CN101209805A - Method and equipment for hanging iron tower - Google Patents

Method and equipment for hanging iron tower Download PDF

Info

Publication number
CN101209805A
CN101209805A CNA2007103003054A CN200710300305A CN101209805A CN 101209805 A CN101209805 A CN 101209805A CN A2007103003054 A CNA2007103003054 A CN A2007103003054A CN 200710300305 A CN200710300305 A CN 200710300305A CN 101209805 A CN101209805 A CN 101209805A
Authority
CN
China
Prior art keywords
lifting
hoisting
turricula
rope
lazy arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007103003054A
Other languages
Chinese (zh)
Inventor
王树声
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA2007103003054A priority Critical patent/CN101209805A/en
Publication of CN101209805A publication Critical patent/CN101209805A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The invention provides a hoisting method for a turricula and the device thereof. A lifting pedestal and a lazy arm pedestal are arranged on a lifting working platform. A rotary lazy arm is hinged with the lazy arm pedestal. A lifting rope and a lifting winch form a lifting mechanism through a crown block and the rotary lazy arm of the lazy arm pedestal. A pulling rope and a pulling winch form a pulling mechanism through the crown block of the rotary lazy arm. A hoisting rope and a hoisting winch form a hoisting mechanism through a hoisting block of the rotary lazy arm and a block on the lazy arm pedestal. The other end of the hoisting rope is provided with a lifting hook. The invention uses the lifting winch to lift the lazy arm in the hoisting mechanism and simultaneously lift the turricula and prick as well as release the hoisting winch and the pulling winch to arrange the turricula on a preassemble tower seat, mount and construct thereof to finish the hoisting of the turricula. The invention solves the problems that the upright stanchion tower of a crane group in existing hoisting construction method and device for turricula is restricted by conditions and has the disadvantages of higher tower composing cost, needing men for measuring instruments, a plurality of anchor block pits and operating personnel as well as low efficiency, etc.

Description

A kind of hanging method of iron tower and equipment
Technical field:
The present invention relates to a kind of hanging method of iron tower, corresponding hanging device also is provided simultaneously, belong to the lifting equipment technical field.
Background technology
At present, electric power circuit group vertical rod tower has crane and two kinds of methods of pole.Adopt the crane integral basis to hang the vertical rod tower, need be in the place that transportation condition allows, specification according to shaft tower, 25~150 tons of cranes of general use, line construction is often remote, and large-scale crane generally is difficult in the locality rent, and crane group vertical rod tower is had relatively high expectations to road conditions, only be adapted at the higher place construction of region of no relief ground intensity, group vertical rod tower expense is higher; Adopt existing pole group vertical rod tower not limited by road and landform, but need Work tools such as a large amount of steel cable, the rope made of hemp, coaster, cucurbit and earth anchor, pole, the every at least base of split tower erection will dig 4 shakedown holes, with the upright iron tower of integral body group is example, with upright general 20~22 people that need of pole group, needs production time 16 hours, also not including ground prepares and the ground group tower time, the group vertical rod tower time is longer, needs more operating personnel, and the construction safety dangerous point is many.
Summary of the invention
The invention provides a kind of hanging method of iron tower, its objective is that will solve existing iron tower construction method for hanging crane group vertical rod tower is subjected to condition restriction, the higher and existing pole group of group tower expense vertical rod tower needs the people to measure problems such as Work tool, ground anchor pit and operating personnel are many, efficient is low.
Technical solution of the present invention is as follows:
On the lifting work platform, be respectively equipped with derricking gear, hoisting mechanism and trailer coupling, iron tower is fixed on arm two ends in the hoisting mechanism, by derricking gear with the arm pull-up, iron tower is promoted vertically, the twisted rope that discharges derricking gear and trailer coupling is placed on iron tower on the prepackage tower seat, the lifting of iron tower is finished in installation.
Concrete hoisting equipment structure is as follows:
Lifting pedestal and boom base are set on the lifting work platform, each pedestal be provided with fixed pulley, one end of rotary suspension arm and boom base hinge-coupled, lifting rope is fixed on the front end of rotary suspension arm, and constitutes derricking gear by the fixed pulley of boom base with the lifting capstan winch; One end of hauling rope constitutes trailer coupling through the fixed pulley and the towing capstan on the lifting platform at rotary suspension arm middle part, and the other end is provided with suspension hook and the bottom of iron tower can be fixed; The lifting rope constitutes hoisting mechanism through the fixed pulley and the lifting capstan winch on fixed pulley on the boom base and the lifting work platform on rotary suspension arm top, and the other end is provided with fishhook.
Described lifting work platform bottom is provided with the rotation of rotating mechanism may command platform.
When hanging device of the present invention uses,, select lifting work platform permanent seat to be connected the jig size, prepare basic discrepancy in elevation chock with the basis according to the key dimension and the site contour of prepackage column foot; Open and height according to the iron tower root, select arm and rise and fall pole joint number and size; According to iron tower weight, size and complete equipment parameter, check the lifting condition.
The on-the-spot layout: the basis and the lifting work platform permanent seat that connect prepackage iron tower base; The lifting work platform is installed on lifting work platform permanent seat; Weight-lifting equipments such as lifting pedestal, boom base, lifting capstan winch, lifting capstan winch, towing capstan are installed on the lifting work platform; Connect arm along the iron tower bottom to the tower head direction, state is lifted by crane on the ground of seeing Fig. 1 of putting of iron tower and rotary suspension arm; Hauling rope, lifting rope, rotary suspension arm are connected with iron tower; Tighten hauling rope and lifting rope, the lifting rope fixation side is trivial dead; Start the lifting capstan winch, the pull-up rotary suspension arm is checked the stressed and device situation of each by the lifting regulation; By the weight line, iron tower is winched to basic on a line of centers; Open the fixed pulley of iron tower bottom and rotary suspension arm, iron tower is vertically dropped down onto iron tower foundation, aim at holding-down bolt, iron tower lower margin side is gone in the holding-down bolt last anchor bolt; Unclamp lifting rope, put down the weight line, rotation lifting work platform is to the iron tower side; Start winch, put down the installation that rotary suspension arm is finished iron tower.
Advantage and progressive being that the present invention has with respect to prior art: be respectively equipped with derricking gear, hoisting mechanism and trailer coupling on the lifting work platform, by lifting by crane capstan winch with the arm pull-up in the hoisting mechanism, iron tower and the lifting of arm one, the iron tower lifting is holded up, discharging lifting capstan winch and towing capstan is placed on iron tower on the prepackage tower seat, the lifting of iron tower is finished in installation.The invention solves existing iron tower construction method for hanging, crane group vertical rod tower is subjected to condition restriction, the higher and existing pole group of group tower expense vertical rod tower needs the people to measure problems such as Work tool, ground anchor pit and operating personnel are many, efficient is low.Overcome in the crane lifting iron tower leg scrape and the wayward problem of swinging, must professional driver not cooperate in the lifting.Improve work efficiency, reduced power off time.Not limited by the road landform, need not excavate cat hole, ground, scope of work is little, reduces labour intensity, reduces construction costs, and the group column efficiency can improve more than 75%.
Description of drawings
Fig. 1 is an invention hoisting equipment structure schematic diagram.
Fig. 2 is a mode of operation schematic diagram of the present invention.
1, lifting capstan winch; 2, lifting work platform; 3, lifting pedestal; 4, lifting fixed pulley; 5, towing capstan; 6, boom base; 7, rotary suspension arm; 8, lifting pulley; 9, iron tower; 10, hauling block; 11, lifting fixed pulley; 12, lifting capstan winch; 13, hauling rope; 14, lifting rope; 15, lifting rope.
The specific embodiment
Embodiment 1
According to key dimension and site contour, select lifting work platform permanent seat to be connected the jig size with the basis, prepare basic discrepancy in elevation chock; Open and height according to the iron tower root, select arm and rise and fall pole joint number and size; According to iron tower weight, size and complete equipment parameter, check the lifting condition.
As shown in Figure 1, lifting pedestal 3, boom base 6, lifting capstan winch 1, towing capstan 5, lifting capstan winch 12 are installed on lifting work platform 2, arm 7 is hinged on the boom base 6, and lifting rope 14 is captiveed joint with arm 7 through lifting capstan winch 1, lifting fixed pulley 4; State is lifted by crane on the ground of seeing Fig. 2 of putting of iron tower 9 and arm 7; Towing capstan 5, hauling rope 13 are captiveed joint with the bottom of iron tower 9 by traction wheel 10; Lifting rope 15 is through lifting capstan winch 12, lifting fixed pulley 11, lifting the top captive joint of pulley 8 with iron tower 9.
Tighten hauling rope 13 and lifting rope 15, it is trivial extremely lift rope 15 fixation side; Start lifting capstan winch 1, pull-up rotary suspension arm 7 is checked the stressed and device situation of each by the lifting regulation; Iron tower 9 is winched to basic on a line of centers; Control towing capstan 5 and lifting capstan winch 12 vertically slowly drop down onto iron tower foundation with iron tower 9, aim at holding-down bolt, iron tower lower margin side are gone in the holding-down bolt last anchor bolt; Unclamp lifting rope, put down the weight line, rotation lifting work platform is to the iron tower side; Start winch, put down rotary suspension arm; Press assembling sequence, from after dismantle equipment forward, prevent into packing chest.
Utilize hanging method of the present invention and the device just will commander responsible official 1 people, ground and operation electrician 2 people, power worker 2~4 people can finish the lifting work of iron tower.

Claims (2)

1. the hanging method of a turricula, it is characterized in that: on the lifting work platform, be respectively equipped with derricking gear, hoisting mechanism and trailer coupling, turricula is fixed on arm two ends in the hoisting mechanism, by derricking gear with the arm pull-up, the turricula lifting is holded up, the twisted rope that discharges derricking gear and trailer coupling is placed on turricula on the prepackage tower seat, and the lifting of turricula is finished in installation.
2. turricula hanging device, it is characterized in that: lifting pedestal and boom base are set on the lifting work platform, each pedestal be provided with fixed pulley, one end of rotary suspension arm and boom base hinge-coupled, lifting rope is fixed on the front end of rotary suspension arm, and constitutes derricking gear by the fixed pulley of boom base with the lifting capstan winch; One end of hauling rope constitutes trailer coupling through the fixed pulley and the towing capstan on the lifting platform at rotary suspension arm middle part, and the other end is provided with suspension hook and the bottom of turricula can be fixed; The lifting rope constitutes hoisting mechanism through the fixed pulley and the lifting capstan winch on fixed pulley on the boom base and the lifting work platform on rotary suspension arm top, and the other end is provided with fishhook.
CNA2007103003054A 2007-12-21 2007-12-21 Method and equipment for hanging iron tower Pending CN101209805A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007103003054A CN101209805A (en) 2007-12-21 2007-12-21 Method and equipment for hanging iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007103003054A CN101209805A (en) 2007-12-21 2007-12-21 Method and equipment for hanging iron tower

Publications (1)

Publication Number Publication Date
CN101209805A true CN101209805A (en) 2008-07-02

Family

ID=39610088

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007103003054A Pending CN101209805A (en) 2007-12-21 2007-12-21 Method and equipment for hanging iron tower

Country Status (1)

Country Link
CN (1) CN101209805A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510742A (en) * 2013-10-15 2014-01-15 国家电网公司 Multifunctional rotary derrick
CN104132037A (en) * 2014-07-18 2014-11-05 国家电网公司 Hoisting point fixing device for emergency repair tower
CN106044582A (en) * 2016-07-01 2016-10-26 国网冀北电力有限公司迁西县供电分公司 Integral hoisting method for super-long tower
CN109610922A (en) * 2018-12-17 2019-04-12 国网西藏电力有限公司 A kind of typical case's landform tower erection construction equipment
CN109607406A (en) * 2019-01-09 2019-04-12 中国人民解放军海军航空大学 One kind point hangs Superimposed hoisting apparatus and hoisting method
CN115324416A (en) * 2022-03-14 2022-11-11 中铁一局集团电务工程有限公司 Integral hoisting construction process for iron tower
CN116835455A (en) * 2023-09-04 2023-10-03 河南省中原矿山设备有限公司 Barrier-free hoisting device for farmland erection electric power iron tower

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103510742A (en) * 2013-10-15 2014-01-15 国家电网公司 Multifunctional rotary derrick
CN103510742B (en) * 2013-10-15 2016-04-27 国家电网公司 Multifunctional rotary derrick
CN104132037A (en) * 2014-07-18 2014-11-05 国家电网公司 Hoisting point fixing device for emergency repair tower
CN104132037B (en) * 2014-07-18 2016-02-03 国家电网公司 Be used in the suspension centre fixing device on emergency first-aid repair tower
CN106044582A (en) * 2016-07-01 2016-10-26 国网冀北电力有限公司迁西县供电分公司 Integral hoisting method for super-long tower
CN109610922A (en) * 2018-12-17 2019-04-12 国网西藏电力有限公司 A kind of typical case's landform tower erection construction equipment
CN109607406A (en) * 2019-01-09 2019-04-12 中国人民解放军海军航空大学 One kind point hangs Superimposed hoisting apparatus and hoisting method
CN109607406B (en) * 2019-01-09 2024-03-29 中国人民解放军海军航空大学 Separate-hanging stacked lifting device and lifting method
CN115324416A (en) * 2022-03-14 2022-11-11 中铁一局集团电务工程有限公司 Integral hoisting construction process for iron tower
CN116835455A (en) * 2023-09-04 2023-10-03 河南省中原矿山设备有限公司 Barrier-free hoisting device for farmland erection electric power iron tower
CN116835455B (en) * 2023-09-04 2024-01-19 河南省中原矿山设备有限公司 Barrier-free hoisting device for farmland erection electric power iron tower

Similar Documents

Publication Publication Date Title
CN201176373Y (en) Hoisting device for pylon
CN101209805A (en) Method and equipment for hanging iron tower
CN201901539U (en) Internal climbing type and external climbing type tower crane with luffing jib
CN105692470B (en) Inner climbing crane tower and its operating method
CN201924360U (en) Multifunctional hydraulic static pile press
CN201495048U (en) Double movable-arm crane used for iron tower installation
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN101077763B (en) Manned lift truck
CN103630416B (en) Test platform of hoisting mechanism
CN101214908A (en) Gin pole integrated dismounting method for tower crane
CN108910730B (en) Installation and construction method of large horizontal tower crane
CN110130346A (en) Hammer the prefabricated pile pile-sinking device and construction method in conjunction with static pressure
CN201757714U (en) Ground anchor type static load testing device
CN109441361A (en) A kind of pile frame and its vertical mast method
CN106245984B (en) Jack up Multifunctional creeping gin pole
CN201280718Y (en) Complete-hydraulic anchor rod grouting trolley
CN104942564B (en) A kind of offshore vessel carries the installation method of the large-tonnage bearing pin on jib-type crane arm support
CN101016827A (en) 18 m hydraulic pressure rise and fall retractable drill tower
CN202499663U (en) Wellhead vertical lifting machine
CN209163736U (en) A kind of pile frame
CN108545629B (en) Utilize the construction method of tower crane lifting girder truss
CN101074087A (en) Self-raising tower crane
CN202785385U (en) Simple and easy hoisting combination body hanger rod used for replacing inoperative parts of tower crane
CN206769526U (en) Jack up Multifunctional creeping gin pole
CN208361796U (en) For cooperating the device of tower crane lifting girder truss

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080702