CN108749442A - High-efficiency point driller skill and high-efficiency point boring device - Google Patents

High-efficiency point driller skill and high-efficiency point boring device Download PDF

Info

Publication number
CN108749442A
CN108749442A CN201810673450.5A CN201810673450A CN108749442A CN 108749442 A CN108749442 A CN 108749442A CN 201810673450 A CN201810673450 A CN 201810673450A CN 108749442 A CN108749442 A CN 108749442A
Authority
CN
China
Prior art keywords
brill
pattern
point
workpiece
driller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810673450.5A
Other languages
Chinese (zh)
Other versions
CN108749442B (en
Inventor
范杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shishi Guanxin Hardware Accessories Factory
Original Assignee
Shishi Guanxin Hardware Accessories Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shishi Guanxin Hardware Accessories Factory filed Critical Shishi Guanxin Hardware Accessories Factory
Priority to CN201810673450.5A priority Critical patent/CN108749442B/en
Publication of CN108749442A publication Critical patent/CN108749442A/en
Application granted granted Critical
Publication of CN108749442B publication Critical patent/CN108749442B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44BMACHINES, APPARATUS OR TOOLS FOR ARTISTIC WORK, e.g. FOR SCULPTURING, GUILLOCHING, CARVING, BRANDING, INLAYING
    • B44B9/00Machines or apparatus for inlaying with ornamental structures, e.g. tarsia or mosaic work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05CAPPARATUS FOR APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05C5/00Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work
    • B05C5/02Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work the liquid or other fluent material being discharged through an outlet orifice by pressure, e.g. from an outlet device in contact or almost in contact, with the work
    • B05C5/0208Apparatus in which liquid or other fluent material is projected, poured or allowed to flow on to the surface of the work the liquid or other fluent material being discharged through an outlet orifice by pressure, e.g. from an outlet device in contact or almost in contact, with the work for applying liquid or other fluent material to separate articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44CPRODUCING DECORATIVE EFFECTS; MOSAICS; TARSIA WORK; PAPERHANGING
    • B44C1/00Processes, not specifically provided for elsewhere, for producing decorative surface effects
    • B44C1/28Uniting ornamental elements on a support, e.g. mosaics
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B44DECORATIVE ARTS
    • B44BMACHINES, APPARATUS OR TOOLS FOR ARTISTIC WORK, e.g. FOR SCULPTURING, GUILLOCHING, CARVING, BRANDING, INLAYING
    • B44B2700/00Machines, apparatus, tools or accessories for artistic work
    • B44B2700/12Accessories; Tool or work holders

Landscapes

  • Perforating, Stamping-Out Or Severing By Means Other Than Cutting (AREA)

Abstract

The present invention relates to a kind of high-efficiency point driller skill and high-efficiency point boring device, this driller's skill is by making respectively and waiting for the shape of a drill workpiece, bore position and match and match suitable dispensing pattern, suction brill pattern and point brill pattern;Carry out dispensing successively using these patterns, suction is bored, point driller's sequence is efficiently completed a little to bore operation.The boring device, including operation console and upper workpiece station on operation console, gluing station, point driller position and take workpiece station.Point driller's skill of the present invention is a workpiece or multiple workpiece carry out a minor synchronous point glue and a minor synchronous point bores operation, the technique can be artificial, artificial+machine, intelligent automatic equipment selects implementation completion entirely, existing driller's skill relatively, production efficiency has obtained great promotion, artificial point bores can reach 1.5~2.5 ten thousand brills daily, and machine point brill can reach 3~100,000 brills per hour, and point driller's skill implementation cost is low, it is easy to implement, point brill is efficient, effect is good.

Description

High-efficiency point driller skill and high-efficiency point boring device
Technical field
The present invention relates to the point brill field of diamond, water drilling, a kind of high-efficiency point driller skill and high-efficiency point boring device are particularly related to.
Background technology
Decoration is very common in daily life, wherein many decorations are to increase its aesthetic feeling of glittering to glue equipped with perhaps More diamonds, water drilling bore the gadgets such as shape zircon, plastics brill, these gadget sizes are much smaller, usually between 0.8~3mm, And the surface of many decorations is covered with these gadgets, for this purpose, producing this decoration with regard to cumbersome.Existing majority is this Decoration is to carry out a brill by artificial ground to operate, and there is also the artificial brills that carries out of point drilling machine replacement automatically to grasp Make.
Existing automation point drilling machine all can only achieve one brill of the glue once made a hole and point, i.e. its driller's skill And a ground carries out a brill and operates, by the high-speed cruising of mechanical arm, relatively artificial point bores, and putting brill efficiency is had Effect improves, but the point that production efficiency hourly can only achieve 5000~8000 brills substantially bores processing, in market is applied It was found that when producing in enormous quantities, these equipment and technology cannot reach current production requirement.
Invention content
A kind of high-efficiency point driller skill of present invention offer and high-efficiency point boring device, to overcome existing driller's skill and point to bore dress Set the high problem of low production efficiency, production cost.
The present invention adopts the following technical scheme that:
High-efficiency point driller's skill, including the following step that carries out successively:
A. pattern is made:Make respectively with wait for the shape of a drill workpiece, bore position match with suitable dispensing pattern, inhale bore pattern and Point bores pattern;Dispensing pattern is configured with several point plastic pins, point plastic pin and the brill position one-to-one correspondence for waiting for dispensing workpiece;It inhales and bores pattern It is interior to be equipped with negative pressure chamber, it inhales in each of brill pattern brill position and is equipped with the sucker being connected to negative pressure chamber, inhale the brill position for boring pattern and brill Root coincide with suitable;Point bores and is equipped with negative pressure chamber in pattern, and point is bored to be equipped in each brill position of pattern and is connected to negative pressure chamber Sucker, point bores the brill position of pattern and the face of brill coincide with suitable;
B. dispensing:Several plastic pins are synchronized to dip glue and synchronize contraposition and are inserted into the brill position for waiting for a drill workpiece;
C. it inhales and bores:It will bore and lay in the top for inhaling brill pattern;The root contraposition of brill is packed into the brill position to match, is drilled in negative pressure Under the face for being fixed on and boring on position, and boring can be sucked be packed into or tilt to be packed into and bore position, brill will not be sucked by boring position, by shaking The loading orientation bored pattern and change brill is inhaled in dynamic or vibrations, completes to inhale driller's sequence until boring when position is equipped with the brill to match;
D. point bores:Brill pattern is inhaled to move to a brill pattern and mold, at this point, the negative pressure revocation for the negative pressure chamber for boring pattern is inhaled, and point brill The negative pressure chamber of pattern starts negative pressure, and the brill on the corresponding brill position for inhaling brill pattern is sucked for the brill position that point bores pattern;A brill is leaned on It is embossed in and waits on a drill workpiece, point bores the brill on pattern and synchronizes on the corresponding brill position for being packed into and waiting for a drill workpiece, and point bores the negative of pattern The negative pressure of pressure chamber cancels;Primary point is completed when glue solidifies bores operation.
It is further improved ground, a set of or more sets are equipped on each above-mentioned pattern and waits for the mould that a drill workpiece matches Position, per cover die position alignment processing, one is waited for a drill workpiece.
High-efficiency point boring device, the boring device are used for the implementation of above-mentioned high-efficiency point driller skill, which includes operation Platform and upper workpiece station on operation console, gluing station, point driller position and take workpiece station;Station is glued configured with upper Glue pattern, gluing pattern includes the bottom plate, resilient layer and top plate for overlapping connection successively;Bottom plate is configured with several dispensings Needle, point plastic pin are distributed correspondingly with the brill position of dispensing workpiece is waited for, the upper end for putting plastic pin is located between bottom plate and resilient layer, The lower end of point plastic pin is through bottom plate and extends outside;Point boring device is used configured at least one driller position, a driller position It is handled in a kind of point brill of brill of model;Each point driller position bores pattern configured with suction and point bores pattern;It inhales to bore and be equipped in pattern Negative pressure chamber and vacuum machine interface are inhaled in each of brill pattern brill position and are equipped with the sucker being connected to negative pressure chamber, inhales the brill for boring pattern Position coincide with the root bored with suitable;Point bores and is equipped with negative pressure chamber and vacuum machine interface in pattern, and point bores each of pattern and bores in position Equipped with the sucker being connected to negative pressure chamber, point bores the brill position of pattern and the face of brill coincide with suitable;Upper workpiece station will be for that will wait for a little The workpiece of brill is placed on operation console, takes workpiece station for will put the Workpiece transfer of brill to designated position.
It is further improved ground, further includes mending driller position, benefit driller position is set to above-mentioned driller position and takes workpiece station with above-mentioned Between, it mends driller position and is bored for being mended to vacancy brill position progress single-point.
It is further improved ground, further includes helping driller position, driller position is helped to be set to the above-mentioned upper station for taking workpiece station;Help brill Station helps brill pattern to be equipped with and helps brill position correspondingly with the brill position of workpiece, help the shape and brill for boring position configured with brill pattern is helped Face match.
It is further improved ground, above-mentioned upper workpiece station is configured with workpiece pattern, and workpiece pattern is equipped with workpiece placing groove and just Mouth is picked and placeed in what workpiece picked and placeed, mouth is picked and placeed and is connected to workpiece placing groove.Above-mentioned workpiece pattern, above-mentioned gluing pattern, above-mentioned suction are bored Pattern and above-mentioned point bore pattern and are respectively equipped at least two location holes, and the location hole that fits through between each pattern positions, is right Position.
It is further improved ground, aforesaid operations platform is of a straight line type or collar plate shape, the above-mentioned upper workpiece of the operation console of collar plate shape Station and it is above-mentioned take workpiece station be same station.
It is further improved ground, above-mentioned resilient layer is high-elastic sponge, high-elastic silica gel or elastomer;Or each dispensing Needle configures an adjustable spring, and adjustable spring geometrical clamp is set between point plastic pin and above-mentioned top plate.
By the above-mentioned description to structure of the invention it is found that compared to the prior art, the invention has the advantages that:The present invention Point driller's skill be that a workpiece or multiple workpiece carry out a minor synchronous point glue and a minor synchronous point bores operation, the reality of the technique It can manually implement to apply, and can also assist completing by machine, can also be that full smart machine is automatically performed driller's skill, phase To existing driller's skill, production efficiency has obtained great promotion, and artificial point bores can reach 1.5~2.5 ten thousand brills daily, and Machine point bore can reach per hour 3~100,000 brill points bore processing, point bore quantity also with the brill bit quantity of single workpiece Correlation, workpiece bore bit quantity it is bigger, day point bore quantity it is bigger.In addition, point driller's skill implementation cost of the application is low, it is easy to apply Row, point brill is efficient, effect is good.
Description of the drawings
Fig. 1 is the station distribution schematic diagram of high-efficiency point boring device.
Fig. 2 is the overlooking structure diagram of workpiece pattern.
Fig. 3 is the cross-sectional view at workpiece pattern in fig. 2 A-A.
Fig. 4 is the present invention looks up structural representation of dispensing pattern.
Fig. 5 is the section structure diagram at dispensing pattern in Fig. 4 B-B.
Fig. 6 is to inhale the overlooking structure diagram for boring pattern.
Fig. 7 is to inhale the section structure diagram for boring pattern in figure 6 at C-C.
Fig. 8 is the present invention looks up structural representation for a little boring pattern.
Fig. 9 is a little to bore section structure diagram of the pattern in fig. 8 at D-D.
Specific implementation mode
Illustrate the specific implementation mode of the present invention with reference to the accompanying drawings.
High-efficiency point driller's skill, including the following step that carries out successively:
A. pattern is made:It makes respectively and waits for the shape of a drill workpiece, bores position and match and match suitable dispensing pattern, suction brill pattern 31 Pattern 32 is bored with;Dispensing pattern is configured with several point plastic pins 214, point plastic pin 214 and one a pair of brill position for waiting for dispensing workpiece It answers;It inhales and is equipped with negative pressure chamber in brill pattern 31, suction bores in each of pattern 31 brill position and is equipped with the sucker being connected to negative pressure chamber, inhales and bores The brill position of pattern 31 and the root of brill coincide with suitable;Point bores and is equipped with negative pressure chamber in pattern 32, and point bores each of pattern 32 and bores in position It is equipped with the sucker being connected to negative pressure chamber, point bores the brill position of pattern 32 and the face of brill coincide with suitable;
B. dispensing:Several plastic pins 214 are synchronized to dip glue and synchronize contraposition and are inserted into the brill position for waiting for a drill workpiece;Point plastic pin 214 thickness is corresponding with the size of position is bored, and brill position is larger then to use thicker point plastic pin 214, thicker point plastic pin 214 to dip in glue Measure larger, and to dip in glue amount smaller for thinner plastic pin 214;
C. it inhales and bores:It will bore and lay in the top for inhaling brill pattern 31;The root contraposition of brill is packed into the brill position to match, is drilled in negative Pressure can be sucked to be fixed on and be bored on position, and the face of brill is packed into or tilts and is packed into brill position, and brill will not be sucked by boring position, be passed through It shakes or vibrations inhales and bore pattern 31 and change the loading orientation bored, complete to inhale driller until boring when position is equipped with the brill to match Sequence;
D. point bores:Brill pattern 31 is inhaled to move to a brill pattern 32 and mold, at this point, the negative pressure revocation for the negative pressure chamber for boring pattern 31 is inhaled, And the negative pressure chamber's startup negative pressure for boring pattern 32 is put, the corresponding brill bored on position for inhaling brill pattern 31 is inhaled in the position of boring that point bores pattern 32 Firmly;A brill pattern 32 is pressed in and is waited on a drill workpiece, the brill on point brill pattern 32, which synchronizes to be packed into, waits for that the corresponding of a drill workpiece bores position On, point bores the negative pressure revocation of the negative pressure chamber of pattern 32;Primary point is completed when glue solidifies bores operation.
Referring to Fig.1, high-efficiency point boring device, the boring device are used for the implementation of above-mentioned high-efficiency point driller skill, the boring device Upper workpiece station 1 including operation console 7 and on operation console 7, point driller position 3, mends driller position 4, helps brill gluing station 2 Station 5 and take workpiece station 6.Aforesaid operations platform 7 is of a straight line type or collar plate shape as shown in Figure 1, the operation console 7 of collar plate shape Above-mentioned upper workpiece station 1 and it is above-mentioned take workpiece station 6 be same station.Upper workpiece station 1 is used to wait for that the workpiece bored to be put To operation console 7, take workpiece station 6 for the Workpiece transfer of brill will to have been put to designated position.
Referring to Fig.1, Fig. 2, Fig. 3, above-mentioned upper workpiece station 1 are configured with workpiece pattern 11, and workpiece pattern 11 is put equipped with workpiece It sets slot 111 and picks and places mouth 112, pick and place mouth 112 and be connected to workpiece placing groove 111, the configuration for picking and placeing mouth 112 is put into work convenient for workpiece The taking-up of part placing groove 111 and workpiece operates.Upper workpiece station 1 assembles when drill workpiece, waits for that a drill workpiece is positioned over workpiece In placing groove 111.
Referring to Fig.1, Fig. 2, Fig. 3, gluing station 2 include overlapping successively configured with gluing pattern 21, gluing pattern 21 Bottom plate 211, resilient layer 212 and the top plate 213 of connection.Bottom plate 211 is configured with several points plastic pin 214, as shown in figure 3, dispensing Needle 214 has for upper end expands portion structure, and the position of expanding for putting the upper end of plastic pin 214 is located in bottom plate 211 and resilient layer Between 212, the lower end of point plastic pin 214 through bottom plate 211 and extends outside, the plastic pin 214 and the brill position one for waiting for dispensing workpiece One is accordingly distributed.Above-mentioned resilient layer 212 is preferably high-elastic sponge, high-elastic silica gel or elastomer, can also be used following Replacing structure:Each point plastic pin 214 configures an adjustable spring, and adjustable spring geometrical clamp is set to point plastic pin 214 and above-mentioned top Between plate 213.
Referring to Fig.1, Fig. 6, Fig. 7, point boring device is configured at least one driller position 3, and a driller position 3 is for one kind The point brill of the brill of model is handled, as soon as configuring how many kinds of specification or variform brill that is, on workpiece, configures corresponding number Dispensing station 3.Each point driller position 3 bores pattern 31 configured with suction and point bores pattern 32.Referring to Fig.1, Fig. 6, Fig. 7 are inhaled to bore and be leaned on It is equipped with Xi Zuan negative pressure chamber 310 in mould 31 and inhales brill vacuum machine interface 311, inhales to bore to be equipped in each of pattern 31 brill position and be bored with suction Sucker 312 is bored in the suction that negative pressure chamber 310 is connected to, and the root of the brill position and brill of inhaling brill pattern 31 coincide with suitable.It will bore to lay and be bored in suction The top of pattern 31 can configure brace box when inhaling brill, brace box, which is equipped with and inhales, bores the installing port that pattern 31 matches, and inhales brill and leans on Mould 31 is packed into the installing port, and brill is then poured into brace box;The root contraposition of brill is packed into the brill position to match, is drilled in negative pressure Under the face for being fixed on and boring on position, and boring can be sucked be packed into or tilt to be packed into and bore position, brill will not be sucked by boring position, by shaking Dynamic or vibrations brace box and suction bore pattern 31 and change the loading orientation bored, until brill position is completed when being equipped with the brill to match Inhale driller's sequence.Referring to Fig.1, Fig. 8, Fig. 9, point bore in pattern 32 and bore vacuum machine interface 321, point equipped with Dian Zuan negative pressure chamber 320 and point Bore pattern 32 and each bore and be equipped with the point that be connected to Dian Zuan negative pressure chamber 320 in position and bore sucker 322, the brill position of point brill pattern 32 and The face of brill coincide with suitable.The brill position of suction brill pattern 31, which is inhaled, to be moved to a brill pattern 32 and molds after having brill, leaned at this point, inhaling brill The negative pressure of the Xi Zuan negative pressure chamber 310 of mould 31 cancels, and puts the startup negative pressure of Dian Zuan negative pressure chamber 320 for boring pattern 32, and point bores pattern 32 Brill position by it is corresponding inhale bore pattern 31 brill position on brill be sucked;A brill pattern 32 is pressed in and is waited on a drill workpiece, point is bored and leaned on Brill on mould 32, which synchronizes to be packed into, waits for that the corresponding of a drill workpiece is bored on position, and then point bores the negative pressure of the Dian Zuan negative pressure chamber 320 of pattern 32 Revocation;Primary point is completed when glue solidifies bores operation.
With continued reference to Fig. 1, mends driller position 4 and bored for being mended to vacancy brill position progress single-point, mend driller 4 and can configure knowledge of taking pictures Other device and existing automatic boring device, take pictures identification device by camera to workpiece take pictures comparison and identify bore position on With the presence or absence of scarce brill, the brill position progress single-point of the scarce brill for identification device transmission of taking pictures is mended brill by automatic boring device of putting one by one.Help brill Station 5 helps brill pattern actually similar to the brill construction of pattern 32, brill pattern is helped not need collocation point configured with brill pattern is helped It bores negative pressure chamber 320 and point and bores sucker 322, that is, help brill pattern to be equipped with and help brill position correspondingly with the brill position of workpiece, help and bore position The face of shape and brill matches;The righting that workpiece of the driller position 5 for being drilled to point makees last time is helped to work so that institute Some brills can be bored without tilting, being assemblied in without the ground standard that walks on position.In actual production, mends driller position 4 and help driller position 5 can not It is configured, because workpiece prepared by the gluing process by the present invention is substantially all and is capable of the installation of fully-jewelled and brill and rectifies.
With reference to Fig. 2, Fig. 4, Fig. 6, Fig. 8, it is equipped with a set of or more sets on each above-mentioned pattern and matches with a drill workpiece is waited for Suitable mould position 8, each pattern is equipped with the corresponding mould position 8 in 4 sets of positions in figure, waits for boring per 8 alignment processing of cover die position one Workpiece;That is, each pattern one or more can wait for that a drill workpiece, production efficiency are further promoted with synchronization process;And As shown, above-mentioned workpiece pattern 11, above-mentioned gluing pattern 21, above-mentioned suction brill pattern 31, above-mentioned point bore pattern 32, help brill pattern At least two location holes 10 are respectively equipped with, location hole positioning, contraposition are fitted through between each pattern.
Point driller's skill of the present invention is a workpiece or multiple workpiece carry out a minor synchronous point glue and a minor synchronous point bores Operation, the implementation of the technique can manually be implemented, and can also assist completing by machine, can also be that full smart machine is automatic Point driller's skill, relatively existing driller's skill are completed, production efficiency has obtained great promotion, and artificial point bores can reach daily 1.5~2.5 ten thousand brill, and machine point bore can reach per hour 3~100,000 brill points bore processing, point bore quantity also with list The brill bit quantity of a workpiece is related, and it is bigger that workpiece bores bit quantity, day point to bore quantity bigger.In addition, point driller's skill of the application Implementation cost is low, is easy to implement, point brill is efficient, effect is good.
The specific implementation mode of the present invention is above are only, but the design concept of the present invention is not limited thereto, it is all to utilize this Conceive the change for carrying out unsubstantiality to the present invention, the behavior for invading the scope of the present invention should all be belonged to.

Claims (9)

1. high-efficiency point driller's skill, which is characterized in that including the following step carried out successively:
A. pattern is made:Make respectively with wait for the shape of a drill workpiece, bore position match with suitable dispensing pattern, inhale bore pattern and Point bores pattern;Dispensing pattern is configured with several point plastic pins, point plastic pin and the brill position one-to-one correspondence for waiting for dispensing workpiece;It inhales and bores pattern It is interior to be equipped with negative pressure chamber, it inhales in each of brill pattern brill position and is equipped with the sucker being connected to negative pressure chamber, inhale the brill position for boring pattern and brill Root coincide with suitable;Point bores and is equipped with negative pressure chamber in pattern, and point is bored to be equipped in each brill position of pattern and is connected to negative pressure chamber Sucker, point bores the brill position of pattern and the face of brill coincide with suitable;
B. dispensing:Several plastic pins are synchronized to dip glue and synchronize contraposition and are inserted into the brill position for waiting for a drill workpiece;
C. it inhales and bores:It will bore and lay in the top for inhaling brill pattern;The root contraposition of brill is packed into the brill position to match, is drilled in negative pressure Under the face for being fixed on and boring on position, and boring can be sucked be packed into or tilt to be packed into and bore position, brill will not be sucked by boring position, by shaking The loading orientation bored pattern and change brill is inhaled in dynamic or vibrations, completes to inhale driller's sequence until boring when position is equipped with the brill to match;
D. point bores:Brill pattern is inhaled to move to a brill pattern and mold, at this point, the negative pressure revocation for the negative pressure chamber for boring pattern is inhaled, and point brill The negative pressure chamber of pattern starts negative pressure, and the brill on the corresponding brill position for inhaling brill pattern is sucked for the brill position that point bores pattern;A brill is leaned on It is embossed in and waits on a drill workpiece, point bores the brill on pattern and synchronizes on the corresponding brill position for being packed into and waiting for a drill workpiece, and point bores the negative of pattern The negative pressure of pressure chamber cancels;Primary point is completed when glue solidifies bores operation.
2. high-efficiency point driller skill as described in claim 1, it is characterised in that:Be equipped on each pattern a set of or more sets with Wait for the mould position that a drill workpiece matches, one is waited for a drill workpiece per cover die position alignment processing.
3. high-efficiency point boring device, which is characterized in that the boring device is for high-efficiency point driller's skill described in claims 1 or 2 Implement, which includes operation console and upper workpiece station on operation console, gluing station, point driller position and take work Part station;
Station is glued configured with gluing pattern, gluing pattern includes the bottom plate, resilient layer and top plate for overlapping connection successively;Bottom Plate is configured with several points plastic pin, and point plastic pin is distributed correspondingly with the brill position of dispensing workpiece is waited for, puts the upper end sandwiched of plastic pin Between bottom plate and resilient layer, the lower end of plastic pin is put through bottom plate and extends outside;
Point boring device is handled configured at least one driller position, a kind of point brill of the driller position for brill of model;Often Pattern is bored configured with brill pattern and point is inhaled in a driller position;It inhales to bore and is equipped with negative pressure chamber and vacuum machine interface in pattern, inhale and bore pattern Each of bore in position and be equipped with sucker be connected to negative pressure chamber, inhale and bore the root for boring position and brill of pattern and coincide with fitting;Point is bored and is leaned on Negative pressure chamber and vacuum machine interface are equipped in mould, point bores in each of pattern brill position and is equipped with the sucker being connected to negative pressure chamber, and point bores The brill position of pattern and the face of brill coincide with suitable;
Upper workpiece station is used to wait for that the workpiece bored to be placed into operation console, takes workpiece station for moving the workpiece for having put brill It send to designated position.
4. high-efficiency point boring device as claimed in claim 3, it is characterised in that:Further include mending driller position, mends driller position and be set to institute State driller position and it is described take workpiece station between, mend driller position and carry out single-point and mend to bore for boring position to vacancy.
5. the high-efficiency point boring device as described in claim 3 or 4, it is characterised in that:Further include helping driller position, driller position is helped to set In the upper station for taking workpiece station;It helps driller position configured with brill pattern is helped, helps and bore pattern equipped with the brill position one with workpiece One corresponding helps bores position, and the face of the shape and brill of helping brill position matches.
6. high-efficiency point boring device as claimed in claim 3, it is characterised in that:The upper workpiece station is configured with workpiece pattern, Workpiece pattern is equipped with workpiece placing groove and picks and places mouth convenient for what workpiece picked and placeed, picks and places mouth and is connected to workpiece placing groove.
7. high-efficiency point boring device as claimed in claim 6, it is characterised in that:It is the workpiece pattern, the gluing pattern, described It inhales brill pattern and the point bores pattern and is respectively equipped at least two location holes, the location hole that fits through between each pattern is determined Position, contraposition.
8. high-efficiency point boring device as claimed in claim 3, it is characterised in that:The operation console is of a straight line type or collar plate shape, The upper workpiece station of the operation console of collar plate shape and it is described take workpiece station be same station.
9. high-efficiency point boring device as claimed in claim 3, it is characterised in that:The resilient layer is high-elastic sponge, high-elastic silica gel Or elastomer;Or each point plastic pin configure an adjustable spring, adjustable spring geometrical clamp be set to point plastic pin with it is described Between top plate.
CN201810673450.5A 2018-06-27 2018-06-27 Efficient point drilling process and efficient point drilling device Active CN108749442B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810673450.5A CN108749442B (en) 2018-06-27 2018-06-27 Efficient point drilling process and efficient point drilling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810673450.5A CN108749442B (en) 2018-06-27 2018-06-27 Efficient point drilling process and efficient point drilling device

Publications (2)

Publication Number Publication Date
CN108749442A true CN108749442A (en) 2018-11-06
CN108749442B CN108749442B (en) 2020-01-21

Family

ID=63977900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810673450.5A Active CN108749442B (en) 2018-06-27 2018-06-27 Efficient point drilling process and efficient point drilling device

Country Status (1)

Country Link
CN (1) CN108749442B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111150192A (en) * 2020-01-14 2020-05-15 东莞美景实业有限公司 Jewelry manufacturing process capable of reducing glue consumption

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203662140U (en) * 2013-10-23 2014-06-25 浙江师范大学 Automatic diamond gluing equipment
CN104385420A (en) * 2014-11-10 2015-03-04 浙江天竹工贸有限公司 Automatic branding, drilling and labelling machine
CN205075558U (en) * 2015-07-27 2016-03-09 上海大花自动化科技有限公司 Brill device is glued to automatic subsides of bull
CN106337520A (en) * 2016-10-28 2017-01-18 广州机施建设集团有限公司 The construction technology of large-cell point glass curtain wall
CN206327069U (en) * 2016-12-28 2017-07-14 孙旺明 Dispensing decoration materials are bored in one kind emulation
CN206456121U (en) * 2017-01-20 2017-09-01 江门市金铭礼品包装材料有限公司 A kind of automatic greeting card patch rig of vision positioning

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203662140U (en) * 2013-10-23 2014-06-25 浙江师范大学 Automatic diamond gluing equipment
CN104385420A (en) * 2014-11-10 2015-03-04 浙江天竹工贸有限公司 Automatic branding, drilling and labelling machine
CN205075558U (en) * 2015-07-27 2016-03-09 上海大花自动化科技有限公司 Brill device is glued to automatic subsides of bull
CN106337520A (en) * 2016-10-28 2017-01-18 广州机施建设集团有限公司 The construction technology of large-cell point glass curtain wall
CN206327069U (en) * 2016-12-28 2017-07-14 孙旺明 Dispensing decoration materials are bored in one kind emulation
CN206456121U (en) * 2017-01-20 2017-09-01 江门市金铭礼品包装材料有限公司 A kind of automatic greeting card patch rig of vision positioning

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111150192A (en) * 2020-01-14 2020-05-15 东莞美景实业有限公司 Jewelry manufacturing process capable of reducing glue consumption

Also Published As

Publication number Publication date
CN108749442B (en) 2020-01-21

Similar Documents

Publication Publication Date Title
CN208544032U (en) Point for boring device bores pattern
WO2017108006A1 (en) Shuttlecock manufacturing apparatus and applications thereof
CN108749442A (en) High-efficiency point driller skill and high-efficiency point boring device
CN101286061A (en) Information driven leather shoe preparation method
CN104443616A (en) Automatic labeling machine of six-axis mechanical arm
CN208376388U (en) High-efficiency point boring device
CN208627704U (en) Gluing pattern for boring device
CN208630233U (en) Pattern is bored in suction for boring device
CN202784002U (en) Stripping plate device of automatic labeling machine
CN101214612A (en) Processing equipment for paw chain diamond setting
CN111775492B (en) Wine box top cover pasting device and method
CN203692640U (en) Artificial flower setting machine
CN204294964U (en) Scroll chuck clamping head
DE502005002734D1 (en) GRIPPING UNIT, BUTTON HEAD AND METHOD FOR FITTING SUBSTRATES WITH ELECTRICAL COMPONENTS
CN105965763A (en) Shoe insole making method, shoe insole die and shoe insole made through shoe insole making method and shoe insole die
CN102845579B (en) Ball-candy drilling, spraying, and pin inserting integral machine
CN205439757U (en) Automatic brush bores machine that draws that pastes
CN104085712B (en) A kind of single cylinder automatic conveyor of screen cloth type vamp cut-parts
CN207982725U (en) A kind of flexible automatic setup system based on manipulator
CN108127372A (en) A kind of screw and insulation sleeve press equipment
CN209795020U (en) Point drilling machine
CN201258397Y (en) Handpiece structure for computer paillette embroidery
CN105643958A (en) Forming tool and method for composite
CN206888268U (en) A kind of quick installation Wood plastic wall board
CN208225765U (en) A kind of silica gel push-button for meeting automation installation and needing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant