CN108747106A - A kind of the welding protective tooling and its production process of valve body - Google Patents

A kind of the welding protective tooling and its production process of valve body Download PDF

Info

Publication number
CN108747106A
CN108747106A CN201810563665.1A CN201810563665A CN108747106A CN 108747106 A CN108747106 A CN 108747106A CN 201810563665 A CN201810563665 A CN 201810563665A CN 108747106 A CN108747106 A CN 108747106A
Authority
CN
China
Prior art keywords
valve body
protection pipe
absorbent cloth
cloth
welding protective
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810563665.1A
Other languages
Chinese (zh)
Other versions
CN108747106B (en
Inventor
周舟
王晓彬
周锴
古湘龙
杨跃
何庆祝
徐卓恒
马天宇
曾庆斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Geli Heating And Ventilating Equipment Co Ltd
Gree Electric Appliances Inc of Zhuhai
Gree Changsha HVAC Equipment Co Ltd
Original Assignee
Changsha Geli Heating And Ventilating Equipment Co Ltd
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Geli Heating And Ventilating Equipment Co Ltd, Gree Electric Appliances Inc of Zhuhai filed Critical Changsha Geli Heating And Ventilating Equipment Co Ltd
Priority to CN201810563665.1A priority Critical patent/CN108747106B/en
Publication of CN108747106A publication Critical patent/CN108747106A/en
Application granted granted Critical
Publication of CN108747106B publication Critical patent/CN108747106B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/003Cooling means

Abstract

A kind of the welding protective tooling and its production process of valve body, including:The protection pipe that is sleeved on outside valve body is located at the absorbent cloth that protection inside pipe wall be bonded with valve body, and the absorbent cloth is bonded the outer wall of the package valve body.The present invention, directly this tooling sleeve outside valve body, protects valve body, greatly reduces the input of labour, improve work efficiency in welding.

Description

A kind of the welding protective tooling and its production process of valve body
Technical field
The present invention relates to the protection field that solenoid valve or T-type electric expansion valve weld, more specifically a kind of valve body Weld protective tooling and its production process.
Background technology
In solenoid valve market, need branch pipe 4 with solenoid valve to weld together, in such Product jointing, because of its structure The reason of, it can not be using the method for soaked welding;The valve bodies such as solenoid valve, electric expansion valve are damaged by excessive heat in order to prevent Bad, the method for generally use packet wet cloth is protected.
Currently, winding wet cloth process is more complex, employee needs to manually locate wet cloth, and not only operation difficulty is big, Er Qiecao Time-consuming for work, therefore its working efficiency is comparable low;Also after valve body is welded, it is also necessary to manually wet cloth is removed, by In what is be wound around up, the time removed is also very long, and whole process takes time and effort;Since this process is entirely to be controlled by manually , this, which can bring about some other situations, occurs, such as artificial packet wet cloth, wraps situation not in place and happens occasionally, this will Cause solenoid valve and T-type electric expansion valve etc. that cannot be effectively protected, will damage solenoid valve in welding and T-type electronics is swollen Swollen valve brings certain economic loss to producer.
So the method for human hand winding wet cloth is a kind of method got half the result with twice the effort, a kind of protection solenoid valve of exploitation and T-type electricity The tooling of the valve bodies such as sub- expansion valve welding has great importance.
Invention content
The object of the present invention is to provide the welding protective tooling and its production process of a kind of valve body, the welding of the valve body is protected Tooling need not waste the excessive time again, it is only necessary to the tooling made be directly sleeved on valve body i.e. when being welded to connect bar Valve body can be protected, it is convenient and practical, a large amount of time is saved, while also saving labour.
In order to achieve the above object, the technical solution adopted by the present invention is as follows:
A kind of welding protective tooling of valve body, it is characterised in that including:The protection pipe that is sleeved on outside valve body, be located at protection inside pipe wall with The outer wall of the valve body is wrapped up in the absorbent cloth of valve body fitting, the absorbent cloth fitting.
Preferably, the protection pipe outer wall also is provided with absorbent cloth.
Preferably, the side of the valve body is equipped with branch pipe, and the one end of the protection pipe is equipped with matches with the manifold size The locating aperture of conjunction.
Preferably, the protection tube end is equipped with label cloth.
Preferably, the color of the label cloth is different from absorbent cloth.
Preferably, the length of the protection pipe is not less than the length of valve body.
Preferably, the absorbent cloth is gauze.
Preferably, the absorbent cloth is wrapped with Medical adhesive plaster.
Preferably, the protection pipe is the plastics sebific duct of PVC material.
A kind of production process of the welding protective tooling of above-mentioned valve body, is as follows:
Step 1: get out absorbent cloth, protection pipe, High temperature-resistanadhesive adhesive tape and Medical adhesive plaster, the width of absorbent cloth and protection pipe Inner circumferential length matches;
Step 2: absorbent cloth is penetrated from one end of protection pipe and stretched out the other end, two long sides of absorbent cloth are connected and are intervolved Get up;
Step 3: two long sides of absorbent cloth are aligned with locating aperture, one end close to locating aperture on absorbent cloth is turned-out Side, package protection pipe have the end of locating aperture;
Step 4: fixing the absorbent cloth in protection pipe outer wall with High temperature-resistanadhesive adhesive tape;
Step 5: the other end outward flanging of absorbent cloth, end of the protection pipe without locating aperture is wrapped up, it is viscous with High temperature-resistanadhesive adhesive tape The absorbent cloth being firmly bonded with protection pipe outer wall;
Step 6: being wrapped in outside absorbent cloth with Medical adhesive plaster, bonding is secured;
Preferably, when being tied at least two layers of waterproof cloth in the protection pipe, step 5 further include by absorbent cloth flange it The part for exceeding protection pipe afterwards has the end of locating aperture to turn back in protection pipe from protection pipe, repeat step 3 to step 5 until Winding is completed;
Preferably, the step 4 further includes the absorbent cloth for arranging with being bonded inside protection pipe, makes its localization of internal corrugationless;
Preferably, the step 1 further includes:Prepare label cloth, by label cloth sewing on the absorbent cloth;
The step 3 further includes:Protection pipe has the end of locating aperture in the centre of label cloth.
Compared with prior art, the present invention at least has the advantages that:
The present invention need not waste the excessive time again, it is only necessary to the tooling made be directly sleeved on valve when being welded to connect bar Valve body can be protected on body, it is convenient and practical, save a large amount of time;Also save labour;But also it is equipped with locating aperture, When welding some solenoid valves or T-type electric expansion valve, positioning can be played the role of.
Description of the drawings
Fig. 1 is the schematic diagram that an embodiment valve body loads onto tooling;
Fig. 2 is an embodiment protection pipe structure chart;
Fig. 3 is electromagnetic valve structure figure;
Fig. 4 is T-type electronic expansion valve structure figure.
Specific implementation mode
The present invention will be further described with reference to the accompanying drawings and examples.
Referring to Fig.1-2, a kind of welding protective tooling of the valve body provided for an embodiment, including protection pipe 1, absorbent cloth 2, Absorbent cloth is wrapped in the inner and outer wall of protection pipe 1, and the thickness of absorbent cloth package can be set according to actual conditions, after package Protection pipe be absorbent cloth on inner wall be to need to be fitted on the valve body 5 for needing to weld, since its internal absorbent cloth is Soft, the internal diameter of the protection pipe after having wrapped up absorbent cloth is less than the outer diameter of valve body, it can be tightly placed in outside valve body 5 in this way, have Certain fixed function, and the heat on valve body 5 can be absorbed.It can play the role of cooling when welding, also play guarantor Protect valve body effect, as absorbent cloth winding number can according to actual conditions, not need transition waste absorbent cloth.This tooling When in use, need not be again as now general scheme, the method wound with wet cloth takes time and effort, and after having welded, also needs The wet cloth one wound is enclosed taking off slowly;Only need that the tooling for impregnating water is brought to be directly sleeved on to need to weld On the valve body connect, after having welded, directly this tooling is released, saves a large amount of labour, while also saving The input of time, has cut down the cost of labor of production.
In the present embodiment, a locating aperture 11 has also been set in the one end of protection pipe, this locating aperture plays The effect of positioning is the presence of the branch pipe 4 vertical with valve body in the side of some valve bodies 5(Such as Fig. 3-4), this locating aperture it is big Small design matches with the diameter of branch pipe 4, so when mounted can be directly this opening alignment branch pipe 4, to weldering The work connect brings many facilities, and the consistency of this tooling installation also ensured that, and valve body can be all blocked, Protect valve body.The label cloth of one piece of other color is set in the end of protection pipe, it can increase the positioning action of opening, and make Its clamping force here is slightly larger, it can also increase water absorption herein, increases heat-insulating capability.
In the present embodiment, the length of protection pipe is greater than the length either equal to the valve body for needing to weld, it is needed In valve body is wrapped in all over, it is ensured that protective effect of this tooling to valve body.Absorbent cloth chooses gauze, and water imbibition is preferable, It is cemented again with Medical adhesive plaster in the outside of absorbent cloth, it is made not scatter.Protection pipe selects plastics sebific duct, plastics sebific duct preferred It is made of PVC material, selects such material, thermal insulation is preferable, stronger to the protection of valve body in welding.
In some other embodiment, thicker absorbent cloth is selected directly to be bonded on the inner wall of protection pipe, it is also tool Spongy, the cooperation of the outer wall of absorbent cloth and valve body on inner wall can also play protection and heat-insulated function, but this It is more difficult that technical solution makes, and cost is higher, and the outer wall of protection pipe is naked to be exposed on the external, and electric spark may be damaged when soldered Protection pipe.
The present invention also protects a kind of production process of the welding protective tooling of valve body, is as follows:
Step 1: get out absorbent cloth, protection pipe, High temperature-resistanadhesive adhesive tape and Medical adhesive plaster, the width of absorbent cloth and protection pipe Inner circumferential length matches;
Step 2: absorbent cloth is penetrated from one end of protection pipe and stretched out the other end, a segment length is stretched out, by two of absorbent cloth Long side, which connects, to be intervolved(Namely absorbent cloth is fitted on the inner wall of protection pipe), due to the width and protection pipe of absorbent cloth The perimeter of inner circle is consistent, so absorbent cloth is on the inner wall for can stick entire protection pipe;
Step 3: two long sides of absorbent cloth are aligned with locating aperture, preferably in the centre of locating aperture, making limited bayonet It is easier to snap onto on branch pipe 4, then one end outward flanging close to locating aperture on absorbent cloth, package protection pipe has positioning to open The end of mouth, makes it be fitted on the outer wall of protection pipe;
Step 4: winding the absorbent cloth in protection pipe outer wall with High temperature-resistanadhesive adhesive tape, it is made to fix;
Step 5: the other end of absorbent cloth is made the outer wall of absorbent cloth package protection pipe, uses high temperature resistant to protection pipe outer wall flange Adhesive tape clings the absorbent cloth being bonded with protection pipe outer wall;
Step 6: being wrapped in outside absorbent cloth with Medical adhesive plaster, bonding securely ensures whole fastness.
When needing to wrap up the absorbent cloth of more layers, the length of absorbent cloth is just longer, viscous with High temperature-resistanadhesive adhesive tape in step 5 After the absorbent cloth being firmly bonded with protection pipe outer wall, Medical adhesive plaster is not used directly, but absorbent cloth is stretched from locating aperture end again It into inside protection pipe, is stretched out from the other end, absorbent cloth on inner wall is made to be bonded the inner wall of protection pipe, then from no locating aperture end Absorbent cloth be folded to the outer wall of protection pipe, be bonded with outer wall, wound with High temperature-resistanadhesive adhesive tape, continued absorbent cloth from locating aperture End reaches inside protection pipe, is stretched out from the other end, repeats above step, if thickness is much of that, then be one with absorbent cloth from nothing After locating aperture end is stretched out, after fitting protection pipe outer wall, directly winds Medical adhesive plaster and fix
For being smoothed out for protection pipe installation, when carrying out step 4 and step 5, need to arrange fitting inside protection pipe Absorbent cloth makes it not have fold, this also can make the protecting tool set-up of making more beautiful, and protecting effect is consistent.
In order to make the consistency of protecting tool set-up, one piece of label cloth, when making, protection are sewed on one end of absorbent cloth Pipe has the centre that the end of locating aperture is placed on label cloth, is then the inner wall of protection pipe after the flange in this way in step 3 With the label cloth for having half on outer wall, it not just plays the role of facilitating making and marking, also add at locating aperture The thickness of absorbent cloth, this is also the increase in the moisture absorption amount at locating aperture, and heat insulation herein is better.
Above by specific embodiment, invention is explained in detail, these detailed description are only limited to help Those skilled in the art understand that present disclosure, can not be interpreted as limiting the scope of the invention.Art technology Personnel should be included in various retouchings, equivalent transformation etc. that said program carries out under present inventive concept the protection model of the present invention It encloses.

Claims (14)

1. a kind of welding protective tooling of valve body, it is characterised in that including:It is sleeved on valve body(5)Outer protection pipe(1), be located at protection The absorbent cloth of inside pipe wall(2), the outer wall of the absorbent cloth fitting package valve body.
2. the welding protective tooling of valve body according to claim 1, it is characterised in that:The protection pipe outer wall also is provided with inhaling Water cloth.
3. the welding protective tooling of valve body according to claim 1, it is characterised in that:The valve body(5)Side be equipped with Branch pipe(4), the one end of the protection pipe is equipped with the locating aperture coordinated with the branch pipe(11).
4. the welding protective tooling of valve body according to claim 1, it is characterised in that:The protection tube end is equipped with label Cloth(3).
5. the welding protective tooling of valve body according to claim 4, it is characterised in that:The label cloth(3)Color with Absorbent cloth(2)It is different.
6. the welding protective tooling of valve body according to claim 1, it is characterised in that:The protection pipe(1)Length not Less than the length of valve body.
7. the welding protective tooling of valve body according to claim 1, it is characterised in that:The absorbent cloth is gauze.
8. the welding protective tooling of valve body according to claim 2, it is characterised in that:The absorbent cloth is wrapped with medical rubber Skin cream.
9. the welding protective tooling of valve body according to claim 1, it is characterised in that:The protection pipe is PVC material Plastics sebific duct.
10. the production process of the welding protective tooling of valve body according to claim 3, is as follows:
Step 1: get out absorbent cloth, protection pipe, High temperature-resistanadhesive adhesive tape and Medical adhesive plaster, the width of absorbent cloth and protection pipe Inner circumferential length matches;
Step 2: absorbent cloth is penetrated from one end of protection pipe and stretched out the other end, two long sides of absorbent cloth are connected and are intervolved Get up;
Step 3: two long sides of absorbent cloth are aligned with locating aperture, one end close to locating aperture on absorbent cloth is turned-out Side, package protection pipe have the end of locating aperture;
Step 4: fixing the absorbent cloth in protection pipe outer wall with High temperature-resistanadhesive adhesive tape;
Step 5: the other end outward flanging of absorbent cloth, end of the protection pipe without locating aperture is wrapped up, it is viscous with High temperature-resistanadhesive adhesive tape The absorbent cloth being firmly bonded with protection pipe outer wall;
Step 6: being wrapped in outside absorbent cloth with Medical adhesive plaster, bonding is secured.
11. production process according to claim 10, which is characterized in that when being tied at least described in two layers in the protection pipe When waterproof cloth, step 5 further includes that the part beyond protection pipe after absorbent cloth flange is had to the end of locating aperture from protection pipe It turns back in protection pipe, repeats step 3 to step 5 until winding is completed.
12. production process according to claim 10, which is characterized in that the step 4 further includes arrangement and protection pipe The absorbent cloth of inside fitting makes its internal corrugationless.
13. production process according to claim 10, which is characterized in that the step 5 further includes arrangement and protection pipe The absorbent cloth of inside fitting, makes its localization of internal corrugationless.
14. production process according to claim 10, it is characterised in that:
The step 1 further includes:Prepare label cloth, by label cloth sewing on the absorbent cloth;
The step 3 further includes:Protection pipe has the end of locating aperture in the centre of label cloth.
CN201810563665.1A 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof Active CN108747106B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810563665.1A CN108747106B (en) 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810563665.1A CN108747106B (en) 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof

Publications (2)

Publication Number Publication Date
CN108747106A true CN108747106A (en) 2018-11-06
CN108747106B CN108747106B (en) 2020-07-07

Family

ID=64002715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810563665.1A Active CN108747106B (en) 2018-06-04 2018-06-04 Welding protection tool for valve body and manufacturing process thereof

Country Status (1)

Country Link
CN (1) CN108747106B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109483104A (en) * 2018-12-05 2019-03-19 格力电器(合肥)有限公司 A kind of welding protecting tool set-up

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6705510B1 (en) * 2002-03-11 2004-03-16 James O Sims Valve housing fabrication process enabling complete coverage of joint surfaces with protective coating
CN201287247Y (en) * 2008-10-13 2009-08-12 海信(山东)空调有限公司 Stop valve soldering protection ring
CN202207876U (en) * 2011-09-02 2012-05-02 珠海格力电器股份有限公司 Cooling holding device
CN202545994U (en) * 2012-04-18 2012-11-21 珠海格力电器股份有限公司 Welding cooling protective device for electronic expansion valve
CN202894612U (en) * 2012-09-25 2013-04-24 广东志高暖通设备股份有限公司 Welding protective tool
CN205096751U (en) * 2015-10-29 2016-03-23 长沙格力暖通制冷设备有限公司 Cooling protector
CN107552991A (en) * 2017-10-16 2018-01-09 上海建科检验有限公司 The welding method of cable jacket iron pipe in a kind of earth work

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6705510B1 (en) * 2002-03-11 2004-03-16 James O Sims Valve housing fabrication process enabling complete coverage of joint surfaces with protective coating
CN201287247Y (en) * 2008-10-13 2009-08-12 海信(山东)空调有限公司 Stop valve soldering protection ring
CN202207876U (en) * 2011-09-02 2012-05-02 珠海格力电器股份有限公司 Cooling holding device
CN202545994U (en) * 2012-04-18 2012-11-21 珠海格力电器股份有限公司 Welding cooling protective device for electronic expansion valve
CN202894612U (en) * 2012-09-25 2013-04-24 广东志高暖通设备股份有限公司 Welding protective tool
CN205096751U (en) * 2015-10-29 2016-03-23 长沙格力暖通制冷设备有限公司 Cooling protector
CN107552991A (en) * 2017-10-16 2018-01-09 上海建科检验有限公司 The welding method of cable jacket iron pipe in a kind of earth work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109483104A (en) * 2018-12-05 2019-03-19 格力电器(合肥)有限公司 A kind of welding protecting tool set-up

Also Published As

Publication number Publication date
CN108747106B (en) 2020-07-07

Similar Documents

Publication Publication Date Title
CN106241056B (en) One kind insulation bag production method
US2985552A (en) Thermal insulating unit for faucets
JPS5934839A (en) Sausage casing and production thereof
CN108747106A (en) A kind of the welding protective tooling and its production process of valve body
CN217604245U (en) Machine connection pencil in integration air conditioner
CN208503771U (en) Heat supply pipeline defroster
CN204664649U (en) A kind of automatic contractive aircraft earth surface air-conditioning air supplying hose
CN205035316U (en) Medical adhesive tape
CN209196362U (en) A kind of fire hose and water belt lacing tie wire protective device
CN207151371U (en) Tree protecting coat
CN203932887U (en) A thermal-insulated pipe of pencil for automobile engine pencil is thermal-insulated
CN205583156U (en) Structure that continues on railway internal shield digital signal cable internal shield layer
CN207687520U (en) Inner ring flow control temperature special-purpose thermal insulation pipeline
CN205479688U (en) Tap is with cold -proof device of heating
CN205101759U (en) Overlap joint formula heat shrinkage bush with opening cell body
CN205781714U (en) Heat preservation member, air-conditioning and connecting pipe component thereof
CN201498285U (en) Medium- and low-voltage open-type insulation protection sleeve
CN104847976B (en) A kind of automatic contractive aircraft earth surface air-conditioning air supplying hose and preparation method thereof
CN205101710U (en) Connecting strip butt joint type heat shrinkage bush
CN205024264U (en) Flexible local heat treatment device
CN220228348U (en) Air conditioner copper pipe heat preservation sleeve
CN104235556B (en) A kind of pipeline aluminium foil binding device
CN205101843U (en) Butt joint type heat shrinkage bush that contains opening cell body
CN204202765U (en) A kind of insulation bandage
CN210681003U (en) Windproof waterproof warm-keeping handle sheath

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant