CN108777470A - A kind of cable duct bank and its construction method - Google Patents

A kind of cable duct bank and its construction method Download PDF

Info

Publication number
CN108777470A
CN108777470A CN201810959567.XA CN201810959567A CN108777470A CN 108777470 A CN108777470 A CN 108777470A CN 201810959567 A CN201810959567 A CN 201810959567A CN 108777470 A CN108777470 A CN 108777470A
Authority
CN
China
Prior art keywords
cable
joint
pillow
pipes
overlapping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810959567.XA
Other languages
Chinese (zh)
Inventor
杨广超
李志高
姚栋
李斌斌
陆立东
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Construction Materials China Co Ltd
Original Assignee
Jianhua Construction Materials China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianhua Construction Materials China Co Ltd filed Critical Jianhua Construction Materials China Co Ltd
Priority to CN201810959567.XA priority Critical patent/CN108777470A/en
Publication of CN108777470A publication Critical patent/CN108777470A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/06Installations of electric cables or lines in or on the ground or water in underground tubes or conduits; Tubes or conduits therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/06Joints for connecting lengths of protective tubing or channels, to each other or to casings, e.g. to distribution boxes; Ensuring electrical continuity in the joint
    • H02G3/0608Joints for connecting non cylindrical conduits, e.g. channels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Electric Cable Installation (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)

Abstract

本发明公开了一种电缆排管及其施工方法。该电缆排管包括管体、线缆管道和接头U形卡枕,线缆管道贯穿管体内部,管体的端面设有凸出的搭接错台;搭接错台放置在接头U形卡枕内。本发明的电缆排管可以模块化生产,模块化拼装,能实现横向单层多列、多层多列排管的拼装布置,满足现有各种排管设计的排布形式,具有施工效率高、结构简单、适用范围广、铺设连接可靠、经济环保等特点。

The invention discloses a cable pipe arrangement and a construction method thereof. The cable conduit includes a pipe body, a cable duct and a joint U-shaped clamping pillow. The cable duct runs through the interior of the pipe body, and the end surface of the pipe body is provided with a protruding lap joint; the lap joint is placed on the joint U-shaped clamp. pillow. The cable pipe arrangement of the present invention can be produced modularly and assembled in modules, and can realize the assembly and arrangement of horizontal single-layer multi-column and multi-layer multi-row pipe arrangement, satisfying the arrangement forms of various existing pipe design, and having high construction efficiency , simple structure, wide application range, reliable laying connection, economical and environmental protection.

Description

一种电缆排管及其施工方法A kind of cable pipe and its construction method

技术领域technical field

本发明涉及电力领域建设,尤其是一种电缆排管及其施工方法。The invention relates to construction in the electric power field, in particular to a cable pipe arrangement and a construction method thereof.

背景技术Background technique

随着城镇化建设的发展需求,电力电缆逐渐由空中架设转为地下敷设。With the development needs of urbanization construction, power cables have gradually changed from aerial erection to underground laying.

传统的电缆敷设,尤其是多条线缆敷设时普遍采用电缆排管的形式,通过现场开挖基槽,布设电缆专用管道,再浇筑混凝土养护成型。这种传统方式存在施工作业面大、施工周期长、现场污染严重等缺点,尤其在市政电缆排管敷设的过程中,会造成城市道路封堵,现场浇筑混凝土污染环境,严重影响人们的日常生活,不符合现代城市发展的需求。The traditional cable laying, especially the laying of multiple cables, generally adopts the form of cable pipes. The foundation trench is excavated on site, the special cable pipes are laid, and then concrete is poured for curing. This traditional method has disadvantages such as large construction area, long construction period, and serious site pollution. Especially in the process of laying municipal cable pipes, it will cause urban roads to be blocked, and concrete pouring on site will pollute the environment and seriously affect people's daily life. , does not meet the needs of modern urban development.

发明内容Contents of the invention

基于以上现有传统施工技术中存在的问题,本发明提供一种电缆排管及其施工方法,能够实现工厂化生产、装配化拼装和机械化施工。Based on the above problems existing in the existing traditional construction technology, the present invention provides a cable pipe arrangement and a construction method thereof, which can realize factory production, assembly assembly and mechanized construction.

本发明采用的技术方案如下:The technical scheme that the present invention adopts is as follows:

一种电缆排管,包括管体、线缆管道和接头U形卡枕,线缆管道贯穿管体内部,所述管体的端面设有凸出的搭接错台;所述搭接错台放置在接头U形卡枕内。A cable pipe arrangement, comprising a pipe body, a cable duct and a joint U-shaped clamping pillow, the cable duct runs through the interior of the pipe body, and the end surface of the pipe body is provided with a protruding overlapping joint; the overlapping joint Place it in the U-shaped card pillow of the joint.

进一步地,所述电缆排管还包括接头卡板,所述接头卡板与接头U形卡枕连接形成环形抱箍。Further, the cable duct also includes a joint clamping plate, and the joint clamping plate is connected with the joint U-shaped clamping pillow to form an annular hoop.

进一步地,所述接头卡板与接头U形卡枕通过螺栓固定连接。Further, the joint clamping plate and the joint U-shaped clamping pillow are fixedly connected by bolts.

进一步地,所述电缆排管上预埋有起吊装置。Further, a lifting device is pre-embedded on the cable conduit.

进一步地,所述搭接错台的端口处经倒角处理。Further, the port of the overlapping staggered platform is chamfered.

进一步地,相邻搭接错台对接后,端口形成的倒角拼缝内放置密封条。Further, after the adjacent overlapping joints are docked in a staggered stage, a sealing strip is placed in the chamfered seam formed by the ports.

进一步地,线缆管道的端口设置为圆弧倒角或者扩径喇叭口。Further, the port of the cable duct is set as an arc chamfer or an enlarged bell mouth.

进一步地,所述搭接错台凸出端面的长度为200mm~400mm。Further, the length of the protruding end surface of the overlapped staggered platform is 200 mm to 400 mm.

进一步地,所述线缆管道呈矩阵式排列,按行×列排布为:1×N、2×N或者3×N,其中,N=2、3和4。Further, the cable ducts are arranged in a matrix, arranged in rows×columns: 1×N, 2×N or 3×N, where N=2, 3 and 4.

本发明一种电缆排管的施工方法,具体步骤如下:A kind of construction method of cable pipe arrangement of the present invention, concrete steps are as follows:

1)开挖基槽,铺设垫层并找平;1) Excavate the foundation trench, lay the cushion and level it;

2)铺设接头U形卡枕,将接头U形卡枕的底梁埋入垫层内;2) Lay the U-shaped pillow of the joint, and bury the bottom beam of the U-shaped pillow of the joint in the cushion;

3)吊装电缆排管,将排管的搭接错台放入接头U形卡枕内,并保证搭接错台的边沿与卡枕的边沿对齐;根据需要,进行电缆排管的横向拼装,并保证搭接错台在横向方向上对齐;3) Hoist the cable pipes, put the overlapping joints of the pipes into the U-shaped clamping pillow of the joint, and ensure that the edges of the overlapping joints are aligned with the edges of the clamping pillows; according to the needs, carry out horizontal assembly of the cable pipes, And ensure that the overlapping staggered table is aligned in the lateral direction;

4)横向拼装完成后,在搭接错台的端口处的倒角位置,粘贴密封条,并预留一定长度的密封条;4) After the horizontal assembly is completed, paste a sealing strip at the chamfering position at the port of the overlapping staggered platform, and reserve a certain length of the sealing strip;

5)沿电缆排管的轴向对电缆排管进行纵向拼装,将排管的搭接错台放入接头U形卡枕内并与横向拼装的电缆排管的搭接错台对接,搭接错台的边沿与卡枕的边沿对齐;纵向拼装完成后,将预留的密封条贴紧在两排管对接形成的倒角拼缝内;5) Assemble the cable pipes longitudinally along the axial direction of the cable pipes, put the overlapping joints of the pipes into the U-shaped clamping pillow of the joint and connect them with the overlapping joints of the horizontally assembled cable pipes. The edge of the staggered table is aligned with the edge of the card pillow; after the longitudinal assembly is completed, the reserved sealing strip is tightly attached to the chamfered seam formed by the butt joint of the two rows of pipes;

6)在接头U形卡枕的顶部安装接头卡板并压实,采用螺栓将接头卡板与接头U形卡枕紧固为一体;6) Install the joint clamping plate on the top of the joint U-shaped clamping pillow and compact it, and use bolts to fasten the joint clamping plate and the joint U-shaped clamping pillow as one;

7)重复步骤4)、5)和6),直至一个区段施工完毕;最后基槽回填,施工结束。7) Steps 4), 5) and 6) are repeated until the construction of a section is completed; finally, the foundation trench is backfilled, and the construction ends.

本发明的有益效果为:The beneficial effects of the present invention are:

(1)本发明的电缆排管可以模块化生产,模块化拼装,能实现横向单层多列、多层多列排管的拼装布置,满足现有各种排管设计的排布形式。(1) The cable pipe arrangement of the present invention can be produced and assembled in a modular manner, and can realize the assembly and arrangement of horizontal single-layer multi-row and multi-layer multi-row pipe arrangement, satisfying the arrangement forms of various existing pipe design.

(2)接头U形卡枕有效地将横向并列布置的电缆排管抱在一起形成整体,限制了电缆排管的侧向移动,保证排管的整体性以及纵向线缆管道对接的准确性;与接头卡板通过螺栓形成一个环形抱箍,卡抱着接头处纵横两个方向的电缆排管,进一步保证接头的连接强度。(2) The U-shaped clamping pillow of the joint effectively hugs the horizontally arranged cable pipes together to form a whole, which limits the lateral movement of the cable pipes and ensures the integrity of the pipes and the accuracy of the butt connection of the longitudinal cable pipes; It forms an annular hoop with the joint clamping plate through bolts, and holds the cable pipes in both vertical and horizontal directions at the joint to further ensure the connection strength of the joint.

(3)接头U形卡枕底梁根据工程需求可以加厚,兼具轨枕的作用,使电缆排管接头处不因受力的作用而产生纵向及横向位移,保证电缆排管的整体性,在基础较差的地区,可仅做U形卡枕下部的地基处理,排管整体呈两端简支结构,节约整体地基处理成本。(3) The bottom beam of the joint U-shaped card sleeper can be thickened according to the engineering requirements, and also has the function of the sleeper, so that the cable pipe joints will not be displaced longitudinally and laterally due to the force, ensuring the integrity of the cable pipes. In areas with poor foundations, only the foundation treatment of the lower part of the U-shaped clamp can be done, and the pipe as a whole has a simply supported structure at both ends, which saves the overall foundation treatment cost.

(4)搭接错台接头处形成的倒角拼缝空间内设置一圈闭合的密封胶条,通过卡板压实连接后,有效的保证了接头处的防水性能,防止泥浆水渗入线缆管道内。(4) A circle of closed sealing rubber strips is set in the chamfered seam space formed at the overlapping joints. After being compacted and connected by clamps, the waterproof performance of the joints is effectively guaranteed to prevent mud water from seeping into the cables. inside the pipe.

(5)线缆管道端口的圆弧倒角或一端设为扩径喇叭口,有效地消除了纵向两节管道对位不准造成的管口错台,保证线缆的顺利穿入,消除管口错台对线缆的剐蹭。(5) The arc chamfering of the port of the cable duct or one end is set as a flared bell mouth, which effectively eliminates the misalignment of the pipe opening caused by the inaccurate alignment of the two longitudinal sections of the pipe, ensures the smooth penetration of the cable, and eliminates the Scratching the cable by the wrong station.

(6)本发明的电缆排管施工方式全部采用干式连接,现场无大量湿作业,环保无污染,无模板拆装作业,无需混凝土养护,安装完毕即可封土恢复场地原貌,快捷高效。(6) The construction methods of the cable pipes of the present invention all adopt dry connection, there is no large amount of wet work on site, environmental protection and pollution-free, no formwork disassembly operation, no need for concrete maintenance, the soil can be sealed to restore the original appearance of the site after installation, fast and efficient.

附图说明Description of drawings

图1为本发明实施例中预制电缆排管端面示意图,(a)电缆排管的结构,(b)另一种电缆排管的结构。Fig. 1 is a schematic diagram of the end face of the prefabricated cable pipe in the embodiment of the present invention, (a) the structure of the cable pipe, (b) another structure of the cable pipe.

图2为本发明实施例中预制电缆排管侧面示意图。Fig. 2 is a schematic side view of the prefabricated cable conduit in the embodiment of the present invention.

图3为接头卡板示意图,(a)正视图,(b)侧视图。Fig. 3 is a schematic diagram of the joint card board, (a) front view, (b) side view.

图4为接头U形卡枕示意图,(a)正视图,(b)侧视图。Fig. 4 is a schematic diagram of a U-shaped clamping pillow of a joint, (a) a front view, (b) a side view.

图5为电缆排管拼装接点的横向断面示意图。Fig. 5 is a schematic transverse cross-sectional view of the assembly joint of the cable pipe arrangement.

图6为电缆排管拼装接点的纵向断面示意图。Fig. 6 is a schematic diagram of a longitudinal section of a cable pipe assembly joint.

图7为本发明实施例中的电缆排管安装示意图。Fig. 7 is a schematic diagram of the installation of cable ducts in the embodiment of the present invention.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

如图1所示,本实施例中的电缆排管包括管体1、线缆管道和搭接错台3,管体1的截面呈矩形,两端设有搭接错台3,内部设置有线缆管道。在管体1内可以仅设置管径较大的电缆管道2(见图(a)),也可以同时设置管径较小的电缆管道2和通讯线缆管道4(见图(b))。线缆管道的外围布置有钢筋,电缆排管整体为混凝土浇筑成型。As shown in Figure 1, the cable duct in this embodiment includes a pipe body 1, a cable duct and an overlapping joint 3. The cross section of the pipe body 1 is rectangular, and the two ends are provided with an overlapping joint 3, and the interior is provided with Cable conduit. In the pipe body 1, only the cable duct 2 with a larger diameter can be arranged (see figure (a)), or the cable duct 2 and the communication cable duct 4 with a smaller diameter can be arranged at the same time (see figure (b)). The periphery of the cable duct is arranged with steel bars, and the cable duct is formed by pouring concrete as a whole.

如图2所示,搭接错台3也为矩形,凸出于管体1的端面,凸出的长度为200mm~400mm。搭接错台3的横截面小于管体1的横截面,搭接错台3四周侧壁向内凹陷20mm~40mm。搭接错台3端部的四周边角均做10mm~20mm*45°倒角6处理。管体1的上表面预埋有吊钉5作为起吊装置,当然也可以采用吊环或者螺纹套筒等其他起吊结构。As shown in FIG. 2 , the overlapping joint 3 is also rectangular and protrudes from the end surface of the pipe body 1 , and the protruding length is 200 mm to 400 mm. The cross-section of the overlapping staggered platform 3 is smaller than that of the pipe body 1 , and the side walls around the overlapping staggered platform 3 are inwardly recessed by 20 mm to 40 mm. The four peripheral corners at the ends of the lapped wrong platform 3 are all chamfered 6 at 10mm-20mm*45°. The upper surface of the pipe body 1 is pre-embedded with a lifting nail 5 as a lifting device, and of course other lifting structures such as lifting rings or threaded sleeves can also be used.

线缆管道的截面呈圆形或者矩形,由线缆专用管道预埋成型或者由混凝土抽芯成型,管道内径(边长)不全相同,管道呈矩阵式排列,按行×列排布为:1×N,2×N,3×N(N=2、3、4)。线缆管道的端口均做圆弧倒角处理,圆弧7的半径为10~20mm。或者将线缆管道两个端口中的一端设为扩径喇叭口,一端为正常尺寸。通过圆弧倒角或者喇叭口的设置,能保证线缆顺利穿入管道,消除管口错台对线缆的剐蹭。The cross-section of the cable duct is circular or rectangular, and it is pre-embedded or formed by concrete core-pulling for special cable ducts. The inner diameters (side lengths) of the ducts are not the same, and the ducts are arranged in a matrix, arranged in rows and columns: 1 ×N, 2×N, 3×N (N=2, 3, 4). The ports of the cable ducts are all chamfered in an arc, and the radius of the arc 7 is 10-20mm. Or set one end of the two ports of the cable duct as a flared mouth, and the other end as a normal size. Through the setting of arc chamfering or bell mouth, the cable can be smoothly inserted into the pipe, and the scratch on the cable caused by the misalignment of the pipe mouth can be eliminated.

搭接错台3放置在接头U形卡枕8内。接头U形卡枕8由两个侧壁9和一个底梁10组成,整体为钢筋混凝土结构。本实施例中的侧壁9壁厚为60mm~100mm,内部净高=电缆排管搭接错台高度,长度=2倍搭接错台长度,侧壁9上部预埋螺纹套筒11。底梁10厚度60mm~400mm,内部净宽=1个电缆排管搭接错台宽度+其余接头横向并列电缆排管总宽度之和,长度=2倍搭接错台长度。The lap joint staggered platform 3 is placed in the U-shaped clamping pillow 8 of the joint. The joint U-shaped clamping pillow 8 is composed of two side walls 9 and a bottom beam 10, and the whole is a reinforced concrete structure. The wall thickness of the side wall 9 in this embodiment is 60 mm to 100 mm, the internal net height = the height of the lap joint of the cable pipe, the length = twice the length of the lap joint, and the upper part of the side wall 9 is pre-embedded with a threaded sleeve 11 . Bottom beam 10 has a thickness of 60mm to 400mm, internal clear width = the width of one cable pipe overlap joint + the sum of the total width of the other joints horizontally parallel cable pipes, length = 2 times the length of the overlap joint.

接头卡板12的结构如图4所示,本实施例中接头卡板12为矩形钢筋混凝土板,板厚60mm~100mm,板的两端预留紧固螺栓安装孔13,接头卡板长度=底梁内部净长度+2*侧壁壁厚。螺栓安装孔13与螺纹套筒11相对应,由螺栓紧固连接,将接头卡板12与接头U形卡枕8连接成封闭的环。The structure of the joint clamp 12 is shown in Figure 4. In this embodiment, the joint clamp 12 is a rectangular reinforced concrete slab with a thickness of 60 mm to 100 mm. Fastening bolt mounting holes 13 are reserved at both ends of the plate, and the length of the joint clamp = The inner net length of the bottom beam + 2* side wall thickness. The bolt mounting holes 13 correspond to the threaded sleeves 11 and are tightly connected by bolts to connect the joint clamping plate 12 and the joint U-shaped clamping pillow 8 to form a closed ring.

本实施例的电缆排管,可纵、横两个方向灵活拼装,横向各节排管并列紧密排布,端部各排管的搭接错台3对齐放置在接头U形卡枕8上,横向形成整体;纵向两节电缆排管的搭接错台3与接头U形卡枕8搭接,接头U形卡枕8的顶部与接头卡板12用螺栓15紧固连接,形成环形抱箍,连接固定纵向电缆排管接点。搭接错台3的倒角边,在纵向电缆排管对接后,接缝端面四周形成环形的倒角拼缝,在倒角拼缝内放置一圈密封胶条。The cable pipe arrangement of this embodiment can be flexibly assembled in both vertical and horizontal directions, and the horizontal pipe sections are closely arranged side by side. Form a whole in the horizontal direction; the overlapping wrong platform 3 of the two vertical cable pipes is overlapped with the U-shaped clamping pillow 8 of the joint, and the top of the U-shaped clamping pillow 8 of the joint is fastened with the clamping plate 12 of the joint with bolts 15 to form an annular hoop , to connect and fix the vertical cable conduit joints. Lap the chamfered edges of the wrong platform 3, after the longitudinal cable pipes are butted, a circular chamfered seam is formed around the end face of the seam, and a ring of sealing rubber strips is placed in the chamfered seam.

如图5、6和7所示,本实施例的电缆排管的施工方法如下:As shown in Figures 5, 6 and 7, the construction method of the cable pipe arrangement of the present embodiment is as follows:

1)测量放线,开挖基槽,铺设垫层14并找平,所述的垫层14为砂石垫层,分上下两层,下部一层为天然级配碎石,其中最大粒径不宜大于25mm,上部一层为中砂、粗砂。1) Measure the setting-out, excavate the foundation trench, lay the cushion 14 and level it. The cushion 14 is a sandstone cushion, divided into upper and lower layers, and the lower layer is natural graded crushed stone, wherein the maximum particle size is not suitable More than 25mm, the upper layer is medium sand and coarse sand.

2)吊装接头U形卡枕8,并定位调平,纵向间距与电缆排管长度相同,卡枕底梁10的一部分埋入垫层14内,底梁10下部垫层厚度与正常垫层等厚,底梁露出垫层上表面高度不大于搭接错台凹陷深度。2) Hoist the U-shaped card pillow 8 of the joint, and position and level it. The longitudinal distance is the same as the length of the cable pipe. A part of the bottom beam 10 of the card pillow is buried in the cushion 14. The thickness of the cushion under the bottom beam 10 is the same as that of the normal cushion, etc. The height of the bottom beam exposed to the upper surface of the cushion layer is not greater than the depth of the depression of the overlapped staggered platform.

3)吊装电缆排管,先进行横向拼装,第一电缆排管16和第二电缆排管17的两端搭接错台3卡入接头U形卡枕8的底梁10上,搭接错台3的边沿与卡枕边沿对齐,同时在横向拼装各排管间形成的竖缝处粘贴防水材料或塞填泡沫块18;横向拼装完成后,在已安装排管最外沿的倒角处(U形卡枕内侧)粘贴密封胶条19,并预留能够环绕拼接后环形抱箍横截面一周的长度;然后以同样的方式进行纵向拼装,保证下一节电缆排管搭接错台3边沿与卡枕边沿对齐;最后将预留的密封胶条19贴紧在搭接错台3接缝端面的倒角拼缝21内。3) To hoist the cable pipes, first perform horizontal assembly, the two ends of the first cable pipe 16 and the second cable pipe 17 are overlapped by the wrong platform 3 and snapped into the bottom beam 10 of the U-shaped clamping pillow 8 of the joint, and the overlap is wrongly connected. The edge of platform 3 is aligned with the edge of the card pillow, and at the same time, paste waterproof material or fill foam block 18 at the vertical seam formed between the horizontally assembled pipes; (Inside the U-shaped clamping pillow) paste the sealing strip 19, and reserve a length that can surround the cross-section of the annular hoop after splicing; then perform longitudinal assembly in the same way to ensure that the next section of the cable pipe is lapped and wrongly connected 3 The edge is aligned with the edge of the card pillow; finally, the reserved sealing rubber strip 19 is tightly attached to the chamfered seam 21 on the end face of the seam of the overlapped staggered table 3 .

4)安装接头卡板12并压实,用紧固螺栓15将接头卡板12与U形卡枕紧固为一体,形成一个封闭的环型套筒,固定接头位置预制排管的位置,并用水泥砂浆20抹平螺栓安装孔13及吊点孔,至此一个接头的安装施工结束。4) Install the joint clamping plate 12 and compact it, fasten the joint clamping plate 12 and the U-shaped clamping pillow as a whole with fastening bolts 15 to form a closed ring-shaped sleeve, fix the position of the joint and prefabricate the position of the pipe, and use The cement mortar 20 smoothes the bolt mounting holes 13 and the lifting point holes, and the installation and construction of a joint is completed so far.

采用本发明的电缆排管,能够做到傍晚封路开槽、晚上施工、凌晨封土、白天通路的快速施工效果,具有施工效率高、结构简单、适用范围广、铺设连接可靠、经济环保等特点。By adopting the cable pipe arrangement of the present invention, it is possible to achieve rapid construction effects such as road closure and slotting in the evening, construction in the evening, soil sealing in the early morning, and passage in the daytime. It has the characteristics of high construction efficiency, simple structure, wide application range, reliable laying and connection, economical and environmental protection, etc. .

Claims (10)

1.一种电缆排管,其特征在于,包括管体、线缆管道和接头U形卡枕,线缆管道贯穿管体内部,所述管体的端面设有凸出的搭接错台;所述搭接错台放置在接头U形卡枕内。1. A cable pipe arrangement, characterized in that it comprises a pipe body, a cable duct and a joint U-shaped clamping pillow, the cable duct runs through the interior of the pipe body, and the end face of the pipe body is provided with a protruding lap joint; The overlapping staggered table is placed in the U-shaped clamping pillow of the joint. 2.根据权利要求1所述的一种电缆排管,其特征在于,所述电缆排管还包括接头卡板,所述接头卡板与接头U形卡枕连接形成环形抱箍。2 . The cable pipe arrangement according to claim 1 , wherein the cable pipe arrangement further comprises a joint clip, and the joint clip is connected with a joint U-shaped clamp to form an annular hoop. 3 . 3.根据权利要求2所述的一种电缆排管,其特征在于,所述接头卡板与接头U形卡枕通过螺栓固定连接。3 . The cable pipe arrangement according to claim 2 , wherein the joint clamping plate and the joint U-shaped clamping pillow are fixedly connected by bolts. 4 . 4.根据权利要求1至3之一所述的一种电缆排管,其特征在于,所述电缆排管上预埋有起吊装置。4. The cable conduit according to any one of claims 1 to 3, wherein a lifting device is pre-embedded on the cable conduit. 5.根据权利要求1至3之一所述的一种电缆排管,其特征在于,所述搭接错台的端口处经倒角处理。5. The cable duct according to any one of claims 1 to 3, characterized in that, the ports of the overlapping staggered platforms are chamfered. 6.根据权利要求5所述的一种电缆排管,其特征在于,相邻搭接错台对接后,端口形成的倒角拼缝内放置密封条。6 . The cable duct according to claim 5 , wherein, after the adjacent lap joints are butt-jointed, a sealing strip is placed in the chamfered joints formed by the ports. 7 . 7.根据权利要求1至3之一所述的一种电缆排管,其特征在于,线缆管道的端口设置为圆弧倒角或者扩径喇叭口。7. The cable duct according to any one of claims 1 to 3, characterized in that the port of the cable duct is set as a circular arc chamfer or an enlarged diameter bell mouth. 8.根据权利要求1至3之一所述的一种电缆排管,其特征在于,所述搭接错台凸出端面的长度为200mm~400mm。8. The cable duct according to any one of claims 1 to 3, wherein the length of the protruding end surface of the overlapped staggered platform is 200mm-400mm. 9.根据权利要求1至3之一所述的一种电缆排管,其特征在于,所述线缆管道呈矩阵式排列,按行×列排布为:1×N、2×N或者3×N,其中,N=2、3和4。9. A cable duct according to any one of claims 1 to 3, characterized in that, the cable ducts are arranged in a matrix, arranged in rows and columns: 1×N, 2×N or 3 ×N, where N=2, 3 and 4. 10.一种电缆排管的施工方法,其特征在于,具体步骤如下:10. A construction method for cable piping, characterized in that the specific steps are as follows: 1)开挖基槽,铺设垫层并找平;1) Excavate the foundation trench, lay the cushion and level it; 2)铺设接头U形卡枕,将接头U形卡枕的底梁埋入垫层内;2) Lay the U-shaped pillow of the joint, and bury the bottom beam of the U-shaped pillow of the joint in the cushion; 3)吊装电缆排管,将排管的搭接错台放入接头U形卡枕内,并保证搭接错台的边沿与卡枕的边沿对齐;根据需要,进行电缆排管的横向拼装,并保证搭接错台在横向方向上对齐;3) Hoist the cable pipes, put the overlapping joints of the pipes into the U-shaped clamping pillow of the joint, and ensure that the edges of the overlapping joints are aligned with the edges of the clamping pillows; according to the needs, carry out horizontal assembly of the cable pipes, And ensure that the overlapping staggered table is aligned in the lateral direction; 4)横向拼装完成后,在搭接错台的端口处的倒角位置,粘贴密封条,并预留一定长度的密封条;4) After the horizontal assembly is completed, paste a sealing strip at the chamfering position at the port of the overlapping staggered platform, and reserve a certain length of the sealing strip; 5)沿电缆排管的轴向对电缆排管进行纵向拼装,将排管的搭接错台放入接头U形卡枕内并与横向拼装的电缆排管的搭接错台对接,搭接错台的边沿与卡枕的边沿对齐;纵向拼装完成后,将预留的密封条贴紧在两排管对接形成的倒角拼缝内;5) Assemble the cable pipes longitudinally along the axial direction of the cable pipes, put the overlapping joints of the pipes into the U-shaped clamping pillow of the joint and connect them with the overlapping joints of the horizontally assembled cable pipes. The edge of the staggered table is aligned with the edge of the card pillow; after the longitudinal assembly is completed, the reserved sealing strip is tightly attached to the chamfered seam formed by the butt joint of the two rows of pipes; 6)在接头U形卡枕的顶部安装接头卡板并压实,采用螺栓将接头卡板与接头U形卡枕紧固为一体;6) Install the joint clamping plate on the top of the joint U-shaped clamping pillow and compact it, and use bolts to fasten the joint clamping plate and the joint U-shaped clamping pillow as one; 7)重复步骤4)、5)和6),直至一个区段施工完毕;最后基槽回填,施工结束。7) Steps 4), 5) and 6) are repeated until the construction of a section is completed; finally, the foundation trench is backfilled, and the construction ends.
CN201810959567.XA 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method Pending CN108777470A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810959567.XA CN108777470A (en) 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810959567.XA CN108777470A (en) 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method

Publications (1)

Publication Number Publication Date
CN108777470A true CN108777470A (en) 2018-11-09

Family

ID=64028886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810959567.XA Pending CN108777470A (en) 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method

Country Status (1)

Country Link
CN (1) CN108777470A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111799722A (en) * 2020-07-08 2020-10-20 国网江苏省电力有限公司连云港供电分公司 A kind of GFRP light-weight prefabricated cable pipe and its construction method
CN116641420A (en) * 2023-05-30 2023-08-25 天津新业送变电安装有限公司 Enclosed prefabricated cable trench elements
CN117134269A (en) * 2023-10-20 2023-11-28 国网山东省电力公司博兴县供电公司 A power supply pipeline installation and fastening device

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1980000182A1 (en) * 1978-07-03 1980-02-07 M Sammaritano Preformed conduit joining apparatus and method
JPH1014071A (en) * 1996-06-18 1998-01-16 Adobuansu:Kk Underground wiring pipeline block and its connection structure
JPH1189067A (en) * 1997-09-05 1999-03-30 Koken Sangyo Kk Flexible joint device of pipe section orthogonal to CC special section
CN102359123A (en) * 2011-07-21 2012-02-22 济南城建集团有限公司 Cast-in-place concrete cable conduit construction method
CN103669400A (en) * 2013-12-03 2014-03-26 国家电网公司 Typical construction method for prefabricated tube bank
CN104242163A (en) * 2014-10-13 2014-12-24 邱小宁 Cable tube, laying method and laying tool special for laying method
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN206962404U (en) * 2017-05-04 2018-02-02 南通电力设计院有限公司 A kind of pre-fabricated electric cables comb
CN207542753U (en) * 2017-11-28 2018-06-26 杭州中能管业有限公司 A kind of cable protection pipe connection
CN208782449U (en) * 2018-08-22 2019-04-23 建华建材(中国)有限公司 A kind of cable duct bank

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1980000182A1 (en) * 1978-07-03 1980-02-07 M Sammaritano Preformed conduit joining apparatus and method
JPH1014071A (en) * 1996-06-18 1998-01-16 Adobuansu:Kk Underground wiring pipeline block and its connection structure
JPH1189067A (en) * 1997-09-05 1999-03-30 Koken Sangyo Kk Flexible joint device of pipe section orthogonal to CC special section
CN102359123A (en) * 2011-07-21 2012-02-22 济南城建集团有限公司 Cast-in-place concrete cable conduit construction method
CN103669400A (en) * 2013-12-03 2014-03-26 国家电网公司 Typical construction method for prefabricated tube bank
CN104242163A (en) * 2014-10-13 2014-12-24 邱小宁 Cable tube, laying method and laying tool special for laying method
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN206962404U (en) * 2017-05-04 2018-02-02 南通电力设计院有限公司 A kind of pre-fabricated electric cables comb
CN207542753U (en) * 2017-11-28 2018-06-26 杭州中能管业有限公司 A kind of cable protection pipe connection
CN208782449U (en) * 2018-08-22 2019-04-23 建华建材(中国)有限公司 A kind of cable duct bank

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111799722A (en) * 2020-07-08 2020-10-20 国网江苏省电力有限公司连云港供电分公司 A kind of GFRP light-weight prefabricated cable pipe and its construction method
CN116641420A (en) * 2023-05-30 2023-08-25 天津新业送变电安装有限公司 Enclosed prefabricated cable trench elements
CN117134269A (en) * 2023-10-20 2023-11-28 国网山东省电力公司博兴县供电公司 A power supply pipeline installation and fastening device
CN117134269B (en) * 2023-10-20 2024-02-02 国网山东省电力公司博兴县供电公司 A power supply pipeline installation and fastening device

Similar Documents

Publication Publication Date Title
CN110306616B (en) Construction method of sewage pipeline
CN104674847B (en) A kind of city integrated piping lane of prefabricated concrete
CN107859064B (en) Waterproof structure for connection of prefabricated pipe gallery and cast-in-situ pipe gallery and construction method
CN110004991B (en) Anti-floating system and construction method of underground structure based on convex wing foot plate
CN103225318B (en) Anti-seepage and leaking-stoppage device for underground consecutive wall groove section joint point and construction method thereof
CN206693363U (en) Assembled plastics municipal drainage inspection shaft
CN105951876A (en) Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN108832563A (en) A kind of prefabricated cable pipe and its construction method
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN111395391B (en) Construction method for multi-hole rectangular jacking pipe and light and dark excavation joint pipe gallery joint
CN207597428U (en) Prefabricated piping lane is connected waterproof construction with cast-in-place piping lane
CN112281924A (en) Modular combined prefabricated electric working well and its construction method
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN108777470A (en) A kind of cable duct bank and its construction method
CN108411933A (en) Soft soil foundation concrete reinforced pipe construction method and its foundation structure
CN109629664B (en) Basement construction method based on prefabricated resin concrete drainage ditch
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN110685234B (en) Construction method of corrugated steel pipe culvert
CN113186977B (en) A reverse sequence construction method for underground comprehensive utility gallery
CN106193115A (en) A kind of concrete prefabricated groove
CN202401561U (en) Multifunctional environment-friendly movable water channel
CN105041348A (en) Underground space subsurface excavation construction method adopting combined roof
CN113846737A (en) A kind of basalt fiber composite material drainage ditch installation technology
CN208121929U (en) Heavy caliber combined type smears band interface rain pipe system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181109