CN108735377A - A kind of preparation method of the U-shaped copper line of rabbet joint of NbTi/Cu superconducting wires - Google Patents

A kind of preparation method of the U-shaped copper line of rabbet joint of NbTi/Cu superconducting wires Download PDF

Info

Publication number
CN108735377A
CN108735377A CN201810547105.7A CN201810547105A CN108735377A CN 108735377 A CN108735377 A CN 108735377A CN 201810547105 A CN201810547105 A CN 201810547105A CN 108735377 A CN108735377 A CN 108735377A
Authority
CN
China
Prior art keywords
rabbet joint
nbti
copper line
superconducting wires
rectangle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810547105.7A
Other languages
Chinese (zh)
Other versions
CN108735377B (en
Inventor
郭强
张平祥
李建峰
刘向宏
冯勇
刘建伟
闫凯鹃
柳祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Western Superconducting Technologies Co Ltd
Original Assignee
Western Superconducting Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Western Superconducting Technologies Co Ltd filed Critical Western Superconducting Technologies Co Ltd
Priority to CN201810547105.7A priority Critical patent/CN108735377B/en
Publication of CN108735377A publication Critical patent/CN108735377A/en
Application granted granted Critical
Publication of CN108735377B publication Critical patent/CN108735377B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B12/00Superconductive or hyperconductive conductors, cables, or transmission lines
    • H01B12/02Superconductive or hyperconductive conductors, cables, or transmission lines characterised by their form
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B12/00Superconductive or hyperconductive conductors, cables, or transmission lines
    • H01B12/02Superconductive or hyperconductive conductors, cables, or transmission lines characterised by their form
    • H01B12/04Single wire
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/0016Apparatus or processes specially adapted for manufacturing conductors or cables for heat treatment
    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01BCABLES; CONDUCTORS; INSULATORS; SELECTION OF MATERIALS FOR THEIR CONDUCTIVE, INSULATING OR DIELECTRIC PROPERTIES
    • H01B13/00Apparatus or processes specially adapted for manufacturing conductors or cables
    • H01B13/008Apparatus or processes specially adapted for manufacturing conductors or cables for manufacturing extensible conductors or cables
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/60Superconducting electric elements or equipment; Power systems integrating superconducting elements or equipment

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Superconductors And Manufacturing Methods Therefor (AREA)
  • Wire Processing (AREA)

Abstract

The invention discloses a kind of NbTi/Cu superconducting wires preparation methods of the U-shaped copper line of rabbet joint, specifically include:Φ 8mm copper rods are chosen, its multi pass drawing to Φ 2mm- Φ 3mm is placed in by progress atmosphere protection annealing in atmosphere protection annealing furnace using wire drawing machine again;3 passes moldings are carried out after annealing;By the semi-finished product of roll forming using die drawn to design size to obtain the final product.One aspect of the present invention is beneficial to improve the residual resistance ratio of NbTi superconducting wires, on the one hand reduces follow-up rolling process resistance of deformation;It finally uses three passage continuous rolling methods and the method for final mold drawing to obtain the U-shaped copper line of rabbet joint of high-precision, process drawing and operation of rolling speed, is suitble to the large-scale batch production of the U-shaped copper line of rabbet joint of NbTi/Cu superconducting wires.

Description

A kind of preparation method of the U-shaped copper line of rabbet joint of NbTi/Cu superconducting wires
Technical field
The invention belongs to superconductor processing technique fields, and in particular to a kind of U-shaped copper line of rabbet joint of NbTi/Cu superconducting wires Preparation method.
Background technology
NbTi superconductors are mainly used in magnetic resonance imaging (MRI), nuclear magnetic resonance (NMR), Laboratory Instruments, particle at present The fields such as accelerator, electric power, clearance, ore Magneto separate, magnetic suspension train, superconducting energy storage (SMES);Traditional NbTi/Cu multicores are super The preparation of conducting wire generally comprises alloy preparation, alloy bar processing, the combination of multicore complex and processing, the heat treatment of multiple core superconductive wire Etc. technical process;Due to the influence for the factors such as process is complicated and of high cost, prepared NbTi/Cu multiple core superconductive wires Copper than generally all controls below 4;But for some fields such as 3T or less magnetic resonance imagings (MRI) system, used in NbTi Superconducting magnet needs very high stability, and copper is than being then one of the principal element for influencing its stability;Copper ratio is higher, stablizes Property is better.Therefore, it prepares copper ratio and is higher than 7:1 NbTi/Cu multiple core superconductive wires are for obtaining the NbTi superconducting magnets of high stable extremely It closes important.The whole world need to use about 3600 tons of NbTi superconducting lines at present, and wherein high-copper is about than superconducting wire proportion 80%, therefore preparation and batch production of the high-copper than superconducting wire become the most important thing.
When generally preparing high-copper than superconducting wire using mosaic mode at present, i.e., the superconduction round wires prepared are placed in U-shaped In the copper line of rabbet joint, and the two is welded together using tin.The process and final precision of the U-shaped copper line of rabbet joint can influence U-shaped copper slot The precision of line, and then influence the final performance of superconducting wire.At present since the U-shaped copper line of rabbet joint precision prepared is limited, lead to it The residual resistance ratio (RRR values) of the superconducting wire processed is also restricted by it, it is therefore desirable to develop one kind can improve it is U-shaped The preparation method of copper line of rabbet joint precision, to obtain the NbTi superconducting magnets of high stable.
Invention content
The object of the present invention is to provide a kind of NbTi/Cu superconducting wires preparation methods of the U-shaped copper line of rabbet joint, are high-copper ratio The preparation of NbTi/Cu superconducting wires provides material foundation.
The technical solution adopted in the present invention is:A kind of preparation method of the U-shaped copper line of rabbet joint of NbTi/Cu superconducting wires, tool Body includes the following steps:
Step 1, commercially available Φ 8mm copper rods are chosen, using wire drawing machine by its multi pass drawing to Φ 2mm- Φ 3mm;
Step 2, Φ 2mm- Φ 3mm copper wire in step 2 is placed in progress atmosphere protection annealing in atmosphere protection annealing furnace;
Step 3, annealed state Φ 2mm- Φ 3mm copper wire in step 2 is subjected to 3 passes moldings;
Step 4, by the semi-finished product of roll forming in step 3 using die drawn to design size.
The features of the present invention also characterized in that
In step 1, the material of commercially available Φ 8mm copper rods is C10100 high-purity oxygen-free coppers, every time working modulus is 20%, is drawn It is 100~200m/min to stretch speed.
In step 2, in annealing process, annealing temperature is 250-270 DEG C, according to anneal gauge difference, annealing time 2- 4h, atmosphere 1%H2And 99%N2Mixed atmosphere is protected.
In step 3, the first passage operation of rolling is:Copper wire is rectangular by circle rolling, and the ratio of width to height of rectangle is 1.5, is added Work rate is 7-10%.
In step 3, the second passage operation of rolling is:Copper wire is rolled into the square that upper surface carries semi-circular recesses by rectangle Shape, width remain unchanged, working modulus 4-6%.
In step 3, third passes process is:Copper wire is rolled into upper table by rectangle of the upper surface with semi-circular recesses Face carries the rectangle of U-shaped groove, and width and thickness has working modulus, working modulus 7-10% simultaneously.
Three passes are deformed into disposable continuous rolling in step 3, mill speed according to the different size copper line of rabbet joint without Together, the copper line of rabbet joint is smaller, and speed is faster, conversely, slower, velocity interval is 100~150m/min.
For the mold used in step 4 for the mold of final design size, die angle is 6 degree, and mold material is that size is steady Fixed preferable, wear-resisting Diamond dies, working modulus are 2~3%, it is therefore an objective to which the copper line of rabbet joint after rolling is carried out micro-shaping from reaching tool There is the U-shaped copper line of rabbet joint of high dimensional accuracy.
The advantageous effect of the U-shaped copper line of rabbet joint preparation method of the present invention is to be added commercially available C10100 copper bar by hubbing Work is to specific dimensions, then copper wire will make annealing treatment by the gross, is on the one hand beneficial to improve the residual resistance of NbTi superconducting wires Than on the one hand reducing follow-up rolling process resistance of deformation;Finally use three passage continuous rolling methods and final mold drawing Method obtain the U-shaped copper line of rabbet joint of high-precision, process drawing and operation of rolling speed, be suitble to NbTi/Cu superconducting wires U The large-scale batch production of the type copper line of rabbet joint.
Description of the drawings
Fig. 1 is the design drawing of the special-shaped copper line of rabbet joint in the present invention;
Fig. 2 is different phase rolling deformation figure in the present invention.
Specific implementation mode
The present invention is described in detail with reference to the accompanying drawings and examples.
The NbTi/Cu superconducting wires of the present invention preparation method of the U-shaped copper line of rabbet joint, specifically includes following steps:
Step 1, commercially available Φ 8mm copper rods are chosen, material is C10100 high-purity oxygen-free coppers, using wire drawing machine by its multi-pass It is drawn to Φ 2mm- Φ 3mm;Every time working modulus is 20% or so, and tensile speed is 100~200m/min.
Step 2, Φ 2mm- Φ 3mm copper wire in step 2 is placed in progress atmosphere protection annealing in atmosphere protection annealing furnace, moved back Fiery temperature is 250-270 DEG C, according to anneal gauge difference, annealing time 2-4h, atmosphere 1%H2And 99%N2Mixed atmosphere Protection.Annealing temperature is higher, and annealing time is longer, and size is smaller to working modulus when final molding after annealing, and RRR values are higher.
Step 3, annealed state Φ 2mm- Φ 3mm copper wire in step 2 is subjected to 3-4 passes moldings, the first passes Process is:Copper wire is rectangular by circle rolling, and the ratio of width to height of rectangle is 1.5, working modulus 7-10%.The second passage operation of rolling For:Copper wire is rolled into the rectangle that upper surface carries semi-circular recesses by rectangle, and width remains unchanged, working modulus 4-6%.Third Passes process is:Copper wire is rolled into the rectangle that upper surface carries U-shaped groove by rectangle of the upper surface with semi-circular recesses, Width and thickness has working modulus, working modulus 7-10% simultaneously.Three passes are deformed into disposable continuous rolling, roll Journey schematic diagram is as shown in Fig. 2, and mill speed is different according to the different size copper line of rabbet joint, and the copper line of rabbet joint is smaller, and speed is faster, instead It, slower, velocity interval is 100~150m/min.
Step 4, by the semi-finished product of roll forming in step 3 using die drawn to design size, due to the copper line of rabbet joint at this time Size from final size very close to, it is desirable to rolling equipment can be proposed very high requirement by continuing rolling, therefore use small working modulus Mold molding easily reach higher precision.As shown in Figure 1.It is stretched using common superconducting wire drawing die, Die angle is 6 degree, and mold material is preferable, the wear-resisting Diamond dies of dimensionally stable, and working modulus is 2~3%, it is therefore an objective to will The copper line of rabbet joint carries out micro-shaping from reaching the U-shaped copper line of rabbet joint with high dimensional accuracy after rolling.
NbTi/Cu superconducting wires, obtained NbTi/ are prepared using the U-shaped copper line of rabbet joint of high dimensional accuracy produced by the present invention The residual resistance ratio (RRR values) of Cu superconducting wires is not less than 250, reaches as high as 400 or more, RRR values and passes through working modulus and annealing Technology controlling and process.RRR values represent the stability that superconducting wire is prepared into superconducting magnet, it is seen that the method for the present invention is that follow-up preparation is high The superconducting wire of stability provides good basis, and the NbTi/Cu that same performance can not be prepared using the prior art is super Conductor.
The U-shaped copper line of rabbet joint performance prepared to the method for the present invention is detected, and the results are shown in Table 1.Utilize copper line of rabbet joint processing Superconducting wire performance is shown in Table 2.
The 1 U-shaped copper line of rabbet joint performance of the present invention of table
As shown in Table 1, for the U-shaped copper line of rabbet joint length prepared using the method for the present invention up to 10000m or more, dimensional accuracy is equal +/- 0.02mm is can reach, the RRR (300K/10K) >=400 of the U-shaped copper line of rabbet joint sample, tensile strength Rm>280Mpa.
Superconductor performance prepared by the 2 U-shaped copper line of rabbet joint of the present invention of table
RRR(300K/10K) Rp0.2/MPa A50mm/%
212 185 29.5
It is the specific preparating example of the U-shaped copper line of rabbet joint of the present invention below.
Embodiment 1
Commercially available Φ 8mm copper rods are chosen, and material is C10100 high-purity oxygen-free coppers, its 9 passage is drawn using multidie machine It pulls out to Φ 2.86mm;Every time working modulus is 20% or so, tensile speed 120m/min.Φ 2.86mm copper wire is placed in atmosphere guarantor It protects and carries out atmosphere protection annealing in annealing furnace, annealing temperature is 270 DEG C, according to anneal gauge difference, annealing time 2h, atmosphere For 1%H2And 99%N2Mixed atmosphere is protected.The first passage operation of rolling is:Copper wire is rolled into 2.95*1.97mm by Φ 2.86mm Rectangle, the ratio of width to height of rectangle is 1.5, working modulus 9.5%.The second passage operation of rolling is:Copper wire is rolled by rectangle Surface carries the rectangle of semi-circular recesses, and line of rabbet joint width is 2.95mm, is highly 1.94mm, semi-circular recesses are a diameter of 0.70mm, working modulus 4.8%.Third passes process is:Copper wire is rolled by rectangle of the upper surface with semi-circular recesses The rectangle of U-shaped groove is carried at upper surface, width 2.9mm is highly 1.9mm, and U-type groove width is 0.70, and U-type groove depth is 0.72mm, working modulus 10%.Three passes are deformed into disposable continuous rolling, mill speed 120m/min.It will rolling Using die drawn to design size, the copper line of rabbet joint specification of final molding is molding semi-finished product:Width is 2.88mm, is highly 1.88mm, U-type groove width are 0.74, and U-type groove depth is 0.76mm, working modulus 3%.Die angle is 6 degree, and mold material is Preferable, the wear-resisting Diamond dies of dimensionally stable.
Embodiment 2
Commercially available Φ 8mm copper rods are chosen, and material is C10100 high-purity oxygen-free coppers, its 10 passage is drawn using multidie machine It pulls out to Φ 2.56mm;Every time working modulus is 20% or so, tensile speed 140m/min.Φ 2.56mm copper wire is placed in atmosphere guarantor It protects and carries out atmosphere protection annealing in annealing furnace, annealing temperature is 260 DEG C, according to anneal gauge difference, annealing time 3h, atmosphere For 1%H2And 99%N2Mixed atmosphere is protected.The first passage operation of rolling is:Copper wire is rolled into 2.65*1.75mm by Φ 2.56mm Rectangle, the ratio of width to height of rectangle is 1.5, working modulus 9.9%.The second passage operation of rolling is:Copper wire is rolled by rectangle Surface carries the rectangle of semi-circular recesses, and line of rabbet joint width is 2.65mm, is highly 1.7mm, a diameter of 0.60mm of semi-circular recesses, Working modulus is 5.9%.Third passes process is:Copper wire is rolled into upper surface by rectangle of the upper surface with semi-circular recesses Rectangle with U-shaped groove, width 2.64mm are highly 1.65mm, and U-type groove width is 0.60, and U-type groove depth is 0.62mm, working modulus 9.5%.Three passes are deformed into disposable continuous rolling, mill speed 140m/min.It will rolling Using die drawn to design size, the copper line of rabbet joint specification of final molding is molding semi-finished product:Width is 2.62mm, is highly 1.63mm, U-type groove width are 0.66, and U-type groove depth is 0.64mm, working modulus 3%.Die angle is 6 degree, and mold material is Preferable, the wear-resisting Diamond dies of dimensionally stable.
Embodiment 3
Commercially available Φ 8mm copper rods are chosen, and material is C10100 high-purity oxygen-free coppers, its 11 passage is drawn using multidie machine It pulls out to Φ 2.28mm;Every time working modulus is 20% or so, tensile speed 160m/min.Φ 2.86mm copper wire is placed in atmosphere guarantor It protects and carries out atmosphere protection annealing in annealing furnace, annealing temperature is 250 DEG C, according to anneal gauge difference, annealing time 4h, atmosphere For 1%H2And 99%N2Mixed atmosphere is protected.The first passage operation of rolling is:Copper wire is rolled into 2.35*1.57mm by Φ 2.28mm Rectangle, the ratio of width to height of rectangle is 1.5, working modulus 9.6%.The second passage operation of rolling is:Copper wire is rolled by rectangle Surface carries the rectangle of semi-circular recesses, and line of rabbet joint width is 2.35mm, is highly 1.52mm, semi-circular recesses are a diameter of 0.50mm, working modulus 5.8%.Third passes process is:Copper wire is rolled by rectangle of the upper surface with semi-circular recesses The rectangle of U-shaped groove is carried at upper surface, width 2.30mm is highly 1.48mm, and U-type groove width is 0.50, U-type groove depth For 0.52mm, working modulus 10%.Three passes are deformed into disposable continuous rolling, mill speed 160m/min.It will roll Molding semi-finished product are made using die drawn to design size, the copper line of rabbet joint specification of final molding is:Width is 2.28mm, height For 1.46mm, U-type groove width is 0.53, and U-type groove depth is 0.55mm, working modulus 3%.Die angle is 6 degree, mold material For preferable, the wear-resisting Diamond dies of dimensionally stable.
Embodiment 4
Commercially available Φ 8mm copper rods are chosen, and material is C10100 high-purity oxygen-free coppers, its 12 passage is drawn using multidie machine It pulls out to Φ 2.04mm;Every time working modulus is 20% or so, tensile speed 180m/min.Φ 2.04mm copper wire is placed in atmosphere guarantor It protects and carries out atmosphere protection annealing in annealing furnace, annealing temperature is 250 DEG C, according to anneal gauge difference, annealing time 2h, atmosphere For 1%H2And 99%N2Mixed atmosphere is protected.The first passage operation of rolling is:Copper wire is rolled into 2.20*1.47mm by Φ 2.04mm Rectangle, the ratio of width to height of rectangle is 1.5, working modulus 10%.The second passage operation of rolling is:Copper wire is rolled into upper table by rectangle Face carries the rectangle of semi-circular recesses, and line of rabbet joint width is 2.20mm, is highly 1.42mm, a diameter of 0.40mm of semi-circular recesses, Working modulus is 5.3%.Third passes process is:Copper wire is rolled into upper surface by rectangle of the upper surface with semi-circular recesses Rectangle with U-shaped groove, width 2.15mm are highly 1.38mm, and U-type groove width is 0.40, and U-type groove depth is 0.42mm, working modulus 10%.Three passes are deformed into disposable continuous rolling, mill speed 180m/min.It will rolling Using die drawn to design size, the copper line of rabbet joint specification of final molding is molding semi-finished product:Width is 2.13mm, is highly 1.36mm, U-type groove width are 0.46, and U-type groove depth is 0.44mm, working modulus 3%.Die angle is 6 degree, and mold material is Preferable, the wear-resisting Diamond dies of dimensionally stable.

Claims (5)

1. a kind of NbTi/Cu superconducting wires preparation method of the U-shaped copper line of rabbet joint, which is characterized in that include the following steps:
Step 1, Φ 8mm copper rods are chosen, using wire drawing machine by its multi pass drawing to Φ 2mm- Φ 3mm;
Step 2, the copper wire after drawing is placed in progress atmosphere protection annealing in atmosphere protection annealing furnace;
Step 3, annealed state copper wire is subjected to 3 passes moldings;
Step 4, by the semi-finished product of roll forming using die drawn to design size.
2. the NbTi/Cu superconducting wires according to claim 1 preparation method of the U-shaped copper line of rabbet joint, which is characterized in that described In step 1, the materials of Φ 8mm copper rods is C10100 high-purity oxygen-free coppers, every time working modulus is 20%, tensile speed is 100~ 200m/min。
3. the NbTi/Cu superconducting wires according to claim 1 preparation method of the U-shaped copper line of rabbet joint, which is characterized in that step In 2 annealing processes, annealing temperature is 250-270 DEG C, annealing time 2-4h, atmosphere 1%H2And 99%N2Mixed atmosphere Protection.
4. the NbTi/Cu superconducting wires according to claim 1 preparation method of the U-shaped copper line of rabbet joint, which is characterized in that described In step 3,3 passes moldings are carried out to annealed state copper wire, the first passage operation of rolling is:Copper wire is rolled into square by circle The ratio of width to height of shape, rectangle is 1.5, working modulus 7-10%;The second passage operation of rolling is:Copper wire is rolled into upper surface by rectangle Rectangle with semi-circular recesses, width remain unchanged, working modulus 4-6%;Third passes process is:Copper wire is by upper table Rectangle of the face with semi-circular recesses is rolled into the rectangle that upper surface carries U-shaped groove, and width and thickness has working modulus simultaneously, Working modulus is 7-10%;Three passes are deformed into disposable continuous rolling, mill speed ranging from 100~150m/min.
5. the NbTi/Cu superconducting wires according to claim 1 preparation method of the U-shaped copper line of rabbet joint, which is characterized in that described It is 6 degree that Diamond dies, die angle are used in step 4, and working modulus is 2~3%.
CN201810547105.7A 2018-05-31 2018-05-31 Preparation method of U-shaped copper groove wire for NbTi/Cu superconducting wire Active CN108735377B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810547105.7A CN108735377B (en) 2018-05-31 2018-05-31 Preparation method of U-shaped copper groove wire for NbTi/Cu superconducting wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810547105.7A CN108735377B (en) 2018-05-31 2018-05-31 Preparation method of U-shaped copper groove wire for NbTi/Cu superconducting wire

Publications (2)

Publication Number Publication Date
CN108735377A true CN108735377A (en) 2018-11-02
CN108735377B CN108735377B (en) 2020-08-25

Family

ID=63931313

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810547105.7A Active CN108735377B (en) 2018-05-31 2018-05-31 Preparation method of U-shaped copper groove wire for NbTi/Cu superconducting wire

Country Status (1)

Country Link
CN (1) CN108735377B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114898941A (en) * 2022-05-30 2022-08-12 江苏优轧机械有限公司 Preparation method of U-shaped copper groove wire for superconducting wire
CN116741459A (en) * 2023-07-05 2023-09-12 广东中实金属有限公司 Preparation method of ultra-large copper grooved wire for superconducting cable

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1948531A (en) * 2006-11-03 2007-04-18 宁波博威集团有限公司 High manganese copper nickel zinc alloy and preparation method of its wire, rod and plate belt material
CN102218464A (en) * 2011-01-28 2011-10-19 杭州银都餐饮设备有限公司 Plate U-shaped processing method used on automatic production line
CN203081971U (en) * 2013-03-15 2013-07-24 广东富华工程机械制造有限公司 U-shaped bolt
CN104162616A (en) * 2014-08-26 2014-11-26 贵州航天新力铸锻有限责任公司 Method for forging double-lug U-shaped forged piece for thermonuclear fusion reactor
CN104624685A (en) * 2013-11-08 2015-05-20 青岛宏泰铜业有限公司 Copper rod production technology using extrusion method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1948531A (en) * 2006-11-03 2007-04-18 宁波博威集团有限公司 High manganese copper nickel zinc alloy and preparation method of its wire, rod and plate belt material
CN102218464A (en) * 2011-01-28 2011-10-19 杭州银都餐饮设备有限公司 Plate U-shaped processing method used on automatic production line
CN203081971U (en) * 2013-03-15 2013-07-24 广东富华工程机械制造有限公司 U-shaped bolt
CN104624685A (en) * 2013-11-08 2015-05-20 青岛宏泰铜业有限公司 Copper rod production technology using extrusion method
CN104162616A (en) * 2014-08-26 2014-11-26 贵州航天新力铸锻有限责任公司 Method for forging double-lug U-shaped forged piece for thermonuclear fusion reactor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114898941A (en) * 2022-05-30 2022-08-12 江苏优轧机械有限公司 Preparation method of U-shaped copper groove wire for superconducting wire
CN116741459A (en) * 2023-07-05 2023-09-12 广东中实金属有限公司 Preparation method of ultra-large copper grooved wire for superconducting cable
CN116741459B (en) * 2023-07-05 2024-01-02 广东中实金属有限公司 Preparation method of copper grooved wire for superconducting cable

Also Published As

Publication number Publication date
CN108735377B (en) 2020-08-25

Similar Documents

Publication Publication Date Title
CN102756512B (en) Low-magnetism or magnetism-free and high-strength Ni-W alloy composite base band and preparation method thereof
CN108048678B (en) A kind of high-strength high-plastic high-precision beta-titanium alloy tubing preparation method
EP3045557B1 (en) Zirconium-based amorphous alloy and preparation method therefor
CN109201770B (en) Processing method of large-caliber overlong copper coil
CN105316524B (en) Strong high-ductility titanium alloy and preparation method thereof in a kind of Ti Al Zr Mo V systems
CN101313373B (en) Nb-containing rod-shaped material for use in manufacture of superconducting wire and method for manufacture of Nb3Sn superconducting wire
CN104538543B (en) A kind of low-temperature superconducting wire preparation method of NbTi rods
CN102974643B (en) Preparation method of enhanced Cu-based composite wire of Nb tube
CN108735377A (en) A kind of preparation method of the U-shaped copper line of rabbet joint of NbTi/Cu superconducting wires
CN111105901B (en) Improved bronze Nb method3Preparation method of Sn superconducting wire
CN103236322A (en) Preparation method of rectangular 7-core MgB2 superconducting strip
CN106381418A (en) Preparation method of high-cube texture Ni-10at. percent W alloy base band
CN109722560A (en) A kind of ZrC Reinforced Cu-Fe based composites and preparation method thereof
CN106903183A (en) The manufacture system and method for radio-frequency cable oxygen-free copper pipe
CN115295243A (en) Preparation method of element-doped high-critical-current-density niobium-tin superconducting strand
CN104201278A (en) NbTi/Cu superconducting composite pipe and preparation method thereof
CN104492849B (en) A kind of preparation method of used by nuclear reactor hafnium square rod
CN114898941A (en) Preparation method of U-shaped copper groove wire for superconducting wire
Chen et al. Preparation of Nb3Al by high-energy ball milling and superconductivity
CN104975247A (en) Preparation method of texture nickel-tungsten composite base band
CN112251684B (en) Micro-nanocrystalline maraging steel and preparation method thereof
CN110016584B (en) Wire rod and preparation method thereof
US20070234542A1 (en) Method for Producing Metallic Flat Wires or Strips with a Cube Texture
CN107393653A (en) One kind improves MgB2The preparation method of wire rod performance
CN108735387A (en) A kind of preparation method of the superconductive cable super large-scale copper line of rabbet joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant