CN108755668A - A kind of construction method - Google Patents

A kind of construction method Download PDF

Info

Publication number
CN108755668A
CN108755668A CN201810650073.3A CN201810650073A CN108755668A CN 108755668 A CN108755668 A CN 108755668A CN 201810650073 A CN201810650073 A CN 201810650073A CN 108755668 A CN108755668 A CN 108755668A
Authority
CN
China
Prior art keywords
pile
slip casting
stake
end plate
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810650073.3A
Other languages
Chinese (zh)
Other versions
CN108755668B (en
Inventor
沙焕焕
邓亚光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810650073.3A priority Critical patent/CN108755668B/en
Publication of CN108755668A publication Critical patent/CN108755668A/en
Application granted granted Critical
Publication of CN108755668B publication Critical patent/CN108755668B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/003Injection of material

Abstract

The invention discloses a kind of construction methods of slip casting pipe pile in wall, and when concrete tubular pile is prefabricated, slip casting steel pipe is embedded in pipe of concrete pile lining, not only it is used as Grouting Pipe, but also as the arrangement of reinforcement of concrete tubular pile, a diameter of 1-5cm of slip casting steel pipe, quantity is 2-8, rounded equidistantly distributed;Slip casting steel pipe has screw thread injected hole in concrete tubular pile side and stake end, and the spacing in slip casting around pile hole is 50-500cm;At stake bottom, setting diameter is more than the expansion end plate of pile pile outer diameter 1-30cm, and end plate is welded with pile body in the position box out of screw thread injected hole, end plate or is flexibly connected with the steel strand wires in embedded pile body, and steel strand wires length is 5-30cm;Wireless pressure sensor is set in end plate.The present invention is easy for construction, and construction effect is excellent.

Description

A kind of construction method
Technical field
The present invention relates to a kind of construction methods.
Background technology
When existing pile driving construction, Grouting Pipe is provided in the inner cavity or outside of pile pile, has a single function, performance is not highly desirable; And the construction methods such as common static pressed pile, construction is complicated, and construction effect is bad, needs further to be improved.
Invention content
The purpose of the present invention is to provide a kind of easy for construction, construction methods of the good stake of effect.
Technical solution of the invention is:
The construction method of slip casting pipe pile in a kind of wall, it is characterized in that:
(1)When concrete tubular pile is prefabricated, it is embedded to slip casting steel pipe in pipe of concrete pile lining, is not only used as Grouting Pipe, but also as coagulation The arrangement of reinforcement of native pile pile, a diameter of 1-5cm of slip casting steel pipe, quantity are 2-8, rounded equidistantly distributed;Slip casting steel pipe is mixed There is screw thread injected hole at solidifying soil pile pile side and stake end, and the spacing in slip casting around pile hole is 50-500cm;At stake bottom, setting diameter is more than The expansion end plate of pile pile outer diameter 1-30cm, end plate in the position box out of screw thread injected hole, end plate welded with pile body or with embedded pile body Interior steel strand wires flexible connection, steel strand wires length are 5-30cm;Wireless pressure sensor is set in end plate;
(2)It, will by the way that spindle hollow steel tube is arranged between adjacent double section tube stake when single pile length needs more piece pile pile to connect Slip casting fastener for connection, it is close that the upper and lower ends microcephaly of connecting tube is respectively embedded into blend rubber pad in the slip casting steel pipe of adjacent double section tube stake Envelope, embedded length 3-10cm, for intermediate enlargement between adjacent double section tube stake, length is identical as pile pile connection length.
Static pressure method or hammer-impact construction can be used in construction pile pile:When using static pressure method, stake top screw thread injected hole and outside Slip casting hose thread connects;When using hammering method, most upper stake side screw thread injected hole is connect with external slip casting hose thread; External grouting equipment high pressure injects concrete and/or soil cement to pile sinking simultaneously, since bellend board diameter is more than pile pile outer diameter 1- 30cm generates gap between pile pile outer wall and the soil body, cutting soil also may be used when slurry injects gap by slip casting around pile hole high pressure Increase gap, which can reduce the frictional force in construction, facilitate pile sinking;Concrete and/or soil-cement body in gap simultaneously Intensity is higher after solidification, forms concrete and/or soil cement and pile pile composite pile, increases the bearing capacity and stability of stake.
When using static pressure construction and single pile is single-unit pile pile, the setting of stake bottom expands end plate and the steel in embedded pile body Twisted wire is flexibly connected, and since there are Static pressure pile drivers after the completion of pile sinking can embrace tube drawing stake easily for stake side clearance, that is pulled out on pile pile is same When end plate and pile body between detached due to pulling force, only connected by steel strand wires, can be pulled out at this time on pile pile by pile pile center cavity Concrete and/or soil cement are injected in the gap of formation, seal stake top cavity with steel plate after pulling out on pile pile is part or all of Extremely, pile sinking operation densification concrete and/or soil cement are carried out again, and it is compound with pile pile to form squeezed concrete and/or soil cement Stake, increases the bearing capacity and stability of stake.
The present invention is easy for construction, and construction effect is excellent.
With reference to embodiment, the invention will be further described.
Specific implementation mode
The construction method of slip casting pipe pile in a kind of wall,
(1)When concrete tubular pile is prefabricated, it is embedded to slip casting steel pipe in pipe of concrete pile lining, is not only used as Grouting Pipe, but also as coagulation The arrangement of reinforcement of native pile pile(Both have the function of slip casting, in turn ensure the intensity of pile pile, play the role of anti-folding, bending resistance, measuring body), slip casting A diameter of 1-5cm of steel pipe, quantity are 2-8, rounded equidistantly distributed;Slip casting steel pipe is equal in concrete tubular pile side and stake end There is screw thread injected hole(Not only can downward punching press, but also can to side punching press, carry out antifriction);The spacing in slip casting around pile hole is 50- 500cm;At stake bottom, setting diameter is more than the expansion end plate of pile pile outer diameter 1-30cm(Can be the abnormity such as cross, X-shaped, Y shape), In the position box out of screw thread injected hole, end plate is welded with pile body or is flexibly connected with the steel strand wires in embedded pile body, steel strand wires end plate Length is 5-30cm;Wireless pressure sensor is set in end plate;
(2)It, will by the way that spindle hollow steel tube is arranged between adjacent double section tube stake when single pile length needs more piece pile pile to connect Slip casting fastener for connection, it is close that the upper and lower ends microcephaly of connecting tube is respectively embedded into blend rubber pad in the slip casting steel pipe of adjacent double section tube stake Envelope, embedded length 3-10cm, for intermediate enlargement between adjacent double section tube stake, length is identical as pile pile connection length.
Static pressure method or hammer-impact construction can be used in construction pile pile:When using static pressure method, stake top screw thread injected hole and outside Slip casting hose thread connects;When using hammering method, most upper stake side screw thread injected hole is connect with external slip casting hose thread; External grouting equipment high pressure injects concrete and/or soil cement to pile sinking simultaneously, since bellend board diameter is more than pile pile outer diameter 1- 30cm generates gap between pile pile outer wall and the soil body, cutting soil also may be used when slurry injects gap by slip casting around pile hole high pressure Increase gap, which can reduce the frictional force in construction, facilitate pile sinking;Concrete and/or soil-cement body in gap simultaneously Intensity is higher after solidification, forms concrete and/or soil cement and pile pile composite pile, increases the bearing capacity and stability of stake.
When using static pressure construction and single pile is single-unit pile pile, the setting of stake bottom expands end plate and the steel in embedded pile body Twisted wire is flexibly connected, and since there are Static pressure pile drivers after the completion of pile sinking can embrace tube drawing stake easily for stake side clearance, that is pulled out on pile pile is same When end plate and pile body between detached due to pulling force, only connected by steel strand wires, can be pulled out at this time on pile pile by pile pile center cavity Concrete and/or soil cement are injected in the gap of formation, seal stake top cavity with steel plate after pulling out on pile pile is part or all of Extremely, pile sinking operation densification concrete and/or soil cement are carried out again, and it is compound with pile pile to form squeezed concrete and/or soil cement Stake, increases the bearing capacity and stability of stake.

Claims (3)

1. the construction method of slip casting pipe pile in a kind of wall, it is characterized in that:
(1)When concrete tubular pile is prefabricated, it is embedded to slip casting steel pipe in pipe of concrete pile lining, is not only used as Grouting Pipe, but also as coagulation The arrangement of reinforcement of native pile pile, a diameter of 1-5cm of slip casting steel pipe, quantity are 2-8, rounded equidistantly distributed;Slip casting steel pipe is mixed There is screw thread injected hole at solidifying soil pile pile side and stake end, and the spacing in slip casting around pile hole is 50-500cm;At stake bottom, setting diameter is more than The expansion end plate of pile pile outer diameter 1-30cm, end plate in the position box out of screw thread injected hole, end plate welded with pile body or with embedded pile body Interior steel strand wires flexible connection, steel strand wires length are 5-30cm;Wireless pressure sensor is set in end plate;
(2)It, will by the way that spindle hollow steel tube is arranged between adjacent double section tube stake when single pile length needs more piece pile pile to connect Slip casting fastener for connection, it is close that the upper and lower ends microcephaly of connecting tube is respectively embedded into blend rubber pad in the slip casting steel pipe of adjacent double section tube stake Envelope, embedded length 3-10cm, for intermediate enlargement between adjacent double section tube stake, length is identical as pile pile connection length.
2. the construction method of slip casting pipe pile in a kind of wall according to claim 1, it is characterized in that:Construction pile pile can be used quiet Platen press or hammer-impact construction:When using static pressure method, stake top screw thread injected hole is connect with external slip casting hose thread;When using hammer When striking, most upper stake side screw thread injected hole is connect with external slip casting hose thread;Pile sinking while external grouting equipment high pressure Concrete and/or soil cement are injected, since bellend board diameter is more than pile pile outer diameter 1-30cm, is produced between pile pile outer wall and the soil body Raw gap, cutting soil can also increase gap when slurry injects gap by slip casting around pile hole high pressure, which can reduce construction In frictional force, facilitate pile sinking;Intensity is higher after the concrete in gap and/or soil-cement body solidify simultaneously, forms concrete And/or soil cement and pile pile composite pile, increase the bearing capacity and stability of stake.
3. the construction method of slip casting pipe pile in a kind of wall according to claim 2, it is characterized in that:When using static pressure construction And single pile, when being single-unit pile pile, the end plate that expands of stake bottom setting is flexibly connected with the steel strand wires in embedded pile body, due between stake side Gap there are Static pressure pile drivers after the completion of pile sinking can embrace tube drawing stake easily, due to pulling force point between end plate and pile body while being pulled out on pile pile From, only connected by steel strand wires, can be pulled out at this time on pile pile by pile pile center cavity in the gap to be formed inject concrete and/ Or soil cement, stake top cavity is shut with steel plate after pulling out on pile pile is part or all of, it is mixed to carry out pile sinking operation densification again Solidifying soil and/or soil cement, form squeezed concrete and/or soil cement and pile pile composite pile, increase the bearing capacity of stake and steady It is qualitative.
CN201810650073.3A 2018-06-22 2018-06-22 Pile construction method Active CN108755668B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810650073.3A CN108755668B (en) 2018-06-22 2018-06-22 Pile construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810650073.3A CN108755668B (en) 2018-06-22 2018-06-22 Pile construction method

Publications (2)

Publication Number Publication Date
CN108755668A true CN108755668A (en) 2018-11-06
CN108755668B CN108755668B (en) 2020-04-28

Family

ID=63976166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810650073.3A Active CN108755668B (en) 2018-06-22 2018-06-22 Pile construction method

Country Status (1)

Country Link
CN (1) CN108755668B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2272459Y (en) * 1995-04-10 1998-01-14 中国建筑科学研究院地基基础研究所 Pile-side mortar-pressing device for mud wall-protection pouring pile
CN201874006U (en) * 2010-12-13 2011-06-22 河南省电力勘测设计院 Intubating grouting base of transmission line iron tower
CN202543906U (en) * 2012-03-27 2012-11-21 浙江大学城市学院 Precast pile with reserved grouting pipes
CN102953372A (en) * 2012-11-14 2013-03-06 福建工程学院 Steel pipe pile and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2272459Y (en) * 1995-04-10 1998-01-14 中国建筑科学研究院地基基础研究所 Pile-side mortar-pressing device for mud wall-protection pouring pile
CN201874006U (en) * 2010-12-13 2011-06-22 河南省电力勘测设计院 Intubating grouting base of transmission line iron tower
CN202543906U (en) * 2012-03-27 2012-11-21 浙江大学城市学院 Precast pile with reserved grouting pipes
CN102953372A (en) * 2012-11-14 2013-03-06 福建工程学院 Steel pipe pile and construction method thereof

Also Published As

Publication number Publication date
CN108755668B (en) 2020-04-28

Similar Documents

Publication Publication Date Title
CN106193030B (en) A kind of prestressing force grouted anchor bar and construction method with hangnail head
CN201704689U (en) Four-corner-reinforced pre-stressed anchor rope head for reinforcing rock slope
CN101761074A (en) Method for improving bearing capacity and tensile capacity of tubular pile end
CN210562157U (en) Post-grouting composite pile
CN202544883U (en) Self-boring full thread hollow grouting anchor rod
CN205422773U (en) Novel hollow grouting anchor bolt
CN206646502U (en) A kind of steel pipe type soil nailing
CN204551461U (en) A kind of pressure dispersing type electric hoist enlarged footing anchor cable
CN210151728U (en) Tubular pile for foundation reinforcement
CN209011137U (en) A kind of prestressing force miniature steel pipe pile constructing structure
CN108755668A (en) A kind of construction method
CN2723681Y (en) Inner anchor external injection type anchor rod
CN203452084U (en) Sleeve type bottom-conveying rear grouting device for later-inserted pipe
CN108222022A (en) A kind of tubular type Soil-Nailing Wall Structure and its construction method
CN204327134U (en) A kind of prestressing force balance anchor cable
CN104499478A (en) Prefabricated concrete supporting anchored pile
CN2154288Y (en) Tube type mud auto-anchor solum anchor rod
CN204877514U (en) Modular cavity slip casting stock
CN106480880B (en) Recoverable soil nailing and the construction method for using recoverable soil nail
CN204174955U (en) Reinforced concrete post connects steel core concrete column syndeton
CN205876364U (en) Cavity intelligence slip casting stock
CN207829927U (en) A kind of block assembly formula allows pressure hollow grouting anchor
CN204827500U (en) Pinniform wedge body stock
CN103572760A (en) Bored grouting pile whole pile length vibrating construction method and device
CN208105280U (en) One kind can apply prestressed complete anchor system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant