CN108756895A - A kind of tunnel excavation support construction method - Google Patents

A kind of tunnel excavation support construction method Download PDF

Info

Publication number
CN108756895A
CN108756895A CN201810426951.3A CN201810426951A CN108756895A CN 108756895 A CN108756895 A CN 108756895A CN 201810426951 A CN201810426951 A CN 201810426951A CN 108756895 A CN108756895 A CN 108756895A
Authority
CN
China
Prior art keywords
hole
soil layer
steel
support
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810426951.3A
Other languages
Chinese (zh)
Other versions
CN108756895B (en
Inventor
彭申凯
孙学军
刘晓晗
崔健
钱申春
杜海峰
杨文柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN201810426951.3A priority Critical patent/CN108756895B/en
Publication of CN108756895A publication Critical patent/CN108756895A/en
Application granted granted Critical
Publication of CN108756895B publication Critical patent/CN108756895B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/102Removable shuttering; Bearing or supporting devices therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of tunnel excavation support construction methods, including step:1) hole pipe roof construction;2) advance support is constructed;3) soil layer one excavates in hole;4) steel arch-shelf is laid;5) just lining anchor pole and the just construction of lining concrete layer;6) soil layer two excavates in hole;7) construction of central division wall;8) soil layer four excavates in soil layer three and hole in hole;9) hole bottom inverted arch is constructed.The beneficial effects of the invention are as follows:Invention unit spelling holder carries out pipe canopy template and sets to lay with steel arch-shelf to construct, and support construction can be substantially improved sets and dismount construction efficiency, saving engineering measure expense;Template inner support is arranged in the present invention between pipe canopy internal model and pipe canopy external mold, and wall thickness control volume is arranged in the outside of wall mould, can effectively promote filling concrete construction quality, save the dosage of material.

Description

A kind of tunnel excavation support construction method
Technical field
The present invention relates to tunnel construction method, more particularly to a kind of self is poor, tunnel width is big tunnel Road excavation supporting construction method, belongs to field of civil engineering, is suitable for weak rocks soil layer tunnel excavation support construction work.
Background technology
During large section Modelling of Tunnel Excavation in Soft Rock, traditional excavation method be two side-wall pilot tunnel, CD methods, CRD methods etc., for large section and the tunnel of country rock difference, two side-wall pilot tunnel, CRD methods have well adapting to property, but because facing When support that more, site operation speed is slow, the stability of enclosed structure is often difficult to guarantee, construction cost is high.
Have a kind of weak surrounding rock large section tunnel excavation supporting structure and its operating method in the prior art, in use Step double side wall divides six-zone digging supporting, gets out of a predicament or an embarrassing situation using seven excavation supportings of benching tunnelling method point.Before excavation, first use advanced small Conduit carries out arch advance support and tunnel cross-section is divided into 13 progress later according to certain sequence.The excavation structure and side For method, it can be achieved that more work surface parallel operations, work efficiency is high, but is difficult to solve the problems, such as temporary support assembling rapid construction.One kind is squeezed Die mould weak surrounding rock large section short tunnel excavation supporting structure and construction method, structure include top supporting from top to bottom, Middle part supporting and lower part supporting, top supporting include the supporting of left side wall base tunnel, mid-board supporting and right side wall base tunnel supporting, middle part Step supporting during supporting includes left step supporting and is right, lower part supporting includes lower-left step supporting and bottom right step supporting.It should The excavation work surface of method is more, it is difficult to effectively promote site operation work efficiency.
Though in conclusion existing construction achieves preferable construction effect under suitable operating mode, applied at promotion scene Work efficiency rate saves supporting construction material utilization amount, preserves the ecological environment etc. and remains deficiency.In consideration of it, to improve tunnel excavation The site operation quality and efficiency of supporting improve the stress performance and disassembly efficiency of supporting construction object, preserve the ecological environment, at present Urgently invent it is a kind of can not only enhance tunnel support structure and surrounding rock stability, and tunnel temporary support structures can be promoted Laying and excavation construction efficiency, can also improve the tunnel excavation support construction method of material recycling rate of waterused.
Invention content
The purpose of the present invention is overcoming deficiency in the prior art, provide it is a kind of can not only enhance tunnel support structure and Surrounding rock stability, and tunnel temporary support structures laying and excavation construction efficiency can be promoted, material repetition can also be improved The tunnel excavation support construction method of utilization rate.
This tunnel excavation support construction method, includes the following steps:
1) hole pipe roof construction:It is tested in engineering site and determines that the space of hole pipe canopy is linear, first lay unit spelling branch Frame, unit spelling holder are connect with pipe canopy internal model by top surface supporting rod and lateral bolster strut, and in top surface supporting rod and side Supporting rod and pipe canopy internal model joint setting pressure diffusion plate one;Template inner support, auxiliary positioning are laid in pipe canopy internal model again Then muscle and reinforcing bar position-limiting tube are arranged pipe canopy external mold, Screw arbor with nut at both-ends are arranged between pipe canopy external mold and pipe canopy internal model;Meanwhile External mold limit body is arranged with soil layer joint outside hole in pipe canopy external mold, and outer diagonal brace is arranged between soil layer outside external mold limit body and hole With external support pier;Finally to concrete perfusion in the gap of pipe canopy external mold and pipe canopy internal model;
2) advance support is constructed:Advanced conduit is applied to soil layer outside the hole in one outside of soil layer in hole, and in advanced conduit Mud jacking is carried out, advance support body is formed;
3) soil layer one excavates in hole:It is soil layer one in hole by soil layer subregion, soil layer two in hole, soil in soil layer three and hole in hole Layer four, first excavates soil layer in hole one;
4) steel arch-shelf is laid:Soil layer one lays steel arch-shelf at once in hole after the completion of excavating, and distinguishes in the both sides of steel arch-shelf Reinforcing layer one and reinforcing layer two are set, locking angle muscle body is arranged in steel arch-shelf corner, and steel arch-shelf lower surface connects with unit spelling holder, And in top surface supporting rod and lateral bolster strut and steel arch-shelf joint setting pressure diffusion plate two;
5) just lining anchor pole and the just construction of lining concrete layer:From advance support external surface, soil layer sets and just serves as a contrast anchor to outside hole Bar, while gap to steel arch-shelf and outside gunite concrete form and just serve as a contrast concrete layer;
6) soil layer two excavates in hole:After just lining concrete layer forms intensity, soil layer two in hole is excavated, and carries out just serving as a contrast anchor Bar and the just construction of lining concrete layer;
7) construction of central division wall:Wall mould is arranged in the outside of soil layer four in soil layer three and hole in hole, and carries out filling concrete Form mid-board;The bottom of wall mould is inserted into the template limiting slot of steelframe bottom plate, between soil layer four in soil layer in hole three and hole It is arranged between setting wall top limit body, with steelframe pillar between setting wall thickness control volume and lateral connection muscle, with advance support body Horizontal-associate;Arranging plate bottom anchor rib between steelframe diagonal brace, with lower part soil layer is set between steelframe bottom plate and steelframe pillar;
8) soil layer four excavates in soil layer three and hole in hole:After mid-board forms intensity, step 3)~step 6) is repeated, is completed In hole in soil layer three and hole soil layer four excavation construction;
9) hole bottom inverted arch is constructed:The sundries at hole bottom is removed, carries out that inverted arch template is arranged at hole bottom inverted arch position, and mixed Solidifying soil perfusion forms hole bottom inverted arch and pipeline trench;Pipeline trench mould is preset in inverted arch template;When the inverted arch steel reinforcement cage binding of hole bottom, first It is needed that stool pier and stool top plate is arranged according to construction, and stool top attachment strap is set between adjacent stool top plate.
As preferred:The height of step 1) the template inner support is identical as hole pipe canopy thickness, is welded with pipe canopy internal model Connection;Auxiliary positioning muscle is arc-shaped, and connection is welded to connect or pasted with reinforcing bar position-limiting tube;The external mold limit body connects with Guan Peng Contacting surface is arc-shaped, and diagonal brace limit body is arranged in free face;External support pier cross section is rounded or rectangle, is set to external mold The outside of limit body, using armored concrete preformed material or section steel material.
As preferred:Step 1) and step 4) the unit spelling holder are by platform top, platform column, top surface supporting rod It is formed with lateral bolster strut, support baseboard, lateral bolster strut and platform column is set between top surface supporting rod and platform top Between setting support rotating cut with scissors;In platform column lower part setting column bottom bearing plate;Divide on top surface supporting rod and lateral bolster strut Regulation ring one and support regulation ring two She Zhi not supported.
As preferred:Step 4) the steel arch-shelf is arc-shaped using rolling of sectional iron, according to soil layer in soil layer in hole one, hole It is prepared by the outer contour shape after the completion of two, soil layer four excavates in soil layer three and hole in hole;The locking angle muscle body is from steel arch-shelf bottom end Portion is oliquely downward set, using steel pipe or section steel material;The reinforcing layer one and reinforcing layer two are fine using bar-mat reinforcement grid or steel Tie up grid or fiberglass grid.
As preferred:Arc is made using steel plate in step 1) the pressure diffusion plate one, and pipe canopy internal model is seamless connects.
As preferred:Arc is made using steel plate in step 4) the pressure diffusion plate two, and steel arch-shelf is seamless connects.
As preferred:Step 7) the mid-board facade is in numerical value line or curved line;The wall thickness control volume uses coagulation Soil material connects or passes through rivet interlacement with wall mould by pasting.
As preferred:Step 9) pipeline trench mould cross section is rectangular, integral prefabricated with inverted arch template;The stool top plate It is welded to connect with stool pier, overlaps and connect with stool top attachment strap, bottom shape is identical as inverted arch template.
The beneficial effects of the invention are as follows:
(1) invention unit spelling holder carry out pipe canopy template set with steel arch-shelf lay construct, support can be substantially improved Structure sets and dismounts construction efficiency, saves engineering measure expense.
(2) template inner support is arranged in the present invention between pipe canopy internal model and pipe canopy external mold, and wall thickness is arranged in the outside of wall mould Control volume can effectively promote filling concrete construction quality, save the dosage of material.
(3) reinforcing layer one and reinforcing layer two is respectively set in steel arch-shelf both sides in the present invention, and different times can be substantially improved and pour Build the globality of concrete;Locking angle muscle body is set in the corner of steel arch-shelf simultaneously, the deformation and movement of steel arch-shelf can be limited.
(4) steelframe bottom plate when construction of central division wall of the present invention, steelframe pillar, steelframe diagonal brace and horizontal-associate can be used as an entirety It is moved, the quick laying of temporary support structure when the construction of wall mould not only may be implemented, and construction of central division wall can be improved Quality.
Description of the drawings
Fig. 1 is construction of central division wall structure section schematic diagram of the present invention;
Fig. 2 is pipe roof construction structure section schematic diagram in hole of the present invention;
Fig. 3 is that steel arch-shelf of the present invention lays constructing structure sectional schematic diagram;
Fig. 4 is the subregion schematic diagram that the present invention excavates soil layer;
Fig. 5 is structure section schematic diagram after inverted arch template of the present invention is laid;
Fig. 6 is structure section schematic diagram after the completion of the inverted arch construction of hole bottom of the present invention;
Fig. 7 is tunnel excavation support construction process figure of the present invention.
Reference sign:The holes 1- Guan Peng;2- unit spelling holders;3- pipe canopy internal models;4- template inner supports;5- is assisted Positioning bar;6- reinforcing bar position-limiting tubes;7- pipe canopy external molds;8- Screw arbor with nut at both-ends;9- external mold limit bodies;Soil layer outside the holes 10-;The outer diagonal braces of 11-; 12- external support piers;13- platform tops;14- platform columns;The top surfaces 15- supporting rod;16- lateral bolster struts;17- supports bottom Plate;18- support rotatings are cut with scissors;19- pressure diffusions plate one;Soil layer one in the holes 20-;The advanced conduits of 21-;22- advance support bodies;23- Steel arch-shelf;24- reinforcing layers one;25- reinforcing layers two;26- locking angle muscle bodies;27- pressure diffusions plate two;28- just serves as a contrast anchor pole;At the beginning of 29- Serve as a contrast concrete layer;Soil layer two in the holes 30-;31- mid-boards;Soil layer three in the holes 32-;Soil layer four in the holes 33-;34- wall moulds;35- steel Frame bottom plate;36- template limiting slots;37- lateral connection muscle;38- wall thickness control volumes;39- wall top limit bodies;40- steelframe pillars; 41- horizontal-associates;42- steelframe diagonal braces;43- board bottom anchor ribs;The holes 44- bottom inverted arch;45- inverted arch templates;46- pipeline trench moulds;47- pipelines Groove;48- inverted arch steel reinforcement cages;49- stool piers;50- stool top plates;51- stools top attachment strap;52- diagonal brace limit bodies;53- columns bottom bearing plate; 54- supports regulation ring one;55- supports regulation ring two.
Specific implementation mode
The present invention is described further with reference to embodiment.The explanation of following embodiments is merely used to help understand this Invention.It should be pointed out that for those skilled in the art, without departing from the principle of the present invention, also Can be with several improvements and modifications are made to the present invention, these improvement and modification also fall into the protection domain of the claims in the present invention It is interior.
The design and construction technology requirement of hole pipe canopy, filling concrete construction technical requirement, tunnel excavation construction technology It is required that, advanced catheter design and construction technical requirement, advance support body pouring construction technology require, reinforcing layer one and reinforcing layer two Design and construction technique require, steel arch-shelf Hoisting Construction Technology require etc., repeated no more in present embodiment, emphasis illustrate this Invention is related to the embodiment of method.
Shown in referring to Fig.1~Fig. 6, pipe canopy external mold 7 of the present invention and pipe canopy internal model 3 are connected by Screw arbor with nut at both-ends 8 and inner support one It connects, the setting external mold limit body 9 in the outside of pipe canopy external mold 7;Pipe canopy internal model 3 is connected with unit spelling holder 2;The bottom of wall mould 34 It is inserted into the template limiting slot 36 of steelframe bottom plate 35, lateral connection muscle 37 is set in hole between soil layer with not excavating, with advanced branch Wall top limit body 39 is set between watch box 22, horizontal-associate 41 is set between steelframe pillar 40;Steelframe bottom plate 35 and steelframe pillar 40 Between setting steelframe diagonal brace 42, the arranging plate bottom anchor rib 43 between the soil layer of lower part;Reinforcement is respectively set in the both sides of steel arch-shelf 23 Locking angle muscle body 26 is arranged in layer 1 and reinforcing layer 2 25, corner, and lower surface is connected with unit spelling holder 2;In inverted arch template 45 Upper default pipeline trench mould 46 is arranged stool top plate 50 in the upper surface of stool pier 49, stool top attachment strap is arranged between adjacent stool top plate 50 51。
Hole pipe canopy 1 uses concrete reinforced pipe canopy, is highly 7m, width 30m.
Unit spelling holder 2 is made of platform top 13, platform column 14, top surface supporting rod 15 and lateral bolster strut 16; The steel plate rolling that platform top 13 uses thickness to be Q235 for 1cm, strength grade forms, width 6m, length 10m;It is flat It is 400 × 400 × 13 × 21mm, strength grade Q235, length 2m that platform column 14, which uses H profile steel, specification,.Top surface supporting rod 15 using a diameter of 300mm, and wall thickness is the steel pipe of 1mm, strength grade Q235.Lateral bolster strut 16 uses a diameter of 200mm, Wall thickness is the steel pipe of 1mm, strength grade Q235.Support baseboard 17 is set between top surface supporting rod 15 and platform top 13, The steel plate rolling that support baseboard 17 uses thickness to be Q235 for 2cm, strength grade forms, width 0.5m, length 0.5m. Support rotating is set between lateral bolster strut 16 and platform column 14 and cuts with scissors 18, support rotating hinge 18 is using a diameter of 200mm's Flexural pivot.The bearing plate 53 at 14 lower part of platform column setting column bottom, column bottom bearing plate 53 use the thickness to be for 2cm, strength grade The steel plate rolling of Q235 forms, width 1m, length 1m.It is respectively set on top surface supporting rod 15 and lateral bolster strut 16 Support regulation ring 1 and support regulation ring 2 55.Support regulation ring 1 and support regulation ring 2 55 are respectively adopted internal diameter and are The garter spring of 300mm and 200mm.
Pipe canopy internal model 3 and pipe canopy external mold 7 are all made of the steel plate rolling that thickness is 2mm, strength grade is Q235 and form.In pipe Template inner support 4, auxiliary positioning muscle 5 and reinforcing bar position-limiting tube 6 are laid in canopy internal model 3.Template inner support 4 uses thickness for 1cm, by force The steel plate rolling that degree grade is Q235 forms, and is highly width 10cm, 30cm.Auxiliary positioning muscle 5 use thickness for 2mm, Strength grade be Q235 steel plate rolling form, width 10cm is welded to connect with reinforcing bar position-limiting tube 6, reinforcing bar position-limiting tube 6 it is straight Diameter is 40mm.
8 a diameter of 20mm of Screw arbor with nut at both-ends, length 400mm.External mold limit body 9 uses the thickness to be for 2mm, strength grade The steel plate rolling of Q235 forms, and height 2m, top width and bottom width are 20mm.Soil layer 10 is the loess of plastic state outside hole. It is the steel pipe of 1mm, strength grade Q235 that outer diagonal brace 11, which uses a diameter of 200mm, wall thickness,.External support pier 12 uses H profile steel, Specification is 200 × 200 × 8 × 12mm, strength grade Q235, length 2m.
Pressure diffusion plate 1 and pressure diffusion plate 2 27 are all made of the steel plate that thickness is 2mm, strength grade is Q235 and roll It makes.
Soil layer 1 in hole, soil layer 2 30 in hole, soil layer 4 33 is loess in soil layer 3 32 and hole in hole, soil layer in hole 1 and hole in soil layer 3 32 height be 5m.
Advanced conduit 21 uses the steel pipe of a diameter of 42mm;Advance support body 22 uses cement mortar, and strength grade is M20。
The specification of steel arch-shelf 23 is I 20a.
Reinforcing layer 1 and reinforcing layer 2 25 are all made of bar-mat reinforcement grid, and bar diameter is 8mm in bar-mat reinforcement.
Locking angle muscle body 26, just lining anchor pole 28, lateral connection muscle 37 and board bottom anchor rib 43 are all made of the spiral shell of a diameter of 32mm Line reinforcing bar.
Just the strength grade of concrete of lining concrete layer 29 is C40, thickness 30cm.
The thickness of mid-board 31 is 40cm, strength grade C35.
The steel plate rolling that wall mould 34 uses thickness to be Q235 for 2mm, strength grade forms.
The steel plate rolling that steelframe bottom plate 35 uses thickness to be Q235 for 2cm, strength grade forms.
The width of template limiting slot 36 is 1cm, depth 1cm.
The height of wall thickness control volume 38 is 20cm, thickness 40cm, using concrete block.
The height of wall top limit body 39 is 40m, and using H profile steel, specification is 200 × 200 × 8 × 12mm, and strength grade is Q235。
It is 400 × 400 × 13 × 21mm, strength grade Q235 that steelframe pillar 40, which uses H profile steel, specification,.
It is 200 × 200 × 8 × 12mm, strength grade Q235 that horizontal-associate 41, which uses H profile steel, specification,.
It is the steel pipe of 1mm, strength grade Q235 that steelframe diagonal brace 42, which uses a diameter of 200mm, wall thickness,.
Hole bottom inverted arch 44 uses Reinforced Concrete Materials, thickness 50cm, strength grade of concrete C40.
Inverted arch template 45 and pipeline trench mould 46 are all made of the steel plate rolling that thickness is 2mm, strength grade is Q235 and form.
The width of pipeline trench 47 is 20cm, is highly 20cm.
The reinforcing bar of inverted arch steel reinforcement cage 48 uses the spiral of a diameter of 32mm and 12mm.
It is 200 × 200 × 8 × 12mm, strength grade Q235 that stool pier 49, which uses H profile steel, specification, is highly 60cm.
Stool top plate 50 and stool top attachment strap 51 are all made of the steel plate rolling that thickness is 2mm, strength grade is Q235 and form.
The steel plate rolling that diagonal brace limit body 52 uses thickness to be Q235 for 2cm, strength grade forms, width 10cm, height Degree is 10cm.
With reference to shown in Fig. 7, the tunnel excavation support construction method, including following construction procedure:
1) hole pipe canopy 1 is constructed:It is tested in engineering site and determines that the space of hole pipe canopy 1 is linear, first lay unit spelling Holder 2, unit spelling holder 2 are connect with pipe canopy internal model 3 by top surface supporting rod 15 and lateral bolster strut 16, and are supported in top surface Bar 15 and lateral bolster strut 16 and 3 joint of pipe canopy internal model setting pressure diffusion plate 1;Again template is laid in pipe canopy internal model 3 Then pipe canopy external mold 7 is arranged, between pipe canopy external mold 7 and pipe canopy internal model 3 in inner support 4, auxiliary positioning muscle 5 and reinforcing bar position-limiting tube 6 Screw arbor with nut at both-ends 8 is set;Meanwhile 10 joint of the soil layer setting external mold limit body 9 outside pipe canopy external mold 7 and hole, and limited in external mold Outer diagonal brace 11 and external support pier 12 are set outside body 9 and hole between soil layer 10;Finally between pipe canopy external mold 7 and pipe canopy internal model 3 Concrete perfusion in gap;
2) advance support is constructed:Advanced conduit 21 is applied to soil layer 10 outside the hole in one 20 outside of soil layer in hole, and to advanced Mud jacking is carried out in conduit 21, forms advance support body 22;
3) soil layer 1 excavates in hole:It is soil layer 1 in hole by soil layer subregion, soil layer 2 30 in hole, soil layer 3 32 in hole With soil layer 4 33 in hole, first soil layer in hole 1 is excavated;
4) steel arch-shelf 23 is laid:Steel arch-shelf 23 is laid after the completion of soil layer 1 excavates in hole at once, and in steel arch-shelf 23 Reinforcing layer 1 and reinforcing layer 2 25 is respectively set in both sides, and locking angle muscle body 26, lower surface and 2 phase of unit spelling holder is arranged in corner It connects, and in top surface supporting rod 15 and lateral bolster strut 16 and 23 joint of steel arch-shelf setting pressure diffusion plate 2 27;
5) just lining anchor pole 28 and the just construction of lining concrete layer 29:It is set from 22 appearance of advance support body towards soil layer outside hole 10 Just lining anchor pole 28, while gap to steel arch-shelf 23 and outside gunite concrete form and just serve as a contrast concrete layer 29;
6) soil layer 2 30 excavates in hole:After just lining concrete forms intensity, soil layer 2 30 in hole is excavated, and carries out just lining Anchor pole 28 and the just construction of lining concrete layer 29;
7) mid-board 31 is constructed:In hole in soil layer 3 32 and hole soil layer 4 33 outside setting wall mould 34, and mixed Solidifying soil perfusion forms mid-board 31;The bottom of wall mould 34 is inserted into the template limiting slot 36 of steelframe bottom plate 35, with soil layer in hole three 32 and hole in wall top is set between setting wall thickness control volume 38 and lateral connection muscle 37, with advance support body 22 between soil layer 4 33 Horizontal-associate 41 is set between limit body 39, with steelframe pillar 40;Steelframe diagonal brace 42 is set between steelframe bottom plate 35 and steelframe pillar 40, The arranging plate bottom anchor rib 43 between the soil layer of lower part;
8) soil layer 4 33 excavates in soil layer 3 32 and hole in hole:After mid-board 31 forms intensity, step 3~step 6 is repeated, Complete the excavation construction of soil layer 4 33 in soil layer 3 32 and hole in hole;
9) hole bottom inverted arch 44 is constructed:The sundries at hole bottom is removed, is carried out in 44 position of hole bottom inverted arch setting inverted arch template 45, and It carries out filling concrete and forms hole bottom inverted arch 44 and pipeline trench 47;Pipeline trench mould 46 is preset in inverted arch template 45;Hole bottom inverted arch When steel reinforcement cage 48 is bound, first needed that stool pier 49 and stool top plate 50 is arranged according to construction, and between adjacent stool top plate 50 be arranged Stool top attachment strap 51.

Claims (8)

1. a kind of tunnel excavation support construction method, it is characterised in that including following construction procedure:
1) hole Guan Peng (1) constructs:It is tested in engineering site and determines that the space of hole Guan Peng (1) is linear, first lay unit spelling Holder (2), unit spelling holder (2) are connect with pipe canopy internal model (3) by top surface supporting rod (15) and lateral bolster strut (16), and Supporting rod (15) and lateral bolster strut (16) and pipe canopy internal model (3) joint setting pressure diffusion plate one (19) in top surface;Exist again Template inner support (4), auxiliary positioning muscle (5) and reinforcing bar position-limiting tube (6) are laid in pipe canopy internal model (3), then pipe canopy external mold is set (7), Screw arbor with nut at both-ends (8) is set between pipe canopy external mold (7) and pipe canopy internal model (3);Meanwhile the soil outside pipe canopy external mold (7) and hole Layer (10) joint setting external mold limit body (9), and outer diagonal brace is set outside external mold limit body (9) and hole between soil layer (10) (11) and external support pier (12);Finally to concrete perfusion in the gap of pipe canopy external mold (7) and pipe canopy internal model (3);
2) advance support is constructed:Advanced conduit (21) is applied to soil layer (10) outside the hole on the outside of soil layer in hole one (20), and to super Mud jacking is carried out in dummy pipe (21), forms advance support body (22);
3) soil layer one (20) excavates in hole:It is soil layer one (20) in hole by soil layer subregion, soil layer two (30) in hole, soil layer three in hole (32) soil layer four (33) and in hole, first excavates soil layer in hole one (20);
4) steel arch-shelf (23) is laid:Steel arch-shelf (23) is laid after the completion of soil layer one (20) excavates in hole at once, and in steel arch-shelf (23) reinforcing layer one (24) and reinforcing layer two (25) is respectively set in both sides, and locking angle muscle body (26) is arranged in steel arch-shelf (23) corner, Steel arch-shelf (23) lower surface connects with unit spelling holder (2), and in top surface supporting rod (15) and lateral bolster strut (16) and steel Pressure diffusion plate two (27) is arranged in arch (23) joint;
5) just lining anchor pole (28) and just lining concrete layer (29) construction:From advance support body (22) appearance towards soil layer outside hole (10) Just lining anchor pole (28) is set, while gap to steel arch-shelf (23) and outside gunite concrete form just lining concrete layer (29);
6) soil layer two (30) excavates in hole:After just lining concrete layer (29) forms intensity, soil layer two (30) in hole is excavated, is gone forward side by side Row just lining anchor pole (28) and the just construction of lining concrete layer (29);
7) mid-board (31) is constructed:In hole in soil layer three (32) and hole soil layer four (33) outside setting wall mould (34), go forward side by side Row filling concrete forms mid-board (31);The bottom of wall mould (34) is inserted into the template limiting slot (36) of steelframe bottom plate (35), Wall thickness control volume (38) and lateral connection muscle (37) is set between soil layer four (33) in soil layer in hole three (32) and hole, and it is advanced Wall top limit body (39) is set between prop (22), horizontal-associate (41) is set between steelframe pillar (40);Steelframe bottom plate (35) Steelframe diagonal brace (42), the arranging plate bottom anchor rib (43) between the soil layer of lower part are set between steelframe pillar (40);
8) soil layer four (33) excavates in soil layer three (32) and hole in hole:After mid-board (31) forms intensity, step 3)~step is repeated It is rapid 6), complete the excavation construction of soil layer four (33) in soil layer three (32) and hole in hole;
9) hole bottom inverted arch (44) is constructed:The sundries at hole bottom is removed, is carried out in hole bottom inverted arch (44) position setting inverted arch template (45), And it carries out filling concrete and forms hole bottom inverted arch (44) and pipeline trench (47);Pipeline trench mould is preset in inverted arch template (45) (46);When hole bottom inverted arch steel reinforcement cage (48) is bound, first needed that stool pier (49) and stool top plate (50) is arranged according to construction, and adjacent Stool top plate (50) between setting stool top attachment strap (51).
2. tunnel excavation support construction method according to claim 1, it is characterised in that:Step 1) the template inner support (4) height is identical as hole Guan Peng (1) thickness, is welded to connect with pipe canopy internal model (3);Auxiliary positioning muscle (5) is arc-shaped, with Reinforcing bar position-limiting tube (6) is welded to connect or pastes connection;The external mold limit body (9) is arc-shaped with pipe canopy contact surface, is facing sky Diagonal brace limit body (52) is arranged in face;External support pier (12) cross section is rounded or rectangle, is set to external mold limit body (9) Outside, using armored concrete preformed material or section steel material.
3. tunnel excavation support construction method according to claim 1, it is characterised in that:Step 1) and the step 4) list First spelling holder (2) is made of platform top (13), platform column (14), top surface supporting rod (15) and lateral bolster strut (16), Support baseboard (17), lateral bolster strut (16) and platform column are set between top surface supporting rod (15) and platform top (13) (14) support rotating is set between and cuts with scissors (18);In platform column (14) lower part setting column bottom bearing plate (53);In top surface supporting rod (15) and on lateral bolster strut (16) support regulation ring one (54) and support regulation ring two (55) is respectively set.
4. tunnel excavation support construction method according to claim 1, it is characterised in that:Step 4) the steel arch-shelf (23) It is arc-shaped using rolling of sectional iron, according to soil layer in soil layer three (32) in soil layer two (30) in soil layer in hole one (20), hole, hole and hole It is prepared by the outer contour shape after the completion of four (33) are excavated;The locking angle muscle body (26) is oliquely downward beaten from steel arch-shelf (23) bottom end If using steel pipe or section steel material;The reinforcing layer one (24) and reinforcing layer two (25) use bar-mat reinforcement grid or steel fibre lattice Grid or fiberglass grid.
5. tunnel excavation support construction method according to claim 1, it is characterised in that:Step 1) the pressure diffusion plate Arc is made using steel plate in one (19), and pipe canopy internal model (3) is seamless connects.
6. tunnel excavation support construction method according to claim 1, it is characterised in that:Step 4) the pressure diffusion plate Arc is made using steel plate in two (27), and steel arch-shelf (23) is seamless connects.
7. tunnel excavation support construction method according to claim 1, it is characterised in that:Step 7) the mid-board (31) Facade is in numerical value line or curved line;The wall thickness control volume (38) uses concrete material, is connected with wall mould (34) by pasting Or pass through rivet interlacement.
8. tunnel excavation support construction method according to claim 1, it is characterised in that:Step 9) the pipeline trench mould (46) cross section is rectangular, integral prefabricated with inverted arch template (45);The stool top plate (50) is welded to connect with stool pier (49), with stool It pushes up attachment strap (51) and overlaps connection, bottom shape is identical as inverted arch template (45).
CN201810426951.3A 2018-05-07 2018-05-07 A kind of tunnel excavation support construction method Active CN108756895B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810426951.3A CN108756895B (en) 2018-05-07 2018-05-07 A kind of tunnel excavation support construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810426951.3A CN108756895B (en) 2018-05-07 2018-05-07 A kind of tunnel excavation support construction method

Publications (2)

Publication Number Publication Date
CN108756895A true CN108756895A (en) 2018-11-06
CN108756895B CN108756895B (en) 2019-09-03

Family

ID=64010044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810426951.3A Active CN108756895B (en) 2018-05-07 2018-05-07 A kind of tunnel excavation support construction method

Country Status (1)

Country Link
CN (1) CN108756895B (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1161708A1 (en) * 1984-01-19 1985-06-15 Конструкторско-Технологическое Бюро Мобильного Специализированного Строительно-Монтажного Треста "Союзшахтоспецпромстрой" Movable power forms
AT386653B (en) * 1984-11-30 1988-09-26 Sp Kt Bjuro Glavtonnelmetrostr TUNNEL CONSTRUCTION
JP2005048382A (en) * 2003-07-30 2005-02-24 Sumitomo Mitsui Construction Co Ltd Work truck, and tunnel excavator equipped with the work truck
CN204002794U (en) * 2014-07-17 2014-12-10 粤水电轨道交通建设有限公司 The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section
CN204457800U (en) * 2014-12-24 2015-07-08 中铁十八局集团有限公司 Large Cross-section Tunnel in Subway Engineering two serves as a contrast the simple and easy chassis mould of arch wall separate type and builds construction equipment
CN106013172A (en) * 2016-07-01 2016-10-12 杭州江润科技有限公司 Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
CN106351671A (en) * 2016-10-17 2017-01-25 中铁五局集团第五工程有限责任公司 Excavation and supporting structure for weak surrounding rock super-large cross-section tunnel and construction method thereof
CN205977238U (en) * 2016-08-29 2017-02-22 黄高飞 Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck
KR101776091B1 (en) * 2017-02-15 2017-09-07 주식회사 구림산업기계 Lining foam for tunnel
CN206860179U (en) * 2017-07-11 2018-01-09 北京市市政三建设工程有限责任公司 A kind of tunnel construction mid-board
CN107747492A (en) * 2017-11-10 2018-03-02 中铁二十四局集团安徽工程有限公司 Extension type cross preliminary bracing structure and its deformation dynamics control method

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1161708A1 (en) * 1984-01-19 1985-06-15 Конструкторско-Технологическое Бюро Мобильного Специализированного Строительно-Монтажного Треста "Союзшахтоспецпромстрой" Movable power forms
AT386653B (en) * 1984-11-30 1988-09-26 Sp Kt Bjuro Glavtonnelmetrostr TUNNEL CONSTRUCTION
JP2005048382A (en) * 2003-07-30 2005-02-24 Sumitomo Mitsui Construction Co Ltd Work truck, and tunnel excavator equipped with the work truck
CN204002794U (en) * 2014-07-17 2014-12-10 粤水电轨道交通建设有限公司 The adjustable comprehensive chassis of a kind of rail formula tunnel cross-section
CN204457800U (en) * 2014-12-24 2015-07-08 中铁十八局集团有限公司 Large Cross-section Tunnel in Subway Engineering two serves as a contrast the simple and easy chassis mould of arch wall separate type and builds construction equipment
CN106013172A (en) * 2016-07-01 2016-10-12 杭州江润科技有限公司 Double row pile and diagonal brace combined soft soil deep foundation pit supporting structure and construction method
CN205977238U (en) * 2016-08-29 2017-02-22 黄高飞 Small cross section's flexible formworking jumbo is walked to tunnel section of widening platform truck
CN106351671A (en) * 2016-10-17 2017-01-25 中铁五局集团第五工程有限责任公司 Excavation and supporting structure for weak surrounding rock super-large cross-section tunnel and construction method thereof
KR101776091B1 (en) * 2017-02-15 2017-09-07 주식회사 구림산업기계 Lining foam for tunnel
CN206860179U (en) * 2017-07-11 2018-01-09 北京市市政三建设工程有限责任公司 A kind of tunnel construction mid-board
CN107747492A (en) * 2017-11-10 2018-03-02 中铁二十四局集团安徽工程有限公司 Extension type cross preliminary bracing structure and its deformation dynamics control method

Also Published As

Publication number Publication date
CN108756895B (en) 2019-09-03

Similar Documents

Publication Publication Date Title
CN101864959B (en) Method for tunneling construction of main structure of underground station
CN203905966U (en) Lining mold used for at-one-time concrete pouring of tunnel inverted arch structure
CN205503146U (en) Novel supporting construction of shallow tunnel suitable for city sensitizing range
CN104405411B (en) Oversized variable cross section tunnel supporting structure
CN105545323A (en) Construction method for open cut tunnel lining
CN113153308A (en) Construction method for double arch tunnel collapse section
CN111520145B (en) Underground excavation tunnel primary support slope adjusting and arch changing construction method
CN108951840B (en) Method for constructing arc-shaped outer wall of basement based on single-side formwork support of shaped support
CN109056656A (en) Tidal channel construction method is formed based on portable sliding formwork integral cast-in-situ
CN110469341A (en) A kind of assembly of Underground Subway Station combines integrated morphology and construction method with pouring
CN105019553A (en) Bracing structure for annular supports of basement
CN113969795A (en) Excavation supporting structure and construction method of tunnel
CN110607805A (en) Cable tunnel construction method
CN108374663B (en) Twice-molding construction method for sandy gravel geological tunnel
CN112459787A (en) Construction method of large-section large-gradient tunnel
CN209818080U (en) Segmental assembled pipe shed pouring construction structure
CN110042855B (en) Concrete impervious wall and construction method
CN210440048U (en) Die carrier suitable for curved well wall construction of multiple arch tunnel is used
CN108756895B (en) A kind of tunnel excavation support construction method
CN108729466B (en) Large formwork supporting method for constructing anchor-free concrete retaining wall
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
CN111206506A (en) Construction method of bridge pier column
CN208534503U (en) Tunnel steel arch frame installs constructing structure
CN208473874U (en) Tunnel portal pipe shed support structure
CN208473890U (en) Tunnel bottom inverted arch constructing structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant