CN108729644A - A kind of novel suspention beam holder and its installation and application - Google Patents

A kind of novel suspention beam holder and its installation and application Download PDF

Info

Publication number
CN108729644A
CN108729644A CN201810783688.3A CN201810783688A CN108729644A CN 108729644 A CN108729644 A CN 108729644A CN 201810783688 A CN201810783688 A CN 201810783688A CN 108729644 A CN108729644 A CN 108729644A
Authority
CN
China
Prior art keywords
shaped side
suspention beam
side arm
supporting member
holder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810783688.3A
Other languages
Chinese (zh)
Other versions
CN108729644B (en
Inventor
赵岩
林家辉
韩振启
鲍少华
吴毅
苏帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Zhongxin Construction Engineering Co Ltd
Original Assignee
China Construction Zhongxin Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Zhongxin Construction Engineering Co Ltd filed Critical China Construction Zhongxin Construction Engineering Co Ltd
Priority to CN201810783688.3A priority Critical patent/CN108729644B/en
Publication of CN108729644A publication Critical patent/CN108729644A/en
Application granted granted Critical
Publication of CN108729644B publication Critical patent/CN108729644B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/046Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention relates to a kind of novel suspention beam holder and its installation and applications, belong to construction and installing engineering technical field.The novel suspention beam holder of the present invention includes supporting rack (1), supporting member (2), mobile folder (3), fixing piece (4) and feeding fastening assembly (5);Support frame as described above (1) is made of two L-shaped side arms (11) and a herringbone plane girder (12);It is connect with front overhang hanging beam (B1) and middle suspention beam (B2) using supporting member (2), make L-shaped side arm vertical portion (111) and mobile folder vertical portion (31) and wall (9) forward and backward side close to further feeding fastening assembly (5) completion and wall (9) are final to be fixed by adjusting by adjusting supporting rack (1) and movement folder (3).In the case where former stress system is constant, stability guarantee is provided for suspention beam system.Critical piece uses square steel, is made of common process such as lathe, welding, makes simply, at low cost.

Description

A kind of novel suspention beam holder and its installation and application
Technical field
The invention belongs to build and installing engineering technical field, it is related to a kind of dress for suspention beam installation, fixed operation It sets more particularly to a kind of novel suspention beam holder and its installation and application.
Background technology
Suspention beam refers to that one end is fixed on wall-attached supporting seat, the suspension girder steel of suspension lifting equipment or falling proof device etc., Also known as cantilever beam.One end of beam is not generate axial direction, vertical displacement and the hold-down support of rotation, and the other end is free end.In work In Cheng Lixue force analysis, belong to than more typical simplified model.In Practical Project analysis, most of Practical Project forced section Part can be reduced to suspention beam.Suspention beam mode structure is mainly used for placing restrictions on due to space, and the other end should not set up pipe or wall Come the occasion that supports as supporting member, such as stretch out outside house balcony, choose corridor, interior fetch ring corridor outside.It is used sometimes in structure On one side of subsiding crack, solves basis and be detached from, make respectively to settle unrelated problem.
In prior art suspention beam installation process, situation complexity is various on the spot, especially because the original that some walls interfere Cause so that original suspention boom support can not normally be set up.Field worker usually directly carries on a shoulder pole suspention beam on the wall, and this way is non- It is often unstable, it easily causes danger, and usually part building concrete or wall are damaged.
The disclosure of the invention of the CN201410355613.7 a kind of installation method of suspention beam and the building equipped with suspention beam The construction method of structure belongs to crane suspention beam mounting technique field, provide it is a kind of can effectively improve suspention beam installation effectiveness, together When avoid the construction of the installation method of the suspention beam damaged to building concrete and the building structure equipped with suspention beam Method.By before carrying out the construction of architecture beam and top plate, suspention beam being hung onto in advance on corresponding scaffold, so The construction of beams and top plate is waited to carry out the installation of suspention beam again after the completion into the construction of cross girders and top plate again afterwards.Due to that will hang in advance Hanging beam is placed on scaffold, and when subsequent installation suspention beam is very convenient, is avoided and is pulled calabash by punching setting on top plate Reed to suspention beam carries out promotion installation.The installation effectiveness of suspention beam can be effectively improved, while save manpower and construction investment, And avoid destruction to building concrete.But the installation method of the invention suspention beam needs to fit and first builds dedicated foot hand Frame increases construction cost and difficulty of construction.
Invention content
The purpose of the present invention is overcome the deficiencies of the prior art and provide a kind of novel suspention beam holder and its side of installing and using Method, the device volume is small, light-weight, easy to operate, convenient for disassembly and assembly.Suitable for the tune dress of suspention beam, fixed operation.
To achieve the above object, the technical solution adopted by the present invention is:A kind of novel suspention beam holder, including supporting rack, Supporting member, mobile folder, fixing piece and feeding fastening assembly.
Support frame as described above is made of two L-shaped side arms and a herringbone plane girder;The herringbone plane girder by Cross bar, standpipe and two inclined support bars are welded, and standpipe is located at cross bar upper center and vertical cross-bar, two inclined support bar positions In standpipe both sides and drawknot standpipe and cross bar both sides, stable lattice supporting framework is formed;Described two L-shaped side arms are parallel, right Title is distributed in herringbone plane girder both sides, L-shaped side arm vertical portion free end vertically downward, L-shaped side arm horizontal part free end to Afterwards, the cross bar vertical welding at middle part and herringbone plane girder keeps herringbone plane girder whole perpendicular to two L-shaped side arm water The plane that flat portion is constituted;Described two L-shaped side arm horizontal part free ends are uniformly arranged 3-5 perforative keyholes, are used for and movement Folder and fixing piece cooperation installation are fixed.
The supporting member is located above supporting rack, in T shape, and the T prefix horizontal components on top are cushion cap, outstanding for carrying Hanging beam;The vertical portion of lower part is inserted link, and insertion is installed in the standpipe of herringbone plane girder, and formation can be moved freely up and down Dynamic set pipe mounting structure.
There are two the mobile folders, L-shaped, moves folder vertical portion free end vertically downward, mobile folder horizontal part For tubular structure, backward, being sleeved on the outside formation of L-shaped side arm horizontal part can be along the set that L-shaped side arm horizontal part freely slides for free end Pipe mounting structure;It is corresponding with two keyholes of arbitrary neighborhood on the L-shaped side arm horizontal part free end, mobile folder horizontal part Corresponding position is provided with 2 perforative keyholes, is fixedly mounted by fixing piece and the L-shaped side arm horizontal part;The mobile folder Part vertical portion is provided with feeding fastening assembly, is further finely tuned for passing through, and is finally completed the novel suspention beam holder of the present invention Fixed installation on wall.
Further, support frame as described above, supporting member, mobile folder are all made of square steel making.
Further, the inserted link of the supporting member is uniformly arranged 3-5 perforative keyholes, correspondingly, with arbitrary phase on inserted link Two adjacent keyholes are corresponding, and 2 perforative keyholes are arranged in the corresponding position of herringbone plane girder standpipe, by fixing piece with Supporting member vertical portion is fixedly mounted, the support height for adjusting supporting member.
Further, the feeding fastening assembly adjusts feet by support and feed mechanism is constituted, and the support adjusts feet It is rotatably connected with feed mechanism top contact end, to expand forced area, increases friction coefficient, the damage to wall is alleviated or avoided While, it prevents from sliding.
Further, it is provided with mobile folder hound between the mobile folder horizontal part and mobile folder vertical portion, used In the stability for further enhancing mobile clamping structure, prevent mobile folder from leading to discontinuity because of feeding fastening assembly use And it deforms.
Further, the feed mechanism is screw nut driven mechanism.
Further, the fixing piece is bolt and nut component or pin component.
Further, the cushion cap of the supporting member is horizontal groove-like structure, for preventing suspention beam from sliding;
Further, 2-3 perforative keyholes are symmetrical arranged on the cushion cap cell wall of the supporting member.
Further, the suspention boom support further includes pillar, and the pillar is in inverted T-shape;Lower part is convergence part, is and holds The horizontal groove-like structure of inversion of platform cooperation installation;With cushion cap cell wall through keyhole corresponding, corresponding position on the cell wall of convergence part It is provided through keyhole, is fixedly mounted by the cushion cap of fixing piece and supporting member;The vertical portion at middle part is column;Top is arranged There is hanging ring, for lifting;Convergence part is all made of welding with column, column and hanging ring.
Further, all components are coated with anti-corrosion face layer.
On this basis, further technical solution is a kind of side of installing and using of novel suspention beam holder of the invention Method operates as follows.
S1. suspention beam system is assembled:By front overhang hanging beam, middle suspention beam, rear overhang hanging beam steel wire rope and match reuse construction electricity Ladder or tower crane handling carry out assembly to construction site.
S2. suspention beam bracket assembled:Smooth fabricating yard is selected, the inserted link of supporting member is inserted into herringbone plane In the standpipe of truss, the height of supporting member is adjusted according to the height of barrier, is fixed with fixing piece;It will mobile folder horizontal part set It is formed and can be fixed with fixing piece along the set pipe mounting structure that L-shaped side arm horizontal part freely slides outside L-shaped side arm horizontal part; Two sets are made with method, respectively as fore-stock and after-poppet.
S3. suspention boom support is connect with suspention beam:Front overhang hanging beam, rear overhang hanging beam are respectively charged into fore-stock and after-poppet Cushion cap in, in suspention beam connect, by pillar be mounted on holder inserted link on, formed roof beam structure component.
S4. suspension mechanism is installed:It checks after confirming that above-mentioned each component installation is correct, suspension mechanism is placed in work Make position;Counterweight is uniformly placed on the cross bar of after-poppet herringbone plane girder, is tied up with rope coil.
S5. roof beam structure component is fixed with wall:Roof beam structure component is lifted into above wall, supporting rack and mobile folder are adjusted Make L-shaped side arm vertical portion and mobile folder vertical portion and the forward and backward side of wall close to further passing through adjusting and feed fastening assembly Complete the final fixation with wall.
Further, in step s 2, fabricating yard selects horizontal plane, when meeting inclined-plane, it should which finishing is paved;Such as erecting bed When ground is water-proof heat-insulation layer, 5 centimetres of solid woods of cushioning, prevent from damaging water-proof heat-insulation layer by pressure under forward and backward seat.
Further, in step s3, between fore-stock and after-poppet distance it is on the scene ground permission under, adjust as possible to maximum away from From.
Further, in step s3, external part is arranged in front overhang hanging beam.
Further, in step s 4, the length of suspension platform should be equal to the distance between on the inside of two sets of suspension mechanisms.
Beneficial effects of the present invention.
1, a kind of novel suspention beam holder provided by the invention, is connect using supporting member with front overhang hanging beam and middle suspention beam, By adjusting supporting rack and mobile folder make L-shaped side arm vertical portion and mobile folder vertical portion and the forward and backward side of wall close to, then into One step feeds the final fixation of fastening assembly completion and wall by adjusting.In the case where former stress system is constant, for suspention Girder system system provides stability guarantee.
2, novel suspention beam holder critical piece of the invention uses square steel, is made of common process such as lathe, welding, Special processing need not be carried out, makes simply, effectively reduces processing cost.
3, general suspention beam has the beam body of different model, novel suspention beam of the invention according to the difference of stress size Holder can match the production of these beam body model tissues, adapt to the perfect connection of different model beam body.
4, the present invention by suspention beam before the beam and top board construction of building structure by being first placed on corresponding suspention beam On holder, wait beams and top board construction to complete and reach the installation operation for carrying out suspention beam after intensity requirement again, avoid because It needs to punch on top plate and building concrete is caused to damage when suspention beam being installed again after the completion of beam and top board construction.Together When, when due to by roof beam structure component integral hoisting to wall, without the obstruction of corresponding beam and top plate, can a handling in place, Handling repeatedly is avoided, it is easy to operate.
5, novel suspention beam holder of the invention installation with remove and can all be operated by screw, it is easy to operate, maintenance at This is low and facilitates durable, remarkable in economical benefits.
Description of the drawings
Fig. 1 is the stereogram of the novel suspention beam holder of the present invention.
Fig. 2 is the mounting structure schematic diagram of the novel suspention beam holder of the present invention.
Fig. 3 is the vertical view of the novel suspention beam holder of the present invention.
Fig. 4 is the left view of the novel suspention beam holder of the present invention.
Fig. 5 is installation effect figure of the novel suspention beam holder of the present invention as fore-stock.
Parts, position and number in figure:1- supporting racks, 11-L shapes side arm, 111-L shape side arms vertical portion, 112-L shapes side Arm horizontal part, 12- herringbones plane girder, 121- cross bars, 122- standpipes, 123- inclined support bars;2- supporting members, 21- cushion caps, 22- inserted links;3- moves folder, 31- movement folders vertical portion, 32- movement folder horizontal parts;4- fixing pieces, 41- bolts, 42- spiral shells It is female;5- feeds fastening assembly, 51- supports adjust feet, 52- feed mechanisms;6- keyholes;7- moves folder hound;8- pillars, The convergence parts 81-, 82- columns, 83- hanging rings;9- walls;B1- front overhang hanging beams;Suspention beam in B2-.
Specific implementation mode
Technical scheme of the present invention is described in detail below in conjunction with the accompanying drawings, but present disclosure is not limited to This.
Embodiment 1:
As shown in Fig. 1-2,5, a kind of novel suspention beam holder of the invention, including it is supporting rack 1, supporting member 2, mobile folder 3, solid Determine part 4 and feeding fastening assembly 5;Support frame as described above 1 is made of two L-shaped side arms 11 and a herringbone plane girder 12;Institute It states herringbone plane girder 12 to be welded by cross bar 121, standpipe 122 and two inclined support bars 123, standpipe 122 is located at cross bar 121 upper centers and vertical with cross bar 121, two inclined support bars 123 are located at 122 both sides of standpipe and drawknot standpipe 122 and cross bar 121 both sides form stable lattice supporting framework;Described two L-shaped side arms 11 are parallel, are symmetrically distributed in herringbone plane girder 12 both sides, 111 free end of L-shaped side arm vertical portion vertically downward, 112 free end of L-shaped side arm horizontal part backward, middle part and herringbone 121 vertical welding of cross bar of plane girder 12 keeps herringbone plane girder 12 whole perpendicular to two L-shaped side arm horizontal parts 112 The plane of composition;Described two 112 free ends of L-shaped side arm horizontal part are uniformly arranged 4 perforative keyholes 6, for being pressed from both sides with mobile Part 3 and the cooperation installation of fixing piece 4 are fixed;The supporting member 2 is located at 1 top of supporting rack, in T shape, the T prefix horizontal parts on top It is divided into cushion cap 21, for carrying suspention beam;The vertical portion of lower part is inserted link 22, and insertion is installed to herringbone plane girder 12 In standpipe 122, the set pipe mounting structure that can freely up and down move is formed;There are two the mobile folders 3, L-shaped, mobile folder Vertically downward, mobile folder horizontal part 32 is tubular structure to 31 free end of part vertical portion, and free end backward, is sleeved on L-shaped side arm water 112 outside of flat portion forms the set pipe mounting structure that can be freely slid along L-shaped side arm horizontal part 112;With the L-shaped side arm horizontal part Two keyholes 6 of arbitrary neighborhood are corresponding on 112 free ends, mobile 32 corresponding position of folder horizontal part be provided with 2 it is perforative Keyhole 6 is fixedly mounted by fixing piece 4 and the L-shaped side arm horizontal part 112;The mobile folder vertical portion 31 be provided with into It to fastening assembly 5, is further finely tuned for passing through, is finally completed fixation of the novel suspention beam holder of the present invention on wall 9 Installation;Support frame as described above 1 and mobile folder 3 coordinate, and are fixedly mounted by fixing piece 4;Support frame as described above 1, supporting member 2, movement Folder 3 is all made of square steel making;The inserted link 22 of the supporting member 2 is uniformly arranged 3 perforative keyholes 6, correspondingly, with inserted link 22 Two keyholes 6 of upper arbitrary neighborhood are corresponding, and 2 perforative keyholes are arranged in 12 standpipe of herringbone plane girder, 122 corresponding position 6, it is fixedly mounted by fixing piece 4 and 2 vertical portion of supporting member, the support height for adjusting supporting member 2;The fixing piece 4 is Bolt 41 and nut 42;The cushion cap 21 of the supporting member 2 is horizontal groove-like structure, for preventing suspention beam from sliding;The bearing 2 perforative keyholes 6 are symmetrical arranged on 21 cell wall of cushion cap of part 2.
Embodiment 2:
As in Figure 3-5, a kind of novel suspention beam holder of the invention is feeding fastening group on the basis of embodiment 1 Part 5 adjusts feet 51 by support and feed mechanism 52 is constituted, and the support adjusts feet 51 can revolve with 52 top contact end of feed mechanism Turn connection, to expand forced area, increase friction coefficient prevents from sliding while the damage to wall 9 is alleviated or avoided;Institute It states and is provided with mobile folder hound 7 between mobile folder horizontal part 32 and mobile folder vertical portion 31, for further enhancing The stability of 3 structure of mobile folder prevents mobile folder 3 from being deformed because feeding 5 use of fastening assembly and leading to discontinuity;Institute It is screw nut driven mechanism to state feed mechanism 52.
Embodiment 3:
As shown in figure 5, a kind of novel suspention beam holder of the present invention, is on the basis of embodiment 1, the suspention boom support is also Including pillar 8, the pillar 8 is in inverted T-shape;Lower part is convergence part 81, for the horizontal channel-shaped of inversion with the cooperation installation of cushion cap 21 Structure;Corresponding through keyhole 6 with 21 cell wall of cushion cap, corresponding position is provided through keyhole 6 on 81 cell wall of convergence part, passes through Fixing piece 4 and the cushion cap 21 of front overhang hanging beam B1, middle suspention beam B2 and supporting member 2 are fixedly mounted;Center vertical part is column 82; Top is provided with hanging ring 83, for lifting;Convergence part 81 is all made of welding with column 82, column 82 and hanging ring 83.
Embodiment 4:
A kind of installation and application of novel suspention beam holder of the present invention, operates as follows.
S1. suspention beam system is assembled:It applies front overhang hanging beam B1, middle suspention beam B2, rear overhang hanging beam steel wire rope and with reuse Work elevator or tower crane handling carry out assembly to construction site;Fabricating yard selects horizontal plane, when meeting inclined-plane, it should finishing paving It is flat;When such as fabricating yard being water-proof heat-insulation layer, 5 centimetres of solid woods of cushioning under forward and backward seat prevent from damaging water-proof heat-insulation layer by pressure.
S2. suspention beam bracket assembled:Smooth fabricating yard is selected, the inserted link 22 of supporting member 2, which is inserted into herringbone, puts down In the standpipe 122 of face truss 12, the height of supporting member 2 is adjusted according to the height of barrier, is fixed with fixing piece 4;It is pressed from both sides mobile Part horizontal part 32 is sleeved on 112 outside of L-shaped side arm horizontal part and is formed and can be installed along the casing that L-shaped side arm horizontal part 112 freely slides Structure is fixed with fixing piece 4;Two sets are made with method, respectively as fore-stock and after-poppet.
S3. suspention boom support is connect with suspention beam:Front overhang hanging beam B1, rear overhang hanging beam are respectively charged into fore-stock and rear branch In the cushion cap 21 of frame, pillar 8 is mounted on holder inserted link 22 by the suspention beam B2 connections in, forms roof beam structure component;Fore-stock and Between after-poppet under the permission on distance ground on the scene, adjusted as possible to maximum distance;External part is arranged in front overhang hanging beam B1.
S4. suspension mechanism is installed:It checks after confirming that above-mentioned each component installation is correct, suspension mechanism is placed in work Make position;Counterweight is uniformly placed on the cross bar 121 of after-poppet herringbone plane girder 12, is tied up with rope coil;Two sets outstanding The length of suspension platform should be equal to the distance between on the inside of suspension mechanism.
S5. roof beam structure component is fixed with wall:As shown in figure 5, roof beam structure component is lifted into 9 top of wall, supporting rack is adjusted 1 and mobile folder 3 make L-shaped side arm vertical portion 111 and mobile folder vertical portion 31 and 9 forward and backward side of wall close to further leading to Overregulate the final fixation of feeding fastening assembly 5 completion and wall 9.
The above is only presently preferred embodiments of the present invention, not to limit the present invention interest field.It is any with this Interest field that claim is covered and the technical solution or any technical person familiar with the field implemented, profit The scheme that many possible changes and modifications are made with the method content of the disclosure above, all belongs to the scope of protection of the present invention.

Claims (10)

1. a kind of novel suspention beam holder, it is characterised in that:Including supporting rack (1), supporting member (2), mobile folder (3), fix Part (4) and feeding fastening assembly (5);
Support frame as described above (1) is made of two L-shaped side arms (11) and a herringbone plane girder (12);The herringbone plane Truss (12) is welded by cross bar (121), standpipe (122) and two inclined support bars (123), and standpipe (122) is located at cross bar (121) upper center and vertical with cross bar (121), two inclined support bars (123) are located at standpipe (122) both sides and drawknot standpipe (122) with cross bar (121) both sides, stable lattice supporting framework is formed;Described two L-shaped side arms (11) are parallel, symmetrical In herringbone plane girder (12) both sides, L-shaped side arm vertical portion (111) free end vertically downward, L-shaped side arm horizontal part (112) Backward, cross bar (121) vertical welding at middle part and herringbone plane girder (12) keeps herringbone plane girder (12) whole for free end The plane that body is constituted perpendicular to two L-shaped side arm horizontal parts (112);Described two L-shaped side arm horizontal part (112) free ends are uniform 3-5 perforative keyholes (6) are set;
The supporting member (2) is located above supporting rack (1), in T shape, and the T prefix horizontal components on top are cushion cap (21);Lower part Vertical portion be inserted link (22), insertion be installed in the standpipe (122) of herringbone plane girder (12), formation can up and down from By mobile set pipe mounting structure;
There are two the mobile folders (3), L-shaped, and vertically downward, mobile folder is horizontal for mobile folder vertical portion (31) free end Portion (32) is tubular structure, and backward, being sleeved on external formed of L-shaped side arm horizontal part (112) can be along L-shaped side arm horizontal part for free end (112) the set pipe mounting structure freely slid;With two bolts of arbitrary neighborhood on L-shaped side arm horizontal part (112) free end Hole (6) is corresponding, and mobile folder horizontal part (32) corresponding position is provided with 2 perforative keyholes (6), by fixing piece (4) with The L-shaped side arm horizontal part (112) is fixedly mounted;The mobile folder vertical portion (31) is provided with feeding fastening assembly (5).
2. a kind of novel suspention beam holder as described in claim 1, it is characterised in that:Support frame as described above (1), supporting member (2), Mobile folder (3) is all made of square steel making.
3. a kind of novel suspention beam holder as described in claim 1, it is characterised in that:The inserted link (22) of the supporting member (2) 3-5 perforative keyholes (6) are uniformly arranged, correspondingly, people corresponding with two keyhole (6) of arbitrary neighborhood on inserted link (22) 2 perforative keyholes (6) are arranged in font plane girder (12) standpipe (122) corresponding position, pass through fixing piece (4) and supporting member (2) vertical portion is fixedly mounted.
4. a kind of novel suspention beam holder as described in claim 1, it is characterised in that:The feeding fastening assembly (5) is by propping up Support adjusts feet (51) and feed mechanism (52) is constituted, and the support adjusts feet (51) can revolve with feed mechanism (52) top contact end Turn connection.
5. a kind of novel suspention beam holder as described in claim 1, it is characterised in that:The mobile folder horizontal part (32) and It is provided with mobile folder hound (7) between mobile folder vertical portion (31).
6. a kind of novel suspention beam holder as described in claim 1, it is characterised in that:The feed mechanism (52) is leading screw spiral shell Female transmission mechanism.
7. a kind of novel suspention beam holder as described in claim 1, it is characterised in that:The fixing piece (4) is bolt (41) Nut (42) component or pin component.
8. a kind of novel suspention beam holder as described in claim 1, it is characterised in that:The cushion cap (21) of the supporting member (2) 2-3 perforative keyholes (6) are symmetrical arranged for horizontal groove-like structure, on cushion cap (21) cell wall.
9. a kind of novel suspention beam holder as claimed in claim 9, it is characterised in that:Further include pillar (8), the pillar (8) it is in inverted T-shape;Lower part is convergence part (81), for the horizontal groove-like structure of inversion with cushion cap (21) cooperation installation;With cushion cap (21) cell wall is corresponding through keyhole (6), and corresponding position is provided through keyhole (6) on convergence part (81) cell wall, by solid Determine part (4) and the cushion cap (21) of supporting member (2) is fixedly mounted;The vertical portion at middle part is column (82);Top is provided with hanging ring (83);Convergence part (81) is all made of welding with column (82), column (82) and hanging ring (83).
10. a kind of installation and application of novel suspention beam holder, operates as follows:
S1. suspention beam system is assembled:It applies front overhang hanging beam (B1), middle suspention beam (B2), rear overhang hanging beam steel wire rope and with reuse Work elevator or tower crane handling carry out assembly to construction site;
S2. suspention beam bracket assembled:Smooth fabricating yard is selected, it is flat that the inserted link (22) of supporting member (2) is inserted into herringbone In the standpipe (122) of face truss (12), the height of supporting member (2) is adjusted according to the height of barrier, it is fixed with fixing piece (4); Mobile folder horizontal part (32) is sleeved on formation outside L-shaped side arm horizontal part (112) can be along L-shaped side arm horizontal part (112) freely The set pipe mounting structure of sliding, it is fixed with fixing piece (4);Two sets are made with method, respectively as fore-stock and after-poppet;
S3. suspention boom support is connect with suspention beam:Front overhang hanging beam (B1), rear overhang hanging beam are respectively charged into fore-stock and after-poppet Cushion cap (21) in, in suspention beam (B2) connect, by pillar (8) be mounted on holder inserted link (22) on, formed roof beam structure component;Before Between holder and after-poppet under the permission on distance ground on the scene, adjusted as possible to maximum distance;
S4. suspension mechanism is installed:It checks after confirming that above-mentioned each component installation is correct, suspension mechanism is placed in working position It sets;Counterweight is uniformly placed on the cross bar (121) of after-poppet herringbone plane girder (12), is tied up with rope coil;
S5. roof beam structure component is fixed with wall:Roof beam structure component is lifted into above wall (9), adjustment supporting rack (1) and mobile folder Part (3) makes L-shaped side arm vertical portion (111) and mobile folder vertical portion (31) and wall (9) forward and backward side close to further leading to Overregulate the final fixation of feeding fastening assembly (5) completion and wall (9).
CN201810783688.3A 2018-07-17 2018-07-17 Suspension beam bracket and installation and use method thereof Active CN108729644B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810783688.3A CN108729644B (en) 2018-07-17 2018-07-17 Suspension beam bracket and installation and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810783688.3A CN108729644B (en) 2018-07-17 2018-07-17 Suspension beam bracket and installation and use method thereof

Publications (2)

Publication Number Publication Date
CN108729644A true CN108729644A (en) 2018-11-02
CN108729644B CN108729644B (en) 2024-03-08

Family

ID=63927126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810783688.3A Active CN108729644B (en) 2018-07-17 2018-07-17 Suspension beam bracket and installation and use method thereof

Country Status (1)

Country Link
CN (1) CN108729644B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109368479A (en) * 2018-11-29 2019-02-22 上海建工四建集团有限公司 Fixed system and floor remove handling method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265417A (en) * 1999-03-12 2000-09-26 Kawaju Koji Kk Moving timbering construction method for bridge floor slab overhang section
EP1327733A2 (en) * 2002-01-15 2003-07-16 Francesco Savio Module for cantilevered scaffolding
CN202202558U (en) * 2011-07-13 2012-04-25 浙江中成建工集团有限公司 Girder-riding weight basket hanging mechanism arranged on high-rise roof frame girder
CN206016225U (en) * 2016-06-15 2017-03-15 中天建设集团有限公司 One kind is without counterweight fixture type gondola-hanging mechanism
CN208604911U (en) * 2018-07-17 2019-03-15 中建中新建设工程有限公司 A kind of novel suspention beam bracket

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265417A (en) * 1999-03-12 2000-09-26 Kawaju Koji Kk Moving timbering construction method for bridge floor slab overhang section
EP1327733A2 (en) * 2002-01-15 2003-07-16 Francesco Savio Module for cantilevered scaffolding
CN202202558U (en) * 2011-07-13 2012-04-25 浙江中成建工集团有限公司 Girder-riding weight basket hanging mechanism arranged on high-rise roof frame girder
CN206016225U (en) * 2016-06-15 2017-03-15 中天建设集团有限公司 One kind is without counterweight fixture type gondola-hanging mechanism
CN208604911U (en) * 2018-07-17 2019-03-15 中建中新建设工程有限公司 A kind of novel suspention beam bracket

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109368479A (en) * 2018-11-29 2019-02-22 上海建工四建集团有限公司 Fixed system and floor remove handling method

Also Published As

Publication number Publication date
CN108729644B (en) 2024-03-08

Similar Documents

Publication Publication Date Title
CN108560719B (en) Supporting and mounting method for super-large-span double-layer bidirectional suspension cable structure
CN110206155B (en) Bottom-added hydraulic jacking system and construction method
CN105544984A (en) Large-span steel structure jig frame integrity slip construction process
CN108979131B (en) Integral lifting platform device for high-rise building construction steel formwork and operation frame
CN105484502A (en) Combination installation method for steel structure roofing purlins and support bars of industrial factory building
CN112049236A (en) Construction method for hanging decoration construction platform under high-altitude large cantilever structure of high-rise building
CN208604911U (en) A kind of novel suspention beam bracket
CN108729644A (en) A kind of novel suspention beam holder and its installation and application
CN206753085U (en) A kind of sliding platform for being used to install high-altitude wire frame steel construction
CN212866793U (en) Assembled construction elevator stops layer platform
CN103112766A (en) Construction elevator suspending over basement roof of building and construction method thereof
CN117005664A (en) Electric translation type hanging basket
CN208310204U (en) Base for supporting and arranging elevator shaft coupling beam template
CN110805258A (en) Double-triangular-support elevator shaft operating platform and construction method
CN110469126B (en) Binding trolley for concrete reinforcing steel bars and binding construction method thereof
CN202745351U (en) Bailey truss supporting structure
CN210659321U (en) Trolley structure for binding concrete reinforcing steel bars
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN204282788U (en) Assembled fixed scaffold
CN209874434U (en) Simple and easy scaffold frame of encorbelmenting of building high latitude
CN209040527U (en) A kind of scaffold cradle structure
CN217782808U (en) Hanging basket support for installing tower crown structure of building
CN217759925U (en) BIM-based steel operating platform for light production well
CN204531472U (en) A kind of cement bunker top Elements of Space Grid Truss braced structures
CN220580489U (en) Sliding hanging basket for construction in umbrella column

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant