CN108747106B - Welding protection tool for valve body and manufacturing process thereof - Google Patents

Welding protection tool for valve body and manufacturing process thereof Download PDF

Info

Publication number
CN108747106B
CN108747106B CN201810563665.1A CN201810563665A CN108747106B CN 108747106 B CN108747106 B CN 108747106B CN 201810563665 A CN201810563665 A CN 201810563665A CN 108747106 B CN108747106 B CN 108747106B
Authority
CN
China
Prior art keywords
cloth
water
valve body
protection
water absorption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810563665.1A
Other languages
Chinese (zh)
Other versions
CN108747106A (en
Inventor
周舟
王晓彬
周锴
古湘龙
杨跃
何庆祝
徐卓恒
马天宇
曾庆斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Gree Changsha HVAC Equipment Co Ltd
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Gree Changsha HVAC Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai, Gree Changsha HVAC Equipment Co Ltd filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201810563665.1A priority Critical patent/CN108747106B/en
Publication of CN108747106A publication Critical patent/CN108747106A/en
Application granted granted Critical
Publication of CN108747106B publication Critical patent/CN108747106B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/003Cooling means

Abstract

The utility model provides a welding protection frock of valve body and preparation process thereof, includes: the water-absorbing valve comprises a protection pipe sleeved outside the valve body and water-absorbing cloth arranged on the inner wall of the protection pipe and attached to the valve body, wherein the water-absorbing cloth is attached to and wraps the outer wall of the valve body. The tool is directly sleeved outside the valve body during welding to protect the valve body, so that the labor input is greatly reduced, and the working efficiency is improved.

Description

Welding protection tool for valve body and manufacturing process thereof
Technical Field
The invention relates to the protection field of welding of an electromagnetic valve or a T-shaped electronic expansion valve, in particular to a welding protection tool for a valve body and a manufacturing process thereof.
Background
In the field of electromagnetic valves, the branch pipe 4 and the electromagnetic valve need to be welded together, and when the products are welded, a water-soaking welding method cannot be adopted due to the structure of the products; in order to prevent the valve bodies such as the solenoid valve and the electronic expansion valve from being damaged by excessive heat, a method of wrapping wet cloth is generally adopted for protection.
At present, the process of winding wet cloth is complex, staff need to manually position the wet cloth, the operation difficulty is high, the time consumption of the operation is long, and therefore the working efficiency is quite low; in addition, after the valve body is welded, the wet cloth needs to be manually taken down, and because the wet cloth is wound, the wet cloth is also long in dismounting time, and the whole process is time-consuming and labor-consuming; the process is completely controlled manually, so other situations occur, for example, the cloth is wrapped manually, the situation that the cloth is not wrapped in place occurs occasionally, the electromagnetic valve, the T-shaped electronic expansion valve and the like cannot be effectively protected, the electromagnetic valve and the T-shaped electronic expansion valve can be damaged during welding, and certain economic loss is brought to manufacturers.
Therefore, the method for winding the wet cloth by hands is a method with half the effort, and the development of a tool for protecting the welding of valve bodies such as an electromagnetic valve, a T-shaped electronic expansion valve and the like has important significance.
Disclosure of Invention
The invention aims to provide a welding protection tool for a valve body and a manufacturing process thereof.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
the utility model provides a welding protection frock of valve body which characterized in that includes: the water-absorbing valve comprises a protection pipe sleeved outside the valve body and water-absorbing cloth arranged on the inner wall of the protection pipe and attached to the valve body, wherein the water-absorbing cloth is attached to and wraps the outer wall of the valve body.
Preferably, the outer wall of the protection pipe is also provided with water absorption cloth.
Preferably, a branch pipe is arranged on the side face of the valve body, and a positioning opening matched with the branch pipe in size is formed in one end of the protection pipe.
Preferably, the end of the protection tube is provided with a marking cloth.
Preferably, the marking cloth is different in color from the water-absorbing cloth.
Preferably, the length of the protection pipe is not less than the length of the valve body.
Preferably, the water-absorbing cloth is gauze.
Preferably, the water-absorbing cloth is wrapped with medical adhesive plaster.
Preferably, the protection pipe is a plastic rubber pipe made of PVC.
The manufacturing process of the welding protection tool for the valve body comprises the following specific steps:
preparing water-absorbing cloth, a protection tube, a high-temperature-resistant adhesive tape and medical adhesive plaster, wherein the width of the water-absorbing cloth is matched with the length of the inner circumference of the protection tube;
step two, the water absorption cloth penetrates into the protection pipe from one end and extends out of the other end, and two long edges of the water absorption cloth are connected and rolled;
step three, aligning two long edges of the water absorption cloth with the positioning opening, flanging one end of the water absorption cloth close to the positioning opening outwards, and wrapping the end part of the protection tube with the positioning opening;
fixing water-absorbing cloth on the outer wall of the protective pipe by using a high-temperature-resistant adhesive tape;
fifthly, flanging the other end of the water absorption cloth outwards, wrapping the end part of the protection tube without the positioning opening, and sticking the water absorption cloth attached to the outer wall of the protection tube by using a high-temperature resistant adhesive tape;
winding medical adhesive plaster outside the water absorbing cloth, and firmly bonding;
preferably, when at least two layers of water-absorbing cloth are wound on the protection tube, the fifth step further comprises inserting the part of the water-absorbing cloth which exceeds the protection tube after flanging into the protection tube from the end of the protection tube with the positioning opening, and repeating the third step to the fifth step until the winding is finished;
preferably, the step four further comprises finishing the water-absorbing cloth attached to the inner part of the protection tube to ensure that no wrinkles exist in the water-absorbing cloth;
preferably, the first step further comprises: preparing a marking cloth, and sewing the marking cloth on the water absorption cloth;
the third step further comprises: the end part of the protective tube with the positioning opening is arranged in the middle of the marking cloth.
Compared with the prior art, the invention has at least the following beneficial effects:
the valve body can be protected only by directly sleeving the manufactured tool on the valve body when the connecting rod is welded without wasting excessive time, so that the valve body is convenient and practical, and a large amount of time is saved; labor force is also saved; and the positioning opening is also arranged, so that the positioning effect can be realized when some electromagnetic valves or T-shaped electronic expansion valves are welded.
Drawings
FIG. 1 is a schematic view of a valve body installation tool according to an embodiment;
FIG. 2 is a diagram of a protective tube according to an embodiment;
FIG. 3 is a view showing the structure of the solenoid valve;
fig. 4 is a structural view of a T-shaped electronic expansion valve.
Detailed Description
The invention is further illustrated with reference to the following figures and examples.
Referring to fig. 1-2, a welding protection tool for a valve body provided for an embodiment includes a protection tube 1 and water-absorbing cloth 2, the water-absorbing cloth is wrapped on the inner wall and the outer wall of the protection tube 1, the thickness of the water-absorbing cloth can be set according to actual conditions, the wrapped protection tube is the water-absorbing cloth on the inner wall and needs to be attached to a valve body 5 needing to be welded, and the water-absorbing cloth inside the protection tube is soft, so that the inner diameter of the protection tube after wrapping the water-absorbing cloth is smaller than the outer diameter of the valve body, and the protection tube can be tightly sleeved outside the valve body 5, has a certain fixing effect, and can absorb heat on the valve body 5. The effect of cooling can be played in the welding, the effect of protection valve body has also been played, as to what the cloth winding that absorbs water can be according to actual conditions, need not the extravagant cloth that absorbs water of transition. When the tool is used, a method of winding wet cloth does not need to be used like the conventional scheme, time and labor are consumed, and the wound wet cloth needs to be slowly taken down for one circle after welding; the tool for soaking water is directly sleeved on the valve body to be welded, and after welding is finished, the tool is directly pulled out, so that a large amount of labor force is saved, time is saved, and labor cost for manufacturing products is reduced.
In this embodiment, a positioning opening 11 is further provided at one end of the protection tube, the positioning opening plays a role of positioning, a branch tube 4 perpendicular to the valve body is provided at the side of some valve bodies 5 (as shown in fig. 3-4), the size of the positioning opening is designed to match the diameter of the branch tube 4, thus the opening can be directly aligned with the branch tube 4 during installation, which brings convenience to welding work, ensures the installation consistency of the tool, and can block the valve body to protect the valve body. The end of the protective pipe is provided with a piece of marking cloth with other colors, which can increase the positioning effect of the opening, make the clamping force at the position slightly larger, and increase the water absorption capacity at the position and the heat insulation capacity.
In this embodiment, the length of protection tube will be greater than or equal to the length of the valve body that needs the welding, and it all wraps up including it needs the valve body is whole, ensures the guard action of this frock to the valve body. The water-absorbing cloth is made of gauze, has good water absorption, and is firmly adhered with medical adhesive plaster outside the water-absorbing cloth, so that the water-absorbing cloth cannot be scattered. The protection tube is a plastic rubber tube, the plastic rubber tube is preferably made of PVC materials, the materials are selected, the heat insulation performance is good, and the protection force on the valve body is stronger during welding.
In other embodiments, the thicker water-absorbing cloth is directly adhered to the inner wall of the protection pipe and has water absorption, and the water-absorbing cloth on the inner wall is matched with the outer wall of the valve body to achieve the functions of protection and heat insulation.
The invention also discloses a manufacturing process of the welding protection tool for the valve body, which comprises the following specific steps:
preparing water-absorbing cloth, a protection tube, a high-temperature-resistant adhesive tape and medical adhesive plaster, wherein the width of the water-absorbing cloth is matched with the length of the inner circumference of the protection tube;
step two, the water absorption cloth penetrates into one end of the protection tube and extends out of the other end of the protection tube, a section of length is extended out, two long edges of the water absorption cloth are connected and rolled (namely, the water absorption cloth is attached to the inner wall of the protection tube), and the water absorption cloth can be attached to the inner wall of the whole protection tube because the width of the water absorption cloth is consistent with the perimeter of the inner circle of the protection tube;
aligning two long edges of the water absorption cloth with the positioning opening, preferably aligning the two long edges of the water absorption cloth with the positioning opening, so that the positioning bayonet is easily clamped on the branch pipe 4, then flanging one end of the water absorption cloth close to the positioning opening outwards, and wrapping the end part of the protection pipe with the positioning opening so as to attach the end part to the outer wall of the protection pipe;
winding the water absorption cloth on the outer wall of the protective pipe by using a high-temperature-resistant adhesive tape to fix the water absorption cloth;
step five, flanging the other end of the water absorption cloth towards the outer wall of the protection pipe, wrapping the water absorption cloth on the outer wall of the protection pipe, and sticking the water absorption cloth attached to the outer wall of the protection pipe by using a high-temperature resistant adhesive tape;
and step six, winding the medical adhesive plaster outside the water absorption cloth, and firmly bonding to ensure the overall firmness.
When more layers of water absorbing cloth need to be wrapped, the length of the water absorbing cloth is longer, after the water absorbing cloth attached to the outer wall of the protection tube is stuck by the high-temperature-resistant adhesive tape in the fifth step, the medical adhesive plaster is not directly used, the water absorbing cloth extends into the protection tube from the positioning opening end and extends out of the other end, the water absorbing cloth on the inner wall is attached to the inner wall of the protection tube, the water absorbing cloth without the positioning opening end is turned over to the outer wall of the protection tube and is attached to the outer wall, the water absorbing cloth is wound by the high-temperature-resistant adhesive tape, the water absorbing cloth continues to extend into the protection tube from the positioning opening end and extends out of the other end, the steps are repeated, if the thickness is enough, the water absorbing cloth and the water absorbing cloth extend out of the positioning
In order to smoothly mount the protection tube, the water-absorbing cloth attached to the inner part of the protection tube needs to be finished in the fourth step and the fifth step, so that the water-absorbing cloth does not have wrinkles, the manufactured protection tool is more attractive, and the protection effect is consistent.
In order to manufacture the consistency of the protection tool, one end of the water absorption cloth is sewn with a piece of marking cloth, when the protection pipe is manufactured, the end part with the positioning opening of the protection pipe is placed in the middle of the marking cloth, so after the flanging in the step three, half of the marking cloth is arranged on the inner wall and the outer wall of the protection pipe, the marking cloth has the function of convenient manufacturing and marking, the thickness of the water absorption cloth at the positioning opening is increased, the moisture absorption amount at the positioning opening is increased, and the heat insulation effect is better.
The present invention has been described in detail with reference to the specific embodiments, and the detailed description is only for the purpose of helping those skilled in the art understand the present invention, and is not to be construed as limiting the scope of the present invention. Various modifications, equivalent changes, etc. made by those skilled in the art in light of the above teachings are intended to be included within the scope of the present invention.

Claims (11)

1. The utility model provides a welding protection frock of valve body which characterized in that includes: the water-absorbing valve comprises a protection pipe (1) sleeved outside a valve body (5) and water-absorbing cloth (2) arranged on the inner wall of the protection pipe, wherein the water-absorbing cloth is attached to and wraps the outer wall of the valve body; the outer wall of the protection pipe is also provided with water absorption cloth; a branch pipe (4) is arranged on the side surface of the valve body (5), and a positioning opening (11) matched with the branch pipe is arranged at one end part of the protection pipe; the water absorption cloth (2) wraps the end part of the positioning opening (11), and the water absorption cloth (2) is turned over and attached to the outer wall of the protection pipe (1); the end part of the protection tube is provided with a marking cloth (3).
2. The welding protection tool for the valve body according to claim 1, characterized in that: the color of the marking cloth (3) is different from that of the water absorption cloth (2).
3. The welding protection tool for the valve body according to claim 1, characterized in that: the length of the protection pipe (1) is not less than that of the valve body.
4. The welding protection tool for the valve body according to claim 1, characterized in that: the water-absorbing cloth is gauze.
5. The welding protection tool for the valve body according to claim 1, characterized in that: the water absorption cloth is wrapped with medical adhesive plaster.
6. The welding protection tool for the valve body according to claim 1, characterized in that: the protection tube is a plastic rubber tube made of PVC materials.
7. The manufacturing process of the welding protection tool for the valve body according to claim 1 comprises the following specific steps:
preparing water-absorbing cloth, a protection tube, a high-temperature-resistant adhesive tape and medical adhesive plaster, wherein the width of the water-absorbing cloth is matched with the length of the inner circumference of the protection tube;
step two, the water absorption cloth penetrates into the protection pipe from one end and extends out of the other end, and two long edges of the water absorption cloth are connected and rolled;
step three, aligning two long edges of the water absorption cloth with the positioning opening, flanging one end of the water absorption cloth close to the positioning opening outwards, and wrapping the end part of the protection tube with the positioning opening;
fixing water-absorbing cloth on the outer wall of the protective pipe by using a high-temperature-resistant adhesive tape;
fifthly, flanging the other end of the water absorption cloth outwards, wrapping the end part of the protection tube without the positioning opening, and sticking the water absorption cloth attached to the outer wall of the protection tube by using a high-temperature resistant adhesive tape;
and step six, winding the medical adhesive plaster outside the water-absorbing cloth, and firmly bonding.
8. The process of claim 7, wherein when at least two layers of the water-absorbent cloth are wound on the protective tube, step five further comprises inserting the portion of the water-absorbent cloth beyond the protective tube after the water-absorbent cloth is crimped back into the protective tube from the end of the protective tube having the positioning opening, and repeating steps three to five until the winding is completed.
9. The process according to claim 7, wherein the fourth step further comprises finishing the water-absorbent cloth attached to the inside of the protective tube so that the inside of the protective tube is free from wrinkles.
10. The process according to claim 7, wherein the fifth step further comprises finishing the water-absorbent cloth attached to the inside of the protective tube so that the inside of the protective tube is free from wrinkles.
11. The manufacturing process according to claim 7, wherein:
the first step further comprises: preparing a marking cloth, and sewing the marking cloth on the water absorption cloth; the third step further comprises: the end part of the protective tube with the positioning opening is arranged in the middle of the marking cloth.
CN201810563665.1A 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof Active CN108747106B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810563665.1A CN108747106B (en) 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810563665.1A CN108747106B (en) 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof

Publications (2)

Publication Number Publication Date
CN108747106A CN108747106A (en) 2018-11-06
CN108747106B true CN108747106B (en) 2020-07-07

Family

ID=64002715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810563665.1A Active CN108747106B (en) 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof

Country Status (1)

Country Link
CN (1) CN108747106B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109483104A (en) * 2018-12-05 2019-03-19 格力电器(合肥)有限公司 A kind of welding protecting tool set-up

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6705510B1 (en) * 2002-03-11 2004-03-16 James O Sims Valve housing fabrication process enabling complete coverage of joint surfaces with protective coating
CN201287247Y (en) * 2008-10-13 2009-08-12 海信(山东)空调有限公司 Stop valve soldering protection ring
CN202207876U (en) * 2011-09-02 2012-05-02 珠海格力电器股份有限公司 Cooling holding device
CN202545994U (en) * 2012-04-18 2012-11-21 珠海格力电器股份有限公司 Welding cooling protective device for electronic expansion valve
CN202894612U (en) * 2012-09-25 2013-04-24 广东志高暖通设备股份有限公司 Welding protective tool
CN205096751U (en) * 2015-10-29 2016-03-23 长沙格力暖通制冷设备有限公司 Cooling protector
CN107552991A (en) * 2017-10-16 2018-01-09 上海建科检验有限公司 The welding method of cable jacket iron pipe in a kind of earth work

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6705510B1 (en) * 2002-03-11 2004-03-16 James O Sims Valve housing fabrication process enabling complete coverage of joint surfaces with protective coating
CN201287247Y (en) * 2008-10-13 2009-08-12 海信(山东)空调有限公司 Stop valve soldering protection ring
CN202207876U (en) * 2011-09-02 2012-05-02 珠海格力电器股份有限公司 Cooling holding device
CN202545994U (en) * 2012-04-18 2012-11-21 珠海格力电器股份有限公司 Welding cooling protective device for electronic expansion valve
CN202894612U (en) * 2012-09-25 2013-04-24 广东志高暖通设备股份有限公司 Welding protective tool
CN205096751U (en) * 2015-10-29 2016-03-23 长沙格力暖通制冷设备有限公司 Cooling protector
CN107552991A (en) * 2017-10-16 2018-01-09 上海建科检验有限公司 The welding method of cable jacket iron pipe in a kind of earth work

Also Published As

Publication number Publication date
CN108747106A (en) 2018-11-06

Similar Documents

Publication Publication Date Title
CN108747106B (en) Welding protection tool for valve body and manufacturing process thereof
AU2017428029B2 (en) Pipe fitting connecting method and connecting structure
CN209991064U (en) Pipeline insulation structure
KR200456768Y1 (en) Seal for pipe connecting apparatus of air conditioner and pipe connecting apparatus of air conditioner with the same
CN204664649U (en) A kind of automatic contractive aircraft earth surface air-conditioning air supplying hose
CN210034786U (en) Heat preservation device of water pipe
CN113790319A (en) Protective gas filling device in pipe splicing pipe
CN208221852U (en) A kind of dedicated two-period form buckle press joint of high pressure steel wire wound hydraulic hose assembly
CN207481208U (en) Harness heat-shrink tube baking oven device
CN210240889U (en) PVC pipeline connecting piece
CN206830964U (en) A kind of water idle call is prefabricated to cross wall connecting pipe
CA2035042A1 (en) Non-digging tube reverse lining engineering method of conduit
JP2983202B1 (en) Electromagnetic wave prevention tube and method of manufacturing the same
CN217272835U (en) Hydraulic rubber hose with specific protection function
KR101065743B1 (en) Connecting method of aluminum clad pipe for air conditioner
CN220892368U (en) Radiator cover plate structure
CN215568921U (en) Lining structure for trenchless repairing of pipeline
CN213452400U (en) Rubber and plastic heat-insulation board with composite layer structure
CN104847976B (en) A kind of automatic contractive aircraft earth surface air-conditioning air supplying hose and preparation method thereof
CN211738305U (en) Pipeline sealing and splicing structure for exhaust pipe of refrigeration equipment
CN211650670U (en) Flexible heat preservation return air pipe system of formula that allies oneself with row and support sleeve subassembly linking
CN219415892U (en) Water pipe for composite radiator
CN219346759U (en) IXPE air outlet amortization connects unit soon
CN211002667U (en) Heat supply buried pipe telescopic pipe cap
CN213488686U (en) Shoe drying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant