CN108729855B - Drilling and mounting integrated anchor rod construction equipment and using method thereof - Google Patents

Drilling and mounting integrated anchor rod construction equipment and using method thereof Download PDF

Info

Publication number
CN108729855B
CN108729855B CN201710279427.3A CN201710279427A CN108729855B CN 108729855 B CN108729855 B CN 108729855B CN 201710279427 A CN201710279427 A CN 201710279427A CN 108729855 B CN108729855 B CN 108729855B
Authority
CN
China
Prior art keywords
drilling
vehicle body
truss
fixed
anchor rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710279427.3A
Other languages
Chinese (zh)
Other versions
CN108729855A (en
Inventor
施群凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201710279427.3A priority Critical patent/CN108729855B/en
Publication of CN108729855A publication Critical patent/CN108729855A/en
Application granted granted Critical
Publication of CN108729855B publication Critical patent/CN108729855B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/02Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B15/00Supports for the drilling machine, e.g. derricks or masts
    • E21B15/006Means for anchoring the drilling machine to the ground
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B19/00Handling rods, casings, tubes or the like outside the borehole, e.g. in the derrick; Apparatus for feeding the rods or cables
    • E21B19/008Winding units, specially adapted for drilling operations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention relates to the field of hoisting devices for continuously hoisting loads, in particular to anchor rod construction equipment integrating drilling and installation and a using method thereof. The utility model provides a drilling and integrative stock construction equipment of installation, includes removal drilling equipment (1), characterized by: the movable drilling device (1) comprises a vehicle body (11), an engine (12), a control chamber (13), wheels (14), a support (15), a hydraulic support rod (16), a drag chain (17), a drill bit (18) and a hydraulic jacking oil cylinder (19); the hoisting device (2) comprises a winch (21), a truss (22), a fixed pulley (23) and a stay cable (24). A use method of anchor rod construction equipment integrating drilling and installation is characterized in that: the method is implemented in sequence according to the following steps: a. parking; b. drilling; c. a vertical rod. The invention has simple structure, convenient use, reliable hoisting and cost saving.

Description

Drilling and mounting integrated anchor rod construction equipment and using method thereof
Technical Field
The invention relates to the field of hoisting devices for continuously hoisting loads, in particular to anchor rod construction equipment integrating drilling and installation and a using method thereof.
Background
The soil layer uplift anchor rod is generally designed to be provided with a reinforcement cage in the vertical direction so as to achieve the best uplift effect. In actual construction, anchor rod drilling needs to be carried out to a rock stratum, so that a steel reinforcement cage can be very long (as long as more than ten meters to more than twenty meters), and when the anchor rod is designed to be composed of a plurality of bundles of steel reinforcements, the anchor rod steel reinforcement cage required to be installed is large (the diameter of the anchor rod steel reinforcement cage reaches 100mm to 220 mm) and long, manual operation cannot be adopted due to vertical installation, and a crane needs to be additionally arranged. Because the bottom of the uplift anchor rod needs to be anchored into the rock stratum, the rock breaking construction time is longer along with the increase of the rock stratum hardness, the crane has to be idle for a long time, and the construction cost is increased.
Disclosure of Invention
In order to overcome the defects of the prior art and provide lifting equipment which is simple in structure, convenient to use, reliable in lifting and cost-saving, the invention discloses anchor rod construction equipment integrating drilling and installation and a using method thereof.
The invention achieves the purpose by the following technical scheme:
the utility model provides a drilling and integrative stock construction equipment of installation, includes removal drilling equipment, characterized by: also comprises a hoisting device which is arranged on the frame,
the movable drilling device comprises a vehicle body, an engine, an operation chamber, wheels, a bracket, a hydraulic support rod, a drag chain, a drill bit and a hydraulic jacking oil cylinder,
the vehicle body is provided with an engine and an operation room, the lower part of the vehicle body is rotatably provided with wheels, and the engine is connected with the wheels through a transmission mechanism;
the front end of the vehicle body is vertically fixed with a bracket, the bracket and the vehicle body are supported by a hydraulic support rod, the rear half part of the drag chain is arranged in the bracket, the front half part of the drag chain is arranged outside the bracket, and the front end of the drag chain is fixed with a drill bit;
the four corners of the vehicle body are respectively provided with a hydraulic jacking cylinder, the cylinder body of the hydraulic jacking cylinder is fixed on the vehicle body, and the moving end of the piston rod of the hydraulic jacking cylinder penetrates through the vehicle body and faces downwards;
the control chamber is internally provided with a control lever which is respectively connected with the engine, the drill bit and the hydraulic jacking oil cylinder;
the hoisting device comprises a winch, a truss, a fixed pulley and a stay cable,
the winch is connected with an external power supply through a power line;
the truss is vertically arranged, a connecting piece is arranged at the bottom of the truss, a horizontal support is horizontally arranged at the top of the truss, the outer end of the horizontal support extends out of the outer side face of the truss, an inclined stay bar is fixed between the horizontal support and the outer side face of the truss, and a fixed pulley is rotatably arranged at the outer end of the horizontal support;
the winch is fixed in the truss, the inner end of the steel wire rope is fixed on the winch, the steel wire rope is led out of the winch and then wound in a pulley groove of the fixed pulley, the outer end of the steel wire rope is fixed with a lifting hook, and an operating lever is arranged in the operating chamber and connected with the winch;
the hoisting device is fixed on the top of the support through a connecting piece at the bottom of the truss, and two ends of the stay cable are respectively connected with the top of the truss and the vehicle body.
Drilling and integrative stock construction equipment of installation, characterized by: the connecting piece chooses for use the connection stabilizer blade, and the connection stabilizer blade is four angle irons that the truss extends out, connects stabilizer blade and leg joint, adjusts the support to the level earlier during the installation, with modes such as bolt, welding, rivet and leg joint for hoist device, stands up whole support and hoist device after finishing connecting again.
The use method of the anchor rod construction equipment integrating drilling and installation is characterized in that: the method is implemented in sequence according to the following steps:
a. parking: the drilling device is moved to the anchor rod drilling operation position after carrying the hoisting device, then a piston rod of the hydraulic jacking oil cylinder extends downwards, and the jacking vehicle body is lifted until the wheels leave the ground; or the movable drilling device is driven to the anchor rod drilling operation position firstly, then a piston rod of the hydraulic jacking oil cylinder extends downwards, the jacking vehicle body is lifted until the wheels leave the ground, and then the hoisting device is fixed on the movable drilling device;
b. drilling: starting a drill bit through a drag chain to drill holes on the ground at the anchor rod drilling operation position, and drilling an anchor rod fixing hole;
c. vertical rod: tying the reinforcement cage on the lifting hook, starting the winch, and lifting and fixing the reinforcement cage in the anchor rod fixing hole.
When the steel wire rope truss is used, the diameter of the steel wire rope and the height of the truss are determined by calculation of safety calculation software after factors such as self weight, weight and length of a steel reinforcement cage, wind load and the like are comprehensively considered.
The invention solves the problem of mounting the large and long reinforcement cages in the uplift anchor rod, reduces the expensive cost of a crane in use, and has the following characteristics:
1. the original use function of the anchor rod drilling machine is not influenced;
2. the cost for additionally arranging mechanical equipment such as a crane, a tower crane and the like is reduced, and the construction cost is reduced;
3. the entering quantity of the equipment is reduced, and the construction site is kept clean and tidy.
The invention has the beneficial effects that: simple structure, convenient use, reliable hoisting and cost saving.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the hoisting device of the present invention.
Detailed Description
The invention is further illustrated by the following specific examples.
Example 1
A drilling and integrative stock construction equipment of installation, is including removing drilling equipment 1 and hoist device 2, as shown in fig. 1 and 2, the concrete structure is:
the mobile drilling device 1 comprises a vehicle body 11, an engine 12, a control cabin 13, wheels 14, a bracket 15, a hydraulic support rod 16, a drag chain 17, a drill bit 18 and a hydraulic jacking cylinder 19,
an engine 12 and an operation room 13 are arranged on the vehicle body 11, wheels 14 are rotatably arranged at the lower part of the vehicle body 11, and the engine 12 is connected with the wheels 14 through a transmission mechanism;
a bracket 15 is vertically fixed at the front end of the vehicle body 11, the bracket 15 and the vehicle body 11 are supported by a hydraulic support rod 16, the rear half part of a drag chain 17 is arranged in the bracket 15, the front half part of the drag chain 17 is arranged outside the bracket 15, and a drill bit 18 is fixed at the front end of the drag chain 17;
four corners of the vehicle body 11 are respectively provided with a hydraulic jacking cylinder 19, the cylinder body of the hydraulic jacking cylinder 19 is fixed on the vehicle body 11, and the moving end of the piston rod of the hydraulic jacking cylinder 19 penetrates through the vehicle body 11 and faces downwards;
a control rod is arranged in the control chamber 13 and is respectively connected with the engine 12, the drill bit 18 and the hydraulic jacking oil cylinder 19;
the hoisting device 2 is shown in fig. 2: comprises a winch 21, a truss 22, a fixed pulley 23 and a stay cable 24,
the winch 21 is connected with an external power supply through a power line 211;
the truss 22 is vertically arranged, the bottom of the truss 22 is provided with a connecting piece 221, the top of the truss 22 is horizontally provided with a horizontal bracket 222, the outer end of the horizontal bracket 222 extends out of the outer side face of the truss 22, a diagonal brace 223 is fixed between the horizontal bracket 222 and the outer side face of the truss 22, and the fixed pulley 23 is rotatably arranged at the outer end of the horizontal bracket 222;
the winch 21 is fixed in the truss 22, the inner end of the steel wire rope 212 is fixed on the winch 21, the steel wire rope 212 is led out from the winch 21 and then wound in a pulley groove of the fixed pulley 23, the outer end of the steel wire rope 212 is fixed with a lifting hook 213, and a control lever connected with the winch 21 is further arranged in the control cabin 13;
the hoisting device 2 is fixed on the top of the bracket 15 through a connecting piece 221 at the bottom of the truss 22, and two ends of the stay cable 24 are respectively connected with the top of the truss 22 and the vehicle body 11.
In this embodiment: connecting support legs are selected and used as connecting support legs, the connecting support legs are four angle steels extending out of the truss 22, the connecting support legs are connected with the support 15, the support 15 is adjusted to be horizontal during installation, the hoisting device 2 is connected with the support 15 in the modes of bolts, welding, rivets and the like, and the whole support 15 and the hoisting device 2 are erected after connection is finished.
When the method is used, the steps are implemented in sequence as follows:
a. parking: the mobile drilling device 1 carries the hoisting device 2 and then runs to the anchor rod drilling operation position, then a piston rod of the hydraulic jacking oil cylinder 19 extends downwards, and the jacking vehicle body 11 is lifted until the wheels 14 leave the ground; or the movable drilling device 1 is firstly driven to the anchor rod drilling operation position, then the piston rod of the hydraulic jacking oil cylinder 19 extends downwards, the jacking vehicle body 11 is lifted until the wheels 14 leave the ground, and then the hoisting device 2 is fixed on the movable drilling device 1;
b. drilling: the drill bit 18 is started through the drag chain 17 to drill holes on the ground at the anchor rod drilling operation position, and anchor rod fixing holes are drilled;
c. vertical rod: the reinforcement cage is tied to the hook 213, and the hoist 21 is started to hoist and fix the reinforcement cage in the anchor rod fixing hole.
When the steel wire rope is used in the embodiment, the diameter of the steel wire rope 212 and the height of the truss 22 are determined by calculation of safety calculation software after factors such as self weight, weight and length of the steel reinforcement cage, wind load and the like are comprehensively considered.

Claims (1)

1. A method for using the anchor rod construction equipment integrating drilling and installation comprises the steps of moving a drilling device (1) and a hoisting device (2),
the mobile drilling device (1) comprises a vehicle body (11), an engine (12), a control chamber (13), wheels (14), a bracket (15), a hydraulic support rod (16), a drag chain (17), a drill bit (18) and a hydraulic jacking oil cylinder (19),
an engine (12) and an operation room (13) are arranged on the vehicle body (11), wheels (14) are rotatably arranged at the lower part of the vehicle body (11), and the engine (12) is connected with the wheels (14) through a transmission mechanism;
a bracket (15) is vertically fixed at the front end of a vehicle body (11), the bracket (15) and the vehicle body (11) are supported by a hydraulic support rod (16), the rear half part of a drag chain (17) is arranged in the bracket (15), the front half part of the drag chain (17) is arranged outside the bracket (15), and a drill bit (18) is fixed at the front end of the drag chain (17);
four corners of the vehicle body (11) are respectively provided with a hydraulic jacking cylinder (19), the cylinder body of the hydraulic jacking cylinder (19) is fixed on the vehicle body (11), and the moving end of the piston rod of the hydraulic jacking cylinder (19) penetrates through the vehicle body (11) and faces downwards;
a control rod is arranged in the control chamber (13) and is respectively connected with the engine (12), the drill bit (18) and the hydraulic jacking oil cylinder (19);
the hoisting device (2) comprises a winch (21), a truss (22), a fixed pulley (23) and a stay cable (24),
the winch (21) is connected with an external power supply through a power line (211);
the truss (22) is vertically arranged, the bottom of the truss (22) is provided with a connecting piece (221), the connecting piece (221) is provided with a connecting support leg, the top of the truss (22) is horizontally provided with a horizontal support (222), the outer end of the horizontal support (222) extends out of the outer side face of the truss (22), an inclined support rod (223) is fixed between the horizontal support (222) and the outer side face of the truss (22), and a fixed pulley (23) is rotatably arranged at the outer end of the horizontal support (222);
the hoisting machine (21) is fixed in the truss (22), the inner end of the steel wire rope (212) is fixed on the hoisting machine (21), the steel wire rope (212) is led out from the hoisting machine (21) and then wound in a pulley groove of the fixed pulley (23), the outer end of the steel wire rope (212) is fixed with a lifting hook (213), and a control lever connected with the hoisting machine (21) is arranged in the control cabin (13);
the hoisting device (2) is fixed on the top of the bracket (15) through a connecting piece (221) at the bottom of the truss (22), and two ends of the stay cable (24) are respectively connected with the top of the truss (22) and the vehicle body (11);
the method is characterized in that: the method is implemented in sequence according to the following steps:
a. parking: the mobile drilling device (1) carries the hoisting device (2) and then runs to the anchor rod drilling operation position, then a piston rod of the hydraulic jacking oil cylinder (19) extends downwards, and the jacking vehicle body (11) is lifted until the wheels (14) leave the ground; or the mobile drilling device (1) is firstly driven to the anchor rod drilling operation position, then a piston rod of the hydraulic jacking oil cylinder (19) extends downwards, the jacking vehicle body (11) is lifted until the wheels (14) leave the ground, and then the hoisting device (2) is fixed on the mobile drilling device (1);
b. drilling: the drill bit (18) is started through the drag chain (17) to drill holes on the ground at the anchor rod drilling operation position, and anchor rod fixing holes are drilled;
c. vertical rod: tying the reinforcement cage on a lifting hook (213), starting a winch (21), and hoisting and fixing the reinforcement cage in the anchor rod fixing hole.
CN201710279427.3A 2017-04-25 2017-04-25 Drilling and mounting integrated anchor rod construction equipment and using method thereof Active CN108729855B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710279427.3A CN108729855B (en) 2017-04-25 2017-04-25 Drilling and mounting integrated anchor rod construction equipment and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710279427.3A CN108729855B (en) 2017-04-25 2017-04-25 Drilling and mounting integrated anchor rod construction equipment and using method thereof

Publications (2)

Publication Number Publication Date
CN108729855A CN108729855A (en) 2018-11-02
CN108729855B true CN108729855B (en) 2022-02-25

Family

ID=63934569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710279427.3A Active CN108729855B (en) 2017-04-25 2017-04-25 Drilling and mounting integrated anchor rod construction equipment and using method thereof

Country Status (1)

Country Link
CN (1) CN108729855B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723394B (en) * 2018-11-27 2020-11-17 中国石油集团川庆钻探工程有限公司 Remote control method for upper and lower platforms of under-pressure operation tubular column

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2431676A (en) * 2005-10-28 2007-05-02 Elle Ltd Van Portable and collapsible borehole forming or/and sampling device
CN101806063A (en) * 2009-12-11 2010-08-18 湖南山河智能机械股份有限公司 Crawler-type pile frame and method for mounting same
CN203430423U (en) * 2013-08-23 2014-02-12 徐州徐工基础工程机械有限公司 Environment-friendly drag type horizontal directional drilling machine
CN203756031U (en) * 2014-02-28 2014-08-06 中国建筑第五工程局有限公司广州分公司 Multifunctional machine-mounted anchor rod drilling machine
CN205047152U (en) * 2015-10-14 2016-02-24 中煤地第二勘探局有限责任公司 Full hydraulic rotary engineering driller

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2431676A (en) * 2005-10-28 2007-05-02 Elle Ltd Van Portable and collapsible borehole forming or/and sampling device
CN101806063A (en) * 2009-12-11 2010-08-18 湖南山河智能机械股份有限公司 Crawler-type pile frame and method for mounting same
CN203430423U (en) * 2013-08-23 2014-02-12 徐州徐工基础工程机械有限公司 Environment-friendly drag type horizontal directional drilling machine
CN203756031U (en) * 2014-02-28 2014-08-06 中国建筑第五工程局有限公司广州分公司 Multifunctional machine-mounted anchor rod drilling machine
CN205047152U (en) * 2015-10-14 2016-02-24 中煤地第二勘探局有限责任公司 Full hydraulic rotary engineering driller

Also Published As

Publication number Publication date
CN108729855A (en) 2018-11-02

Similar Documents

Publication Publication Date Title
CN201924360U (en) Multifunctional hydraulic static pile press
CN105692470B (en) Inner climbing crane tower and its operating method
CN201176373Y (en) Hoisting device for pylon
CN109973112B (en) Super-large-dip-angle narrow-space tunnel anchor cable saddle gantry system and installation method thereof
CN104612152A (en) Pile frame and installation method of pile frame
CN203188942U (en) Novel multifunctional racking platform
CN102910532B (en) Method for butting and hoisting large box type derricks in air
CN114751316A (en) Internal climbing type double-flat-arm holding pole
CN210048319U (en) Traction type construction elevator with foldable top beam
CN110002343B (en) Self-driven urban underground prefabricated comprehensive pipe gallery laying hoisting machine and construction method
CN108729855B (en) Drilling and mounting integrated anchor rod construction equipment and using method thereof
CN101209805A (en) Method and equipment for hanging iron tower
CN102926388A (en) Earth moving device and method for deep foundation pit excavation
CN101016827A (en) 18 m hydraulic pressure rise and fall retractable drill tower
CN207537885U (en) Anchoring mechanism for stay cable tension stage
CN203867198U (en) Slip equipment for high-rise steel structure transfer layer truss
CN211691536U (en) Simple lifting mechanism for bare concrete exterior wall cladding
CN111591909B (en) Mast crane
CN211621558U (en) Bored concrete pile steel reinforcement cage elevation control mounting structure
CN212224665U (en) Prefabricated post guiding device and prestressing force frame construction's guide installation device of taking one's place
CN203832507U (en) Flexible vehicle blocking bar lifting device
CN204198329U (en) Anchor pole hanging device
RU2538550C1 (en) Mobile telescopic drilling device of vertical drilling
CN209779468U (en) Lifting type truss working platform for bridge maintenance
CN201738563U (en) Hydraulic climbing scaffold for building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant