CN108777470A - A kind of cable duct bank and its construction method - Google Patents
A kind of cable duct bank and its construction method Download PDFInfo
- Publication number
- CN108777470A CN108777470A CN201810959567.XA CN201810959567A CN108777470A CN 108777470 A CN108777470 A CN 108777470A CN 201810959567 A CN201810959567 A CN 201810959567A CN 108777470 A CN108777470 A CN 108777470A
- Authority
- CN
- China
- Prior art keywords
- cable duct
- connector
- duct bank
- slab ends
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 238000007789 sealing Methods 0.000 claims description 9
- 238000003032 molecular docking Methods 0.000 claims description 4
- 239000000853 adhesive Substances 0.000 claims description 3
- 230000001070 adhesive effect Effects 0.000 claims description 3
- 239000011159 matrix material Substances 0.000 claims description 3
- 210000001520 comb Anatomy 0.000 claims description 2
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 239000002356 single layer Substances 0.000 abstract description 2
- 239000004567 concrete Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 239000010410 layer Substances 0.000 description 3
- 230000005611 electricity Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 241001669679 Eleotris Species 0.000 description 1
- 239000002390 adhesive tape Substances 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000006260 foam Substances 0.000 description 1
- 238000009415 formwork Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G9/00—Installations of electric cables or lines in or on the ground or water
- H02G9/06—Installations of electric cables or lines in or on the ground or water in underground tubes or conduits; Tubes or conduits therefor
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/06—Joints for connecting lengths of protective tubing or channels, to each other or to casings, e.g. to distribution boxes; Ensuring electrical continuity in the joint
- H02G3/0608—Joints for connecting non cylindrical conduits, e.g. channels
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Electric Cable Installation (AREA)
Abstract
The invention discloses a kind of cable duct bank and its construction methods.The cable duct bank includes tube body, cable pipeline and connector U-shaped card pillow, and cable pipeline runs through tubular body, and the end face of tube body is equipped with the overlap joint faulting of slab ends of protrusion;Overlap joint faulting of slab ends is placed in connector U-shaped card pillow.The cable duct bank of the present invention can be with modularized production, modularization assemble, it can realize lateral single layer multiple row, the assembled arrangement of multilayer multiple row comb, the arrangement form for meeting existing various comb designs has the characteristics that construction efficiency is high, simple in structure, applied widely, laying connection is reliable, economic and environment-friendly.
Description
Technical field
The present invention relates to power domain construction, especially a kind of cable duct bank and its construction method.
Background technology
With the growth requirement of Urbanization Construction, power cable gradually switchs to underground laying by setting up in the air.
The form that cable duct bank is generally used when traditional cable laying, especially a plurality of cable laying, is opened by scene
Foundation trench is dug, cable pipe special, then casting concrete maintenance molding are laid.There are operation sides for this traditional approach greatly, applies
The shortcomings of work period is long, scene is seriously polluted, especially during municipal cable duct bank is laid, can cause urban road to seal
Stifled, poured in place concrete pollutes environment, seriously affects daily life, does not meet the demand of Modern Urban Development.
Invention content
The problem of based on the above existing traditional construction technology, a kind of cable duct bank of present invention offer and its construction party
Method can realize factorial praluction, assembling assembly and mechanized construction.
The technical solution adopted by the present invention is as follows:
A kind of cable duct bank, including tube body, cable pipeline and connector U-shaped card pillow, cable pipeline runs through tubular body, described
The end face of tube body is equipped with the overlap joint faulting of slab ends of protrusion;The overlap joint faulting of slab ends is placed in connector U-shaped card pillow.
Further, the cable duct bank further includes connector snap-gauge, and the connector snap-gauge is formed with the pillow connection of connector U-shaped card
Annular anchor ear.
Further, the connector snap-gauge is bolted to connection with connector U-shaped card pillow.
Further, it is embedded with boom hoisting on the cable duct bank.
Further, through chamfered at the port of the overlap joint faulting of slab ends.
Further, after adjacent overlap joint faulting of slab ends docking, sealing strip is placed in the chamfering piece that port is formed.
Further, the port of cable pipeline is set as circular arc chamfering or expanding horn mouth.
Further, the length of the overlap joint faulting of slab ends protrusion end face is 200mm~400mm.
Further, the cable pipeline is in matrix arrangement, is by the arrangement of row × row:1 × N, 2 × N or 3 × N,
In, N=2,3 and 4.
A kind of construction method of cable duct bank of the present invention, is as follows:
1) foundation trench is excavated, laying bed course is simultaneously levelling;
2) it is laid with connector U-shaped card pillow, it will be in the bottom girder embedment bed course of connector U-shaped card pillow;
3) the overlap joint faulting of slab ends of comb is put into connector U-shaped card pillow by crane cable comb, and ensures to overlap the edge of faulting of slab ends
It is aligned with the edge of card pillow;As needed, the laterally assembled of cable duct bank is carried out, and ensures that overlap joint faulting of slab ends is right in a lateral direction
Together;
4) laterally after the completion of assembly, the chamfering position at the port of overlap joint faulting of slab ends, adhesive seal item, and a reserved fixed length
The sealing strip of degree;
5) longitudinal assembly is carried out to cable duct bank along the axial of cable duct bank, the overlap joint faulting of slab ends of comb is put into connector U-shaped
It is docked in card pillow and with the overlap joint faulting of slab ends of the laterally cable duct bank of assembly, the edge for overlapping faulting of slab ends is aligned with the edge that card is rested the head on;It is vertical
To after the completion of assembly, reserved sealing strip is adjacent to and is docked in the chamfering piece to be formed in two combs;
6) it in the top erection joint snap-gauge of connector U-shaped card pillow and is compacted, using bolt by connector snap-gauge and connector U-shaped card
Pillow is fastened as a whole;
7) it repeats step 4), 5) with 6), constructs and finish up to a section;Last foundation trench backfill, construction terminate.
Beneficial effects of the present invention are:
(1) cable duct bank of the invention can realize lateral single layer multiple row, multilayer with modularized production, modularization assemble
The assembled arrangement of multiple row comb meets the arrangement form of existing various comb designs.
(2) connector U-shaped card pillow effectively embraces the cable duct bank being laterally arranged in juxtaposition forms entirety together, limits electricity
The lateral movement of cable comb ensures the globality of comb and the accuracy of longitudinal cable pipeline docking;Pass through with connector snap-gauge
Bolt forms an annular anchor ear, and card has the cable duct bank of joint both direction in length and breadth in arms, is further ensured that the connection of connector
Intensity.
(3) connector U-shaped card pillow bottom girder can be thickeied according to engineering demand, had both the effect of sleeper, made cable duct bank connector
Place does not generate longitudinal and transverse direction displacement because of the effect of stress, ensures the globality of cable duct bank, can in the area that basis is poor
The basement process of U-shaped card napex is only done, comb is in integrally both ends freely supported structure, saves whole ground processing cost.
(4) sealing joint strip that one trap of setting is closed in the chamfering piece space that overlap joint faulting of slab ends joint is formed, passes through snap-gauge
After compacting connection, it is effectively guaranteed the water resistance of joint, prevents slime water from penetrating into cable pipeline.
(5) circular arc chamfering of cable pipeline port or one end are set as expanding horn mouth, effectively eliminate longitudinal 2-section pipe
Nozzle faulting of slab ends caused by road contraposition is inaccurate ensures smoothly penetrating for cable, eliminates nozzle faulting of slab ends and is scratched to cable.
(6) cable duct bank form of construction work of the invention is all connected using dry type, and scene is without a large amount of wet constructions, and environmental protection is without dirt
Dye, no formwork assembling and disassembling operation, be not necessarily to concrete curing, install can grave mound restore place original appearance, quickness and high efficiency.
Description of the drawings
Fig. 1 is pre-fabricated electric cables comb end view in the embodiment of the present invention, and the structure of (a) cable duct bank is (b) another
The structure of cable duct bank.
Fig. 2 is pre-fabricated electric cables comb side schematic view in the embodiment of the present invention.
Fig. 3 is connector snap-gauge schematic diagram, (a) front view, (b) side view.
Fig. 4 is that connector U-shaped card rests the head on schematic diagram, (a) front view, (b) side view.
Fig. 5 is the lateral sectional schematic diagram of cable duct bank assembly contact.
Fig. 6 is longitudinal sectional schematic diagram of cable duct bank assembly contact.
Fig. 7 is the cable duct bank scheme of installation in the embodiment of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, the cable duct bank in the present embodiment includes tube body 1, cable pipeline and overlap joint faulting of slab ends 3, tube body 1 is cut
Face is rectangular, and both ends are equipped with overlap joint faulting of slab ends 3, are internally provided with cable pipeline.The larger electricity of caliber can be only set in tube body 1
The smaller cable channel 2 of caliber and communication cable pipeline 4 can also be arranged in cable pipeline 2 (see figure (a)) simultaneously (see figure (b)).Line
The peripheral disposition of cable pipeline has reinforcing bar, cable duct bank generally concreting to be molded.
As shown in Fig. 2, overlap joint faulting of slab ends 3 is also rectangle, protrude from the end face of tube body 1, the length of protrusion be 200mm~
400mm.The cross section for overlapping faulting of slab ends 3 is less than the cross section of tube body 1, and overlap joint 3 surrounding side wall of faulting of slab ends is recessed inwardly 20mm~40mm.
It does 10mm~20mm*45 ° of chamfering 6 and handles in the surrounding corner of 3 end of overlap joint faulting of slab ends.The upper surface of tube body 1, which is embedded with, hangs 5 work of nail
For boom hoisting, naturally it is also possible to using other hoisting structures such as hanging ring or screw shells.
The rounded either rectangle in section of cable pipeline by cable pipe special Preembedded or by concrete core pulling at
Type, internal diameter of the pipeline (length of side) is not all the same, and pipeline is in matrix arrangement, is by the arrangement of row × row:1 × N, 2 × N, 3 × N (N=
2,3,4).Circular arc chamfering processing is done in the port of cable pipeline, and the radius of circular arc 7 is 10~20mm.Or by cable pipeline two
One end in a port is set as expanding horn mouth, and one end is normal size.By circular arc chamfering or bell-mouthed setting, can protect
Card cable smoothly penetrates pipeline, eliminates nozzle faulting of slab ends and is scratched to cable.
Overlap joint faulting of slab ends 3 is placed in connector U-shaped card pillow 8.Connector U-shaped card pillow 8 is by two side walls 9 and 10 groups of a bottom girder
At generally reinforced concrete structure.9 wall thickness of side wall in the present embodiment is 60mm~100mm, internal clear height=cable duct bank
Faulting of slab ends height is overlapped, length=2 times overlap faulting of slab ends length, the pre-buried screw shell in 9 top of side wall 11.10 thickness 60mm of bottom girder~
400mm, internal lateral the sum of cable duct bank overall width side by side of clear span=1 cable duct bank overlap joint faulting of slab ends width+remaining connector are long
=2 times of overlap joint faulting of slab ends length of degree.
The structure of connector snap-gauge 12 is as shown in figure 4, the present embodiment center tap snap-gauge 12 is rectangle armoured concrete slab, plate thickness
Reserve fastening bolt mounting hole 13, connector snap-gauge length=bottom girder inside clear length+2* side walls in the both ends of 60mm~100mm, plate
Wall thickness.Bolt mounting holes 13 are corresponding with screw shell 11, are fastenedly connected by bolt, and connector snap-gauge 12 and connector U-shaped card are rested the head on 8
Connect into closed ring.
The cable duct bank of the present embodiment, can longitudinal and transverse two directions it is flexibly assembled, laterally each section comb is closely arranged side by side,
The alignment of overlap joint faulting of slab ends 3 of each comb in end is placed on connector U-shaped card pillow 8, is transversely formed entirety;Longitudinal two save cable duct bank
Faulting of slab ends 3 and 8 overlap joint of connector U-shaped card pillow are overlapped, the top of connector U-shaped card pillow 8 is fastenedly connected with the bolt 15 of connector snap-gauge 12, shape
Anchor ear is circularized, longitudinal cable duct bank contact is connected and fixed.The bevel edge for overlapping faulting of slab ends 3 connects after the docking of longitudinal cable duct bank
Seam end face surrounding forms the chamfering piece of annular, and a circle sealing joint strip is placed in chamfering piece.
As shown in Fig. 5,6 and 7, the construction method of the cable duct bank of the present embodiment is as follows:
1) surveying setting-out excavates foundation trench, and laying bed course 14 is simultaneously levelling, and the bed course 14 is sand-gravel cushion, is divided to upper and lower two
Layer, one layer of lower part are prototype gradation rubble, and wherein maximum particle diameter is not preferably greater than 25mm, and one layer of top is middle sand, coarse sand.
2) lifting connector U-shaped card pillow 8, and leveling is positioned, longitudinal pitch is identical as cable duct bank length, card pillow bottom girder 10
In part embedment bed course 14,10 lower part cushion thickness of bottom girder and normal bed course uniform thickness, bottom girder expose bed course upper level not
More than overlap joint faulting of slab ends cup depth.
3) crane cable comb, first progress is laterally assembled, and the both ends of the first cable duct bank 16 and the second cable duct bank 17 are taken
Wrong platform 3 is caught on the bottom girder 10 of connector U-shaped card pillow 8, and the edge for overlapping faulting of slab ends 3 is aligned with card bedside edge, while in lateral spelling
It fills to paste waterproof material at the perps formed between each comb or fill in and fills out foam block 18;Laterally after the completion of assembly, comb is being installed
(U-shaped card pillow inside) adhesive seal adhesive tape 19 at the chamfering of most outer, and reserved can surround annular anchor ear cross section after splicing
One week length;Then it is done in the same fashion longitudinal assembly, ensures that next section cable duct bank overlap joint 3 edge of faulting of slab ends is rested the head on card
Edge is aligned;Finally reserved sealing joint strip 19 is adjacent in the chamfering piece 21 of 3 seam end face of overlap joint faulting of slab ends.
4) it erection joint snap-gauge 12 and is compacted, connector snap-gauge 12 and U-shaped card pillow is fastened as a whole with fastening bolt 15, shape
At a closed annular sleeve, the position of the prefabricated comb in anchor tip position is used in combination cement mortar 20 to smooth out bolt mounting holes
13 and suspension centre hole, the so far installation of a connector terminate.
Cable duct bank using the present invention can accomplish close a road to traffic at dusk fluting, at night construction, morning grave mound, access on daytime
Rapid construction effect, have construction efficiency it is high, it is simple in structure, applied widely, be laid with and connect the spies such as reliable, economic and environment-friendly
Point.
Claims (10)
1. a kind of cable duct bank, which is characterized in that rested the head on including tube body, cable pipeline and connector U-shaped card, cable pipeline runs through tube body
Inside, the end face of the tube body are equipped with the overlap joint faulting of slab ends of protrusion;The overlap joint faulting of slab ends is placed in connector U-shaped card pillow.
2. a kind of cable duct bank according to claim 1, which is characterized in that the cable duct bank further includes connector snap-gauge,
The connector snap-gauge forms annular anchor ear with the pillow connection of connector U-shaped card.
3. a kind of cable duct bank according to claim 2, which is characterized in that the connector snap-gauge and connector U-shaped card pillow are logical
Bolt is crossed to be fixedly connected.
4. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that be embedded on the cable duct bank
Boom hoisting.
5. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that at the port of the overlap joint faulting of slab ends
Through chamfered.
6. a kind of cable duct bank according to claim 5, which is characterized in that after adjacent overlap joint faulting of slab ends docking, port is formed
Chamfering piece in place sealing strip.
7. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that the port of cable pipeline is set as
Circular arc chamfering or expanding horn mouth.
8. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that the overlap joint faulting of slab ends protrudes end face
Length be 200mm~400mm.
9. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that the cable pipeline is in matrix form
Arrangement, arranging by row × row is:1 × N, 2 × N or 3 × N, wherein N=2,3 and 4.
10. a kind of construction method of cable duct bank, which is characterized in that be as follows:
1) foundation trench is excavated, laying bed course is simultaneously levelling;
2) it is laid with connector U-shaped card pillow, it will be in the bottom girder embedment bed course of connector U-shaped card pillow;
3) the overlap joint faulting of slab ends of comb is put into connector U-shaped card pillow by crane cable comb, and ensures to overlap the edge and card of faulting of slab ends
The edge of pillow is aligned;As needed, the laterally assembled of cable duct bank is carried out, and ensures that overlap faulting of slab ends is aligned in a lateral direction;
4) laterally after the completion of assembly, the chamfering position at the port of overlap joint faulting of slab ends, adhesive seal item, and reserved certain length
Sealing strip;
5) longitudinal assembly is carried out to cable duct bank along the axial of cable duct bank, the overlap joint faulting of slab ends of comb is put into connector U-shaped card pillow
Interior and the cable duct bank assembled with transverse direction overlap joint faulting of slab ends docks, and the edge for overlapping faulting of slab ends is aligned with the edge that card is rested the head on;It is longitudinal to spell
After the completion of dress, reserved sealing strip is adjacent to and is docked in the chamfering piece to be formed in two combs;
6) it in the top erection joint snap-gauge of connector U-shaped card pillow and is compacted, is rested the head on connector snap-gauge and connector U-shaped card using bolt tight
It is solidified as a whole;
7) it repeats step 4), 5) with 6), constructs and finish up to a section;Last foundation trench backfill, construction terminate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810959567.XA CN108777470A (en) | 2018-08-22 | 2018-08-22 | A kind of cable duct bank and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810959567.XA CN108777470A (en) | 2018-08-22 | 2018-08-22 | A kind of cable duct bank and its construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108777470A true CN108777470A (en) | 2018-11-09 |
Family
ID=64028886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810959567.XA Pending CN108777470A (en) | 2018-08-22 | 2018-08-22 | A kind of cable duct bank and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108777470A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111799722A (en) * | 2020-07-08 | 2020-10-20 | 国网江苏省电力有限公司连云港供电分公司 | GFRP light prefabricated assembly type cable duct bank and construction method thereof |
CN117134269A (en) * | 2023-10-20 | 2023-11-28 | 国网山东省电力公司博兴县供电公司 | Power supply pipeline installation fastener |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1980000182A1 (en) * | 1978-07-03 | 1980-02-07 | M Sammaritano | Preformed conduit joining apparatus and method |
JPH1014071A (en) * | 1996-06-18 | 1998-01-16 | Adobuansu:Kk | Conduit block for underground wiring and connecting structure thereof |
JPH1189067A (en) * | 1997-09-05 | 1999-03-30 | Koken Sangyo Kk | Flexible jointing device of conduit orthogonally crossing special portion of c-c-box |
CN102359123A (en) * | 2011-07-21 | 2012-02-22 | 济南城建集团有限公司 | Cast-in-place concrete cable conduit construction method |
CN103669400A (en) * | 2013-12-03 | 2014-03-26 | 国家电网公司 | Typical construction method for prefabricated tube bank |
CN104242163A (en) * | 2014-10-13 | 2014-12-24 | 邱小宁 | Cable tube, laying method and laying tool special for laying method |
CN104947709A (en) * | 2015-04-15 | 2015-09-30 | 上海市政工程设计研究总院(集团)有限公司 | Pre-assembled single-compartment municipal tunnel and construction method thereof |
CN206962404U (en) * | 2017-05-04 | 2018-02-02 | 南通电力设计院有限公司 | A kind of pre-fabricated electric cables comb |
CN207542753U (en) * | 2017-11-28 | 2018-06-26 | 杭州中能管业有限公司 | A kind of cable protection pipe connection |
CN208782449U (en) * | 2018-08-22 | 2019-04-23 | 建华建材(中国)有限公司 | A kind of cable duct bank |
-
2018
- 2018-08-22 CN CN201810959567.XA patent/CN108777470A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1980000182A1 (en) * | 1978-07-03 | 1980-02-07 | M Sammaritano | Preformed conduit joining apparatus and method |
JPH1014071A (en) * | 1996-06-18 | 1998-01-16 | Adobuansu:Kk | Conduit block for underground wiring and connecting structure thereof |
JPH1189067A (en) * | 1997-09-05 | 1999-03-30 | Koken Sangyo Kk | Flexible jointing device of conduit orthogonally crossing special portion of c-c-box |
CN102359123A (en) * | 2011-07-21 | 2012-02-22 | 济南城建集团有限公司 | Cast-in-place concrete cable conduit construction method |
CN103669400A (en) * | 2013-12-03 | 2014-03-26 | 国家电网公司 | Typical construction method for prefabricated tube bank |
CN104242163A (en) * | 2014-10-13 | 2014-12-24 | 邱小宁 | Cable tube, laying method and laying tool special for laying method |
CN104947709A (en) * | 2015-04-15 | 2015-09-30 | 上海市政工程设计研究总院(集团)有限公司 | Pre-assembled single-compartment municipal tunnel and construction method thereof |
CN206962404U (en) * | 2017-05-04 | 2018-02-02 | 南通电力设计院有限公司 | A kind of pre-fabricated electric cables comb |
CN207542753U (en) * | 2017-11-28 | 2018-06-26 | 杭州中能管业有限公司 | A kind of cable protection pipe connection |
CN208782449U (en) * | 2018-08-22 | 2019-04-23 | 建华建材(中国)有限公司 | A kind of cable duct bank |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111799722A (en) * | 2020-07-08 | 2020-10-20 | 国网江苏省电力有限公司连云港供电分公司 | GFRP light prefabricated assembly type cable duct bank and construction method thereof |
CN117134269A (en) * | 2023-10-20 | 2023-11-28 | 国网山东省电力公司博兴县供电公司 | Power supply pipeline installation fastener |
CN117134269B (en) * | 2023-10-20 | 2024-02-02 | 国网山东省电力公司博兴县供电公司 | Power supply pipeline installation fastener |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108252329B (en) | Assembly type comprehensive pipe gallery for bearing force of enclosure structure and construction method thereof | |
CN105002931B (en) | The two-way Precast Concrete Segmental Bridges construction method of a kind of large scale underpass | |
CN103741714A (en) | Full-cover excavation top-down construction method for underground engineering | |
CN108832563A (en) | A kind of pre-fabricated electric cables comb and its construction method | |
CN110004991B (en) | Underground structure anti-floating system based on convex wing foot plate and construction method | |
CN106555408A (en) | The structure and construction method of underground pipe gallery | |
CN113668612A (en) | Modular combined prefabricated electric power working well and construction method thereof | |
CN110158656A (en) | A kind of integrated template piping lane and its method of construction | |
CN110306989B (en) | Non-open-cut assembled pipe trench excavation supporting and reinforcing method | |
CN108777470A (en) | A kind of cable duct bank and its construction method | |
CN208782449U (en) | A kind of cable duct bank | |
CN206376277U (en) | The structure of underground pipe gallery | |
CN106088758B (en) | A kind of bilayer assembled underground granary | |
CN106088762B (en) | A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate | |
CN115961647A (en) | Basement roof post-cast strip advanced sealing structure, construction structure and construction method | |
CN208690872U (en) | A kind of pre-fabricated electric cables comb | |
CN109736843B (en) | Reverse waterproof method for assembling and pouring two linings of small template | |
CN106049948B (en) | Bag Plastic preform bulkhead underground granary in a kind of insertion slot type | |
CN106088764B (en) | A kind of stepped prefabricated assembled circular underground granary of encased steel plate | |
CN206722391U (en) | Basement barricade moulding wall formwork erecting structure based on brick fetal membrane | |
CN112482435A (en) | Underground excavation construction method for underground multi-cabin pipe gallery through building | |
CN106088759B (en) | The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind | |
CN106193744B (en) | The round prefabricated assembled underground granary of equal steel plated inside and outside one kind | |
CN212784703U (en) | Modular self-drainage cable trench | |
CN206467651U (en) | Rectangular concrete pile for building piping lane side wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |