication Number Publication Date
CN108788440A true CN108788440A (en) 2018-11-13
CN108788440B CN108788440B (en) 2020-12-04

Family

ID=64073640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810698616.9A Active CN108788440B (en) 2018-06-29 2018-06-29 Ultrasonic welding marking device with wires

Country Status (1)

Country Link
CN (1) CN108788440B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111843221A (en) * 2019-04-23 2020-10-30 大族激光科技产业集团股份有限公司 Non-intermittent assembly line laser marking device and using method thereof
CN112976589A (en) * 2021-02-23 2021-06-18 赣州欧翔电子有限公司 Ultrasonic welding device and ultrasonic welding method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050210670A1 (en) * 2001-11-24 2005-09-29 Delphi Technologies, Inc. Wire loader
CN104227422A (en) * 2014-09-10 2014-12-24 东莞市冠佳电子设备有限公司 Automatic testing, riveting and laser carving production line for wired charger
CN104494138A (en) * 2014-12-09 2015-04-08 深圳市共进电子股份有限公司 Film coiling machine for ultrasonic butt fusion and ultrasonic butt fusion method
CN204773576U (en) * 2015-07-15 2015-11-18 惠州市壹品科技有限公司 Automatic ultrasonic bonding machine of band wire product
CN105899062A (en) * 2016-05-19 2016-08-24 东莞市冠佳电子设备有限公司 Automatic production technology with wired charger
CN206124235U (en) * 2016-08-12 2017-04-26 惠州市壹品科技有限公司 Ultrasonic testing laser machine
CN207043546U (en) * 2017-08-10 2018-02-27 深圳市新能基科技有限公司 A kind of welding marking production line for power supply adaptor
CN108176921A (en) * 2018-03-12 2018-06-19 深圳市兴禾自动化有限公司 A kind of power supply automatic assembling bonding machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050210670A1 (en) * 2001-11-24 2005-09-29 Delphi Technologies, Inc. Wire loader
CN104227422A (en) * 2014-09-10 2014-12-24 东莞市冠佳电子设备有限公司 Automatic testing, riveting and laser carving production line for wired charger
CN104494138A (en) * 2014-12-09 2015-04-08 深圳市共进电子股份有限公司 Film coiling machine for ultrasonic butt fusion and ultrasonic butt fusion method
CN204773576U (en) * 2015-07-15 2015-11-18 惠州市壹品科技有限公司 Automatic ultrasonic bonding machine of band wire product
CN105899062A (en) * 2016-05-19 2016-08-24 东莞市冠佳电子设备有限公司 Automatic production technology with wired charger
CN206124235U (en) * 2016-08-12 2017-04-26 惠州市壹品科技有限公司 Ultrasonic testing laser machine
CN207043546U (en) * 2017-08-10 2018-02-27 深圳市新能基科技有限公司 A kind of welding marking production line for power supply adaptor
CN108176921A (en) * 2018-03-12 2018-06-19 深圳市兴禾自动化有限公司 A kind of power supply automatic assembling bonding machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111843221A (en) * 2019-04-23 2020-10-30 大族激光科技产业集团股份有限公司 Non-intermittent assembly line laser marking device and using method thereof
CN112976589A (en) * 2021-02-23 2021-06-18 赣州欧翔电子有限公司 Ultrasonic welding device and ultrasonic welding method thereof

Also Published As

Publication number Publication date
CN108788440B (en) 2020-12-04

Similar Documents

Publication Publication Date Title
CN106058293B (en) Battery pack automatic assembly equipment
CN105098254B (en) Metal-back power battery pack wiring and packaging technology
CN204885322U (en) Metal -back power battery assembly line
CN103920962B (en) Electronic component automatic welding producing equipment
CN108788440A (en) Band line ultrasonic bonding marking equipment
US10189118B2 (en) Method and apparatus for evaluating an ultrasonic weld junction
CN104708194B (en) Clamp force and alignment checking device
CN107367654B (en) A kind of supercapacitor ageing testing method
KR20170062402A (en) Pouch sealing apparatus for secondary battery production equipment
CN108362739B (en) Device for detecting welding quality of battery and method for detecting welding quality of battery
CN210865934U (en) Ox horn electric capacity ageing oven and full-automatic ox horn electric capacity process control ageing machine
CN108176921A (en) A kind of power supply automatic assembling bonding machine
CN105899062A (en) Automatic production technology with wired charger
CN109332894A (en) The welding method of battery modules
CN208575374U (en) Band line ultrasonic wave automatic welding equipment
CN109759792A (en) High-power offshore wind farm drives generator support manufacturing process and tooling with straight
CN106058602A (en) Wire arranging device
CN208172196U (en) It is a kind of for testing the automatic test machine of electric toothbrush internal component
CN215880923U (en) Six-axis robot feeding and discharging mechanism
CN115070386A (en) Automatic assembling equipment for reed and gear cover
CN211359704U (en) Full-automatic ox horn capacitor process monitoring aging machine
CN215515442U (en) Feeding device for welding
CN110947648B (en) Full-automatic ox horn capacitor aging data monitoring and testing method
CN105643162B (en) Footing bonding machine
CN104339104A (en) Automatic spot welding machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant