CN108788227A - A kind of tube wall finishing attachment device - Google Patents
A kind of tube wall finishing attachment device Download PDFInfo
- Publication number
- CN108788227A CN108788227A CN201810576456.0A CN201810576456A CN108788227A CN 108788227 A CN108788227 A CN 108788227A CN 201810576456 A CN201810576456 A CN 201810576456A CN 108788227 A CN108788227 A CN 108788227A
- Authority
- CN
- China
- Prior art keywords
- plate
- turntable
- steel pipe
- motor
- rack
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B41/00—Boring or drilling machines or devices specially adapted for particular work; Accessories specially adapted therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B47/00—Constructional features of components specially designed for boring or drilling machines; Accessories therefor
- B23B47/26—Liftable or lowerable drill heads or headstocks; Balancing arrangements therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/02—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for mounting on a work-table, tool-slide, or analogous part
- B23Q3/06—Work-clamping means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q7/00—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting
- B23Q7/05—Arrangements for handling work specially combined with or arranged in, or specially adapted for use in connection with, machine tools, e.g. for conveying, loading, positioning, discharging, sorting by means of roller-ways
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Drilling And Boring (AREA)
Abstract
The invention discloses a kind of tube walls to modify attachment device, it is characterized in that, the finishing attachment device includes bottom plate, left plate, top plate, borehole drill construction, fixed mechanism and turns to elevating mechanism, left plate bottom is vertically connected on the upper surface of bottom plate, it is equipped with top plate at the top of left plate, top plate is parallel with bottom plate, and borehole drill construction is equipped between top plate and bottom plate, fixed mechanism is installed on the right side of plate upper surface, is equipped between fixed mechanism and bottom plate and turns to elevating mechanism.Drill precise holes may be implemented in the present invention and welding positions.
Description
Technical field
The invention belongs to technical fields of mechanical processing, and in particular to a kind of tube wall finishing attachment device.
Background technology
Pipeline is to be used to convey gas, liquid or with solid particle with what pipe, pipe connector and valve etc. were connected into
Fluid device.In general, after the superchargings such as air blower, compressor, pump and boiler, low pressure is flowed to from the high pressure of pipeline for fluid
Pressure or the gravity conveying of fluid itself can also be used in place.Having many uses for pipeline is general, be used primarily in water supply, draining, heat supply,
It gives gas, in long distance delivery oil and natural gas, agricultural irrigation, hydraulic engineering and various commercial plants.It was processing
It is frequently necessary to vertical connection between pipeline and pipeline being arranged in journey, needing finishing and positioning to put during traditional processing is
Separated, influence processing efficiency, it is therefore necessary to design a kind of novel finishing attachment device.
Invention content
According to the above-mentioned deficiencies of the prior art, the technical problem to be solved by the present invention is to propose a kind of tube wall finishing connection
Device by bottom plate, left plate, top plate, borehole drill construction, fixed mechanism and turns to elevating mechanism, solves conventional machining device
The problem of the inaccurate positioning trouble of processing, has the characteristics that simple in structure easy to use.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of tube wall finishing attachment device includes
Bottom plate, left plate, top plate, borehole drill construction, fixed mechanism and steering elevating mechanism, left plate bottom is vertically connected on the upper of bottom plate
Surface is equipped with top plate at the top of left plate, and top plate is parallel with bottom plate, and borehole drill construction, bottom are equipped between top plate and bottom plate
Fixed mechanism is installed on the right side of plate upper surface, is equipped between fixed mechanism and bottom plate and turns to elevating mechanism.
As a preferred embodiment, the borehole drill construction is by drilling equipment, the first support plate, the first strut, steel
Pipe clamping device, clamper, steel pipe placing groove, the second support plate, first support bar, steel pipe composition, the drilling equipment are vertical
On the right side of top plate bottom, first support plate one end is vertically mounted on left plate by way of being welded to connect
On right side, the top vertical welding of the other end and the first strut, bottom and the steel pipe clamping device of first strut match
It closes, the clamper is mounted on steel pipe clamping device, and second support plate is vertically mounted on steering by first support bar
On the top of elevating mechanism, second support plate is located at the underface of drilling equipment, and the steel pipe placing groove is connected by bolt
The mode connect is vertically mounted on the top of the second support plate, and the fixed mechanism is located at the right end of the second support plate, is turned to and is risen
The top of falling unit.Drilling equipment is by the first sliding rail, the first sliding block, limited block, the first spring, the second strut, first gear,
One motor, the first rack, the second motor, connecting plate, drilling rod composition, the first sliding rail top are vertically mounted on the bottom of top plate
On, bottom is vertically installed with limited block, is connected at the top of first spring one end and the first rack, the other end and top plate
Bottom is connected, and first rack is slidably matched by the first sliding block and the first sliding rail, first rack bottom with connect
Plate vertical welding, the first motor are equipped with drilling rod, the first motor company of being vertically mounted on by bolted connection
The bottom vertical welding of the bottom of fishplate bar, second strut one end and top plate, the other end and first motor vertical connection, it is described
First gear is connected by key with the output shaft of first motor.Steel pipe clamping device is by second gear, third motor, the second tooth
Item, the second sliding rail, the second sliding block, third support plate, second support bar composition, the third support plate are hung down by second support bar
The straight left side at the top of bottom plate, second sliding rail are vertically mounted on the top of third support plate by bolted connection
In portion, second rack is slidably matched by the second sliding block and the second sliding rail, and the second gear passes through key and third motor
Output be connected, the second gear is meshed with the second rack, one end of second rack and clamper vertical welding.
Clamper is made of clamping disk, fixed disc, T-bar, guide sleeve, circular arc intermediate plate, locating shaft, second spring, the clamping disk
It is equipped with fixed disc, the upper and lower ends of the fixed disc are all opened there are one through-hole, and guide sleeve, the T are equipped on through-hole
Type bar is equipped with second spring through guide sleeve and circular arc intermediate plate vertical welding between the circular arc intermediate plate and fixed disc.It is fixed
Mechanism is made of support base, bearing, binding clasp, connecting shaft, supporting rack, hand-operated device, the first screw rod, the second screw rod, idler wheel, described
Support base is arranged symmetrically, and the support base is vertically mounted on the rear and front end turned at the top of elevating mechanism, on the support base
Bearing, the inner ring interference fit of first screw rod one end and bearing are installed, the other end passes through connecting shaft and the second screw rod
One end is connected, and the other end of second screw rod is connected with hand-operated device, and the binding clasp is arranged symmetrically, first spiral shell
Binding clasp is fitted on bar and the second screw rod, the idler wheel is mounted on supporting rack, and the idler wheel is rolled with connecting shaft to be coordinated.
Binding clasp is arranged symmetrically, and the binding clasp is made of nut seat, movable plate, connecting rod, buffer stopper, clamp clip, the movement
Board bottom portion is equipped with nut seat, and the nut seat is connect with the first screw rod, the second screw flight, and the clamp clip passes through connecting rod
It is connected at the top of movable plate, buffer stopper is installed on the clamp clip.Turn to lifting gear include the first turntable, second turn
Disk, elevating lever and locating fastener, the first turntable and the second turntable are horizontally disposed, are equipped with and rise between the first turntable and the second turntable
Bar drops, and elevating lever bottom end and the upper surface rotation of the first turntable are arranged, and the top of elevating lever and the lower surface of the second turntable rotate
Setting, the first turntable are arranged in the upper surface of bottom plate, and locating fastener is equipped between the first turntable and the second turntable.
Present invention has the advantages that:The present invention will need the steel pipe processed to be placed on steel pipe placing groove, one end and clamping
Device matches, and the T-bar on clamper is up lifted, and second spring is compressed, when one end of steel pipe is placed on circular arc intermediate plate
When lower section, T-bar is unclamped, second spring restores elastic property, circular arc intermediate plate is pressed downward, one end of steel pipe is fixed;Steel
The other end of pipe is placed between binding clasp, rotates clockwise hand-operated device, and the first screw rod is rotated clockwise with the second screw rod, respectively
So that the movable plate that nut seat drives the right and left is moved toward one another, and then make the clamp clip on both sides to the close clamping of steel pipe, by steel
The other end of pipe is fixed, and steel pipe can be firmly fixed on steel pipe placing groove by so fixed mode in both ends;At this point, opening
Dynamic second motor rotation, the second motor drive drilling rod high speed rotation, start first motor and rotate forward, first motor drives first gear
It rotates clockwise, first meshed the second motor of rack drives moves downward slowly, and drilling rod is made to bore steel pipe
Hole;After being drilled hole, first motor is made to invert, drilling rod is risen, when needing to boring multiple holes on steel pipe the same line, by steel pipe
The other end unclamp, start third motor reversal, third motor drive second gear rotation, second gear push it is meshed
The second rack fed to the right on the second sliding rail, to push steel pipe to move right, drilling rod is facilitated to be processed it.When
A piece pipeline processing is good and then retightens second steel pipe, processes the end of steel pipe, and camber structure adds by between
The good pipeline of work is clamped in rotation on clamping device and turns to elevating mechanism, and the head of second pipe is aligned to the drilling position of first pipe
Realization positioning is set, and realizes positioning by welding.
Description of the drawings
The content expressed by this specification attached drawing and the label in figure are briefly described below:
Fig. 1 is the structural schematic diagram of the first of front view of the present invention;
Fig. 2 is second of structural schematic diagram of front view of the present invention;
Fig. 3 is the holder structure schematic diagram of the present invention;
Fig. 4 is the first full cross-sectional view of fixed mechanism right view of the present invention;
Fig. 5 is second of full cross-sectional view of fixed mechanism right view of the present invention.
Wherein, bottom plate -1, left plate -2, top plate -3, borehole drill construction -4, fixed mechanism -5, steering elevating mechanism -6, drilling
Device -41, the first support plate -42, the first strut -43, steel pipe clamping device -44, clamper -45, steel pipe placing groove -46,
Two support plates -47, first support bar -48, steel pipe -49, the first sliding rail -411, the first sliding block -412, limited block -413, the first bullet
Spring -414, the second strut -415, first gear -416, first motor -417, the first rack -418, the second motor -419, connection
Plate -4110, drilling rod -4111, second gear -441, third motor -442, the second rack -443, the second sliding rail -444, second are slided
Block -445, second support bar -447, clamps disk -451, fixed disc -452, T-bar -453, is oriented to third support plate -446
Set -454, circular arc intermediate plate -455, locating shaft -456, second spring -457, support base -51, bearing -52, binding clasp -53, connection
Axis -54, supporting rack -55, hand-operated device -56, the first screw rod -57, the second screw rod -58, idler wheel -59, nut seat -531, movable plate -
532, connecting rod -533, buffer stopper -534, clamp clip -535.
Specific implementation mode
Below against attached drawing, by the description of the embodiment, each component that the specific implementation mode of the present invention is for example involved
Shape, construction, the mutual alignment and connection relation between each section, the effect of each section and operation principle, manufacturing process and
Operate with method etc., is described in further detail, to help those skilled in the art to inventive concept of the invention, technology
Scheme has more complete, accurate and deep understanding.
As shown in Figs. 1-5, a kind of tube wall finishing attachment device includes bottom plate 1, left plate 2, top plate 3, borehole drill construction 4, consolidates
Determine mechanism 5 and turn to elevating mechanism 6,2 bottom of left plate is vertically connected on the upper surface of bottom plate 1, is equipped at the top of left plate 2
Top plate 3, top plate 3 is parallel with bottom plate 1, is equipped with borehole drill construction 4 between top plate 3 and bottom plate 1, on the right side of 1 upper surface of bottom plate
Fixed mechanism 5 is installed, is equipped between fixed mechanism 5 and bottom plate 1 and turns to elevating mechanism 6.
Borehole drill construction includes drilling equipment 41, the first support plate 42, the first strut 43, steel pipe clamping device 44, clamper
45, steel pipe placing groove 46, the second support plate 47 and first support bar 48, the drilling equipment 41 are vertically mounted on 3 bottom of top plate
Right side on, described first support plate, 42 one end is vertically mounted on by way of being welded to connect on the right side of left plate 2, separately
The bottom of the top vertical welding of one end and the first strut 43, first strut 43 is matched with steel pipe clamping device 44, institute
Clamper 45 is stated on steel pipe clamping device 44, second support plate 47 is vertically mounted on by first support bar 48 to be turned
To on the top of elevating mechanism 6, second support plate 47 is located at the underface of drilling equipment 41, and the steel pipe placing groove 46 is logical
It crosses bolted mode to be vertically mounted on the top of the second support plate 47, the fixed mechanism 5 is located at the second support plate 47
Right end, the steel pipe 49 is located on steel pipe placing groove 46, the drilling equipment 41 by the first sliding rail 411, the first sliding block 412,
Limited block 413, the first spring 414, the second strut 415, first gear 416, first motor 417, first the 418, second electricity of rack
Machine 419, connecting plate 4110, drilling rod 4111 form, and first sliding rail, 411 top is vertically mounted on the bottom of top plate 3, bottom
It is vertically installed with limited block 413, described first spring, 414 one end is connected with the top of the first rack 418, the other end and top plate
3 bottom is connected, and first rack 418 is slidably matched by the first sliding block 412 and the first sliding rail 411, first tooth
418 bottom of item and 4110 vertical welding of connecting plate, the first motor 417 are equipped with drilling rod 4111, and the first motor 417 is logical
The bottom that bolted mode is vertically mounted on connecting plate 4110 is crossed, described second strut, 415 one end and the bottom of top plate 3 are hung down
Straight welding, the other end and 417 vertical connection of first motor, the output shaft that the first gear 416 passes through key and first motor 417
It is connected.
Steel pipe clamping device 44 is by second gear 441, third motor 442, the second rack 443, the second sliding rail 444, second
Sliding block 445, third support plate 446, second support bar 447 form, and the third support plate 446 is hung down by second support bar 447
The straight left side mounted on 1 top of bottom plate, second sliding rail 444 are vertically mounted on third support plate by bolted connection
On 446 top, second rack 443 is slidably matched by the second sliding block 445 and the second sliding rail 444, the second gear
441 are connected by key with the output of third motor 442, and the second gear 441 is meshed with the second rack 443, and described
One end of two racks 443 and 45 vertical welding of clamper,
Clamper 45 is by clamping disk 451, fixed disc 452, T-bar 453, guide sleeve 454, circular arc intermediate plate 455, locating shaft
456, second spring 457 forms, and the clamping disk 451 is equipped with fixed disc 452, the upper and lower ends of the fixed disc 452
It all opens there are one through-hole, guide sleeve 454 is installed on through-hole, the T-bar 453 hangs down through guide sleeve 454 and circular arc intermediate plate 455
Straight welding, is equipped with second spring 457, the fixed disc 452 and steel pipe between the circular arc intermediate plate 455 and fixed disc 452
49 one end is fixedly connected,
The other end of steel pipe 49 is connected with fixed mechanism 5, and the fixed mechanism 5 is by support base 51, bearing 52, binding clasp
53, connecting shaft 54, supporting rack 55, hand-operated device 56, the first screw rod 57, the second screw rod 58, idler wheel 59 form, and the support base 51 is
It is symmetrical arranged, the support base 51 is vertically mounted on the rear and front end for turning to 6 top of elevating mechanism, is installed on the support base 51
There are bearing 52, described first screw rod, 57 one end and the inner ring of bearing 52 to be interference fitted, the other end passes through connecting shaft 54 and the second spiral shell
One end of bar 58 is connected, and the other end of second screw rod 58 is connected with hand-operated device 56, and the binding clasp 53 is symmetrically to set
It sets, binding clasp 53 is fitted on first screw rod, 57 and second screw rod 58, the idler wheel 59 is mounted on supporting rack 55, institute
It states idler wheel 59 and is rolled with connecting shaft 54 and coordinated, the binding clasp 53 is arranged symmetrically, and the binding clasp 53 is by nut seat 531, shifting
Movable plate 532, connecting rod 533, buffer stopper 534, clamp clip 535 form, and 532 bottom of the movable plate is equipped with nut seat 531, institute
It states nut seat 531 to be threadedly coupled with the first screw rod 57, the second screw rod 58, the clamp clip 535 passes through connecting rod 533 and movable plate
532 top is connected, and buffer stopper 534 is equipped on the clamp clip 535, and first screw rod 57 is equipped with left-hand thread, institute
It states the second screw rod 58 and is equipped with right-hand thread, first screw rod, 57 and second screw rod 58 is on same axis.
It includes the first turntable, the second turntable, elevating lever and locating fastener, the first turntable and second turn to turn to elevating mechanism 6
Disk is horizontally disposed, and elevating lever is equipped between the first turntable and the second turntable, and elevating lever bottom end and the upper surface of the first turntable turn
Dynamic setting, the top of elevating lever and the lower surface rotation of the second turntable are arranged, and the first turntable is arranged in the upper surface of bottom plate, the
Locating fastener is equipped between one turntable and the second turntable.
The steel pipe 49 processed will be needed to be placed on steel pipe placing groove 46, one end is matched with clamper 45, clamper
T-bar 453 on 45 up lifts, and second spring 457 is compressed, when one end of steel pipe 49 is placed on 455 lower section of circular arc intermediate plate
When, T-bar 453 is unclamped, second spring 457 restores elastic property, circular arc intermediate plate 455 is pressed downward, one end of steel pipe 49 is consolidated
It lives calmly;The other end of steel pipe 49 is placed between binding clasp 53, rotates clockwise hand-operated device 56, the first screw rod 57 and the second screw rod
58 rotate clockwise, and respectively move toward one another the movable plate 532 that nut seat 531 drives the right and left, and then make the clamping on both sides
Close clamping of the piece 535 to steel pipe 49, the other end of steel pipe 49 is fixed, and so fixed mode in both ends can be by steel pipe 49
It is firmly fixed on steel pipe placing groove 46;At this point, starting the rotation of the second motor 419, the second motor 419 drives drilling rod 4111 high
Speed rotation starts first motor 417 and rotates forward, and first motor 417 drives first gear 416 to rotate clockwise, meshed
First rack 418 drives the second motor 419 to move downward slowly, and drilling rod 4111 is made to drill steel pipe 49;After being drilled hole,
So that first motor 417 is inverted, drilling rod 4111 is risen, when needing to boring multiple holes on 49 the same line of steel pipe, by steel pipe 49
The other end unclamp, start third motor 442 and invert, third motor 442 drives second gear 441 to rotate, and second gear 441 pushes away
The second meshed rack 443 is moved to feed to the right on the second sliding rail 444, it is convenient to push steel pipe 49 to move right
Drilling rod 4111 is processed it.When first pipeline processing is good and then newly fixes second steel pipe 49 again, steel is processed
The end of pipe, camber structure process pipeline by between and are clamped in rotation steering elevating mechanism 6 on clamping device, by second
The bore position of the head alignment first pipe of pipeline realizes positioning, and realizes positioning by welding.
The present invention is exemplarily described above in conjunction with attached drawing, it is clear that the present invention implements not by aforesaid way
Limitation, as long as the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress is used, or without changing
Other occasions are directly applied to by the design of the present invention and technical solution, within protection scope of the present invention.This hair
Bright protection domain should be determined by the scope of protection defined in the claims.
Claims (8)
1. a kind of tube wall modifies attachment device, which is characterized in that the finishing attachment device include bottom plate (1), left plate (2),
Top plate (3), borehole drill construction (4), fixed mechanism (5) and steering elevating mechanism (6), left plate (2) bottom is vertically connected on bottom plate
(1) upper surface is equipped with top plate (3) at the top of left plate (2), and top plate (3) is parallel with bottom plate (1), in top plate (3) and bottom plate
(1) borehole drill construction (4) is installed between, fixed mechanism (5) is installed on the right side of bottom plate (1) upper surface, in fixed mechanism (5)
It is equipped between bottom plate (1) and turns to elevating mechanism (6).
2. tube wall according to claim 1 modifies attachment device, which is characterized in that the borehole drill construction (4) is filled by drilling
Set (41), the first support plate (42), the first strut (43), steel pipe clamping device (44), clamper (45), steel pipe placing groove
(46), the second support plate (47), first support bar (48), steel pipe (49) composition, the drilling equipment (41) are vertically mounted on top
On the right side of plate (3) bottom, described first support plate (42) one end is vertically mounted on left plate (2) by way of being welded to connect
Right side on, the top vertical welding of the other end and the first strut (43), the bottom of first strut (43) is pressed from both sides with steel pipe
It holds device (44) to match, the clamper (45) is mounted on steel pipe clamping device (44), and second support plate (47) is logical
It crosses first support bar (48) to be vertically mounted on the top for turning to elevating mechanism (6), second support plate (47) is located at drilling
The underface of device (41), the steel pipe placing groove (46) are vertically mounted on the second support plate (47) by bolted connection
Top on, the fixed mechanism (5) is located at the right end of the second support plate (47), turns to the top of lifting gear.
3. tube wall according to claim 2 modifies attachment device, which is characterized in that the drilling equipment (41) is slided by first
Rail (411), the first sliding block (412), limited block (413), the first spring (414), the second strut (415), first gear (416),
First motor (417), the first rack (418), the second motor (419), connecting plate (4110), drilling rod (4111) composition, described the
It is vertically mounted on the bottom of top plate (3) at the top of one sliding rail (411), bottom is vertically installed with limited block (413), first bullet
It is connected at the top of spring (414) one end and the first rack (418), the other end is connected with the bottom of top plate (3), first tooth
Item (418) is slidably matched by the first sliding block (412) and the first sliding rail (411), the first rack (418) bottom and connecting plate
(4110) vertical welding, the first motor (417) are equipped with drilling rod (4111), and the first motor (417) is connected by bolt
The mode connect is vertically mounted on the bottom of connecting plate (4110), and described second strut (415) one end is vertical with the bottom of top plate (3)
Welding, the other end and first motor (417) vertical connection, the first gear (416) are defeated by key and first motor (417)
Shaft is connected.
4. tube wall according to claim 2 modifies attachment device, which is characterized in that the steel pipe clamping device (44) is by the
Two gears (441), third motor (442), the second rack (443), the second sliding rail (444), the second sliding block (445), third support
Plate (446), second support bar (447) composition, the third support plate (446) are vertically mounted on by second support bar (447)
Left side at the top of bottom plate (1), second sliding rail (444) are vertically mounted on third support plate by bolted connection
(446) on top, second rack (443) is slidably matched by the second sliding block (445) and the second sliding rail (444), described
Second gear (441) is connected by key with the output of third motor (442), the second gear (441) and the second rack
(443) it is meshed, one end and clamper (45) vertical welding of second rack (443).
5. tube wall according to claim 4 modifies attachment device, which is characterized in that the clamper (45) is by clamping disk
(451), fixed disc (452), T-bar (453), guide sleeve (454), circular arc intermediate plate (455), locating shaft (456), second spring
(457) it forms, the clamping disk (451) is equipped with fixed disc (452), and the upper and lower ends of the fixed disc (452) are all opened
There are one through-hole, guide sleeve (454) is installed, the T-bar (453) is through guide sleeve (454) and circular arc intermediate plate on through-hole
(455) vertical welding is equipped with second spring (457) between the circular arc intermediate plate (455) and fixed disc (452).
6. tube wall according to claim 1 modifies attachment device, which is characterized in that the fixed mechanism (5) is by support base
(51), bearing (52), binding clasp (53), connecting shaft (54), supporting rack (55), hand-operated device (56), the first screw rod (57), the second spiral shell
Bar (58), idler wheel (59) composition, the support base (51) are arranged symmetrically, and the support base (51) is vertically mounted on steering lifting
Rear and front end at the top of mechanism (6) is equipped with bearing (52), described first screw rod (57) one end and axis on the support base (51)
The inner ring interference fit of (52) is held, the other end is connected by connecting shaft (54) with one end of the second screw rod (58), and described second
The other end of screw rod (58) is connected with hand-operated device (56), and the binding clasp (53) is arranged symmetrically, first screw rod (57)
Be fitted with binding clasp (53) on the second screw rod (58), the idler wheel (59) is mounted on supporting rack (55), the idler wheel
(59) it rolls and coordinates with connecting shaft (54).
7. tube wall according to claim 6 modifies attachment device, which is characterized in that the binding clasp (53) is symmetrically to set
It sets, the binding clasp (53) is by nut seat (531), movable plate (532), connecting rod (533), buffer stopper (534), clamp clip
(535) it forming, movable plate (532) bottom is equipped with nut seat (531), the nut seat (531) and the first screw rod (57),
Second screw rod (58) be threadedly coupled, the clamp clip (535) by being connected at the top of connecting rod (533) and movable plate (532),
Buffer stopper (534) is installed on the clamp clip (535).
8. tube wall according to claim 1 modifies attachment device, which is characterized in that the steering lifting gear includes first
Turntable, the second turntable, elevating lever and locating fastener, the first turntable and the second turntable are horizontally disposed, in the first turntable and second turn
Elevating lever is equipped between disk, elevating lever bottom end and the upper surface rotation of the first turntable are arranged, the top of elevating lever and the second turntable
Lower surface rotation setting, the first turntable is arranged in the upper surface of bottom plate, and positioning is equipped between the first turntable and the second turntable
Buckle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810576456.0A CN108788227B (en) | 2018-06-06 | 2018-06-06 | Pipe wall trimming and connecting device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810576456.0A CN108788227B (en) | 2018-06-06 | 2018-06-06 | Pipe wall trimming and connecting device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108788227A true CN108788227A (en) | 2018-11-13 |
CN108788227B CN108788227B (en) | 2020-10-13 |
Family
ID=64087290
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810576456.0A Expired - Fee Related CN108788227B (en) | 2018-06-06 | 2018-06-06 | Pipe wall trimming and connecting device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108788227B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110064802A (en) * | 2019-05-29 | 2019-07-30 | 广东技术师范大学 | A kind of workpiece self-tapping industrial robot |
CN110280639A (en) * | 2019-06-06 | 2019-09-27 | 张家港市台和机械制造有限公司 | Material-supporting device in bending machine |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100069157A (en) * | 2008-12-16 | 2010-06-24 | 민승홍 | A hole drilling device of a long wood |
KR20110126233A (en) * | 2010-05-17 | 2011-11-23 | 김충호 | Apparatus for boring of valve sheet |
CN206415655U (en) * | 2016-12-23 | 2017-08-18 | 福建省霞浦县众源机械有限公司 | A kind of angle bar automatic drilling device of turning |
CN206500650U (en) * | 2016-11-15 | 2017-09-19 | 惠州市联达金电子有限公司 | A kind of Copper fabrication equidistant drilling machine of copper pipe |
CN206588369U (en) * | 2017-03-16 | 2017-10-27 | 江苏锐达科技有限公司 | A kind of one piece drilling equipment for solar energy mirror holder |
CN107717453A (en) * | 2017-10-20 | 2018-02-23 | 嘉善申乐五金塑料有限公司 | A kind of drilling and tapping machine people |
CN107830293A (en) * | 2017-10-12 | 2018-03-23 | 王建 | A kind of Pipe installing drilling equipment |
-
2018
- 2018-06-06 CN CN201810576456.0A patent/CN108788227B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20100069157A (en) * | 2008-12-16 | 2010-06-24 | 민승홍 | A hole drilling device of a long wood |
KR20110126233A (en) * | 2010-05-17 | 2011-11-23 | 김충호 | Apparatus for boring of valve sheet |
CN206500650U (en) * | 2016-11-15 | 2017-09-19 | 惠州市联达金电子有限公司 | A kind of Copper fabrication equidistant drilling machine of copper pipe |
CN206415655U (en) * | 2016-12-23 | 2017-08-18 | 福建省霞浦县众源机械有限公司 | A kind of angle bar automatic drilling device of turning |
CN206588369U (en) * | 2017-03-16 | 2017-10-27 | 江苏锐达科技有限公司 | A kind of one piece drilling equipment for solar energy mirror holder |
CN107830293A (en) * | 2017-10-12 | 2018-03-23 | 王建 | A kind of Pipe installing drilling equipment |
CN107717453A (en) * | 2017-10-20 | 2018-02-23 | 嘉善申乐五金塑料有限公司 | A kind of drilling and tapping machine people |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110064802A (en) * | 2019-05-29 | 2019-07-30 | 广东技术师范大学 | A kind of workpiece self-tapping industrial robot |
CN110280639A (en) * | 2019-06-06 | 2019-09-27 | 张家港市台和机械制造有限公司 | Material-supporting device in bending machine |
Also Published As
Publication number | Publication date |
---|---|
CN108788227B (en) | 2020-10-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101362293B (en) | Closed type static pressure turntable and bidirectional piston clamping mechanism thereof | |
CN206747884U (en) | A kind of butt-welded clamping device of straight tube and bend pipe | |
CN108788227A (en) | A kind of tube wall finishing attachment device | |
CN210755285U (en) | Perforating device of hydraulic engineering pipeline | |
CN209394367U (en) | Drilling equipment for construction wall plate | |
CN201275689Y (en) | Closed type static pressure turntable and external clamp structure thereof | |
CN102773568B (en) | Special elastic lamp for grinding conical surface of gear | |
CN215846690U (en) | Novel pipe machining location centre gripping device | |
CN205129476U (en) | Workpiece supporting device used in main shaft hole of pipe thread lathe | |
CN204686076U (en) | Punching drilling machine | |
CN104759919B (en) | A kind of spindle nose milling attachment and its processing technology | |
CN108408384B (en) | Material distributing and positioning device of steel pipe production line | |
CN206702674U (en) | Clamping tooling for the processing of rubber flap check valve sealing surface | |
CN203144277U (en) | Glass tube sintering processing equipment | |
CN208663661U (en) | Speed reducer shaft sleeve detaching device | |
CN220128171U (en) | Pipe machining clamp | |
CN204686197U (en) | Robot high-pressure balancing burr remover | |
CN203804500U (en) | Outer circle centring and locating clamping device for vehicle shock absorber oil storage tank | |
CN206474705U (en) | A kind of automatic Workpiece boring platform | |
CN220162414U (en) | Pipeline fixing device suitable for pipeline processing | |
CN217831944U (en) | Drilling equipment is used in valve processing convenient to it is fixed | |
CN214418464U (en) | Inside and outside surface rust cleaning device of water conservancy construction pipeline | |
CN215966435U (en) | Efficient gantry type automatic drilling and milling equipment for pipeline | |
CN203622556U (en) | Novel drilling machine tool | |
CN220679897U (en) | Pipeline support tool for pipeline welding |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20181107 Address after: 236000 5, Zhenxing lane, Yingdong District, Fuyang, Anhui, 5 Applicant after: Li Na Address before: 241000 room 602, comprehensive building, Wan Chun Zhong Road (Jiujiang Electronic Industrial Park), Jiujiang District Economic Development Zone, Wuhu, Anhui Applicant before: Gong Renle |
|
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20201013 Termination date: 20210606 |