CN108777470A - A kind of cable duct bank and its construction method - Google Patents

A kind of cable duct bank and its construction method Download PDF

Info

Publication number
CN108777470A
CN108777470A CN201810959567.XA CN201810959567A CN108777470A CN 108777470 A CN108777470 A CN 108777470A CN 201810959567 A CN201810959567 A CN 201810959567A CN 108777470 A CN108777470 A CN 108777470A
Authority
CN
China
Prior art keywords
cable duct
connector
duct bank
slab ends
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810959567.XA
Other languages
Chinese (zh)
Inventor
杨广超
李志高
姚栋
李斌斌
陆立东
张超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Construction Materials China Co Ltd
Original Assignee
Jianhua Construction Materials China Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jianhua Construction Materials China Co Ltd filed Critical Jianhua Construction Materials China Co Ltd
Priority to CN201810959567.XA priority Critical patent/CN108777470A/en
Publication of CN108777470A publication Critical patent/CN108777470A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G9/00Installations of electric cables or lines in or on the ground or water
    • H02G9/06Installations of electric cables or lines in or on the ground or water in underground tubes or conduits; Tubes or conduits therefor
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/06Joints for connecting lengths of protective tubing or channels, to each other or to casings, e.g. to distribution boxes; Ensuring electrical continuity in the joint
    • H02G3/0608Joints for connecting non cylindrical conduits, e.g. channels

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Electric Cable Installation (AREA)

Abstract

The invention discloses a kind of cable duct bank and its construction methods.The cable duct bank includes tube body, cable pipeline and connector U-shaped card pillow, and cable pipeline runs through tubular body, and the end face of tube body is equipped with the overlap joint faulting of slab ends of protrusion;Overlap joint faulting of slab ends is placed in connector U-shaped card pillow.The cable duct bank of the present invention can be with modularized production, modularization assemble, it can realize lateral single layer multiple row, the assembled arrangement of multilayer multiple row comb, the arrangement form for meeting existing various comb designs has the characteristics that construction efficiency is high, simple in structure, applied widely, laying connection is reliable, economic and environment-friendly.

Description

A kind of cable duct bank and its construction method
Technical field
The present invention relates to power domain construction, especially a kind of cable duct bank and its construction method.
Background technology
With the growth requirement of Urbanization Construction, power cable gradually switchs to underground laying by setting up in the air.
The form that cable duct bank is generally used when traditional cable laying, especially a plurality of cable laying, is opened by scene Foundation trench is dug, cable pipe special, then casting concrete maintenance molding are laid.There are operation sides for this traditional approach greatly, applies The shortcomings of work period is long, scene is seriously polluted, especially during municipal cable duct bank is laid, can cause urban road to seal Stifled, poured in place concrete pollutes environment, seriously affects daily life, does not meet the demand of Modern Urban Development.
Invention content
The problem of based on the above existing traditional construction technology, a kind of cable duct bank of present invention offer and its construction party Method can realize factorial praluction, assembling assembly and mechanized construction.
The technical solution adopted by the present invention is as follows:
A kind of cable duct bank, including tube body, cable pipeline and connector U-shaped card pillow, cable pipeline runs through tubular body, described The end face of tube body is equipped with the overlap joint faulting of slab ends of protrusion;The overlap joint faulting of slab ends is placed in connector U-shaped card pillow.
Further, the cable duct bank further includes connector snap-gauge, and the connector snap-gauge is formed with the pillow connection of connector U-shaped card Annular anchor ear.
Further, the connector snap-gauge is bolted to connection with connector U-shaped card pillow.
Further, it is embedded with boom hoisting on the cable duct bank.
Further, through chamfered at the port of the overlap joint faulting of slab ends.
Further, after adjacent overlap joint faulting of slab ends docking, sealing strip is placed in the chamfering piece that port is formed.
Further, the port of cable pipeline is set as circular arc chamfering or expanding horn mouth.
Further, the length of the overlap joint faulting of slab ends protrusion end face is 200mm~400mm.
Further, the cable pipeline is in matrix arrangement, is by the arrangement of row × row:1 × N, 2 × N or 3 × N, In, N=2,3 and 4.
A kind of construction method of cable duct bank of the present invention, is as follows:
1) foundation trench is excavated, laying bed course is simultaneously levelling;
2) it is laid with connector U-shaped card pillow, it will be in the bottom girder embedment bed course of connector U-shaped card pillow;
3) the overlap joint faulting of slab ends of comb is put into connector U-shaped card pillow by crane cable comb, and ensures to overlap the edge of faulting of slab ends It is aligned with the edge of card pillow;As needed, the laterally assembled of cable duct bank is carried out, and ensures that overlap joint faulting of slab ends is right in a lateral direction Together;
4) laterally after the completion of assembly, the chamfering position at the port of overlap joint faulting of slab ends, adhesive seal item, and a reserved fixed length The sealing strip of degree;
5) longitudinal assembly is carried out to cable duct bank along the axial of cable duct bank, the overlap joint faulting of slab ends of comb is put into connector U-shaped It is docked in card pillow and with the overlap joint faulting of slab ends of the laterally cable duct bank of assembly, the edge for overlapping faulting of slab ends is aligned with the edge that card is rested the head on;It is vertical To after the completion of assembly, reserved sealing strip is adjacent to and is docked in the chamfering piece to be formed in two combs;
6) it in the top erection joint snap-gauge of connector U-shaped card pillow and is compacted, using bolt by connector snap-gauge and connector U-shaped card Pillow is fastened as a whole;
7) it repeats step 4), 5) with 6), constructs and finish up to a section;Last foundation trench backfill, construction terminate.
Beneficial effects of the present invention are:
(1) cable duct bank of the invention can realize lateral single layer multiple row, multilayer with modularized production, modularization assemble The assembled arrangement of multiple row comb meets the arrangement form of existing various comb designs.
(2) connector U-shaped card pillow effectively embraces the cable duct bank being laterally arranged in juxtaposition forms entirety together, limits electricity The lateral movement of cable comb ensures the globality of comb and the accuracy of longitudinal cable pipeline docking;Pass through with connector snap-gauge Bolt forms an annular anchor ear, and card has the cable duct bank of joint both direction in length and breadth in arms, is further ensured that the connection of connector Intensity.
(3) connector U-shaped card pillow bottom girder can be thickeied according to engineering demand, had both the effect of sleeper, made cable duct bank connector Place does not generate longitudinal and transverse direction displacement because of the effect of stress, ensures the globality of cable duct bank, can in the area that basis is poor The basement process of U-shaped card napex is only done, comb is in integrally both ends freely supported structure, saves whole ground processing cost.
(4) sealing joint strip that one trap of setting is closed in the chamfering piece space that overlap joint faulting of slab ends joint is formed, passes through snap-gauge After compacting connection, it is effectively guaranteed the water resistance of joint, prevents slime water from penetrating into cable pipeline.
(5) circular arc chamfering of cable pipeline port or one end are set as expanding horn mouth, effectively eliminate longitudinal 2-section pipe Nozzle faulting of slab ends caused by road contraposition is inaccurate ensures smoothly penetrating for cable, eliminates nozzle faulting of slab ends and is scratched to cable.
(6) cable duct bank form of construction work of the invention is all connected using dry type, and scene is without a large amount of wet constructions, and environmental protection is without dirt Dye, no formwork assembling and disassembling operation, be not necessarily to concrete curing, install can grave mound restore place original appearance, quickness and high efficiency.
Description of the drawings
Fig. 1 is pre-fabricated electric cables comb end view in the embodiment of the present invention, and the structure of (a) cable duct bank is (b) another The structure of cable duct bank.
Fig. 2 is pre-fabricated electric cables comb side schematic view in the embodiment of the present invention.
Fig. 3 is connector snap-gauge schematic diagram, (a) front view, (b) side view.
Fig. 4 is that connector U-shaped card rests the head on schematic diagram, (a) front view, (b) side view.
Fig. 5 is the lateral sectional schematic diagram of cable duct bank assembly contact.
Fig. 6 is longitudinal sectional schematic diagram of cable duct bank assembly contact.
Fig. 7 is the cable duct bank scheme of installation in the embodiment of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
As shown in Figure 1, the cable duct bank in the present embodiment includes tube body 1, cable pipeline and overlap joint faulting of slab ends 3, tube body 1 is cut Face is rectangular, and both ends are equipped with overlap joint faulting of slab ends 3, are internally provided with cable pipeline.The larger electricity of caliber can be only set in tube body 1 The smaller cable channel 2 of caliber and communication cable pipeline 4 can also be arranged in cable pipeline 2 (see figure (a)) simultaneously (see figure (b)).Line The peripheral disposition of cable pipeline has reinforcing bar, cable duct bank generally concreting to be molded.
As shown in Fig. 2, overlap joint faulting of slab ends 3 is also rectangle, protrude from the end face of tube body 1, the length of protrusion be 200mm~ 400mm.The cross section for overlapping faulting of slab ends 3 is less than the cross section of tube body 1, and overlap joint 3 surrounding side wall of faulting of slab ends is recessed inwardly 20mm~40mm. It does 10mm~20mm*45 ° of chamfering 6 and handles in the surrounding corner of 3 end of overlap joint faulting of slab ends.The upper surface of tube body 1, which is embedded with, hangs 5 work of nail For boom hoisting, naturally it is also possible to using other hoisting structures such as hanging ring or screw shells.
The rounded either rectangle in section of cable pipeline by cable pipe special Preembedded or by concrete core pulling at Type, internal diameter of the pipeline (length of side) is not all the same, and pipeline is in matrix arrangement, is by the arrangement of row × row:1 × N, 2 × N, 3 × N (N= 2,3,4).Circular arc chamfering processing is done in the port of cable pipeline, and the radius of circular arc 7 is 10~20mm.Or by cable pipeline two One end in a port is set as expanding horn mouth, and one end is normal size.By circular arc chamfering or bell-mouthed setting, can protect Card cable smoothly penetrates pipeline, eliminates nozzle faulting of slab ends and is scratched to cable.
Overlap joint faulting of slab ends 3 is placed in connector U-shaped card pillow 8.Connector U-shaped card pillow 8 is by two side walls 9 and 10 groups of a bottom girder At generally reinforced concrete structure.9 wall thickness of side wall in the present embodiment is 60mm~100mm, internal clear height=cable duct bank Faulting of slab ends height is overlapped, length=2 times overlap faulting of slab ends length, the pre-buried screw shell in 9 top of side wall 11.10 thickness 60mm of bottom girder~ 400mm, internal lateral the sum of cable duct bank overall width side by side of clear span=1 cable duct bank overlap joint faulting of slab ends width+remaining connector are long =2 times of overlap joint faulting of slab ends length of degree.
The structure of connector snap-gauge 12 is as shown in figure 4, the present embodiment center tap snap-gauge 12 is rectangle armoured concrete slab, plate thickness Reserve fastening bolt mounting hole 13, connector snap-gauge length=bottom girder inside clear length+2* side walls in the both ends of 60mm~100mm, plate Wall thickness.Bolt mounting holes 13 are corresponding with screw shell 11, are fastenedly connected by bolt, and connector snap-gauge 12 and connector U-shaped card are rested the head on 8 Connect into closed ring.
The cable duct bank of the present embodiment, can longitudinal and transverse two directions it is flexibly assembled, laterally each section comb is closely arranged side by side, The alignment of overlap joint faulting of slab ends 3 of each comb in end is placed on connector U-shaped card pillow 8, is transversely formed entirety;Longitudinal two save cable duct bank Faulting of slab ends 3 and 8 overlap joint of connector U-shaped card pillow are overlapped, the top of connector U-shaped card pillow 8 is fastenedly connected with the bolt 15 of connector snap-gauge 12, shape Anchor ear is circularized, longitudinal cable duct bank contact is connected and fixed.The bevel edge for overlapping faulting of slab ends 3 connects after the docking of longitudinal cable duct bank Seam end face surrounding forms the chamfering piece of annular, and a circle sealing joint strip is placed in chamfering piece.
As shown in Fig. 5,6 and 7, the construction method of the cable duct bank of the present embodiment is as follows:
1) surveying setting-out excavates foundation trench, and laying bed course 14 is simultaneously levelling, and the bed course 14 is sand-gravel cushion, is divided to upper and lower two Layer, one layer of lower part are prototype gradation rubble, and wherein maximum particle diameter is not preferably greater than 25mm, and one layer of top is middle sand, coarse sand.
2) lifting connector U-shaped card pillow 8, and leveling is positioned, longitudinal pitch is identical as cable duct bank length, card pillow bottom girder 10 In part embedment bed course 14,10 lower part cushion thickness of bottom girder and normal bed course uniform thickness, bottom girder expose bed course upper level not More than overlap joint faulting of slab ends cup depth.
3) crane cable comb, first progress is laterally assembled, and the both ends of the first cable duct bank 16 and the second cable duct bank 17 are taken Wrong platform 3 is caught on the bottom girder 10 of connector U-shaped card pillow 8, and the edge for overlapping faulting of slab ends 3 is aligned with card bedside edge, while in lateral spelling It fills to paste waterproof material at the perps formed between each comb or fill in and fills out foam block 18;Laterally after the completion of assembly, comb is being installed (U-shaped card pillow inside) adhesive seal adhesive tape 19 at the chamfering of most outer, and reserved can surround annular anchor ear cross section after splicing One week length;Then it is done in the same fashion longitudinal assembly, ensures that next section cable duct bank overlap joint 3 edge of faulting of slab ends is rested the head on card Edge is aligned;Finally reserved sealing joint strip 19 is adjacent in the chamfering piece 21 of 3 seam end face of overlap joint faulting of slab ends.
4) it erection joint snap-gauge 12 and is compacted, connector snap-gauge 12 and U-shaped card pillow is fastened as a whole with fastening bolt 15, shape At a closed annular sleeve, the position of the prefabricated comb in anchor tip position is used in combination cement mortar 20 to smooth out bolt mounting holes 13 and suspension centre hole, the so far installation of a connector terminate.
Cable duct bank using the present invention can accomplish close a road to traffic at dusk fluting, at night construction, morning grave mound, access on daytime Rapid construction effect, have construction efficiency it is high, it is simple in structure, applied widely, be laid with and connect the spies such as reliable, economic and environment-friendly Point.

Claims (10)

1. a kind of cable duct bank, which is characterized in that rested the head on including tube body, cable pipeline and connector U-shaped card, cable pipeline runs through tube body Inside, the end face of the tube body are equipped with the overlap joint faulting of slab ends of protrusion;The overlap joint faulting of slab ends is placed in connector U-shaped card pillow.
2. a kind of cable duct bank according to claim 1, which is characterized in that the cable duct bank further includes connector snap-gauge, The connector snap-gauge forms annular anchor ear with the pillow connection of connector U-shaped card.
3. a kind of cable duct bank according to claim 2, which is characterized in that the connector snap-gauge and connector U-shaped card pillow are logical Bolt is crossed to be fixedly connected.
4. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that be embedded on the cable duct bank Boom hoisting.
5. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that at the port of the overlap joint faulting of slab ends Through chamfered.
6. a kind of cable duct bank according to claim 5, which is characterized in that after adjacent overlap joint faulting of slab ends docking, port is formed Chamfering piece in place sealing strip.
7. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that the port of cable pipeline is set as Circular arc chamfering or expanding horn mouth.
8. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that the overlap joint faulting of slab ends protrudes end face Length be 200mm~400mm.
9. a kind of cable duct bank according to one of claims 1 to 3, which is characterized in that the cable pipeline is in matrix form Arrangement, arranging by row × row is:1 × N, 2 × N or 3 × N, wherein N=2,3 and 4.
10. a kind of construction method of cable duct bank, which is characterized in that be as follows:
1) foundation trench is excavated, laying bed course is simultaneously levelling;
2) it is laid with connector U-shaped card pillow, it will be in the bottom girder embedment bed course of connector U-shaped card pillow;
3) the overlap joint faulting of slab ends of comb is put into connector U-shaped card pillow by crane cable comb, and ensures to overlap the edge and card of faulting of slab ends The edge of pillow is aligned;As needed, the laterally assembled of cable duct bank is carried out, and ensures that overlap faulting of slab ends is aligned in a lateral direction;
4) laterally after the completion of assembly, the chamfering position at the port of overlap joint faulting of slab ends, adhesive seal item, and reserved certain length Sealing strip;
5) longitudinal assembly is carried out to cable duct bank along the axial of cable duct bank, the overlap joint faulting of slab ends of comb is put into connector U-shaped card pillow Interior and the cable duct bank assembled with transverse direction overlap joint faulting of slab ends docks, and the edge for overlapping faulting of slab ends is aligned with the edge that card is rested the head on;It is longitudinal to spell After the completion of dress, reserved sealing strip is adjacent to and is docked in the chamfering piece to be formed in two combs;
6) it in the top erection joint snap-gauge of connector U-shaped card pillow and is compacted, is rested the head on connector snap-gauge and connector U-shaped card using bolt tight It is solidified as a whole;
7) it repeats step 4), 5) with 6), constructs and finish up to a section;Last foundation trench backfill, construction terminate.
CN201810959567.XA 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method Pending CN108777470A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810959567.XA CN108777470A (en) 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810959567.XA CN108777470A (en) 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method

Publications (1)

Publication Number Publication Date
CN108777470A true CN108777470A (en) 2018-11-09

Family

ID=64028886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810959567.XA Pending CN108777470A (en) 2018-08-22 2018-08-22 A kind of cable duct bank and its construction method

Country Status (1)

Country Link
CN (1) CN108777470A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117134269A (en) * 2023-10-20 2023-11-28 国网山东省电力公司博兴县供电公司 Power supply pipeline installation fastener

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1980000182A1 (en) * 1978-07-03 1980-02-07 M Sammaritano Preformed conduit joining apparatus and method
JPH1014071A (en) * 1996-06-18 1998-01-16 Adobuansu:Kk Conduit block for underground wiring and connecting structure thereof
JPH1189067A (en) * 1997-09-05 1999-03-30 Koken Sangyo Kk Flexible jointing device of conduit orthogonally crossing special portion of c-c-box
CN102359123A (en) * 2011-07-21 2012-02-22 济南城建集团有限公司 Cast-in-place concrete cable conduit construction method
CN103669400A (en) * 2013-12-03 2014-03-26 国家电网公司 Typical construction method for prefabricated tube bank
CN104242163A (en) * 2014-10-13 2014-12-24 邱小宁 Cable tube, laying method and laying tool special for laying method
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN206962404U (en) * 2017-05-04 2018-02-02 南通电力设计院有限公司 A kind of pre-fabricated electric cables comb
CN207542753U (en) * 2017-11-28 2018-06-26 杭州中能管业有限公司 A kind of cable protection pipe connection
CN208782449U (en) * 2018-08-22 2019-04-23 建华建材(中国)有限公司 A kind of cable duct bank

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO1980000182A1 (en) * 1978-07-03 1980-02-07 M Sammaritano Preformed conduit joining apparatus and method
JPH1014071A (en) * 1996-06-18 1998-01-16 Adobuansu:Kk Conduit block for underground wiring and connecting structure thereof
JPH1189067A (en) * 1997-09-05 1999-03-30 Koken Sangyo Kk Flexible jointing device of conduit orthogonally crossing special portion of c-c-box
CN102359123A (en) * 2011-07-21 2012-02-22 济南城建集团有限公司 Cast-in-place concrete cable conduit construction method
CN103669400A (en) * 2013-12-03 2014-03-26 国家电网公司 Typical construction method for prefabricated tube bank
CN104242163A (en) * 2014-10-13 2014-12-24 邱小宁 Cable tube, laying method and laying tool special for laying method
CN104947709A (en) * 2015-04-15 2015-09-30 上海市政工程设计研究总院(集团)有限公司 Pre-assembled single-compartment municipal tunnel and construction method thereof
CN206962404U (en) * 2017-05-04 2018-02-02 南通电力设计院有限公司 A kind of pre-fabricated electric cables comb
CN207542753U (en) * 2017-11-28 2018-06-26 杭州中能管业有限公司 A kind of cable protection pipe connection
CN208782449U (en) * 2018-08-22 2019-04-23 建华建材(中国)有限公司 A kind of cable duct bank

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117134269A (en) * 2023-10-20 2023-11-28 国网山东省电力公司博兴县供电公司 Power supply pipeline installation fastener
CN117134269B (en) * 2023-10-20 2024-02-02 国网山东省电力公司博兴县供电公司 Power supply pipeline installation fastener

Similar Documents

Publication Publication Date Title
CN105002931B (en) The two-way Precast Concrete Segmental Bridges construction method of a kind of large scale underpass
CN108252329B (en) Assembly type comprehensive pipe gallery for bearing force of enclosure structure and construction method thereof
CN103741714A (en) Construction method for full cover-excavation reverse method of underground engineering
CN108832563A (en) A kind of pre-fabricated electric cables comb and its construction method
CN106555408A (en) The structure and construction method of underground pipe gallery
CN110004991B (en) Underground structure anti-floating system based on convex wing foot plate and construction method
CN113668612A (en) Modular combined prefabricated electric power working well and construction method thereof
CN110158656A (en) A kind of integrated template piping lane and its method of construction
CN110306989B (en) Non-open-cut assembled pipe trench excavation supporting and reinforcing method
CN206376277U (en) The structure of underground pipe gallery
CN208782449U (en) A kind of cable duct bank
CN106088758B (en) A kind of bilayer assembled underground granary
CN108777470A (en) A kind of cable duct bank and its construction method
CN115961647A (en) Basement roof post-cast strip advanced sealing structure, construction structure and construction method
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN208690872U (en) A kind of pre-fabricated electric cables comb
CN109736843B (en) Reverse waterproof method for assembling and pouring two linings of small template
CN106049948B (en) Bag Plastic preform bulkhead underground granary in a kind of insertion slot type
CN206722391U (en) Basement barricade moulding wall formwork erecting structure based on brick fetal membrane
CN112482435A (en) Underground excavation construction method for underground multi-cabin pipe gallery through building
CN106088764B (en) A kind of stepped prefabricated assembled circular underground granary of encased steel plate
CN106088759B (en) The equal stepped prefabricated assembled circular underground granary of steel plated inside and outside one kind
CN106193744B (en) The round prefabricated assembled underground granary of equal steel plated inside and outside one kind
CN206467651U (en) Rectangular concrete pile for building piping lane side wall
CN109469103A (en) A kind of environment-friendly type fabricated assembly overall pipe gallery and its assembly method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication