CN108729449A - A kind of construction method and deep basal pit soil transport device of deep basal pit - Google Patents

A kind of construction method and deep basal pit soil transport device of deep basal pit Download PDF

Info

Publication number
CN108729449A
CN108729449A CN201810496508.3A CN201810496508A CN108729449A CN 108729449 A CN108729449 A CN 108729449A CN 201810496508 A CN201810496508 A CN 201810496508A CN 108729449 A CN108729449 A CN 108729449A
Authority
CN
China
Prior art keywords
soil
conveyer belt
foundation pit
foundation
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810496508.3A
Other languages
Chinese (zh)
Inventor
徐金良
徐玉柱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan City Kate Construction Engineering Co Ltd
Original Assignee
Sichuan City Kate Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan City Kate Construction Engineering Co Ltd filed Critical Sichuan City Kate Construction Engineering Co Ltd
Priority to CN201810496508.3A priority Critical patent/CN108729449A/en
Publication of CN108729449A publication Critical patent/CN108729449A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C4/00Crushing or disintegrating by roller mills
    • B02C4/02Crushing or disintegrating by roller mills with two or more rollers
    • B02C4/08Crushing or disintegrating by roller mills with two or more rollers with co-operating corrugated or toothed crushing-rollers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B02CRUSHING, PULVERISING, OR DISINTEGRATING; PREPARATORY TREATMENT OF GRAIN FOR MILLING
    • B02CCRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL; MILLING GRAIN
    • B02C4/00Crushing or disintegrating by roller mills
    • B02C4/28Details
    • B02C4/42Driving mechanisms; Roller speed control
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G37/00Combinations of mechanical conveyors of the same kind, or of different kinds, of interest apart from their application in particular machines or use in particular manufacturing processes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G39/00Rollers, e.g. drive rollers, or arrangements thereof incorporated in roller-ways or other types of mechanical conveyors 
    • B65G39/10Arrangements of rollers
    • B65G39/12Arrangements of rollers mounted on framework
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65GTRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
    • B65G45/00Lubricating, cleaning, or clearing devices
    • B65G45/10Cleaning devices
    • B65G45/12Cleaning devices comprising scrapers
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Food Science & Technology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The present invention relates to a kind of construction method of deep basal pit and the transport devices of deep basal pit soil, belong to technical field of building construction, solve the problems, such as that soil transfer efficiency is low, transport device is for transporting the soil dug out in foundation pit outside foundation pit, Department of Transportation including breaker and several grades, every grade of Department of Transportation includes rack, it is rotatably dispose in the rotating roller at rack both ends, the conveyer belt being set around in rotating roller, soil can be delivered to next stage conveyer belt by being fixedly arranged on the motor for driving rotating roller to rotate, upper level conveyer belt in rack.When work, the soil dug out in foundation pit is entered to the input terminal of conveyer belt after breaker is broken, start motor, motor drives rotating roller rotation, rotating roller driving conveying belt moves, the purpose being delivered to realizing conveyer belt by soil outside foundation pit avoids passing through load wagon transport soil, improves conevying efficiency and safety.

Description

A kind of construction method and deep basal pit soil transport device of deep basal pit
Technical field
The present invention relates to technical field of building construction, more particularly to the construction method and deep basal pit soil of a kind of deep basal pit Transport device.
Background technology
With the continuous development of urban modernization construction, the development & construction of city space require to be increasingly urgent to, all kinds of undergrounds The construction of engineering is also more and more.Requirement of the underground engineering to deep-foundation pit engineering is also higher and higher.In general, deep basal pit refers to Cutting depth be more than 5 meters (containing 5 meters) or three layers of basement above (containing three layers) though or depth be less than 5 meters, geological conditions with Ambient enviroment and the especially complex engineering of underground utilities, ultra-deep foundation pit are then that depth is more than 10 meters, and geological conditions and surrounding Environment and the increasingly complex engineering of underground utilities.Base pit engineering includes mainly that foundation pit supporting system design and construction and the earthwork are opened It digs, is a comprehensive very strong system engineering.It requires geotechnical engineering and Structural Engineering technical staff's close fit.
During excavation of foundation pit, it usually needs first build and lead to the ramp outside foundation pit out of foundation pit, then pass through loading Vehicle transports the soil dug out outside foundation pit, and with the increase of foundation depth, the ramp passed through for load wagon will more and more be grown, If soil water content is larger or encounters rainy weather, the strength and stability in ramp will be severely impacted, to the logical of load wagon Row causes to seriously affect, and influences construction efficiency and safety accident even occurs.
Invention content
One of the objects of the present invention is to provide a kind of deep basal pit soil transport devices, have and improve soil transfer efficiency The advantages of.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of deep basal pit soil transport device, the transport device are used to transport the soil dug out in foundation pit outside foundation pit, Department of Transportation including breaker and several grades, every grade of Department of Transportation includes rack, is rotatably dispose in the rotation at rack both ends Roller, the conveyer belt being set around in rotating roller are fixedly arranged on the motor for driving rotating roller to rotate in rack, are conveyed described in upper level Soil can be delivered to next stage conveyer belt by band.
Implement above-mentioned technical proposal, when work, the soil dug out in foundation pit is entered into conveying after breaker is broken The input terminal of band, starts motor, and motor drives rotating roller rotation, rotating roller driving conveying belt movement, to realize that conveyer belt will Soil is delivered to the purpose outside foundation pit, avoids passing through load wagon transport soil, improves conevying efficiency and safety.
Preferably, in the rack between two rotating rollers rotation be provided with it is several to support roller, each pair of support The relatively V-shaped setting of roller.
Implement above-mentioned technical proposal, support roller plays the role of supporting conveyer belt, and at work, conveyer belt is in soil To be bonded with support roller under pressure, and support roller will be arranged with respect to forming V-shape so that conveyer belt at the high state in intermediate low both sides, To avoid soil to be trickled down during transport to a certain extent.
Preferably, the output end of conveyer belt described in upper level is higher than the input terminal of next stage conveyer belt, and every grade of conveyer belt Input end be provided with the baffle for preventing soil unrestrained.
Implement above-mentioned technical proposal, the input terminal by the output end of upper level conveyer belt higher than next stage conveyer belt is arranged, Soil is facilitated smoothly to fall into next stage conveyer belt under gravity, to achieving the effect that continuous conveying, and baffle is set Prevent soil unrestrained with being set effective.
Preferably, scraper plate is provided in the rack, the scraper plate is located at below conveyer belt and is contacted with conveyer belt.
Implement above-mentioned technical proposal, scraper plate is contacted with conveyer belt, and in the motion process kind of conveyer belt, scraper plate will strike off conveying The soil of adherency is taken, the soil adhered on conveyer belt is reduced, improves conveyer belt conevying efficiency, ensures conveyer belt normal work.
Preferably, it is provided with sliding slot in the rack, is slided in the sliding slot and is provided with mounting plate, the scraper plate is fixedly arranged on On mounting plate, it is provided in the sliding slot for drive installation plate to the elastic component close to belt direction sliding.
Implement above-mentioned technical proposal, after scraper plate is worn, elastic component drives mounting plate to be slided along sliding slot, and mounting plate drive is scraped Plate is moved to close to belt direction, so that scraper plate keeps the state abutted with conveyer belt, ensures the normal work of scraper plate.
Preferably, the breaker includes shell, two parallel shafts being rotatably dispose in shell, coaxial fixed In in shaft breaking disc and the driving motor that is fixedly installed on shell, the breaking disc includes breaking disc one and breaking disc Two, gear is coaxially fixedly installed in two shafts, and two gears intermesh, the output shaft of the driving motor It is fixedly and coaxially connected with any one shaft to drive breaking disc one and breaking disc two to be rotated towards the direction between two shafts, institute It states case top and is equipped with mud inlet, the housing bottom offers mud mouth, and the mud mouth is located at the defeated of first order Department of Transportation Send the top of the input terminal of band.
Implement above-mentioned technical proposal, by the soil in foundation pit out of mud inlet input shell, starts driving motor, driving electricity Machine drives shaft rotation, and shaft drives breaking disc rotation, and two intermeshing gears make two court of breaking disc one and breaking disc It is rotated to the direction between two shafts, finally enters the input terminal of conveyer belt by mud mouth by broken soil, be crushed The purpose of fragmentation volume larger soil and stone is played in the setting of device, prevents relatively large soil or stone from being caused to conveyer belt Damage, extends the service life of conveyer belt.
Preferably, solid on the breaking disc one and breaking disc two between the breaking disc one and breaking disc two there are gap Equipped with crushing teeth, and the crushing teeth on breaking disc one shifts to install mutually with the crushing teeth on breaking disc two.
Implement above-mentioned technical proposal, there are gap, will avoid breaking in soil or stone between breaking disc one and breaking disc two It is so broken that relatively carefully to influence crushing efficiency, while the energy is also saved, and crushing teeth is shifted to install mutually, it effectively raises brokenly Broken effect.
Another object of the present invention is to provide a kind of construction method of deep basal pit, has to avoid building and lead to out of foundation pit Ramp outside foundation pit, the advantages of increasing efficiency and the safety of construction.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of construction method of deep basal pit, includes the following steps:
S1:Foundation pit enclosure, foundation pit enclosure structure is established around foundation pit to be onstructed, and row's steel-pipe pile work is made around foundation pit For building enclosure;
S2:Water-stop curtain establishes water-stop curtain around foundation pit to be onstructed, and the water-stop curtain is Double shaft stirring stake, described Double shaft stirring stake is located at side of the steel-pipe pile far from foundation pit for soil mass consolidation and sealing;
S3:First layer earth excavation, is laid with steel plate first, and job platform is provided for excavator, directly excavates, foundation pit is opened by 0m It digs to -1m;
S4:Then the slot grooving of first steel purlin and bracing members installs first of steel purlin and bracing members;
S5:Second layer earth excavation, is laid with steel plate first, and job platform is provided for excavator, tamps a use with rammer It in the first compacting foundation of frames, then sets up level-one Department of Transportation and rack is installed at the first compacting foundation, and in Breaker is installed at one compacting foundation;
The foundation pit around compacting foundation is excavated to by -1m by -2m by excavator again, the soil dug out is broken by breaker The soil dug out is transported to outside foundation pit after broken, by level-one Department of Transportation;
S6:Then the slot grooving of second steel purlin and bracing members installs second steel purlin and bracing members;
S7:Third layer earth excavation, mode is identical as second layer earth excavation mode, equally tamps the second compacting with rammer Ground, then set up two level Department of Transportation and rack is installed at the second compacting foundation, by the breaker at the first compacting foundation It is hoisted at the second compacting foundation, and is installed by crane;
Foundation pit is excavated to -3m by -2m at twice finally by excavator, then is dug from -3m to hole bottom, the soil dug out is passed through The soil dug out is transported to outside foundation pit after breaker is broken, by level-one Department of Transportation and two level Department of Transportation;
S8:Transport device and breaker are removed, then is dug the first compacting foundation and the second compacting foundation by long-armed excavator It removes, and by the soil dug out directly down to outside foundation pit.
Implement above-mentioned technical proposal, avoids building and lead to the ramp outside foundation pit out of foundation pit, while avoiding passing through load wagon Soil is transported, conevying efficiency is improved, increases efficiency and the safety of construction.
In conclusion the present invention having the beneficial effect that in contrast to the prior art:
When one, working, the soil dug out in foundation pit is entered to the input terminal of conveyer belt after breaker is broken, starts electricity Machine, motor drive rotating roller rotation, rotating roller driving conveying belt movement, to realize that soil is delivered to outside foundation pit by conveyer belt Purpose avoids passing through load wagon transport soil, improves conevying efficiency and safety;
Two, the soil in foundation pit starts driving motor out of mud inlet input shell, and driving motor drives shaft rotation, shaft Breaking disc rotation is driven, and two intermeshing gears make breaking disc one and breaking disc two turn towards the direction between two shafts It is dynamic, finally enter the input terminal of conveyer belt by mud mouth by broken soil, broken body is played in the setting of breaker The purpose of the larger soil and stone of product, prevents relatively large soil or stone from causing to damage to conveyer belt, extends making for conveyer belt Use the service life.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Obtain other attached drawings according to these attached drawings.
Fig. 1 is the whole structural schematic diagram of the embodiment of the present invention one;
Fig. 2 is the structural schematic diagram of the transport device of the embodiment of the present invention one;
Fig. 3 is the portions the A enlarged drawing in Fig. 2;
Fig. 4 is the structural schematic diagram at another visual angle of the transport device of the embodiment of the present invention one;
Fig. 5 is the portions the B enlarged drawing in Fig. 4.
Reference numeral:1, foundation pit;11, steel plate;12, steel purlin;13, bracing members;14, the first compacting foundation;15, it second rams Base on the spot;2, transport device;21, Department of Transportation;211, rack;2111, support roller;212, rotating roller;213, conveyer belt;214, electric Machine;22, breaker;221, shell;2211, mud inlet;2212, mud mouth;222, shaft;2221, gear;223, it is crushed Disk;2231, breaking disc one;2232, breaking disc two;2233, crushing teeth;224, driving motor;3, baffle;4, scraper plate;5, sliding slot; 51, mounting plate;511, bolt;52, elastic component;6, steel-pipe pile;7, Double shaft stirring stake.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this It is all protected by Patent Law in the right of invention.
Embodiment one:
As shown in Figure 1, 2, a kind of deep basal pit soil transport device, including breaker 22 and several grades of Department of Transportation 21, often Grade Department of Transportation 21 includes rack 211, is rotatably dispose in the rotating roller 212 at 211 both ends of rack, is set around defeated in rotating roller 212 Band 213 is sent, is fixedly arranged on the motor 214 for driving rotating roller 212 to rotate, upper level conveyer belt 213 in rack 211 soil is defeated It send to the conveyer belt 213 of next stage, transport device 2 is for transporting the soil dug out in foundation pit 1 outside foundation pit 1.
As shown in Fig. 2, the output end of upper level conveyer belt 213 is higher than the input terminal of next stage conveyer belt 213, and every grade defeated The input end of band 213 is sent to be provided with the baffle 3 for preventing soil unrestrained;When the input terminal of soil from upper level conveyer belt 213 is defeated When sending to output end, under gravity, soil falls into the input terminal of next stage conveyer belt 213, to reach continuous conveying Effect, and to be effectively prevented soil unrestrained for the setting of baffle 3.
As shown in Figure 4,5, in rack 211 between two rotating rollers 212 rotation be provided with it is several to support roller 2111, often To the relatively V-shaped setting of support roller 2111;Support roller 2111 plays the role of supporting conveyer belt 213, at work, conveyer belt 213 will be bonded under the pressure of soil with support roller 2111, and support roller 2111 is arranged with respect to forming V-shape so that conveyer belt 213 At the high state in intermediate low both sides, to avoid soil to be trickled down during transport to a certain extent.
As shown in Figure 2,3, breaker 22 includes shell 221, two parallel shafts being rotatably dispose in shell 221 222, the breaking disc 223 being coaxially fixed in shaft 222 and the driving motor 224 being fixedly installed on shell 221, breaking disc 223 include breaking disc 1 and breaking disc 2 2232, and gear 2221, two teeth are coaxially fixedly installed in two shafts 222 Wheel 2221 intermeshes, and the output shaft of driving motor 224 is fixedly and coaxially connected with any one shaft 222 to drive breaking disc one Direction rotation between 2231 and 2 2,232 two shafts 222 of direction of breaking disc.Between breaking disc 1 and breaking disc 2 2232 There are gap, crushing teeth 2233 is installed on breaking disc 1 and breaking disc 2 2232, and broken on breaking disc 1 Tooth 2233 shifts to install mutually with the crushing teeth 2233 on breaking disc 2 2232;By breaking disc 1 and breaking disc 2 2232 it Between there are gap, avoid soil or stone is relatively carefully and influence crushing efficiency broken, while also saving the energy, and will be crushed Tooth 2233 shifts to install mutually, effectively raises broken effect.
As shown in figure 4,221 top of shell is equipped with mud inlet 2211,221 bottom of shell offers mud mouth 2212, mud extraction Mouth 2212 is located at the top of the input terminal of the conveyer belt 213 of first order Department of Transportation 21.
The course of work:When work, the soil in foundation pit 1 is put into from mud inlet 2211 in shell 221 by excavator, is opened Driving motor 224 is moved, driving motor 224 drives shaft 222 to rotate, and shaft 222 drives breaking disc 223 to rotate, and two mutual Meshed gears 2221 makes breaking disc 223 1 and breaking disc 223 2 towards the direction rotation between two shafts 222, finally passes through Broken soil enters the input terminal of conveyer belt 213 by mud mouth 2212;Start motor 214, motor 214 drives rotating roller 212 rotations, the movement of 212 driving conveying belt 213 of rotating roller, the mesh being delivered to realizing conveyer belt 213 by soil outside foundation pit 1 , load wagon transport soil is avoided passing through, conevying efficiency and safety are improved, and fragmentation volume is played in the setting of breaker 22 The purpose of larger soil and stone, prevents relatively large soil or stone from causing to damage to conveyer belt 213, extends conveyer belt 213 Service life.
As shown in Figure 4,5, scraper plate 4 is provided in rack 211, scraper plate 4 is made of polyurethane, and scraper plate 4 is located at conveyer belt 213 It lower section and is contacted with conveyer belt 213;Scraper plate 4 is contacted with conveyer belt 213, and in the motion process kind of conveyer belt 213, scraper plate 4 will be scraped Except the soil adhered on conveyer belt 213, the soil adhered on conveyer belt 213 is reduced, improves 213 conevying efficiency of conveyer belt, is ensured Conveyer belt 213 works normally.
As shown in Figure 4,5, it is provided with sliding slot 5 in rack 211, is slided in sliding slot 5 and is provided with mounting plate 51, scraper plate 4 is fixed In on mounting plate 51, scraper plate 4 is fixed on by bolt 511 on mounting plate 51, convenient after scraper plate 4 loses effect because of abrasion The handling of scraper plate 4 are provided in sliding slot 5 for drive installation plate 51 to the elastic component 52 slided close to 213 direction of conveyer belt, bullet Property part 52 can be spring leaf or spring, the present embodiment is set as spring, and spring one end is fixedly connected with 5 bottom wall of sliding slot, is another End is fixedly connected with mounting plate 51;After scraper plate 4 is worn, elastic component 52 drives mounting plate 51 to be slided along sliding slot 5,51 band of mounting plate Dynamic scraper plate 4 is moved to close to 213 direction of conveyer belt, so that scraper plate 4 keeps the state abutted with conveyer belt 213, ensures scraper plate 4 Normal work.
Embodiment two:
A kind of construction method of deep basal pit, includes the following steps:
S1:Foundation pit 1 is gone along with sb. to guard him, and 1 building enclosure of foundation pit is established around foundation pit 1 to be onstructed, and row's steel pipe is made around foundation pit 1 Stake 6 is used as building enclosure;
S2:Water-stop curtain establishes water-stop curtain around foundation pit 1 to be onstructed, and water-stop curtain is Double shaft stirring stake 7, and twin shaft stirs It mixes stake 7 and is located at side of the steel-pipe pile 6 far from foundation pit 1 for soil mass consolidation and sealing;
S3:First layer earth excavation, first be laid with steel plate 11, provide job platform for excavator, directly excavation, by foundation pit 1 by 0m is excavated to -1m;
S4:Then the slot grooving of first steel purlin 12 and bracing members 13 installs first of steel purlin 12 and bracing members 13;
S5:Second layer earth excavation is laid with steel plate 11, provides job platform for excavator, tamp one with rammer first Be used to support the first compacting foundation 14 of rack 211, then set up level-one Department of Transportation 21 and by rack 211 with being installed on the first compacting Ji14Chu, and breaker 22 is installed at the first compacting foundation 14;
The foundation pit 1 around compacting foundation is excavated to by -1m by -2m by excavator again, the soil dug out is passed through into breaker 22 it is broken after, by level-one Department of Transportation 21 soil dug out is transported to outside foundation pit 1;
S6:Then the slot grooving of second steel purlin 12 and bracing members 13 installs second steel purlin 12 and bracing members 13;
S7:Third layer earth excavation, mode is identical as second layer earth excavation mode, equally tamps the second compacting with rammer Ground 15, then set up two level Department of Transportation 21 and rack 211 is installed at the second compacting foundation 15, at the first compacting foundation 14 Breaker 22 be hoisted at the second compacting foundation 15 by crane, and installed;
Foundation pit 1 is excavated to -3m by -2m at twice finally by excavator, then is dug from -3m to hole bottom, the soil dug out is passed through Cross breaker 22 it is broken after, by level-one Department of Transportation 21 and two level Department of Transportation 21 soil dug out is transported to outside foundation pit 1;
S8:Transport device 2 and breaker 22 are removed, then the first compacting foundation 14 and second is tamped ground by long-armed excavator Base 15 is excavated, and by the soil dug out directly down to outside foundation pit 1.
By implementing above-mentioned steps, avoids building and lead to the ramp outside foundation pit 1 out of foundation pit 1, while avoiding passing through loading Vehicle transports soil, improves conevying efficiency, increases efficiency and the safety of construction.
The above is only the exemplary embodiment of the present invention, protection domain and is not intended to limit the present invention, this hair Bright protection domain is determined by the attached claims.

Claims (8)

1. a kind of deep basal pit soil transport device, characterized in that including breaker (22) and several grades of Department of Transportation (21), Every grade of Department of Transportation (21) includes rack (211), is rotatably dispose in the rotating roller (212) at rack (211) both ends, is set around and turns Conveyer belt (213) on dynamic roller (212) is fixedly arranged on the motor (214) for driving rotating roller (212) to rotate in rack (211), Soil is delivered on the conveyer belt (213) of next stage by conveyer belt described in upper level (213), and the transport device (2) is used for will The soil dug out in foundation pit (1) transports foundation pit (1) outside.
2. a kind of deep basal pit soil transport device according to claim 1, characterized in that the rack (211) is upper Rotation is provided with several to support roller (2111) between two rotating rollers (212), and each pair of support roller (2111) is relatively V-shaped Setting.
3. a kind of deep basal pit soil transport device according to claim 2, characterized in that conveyer belt described in upper level (213) output end is higher than the input terminal of next stage conveyer belt (213), and the input end of every grade of conveyer belt (213) is provided with The baffle (3) for preventing soil unrestrained.
4. a kind of deep basal pit soil transport device according to claim 1, characterized in that set on the rack (211) It is equipped with scraper plate (4), the scraper plate (4) is located at below conveyer belt (213) and is contacted with conveyer belt (213).
5. a kind of deep basal pit soil transport device according to claim 4, characterized in that set on the rack (211) It is equipped with sliding slot (5), is slided in the sliding slot (5) and is provided with mounting plate (51), the scraper plate (4) is fixedly arranged on mounting plate (51), It is provided in the sliding slot (5) for drive installation plate (51) to the elastic component (52) close to the sliding of conveyer belt (213) direction.
6. a kind of deep basal pit soil transport device according to claim 1, characterized in that breaker (22) packet Shell (221) is included, the parallel shaft (222) of two be rotatably dispose in shell (221) is coaxially fixed in shaft (222) Breaking disc (223) and the driving motor (224) that is fixedly installed on shell (221), the breaking disc (223) includes breaking disc One (2231) and breaking disc two (2232) are coaxially fixedly installed gear (2221) on two shafts (222), described in two Gear (2221) intermeshes, the output shaft of the driving motor (224) and any one shaft (222) be fixedly and coaxially connected with Drive breaking disc one (2231) and breaking disc two (2232) towards the direction rotation between two shafts (222), the shell (221) Top is equipped with mud inlet (2211), and shell (221) bottom offers mud mouth (2212), and the mud mouth (2212) is located at The top of the input terminal of the conveyer belt (213) of first order Department of Transportation (21).
7. a kind of deep basal pit soil transport device according to claim 6, characterized in that the breaking disc one (2231) There are gap between breaking disc two (2232), crushing teeth is installed on the breaking disc one (2231) and breaking disc two (2232) (2233), the crushing teeth (2233) and on breaking disc one (2231) is mutually staggered with the crushing teeth (2233) on breaking disc two (2232) Position setting.
8. a kind of construction method of deep basal pit, characterized in that include the following steps:
S1:Foundation pit (1) is gone along with sb. to guard him, and foundation pit (1) building enclosure is established around foundation pit (1) to be onstructed, is made around foundation pit (1) One row's steel-pipe pile (6) is used as building enclosure;
S2:Water-stop curtain, establishes water-stop curtain around foundation pit (1) to be onstructed, and the water-stop curtain is Double shaft stirring stake (7), the Double shaft stirring stake (7) is located at side of the steel-pipe pile (6) far from foundation pit (1) for soil mass consolidation and sealing;
S3:First layer earth excavation is laid with steel plate (11), job platform is provided for excavator first, directly excavates, by foundation pit (1) -1m is excavated to by 0m;
S4:The slot grooving of first steel purlin (12) and bracing members (13) then installs first of steel purlin (12) and steel branch It supports (13);
S5:Second layer earth excavation is laid with steel plate (11), provides job platform for excavator, tamp one with rammer first A the first compacting foundation (14) for being used to support rack (211), then set up level-one Department of Transportation (21) and be installed on rack (211) At first compacting foundation (14), and breaker (22) is installed at the first compacting foundation (14);
The foundation pit (1) around compacting foundation is excavated to by -2m by -1m by excavator again, by the soil dug out by broken dress Set (22) it is broken after, by level-one Department of Transportation (21) soil dug out is transported to foundation pit (1) outside;
S6:The slot grooving of second steel purlin (12) and bracing members (13) then installs second steel purlin (12) and steel branch It supports (13);
S7:Third layer earth excavation, mode is identical as second layer earth excavation mode, equally tamps the second compacting with rammer Ground (15), then set up two level Department of Transportation (21) and rack (211) is installed at the second compacting foundation (15), by the first compacting Breaker (22) at ground (14) is hoisted to by crane at the second compacting foundation (15), and is installed;
Foundation pit (1) is excavated to -3m by -2m at twice finally by excavator, then is dug from -3m to hole bottom, the soil that will be dug out The soil dug out is transported to base after breaker (22) is broken, by level-one Department of Transportation (21) and two level Department of Transportation (21) Cheat (1) outside;
S8:Remove transport device (2) and breaker (22), then by long-armed excavator by the first compacting foundation (14) and second Compacting foundation (15) is excavated, and by the soil dug out directly down to foundation pit (1) outside.
CN201810496508.3A 2018-05-22 2018-05-22 A kind of construction method and deep basal pit soil transport device of deep basal pit Pending CN108729449A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810496508.3A CN108729449A (en) 2018-05-22 2018-05-22 A kind of construction method and deep basal pit soil transport device of deep basal pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810496508.3A CN108729449A (en) 2018-05-22 2018-05-22 A kind of construction method and deep basal pit soil transport device of deep basal pit

Publications (1)

Publication Number Publication Date
CN108729449A true CN108729449A (en) 2018-11-02

Family

ID=63938848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810496508.3A Pending CN108729449A (en) 2018-05-22 2018-05-22 A kind of construction method and deep basal pit soil transport device of deep basal pit

Country Status (1)

Country Link
CN (1) CN108729449A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111608224A (en) * 2020-05-28 2020-09-01 福建省昊立建设工程有限公司 Unearthed ramp based on deep foundation pit supporting structure
CN111676749A (en) * 2020-06-03 2020-09-18 安徽华仁路桥工程有限公司 Construction method for roadbed earthwork in rainy season
CN112227449A (en) * 2020-09-10 2021-01-15 江西中恒地下空间科技有限公司 Conveying system for underground construction
CN112295770A (en) * 2020-11-05 2021-02-02 万光超 Building deep foundation pit inner wall pressurization type spraying machine and using method thereof
CN112431250A (en) * 2020-11-01 2021-03-02 王建国 Earth conveyer for deep basal pit
CN112722876A (en) * 2020-12-30 2021-04-30 上海建工四建集团有限公司 Reverse construction method foundation pit garbage clearing and lifting device and working method
CN112854230A (en) * 2021-01-09 2021-05-28 湖南省城乡建设勘测院 Construction method of deep foundation pit and transportation device of soil for deep foundation pit
CN112962707A (en) * 2021-02-03 2021-06-15 中铁一局集团建筑安装工程有限公司 Equipment for foundation excavation construction and excavation construction process
CN113089676A (en) * 2021-03-23 2021-07-09 中国建筑一局(集团)有限公司 Rapid unearthing system for ultra-deep foundation pit
WO2021218078A1 (en) * 2020-04-30 2021-11-04 深圳市工勘岩土集团有限公司 Construction method for foundation pit earthwork transportation and crushing
CN113882386A (en) * 2021-11-02 2022-01-04 山东振盛建设工程有限公司 High slope earth and stone excavation protection method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775821A (en) * 2009-12-10 2010-07-14 中国建筑一局(集团)有限公司 Device and method for vertically transporting earthwork by reverse construction method
CN103410186A (en) * 2013-08-01 2013-11-27 江苏省水利机械制造有限公司 Underwater crusher
CN204753662U (en) * 2015-01-31 2015-11-11 新疆科立机械设备有限公司 Broken all -in -one is excavated to movable type by oneself
CN105179006A (en) * 2010-07-09 2015-12-23 乔伊·姆·特拉华公司 Continuous-extraction mining system
CN107100223A (en) * 2017-04-10 2017-08-29 南昌首叶科技有限公司 A kind of quick collecting device in rare earth mining site land used face cubic metre of earth
CN207032354U (en) * 2017-07-26 2018-02-23 北京昊辰投资担保有限公司 Broken or screening plant and standby with broken or screening plant shovel installing
CN207363670U (en) * 2016-08-12 2018-05-15 海瑞克股份公司 For discretely transporting the device of waste material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775821A (en) * 2009-12-10 2010-07-14 中国建筑一局(集团)有限公司 Device and method for vertically transporting earthwork by reverse construction method
CN105179006A (en) * 2010-07-09 2015-12-23 乔伊·姆·特拉华公司 Continuous-extraction mining system
CN103410186A (en) * 2013-08-01 2013-11-27 江苏省水利机械制造有限公司 Underwater crusher
CN204753662U (en) * 2015-01-31 2015-11-11 新疆科立机械设备有限公司 Broken all -in -one is excavated to movable type by oneself
CN207363670U (en) * 2016-08-12 2018-05-15 海瑞克股份公司 For discretely transporting the device of waste material
CN107100223A (en) * 2017-04-10 2017-08-29 南昌首叶科技有限公司 A kind of quick collecting device in rare earth mining site land used face cubic metre of earth
CN207032354U (en) * 2017-07-26 2018-02-23 北京昊辰投资担保有限公司 Broken or screening plant and standby with broken or screening plant shovel installing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
王新文等: "《选煤机械》", 28 February 2017, 冶金工业出版社 *
金丰民等: "《带式输送机实用技术》", 28 February 2012, 冶金工业出版社 *

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021218078A1 (en) * 2020-04-30 2021-11-04 深圳市工勘岩土集团有限公司 Construction method for foundation pit earthwork transportation and crushing
CN111608224A (en) * 2020-05-28 2020-09-01 福建省昊立建设工程有限公司 Unearthed ramp based on deep foundation pit supporting structure
CN111676749B (en) * 2020-06-03 2021-10-01 安徽华仁路桥工程有限公司 Roadbed earthwork construction structure in rainy season
CN111676749A (en) * 2020-06-03 2020-09-18 安徽华仁路桥工程有限公司 Construction method for roadbed earthwork in rainy season
CN112227449A (en) * 2020-09-10 2021-01-15 江西中恒地下空间科技有限公司 Conveying system for underground construction
CN112431250A (en) * 2020-11-01 2021-03-02 王建国 Earth conveyer for deep basal pit
CN112295770A (en) * 2020-11-05 2021-02-02 万光超 Building deep foundation pit inner wall pressurization type spraying machine and using method thereof
CN112722876A (en) * 2020-12-30 2021-04-30 上海建工四建集团有限公司 Reverse construction method foundation pit garbage clearing and lifting device and working method
CN112854230A (en) * 2021-01-09 2021-05-28 湖南省城乡建设勘测院 Construction method of deep foundation pit and transportation device of soil for deep foundation pit
CN112854230B (en) * 2021-01-09 2024-03-15 湖南省城乡建设勘测院有限公司 Construction method of deep foundation pit and conveying device of soil for deep foundation pit
CN112962707A (en) * 2021-02-03 2021-06-15 中铁一局集团建筑安装工程有限公司 Equipment for foundation excavation construction and excavation construction process
CN112962707B (en) * 2021-02-03 2022-08-02 中铁一局集团建筑安装工程有限公司 Equipment for foundation excavation construction and excavation construction process
CN113089676A (en) * 2021-03-23 2021-07-09 中国建筑一局(集团)有限公司 Rapid unearthing system for ultra-deep foundation pit
CN113882386A (en) * 2021-11-02 2022-01-04 山东振盛建设工程有限公司 High slope earth and stone excavation protection method

Similar Documents

Publication Publication Date Title
CN108729449A (en) A kind of construction method and deep basal pit soil transport device of deep basal pit
CN206694038U (en) Hob type push pipe excavator
CN206174017U (en) Novel reverse construction machinery device
CN109812271B (en) Construction method for shield-crossing limited box culvert
KR100902364B1 (en) Shield tunneling apparatus and constructing method thereof
CN107366322A (en) A kind of milling digging machine of automatic material-absorbing
CN209114425U (en) A kind of irrigation canals and ditches that can normally use in a variety of contexts
JP6664647B2 (en) Subbase construction method
CN113684838A (en) Grooving construction method for rock-socketed ultra-deep underground diaphragm wall
CN205712236U (en) A kind of civil engineering efficient excavator tool
CN212225213U (en) Inclined shaft construction equipment
CN116695721A (en) Modularized multi-device foundation pit excavation supporting method and equipment system thereof
CN213114678U (en) Side slope protection device for open pit coal mine
CN114991165A (en) Construction method for subway deep foundation pit adjacent to railway business line
CN209761475U (en) Coal mine tunneling and supporting device
CN112627827A (en) Control device for excavating and deslagging of vertical shaft at upper part of existing tunnel
CN116575467A (en) Modularized multi-device foundation pit excavation supporting equipment system and method thereof
CN104707846B (en) Method for solving urban refuse landfill through building material resource development
JP5869232B2 (en) Excavation soil transport system
CN103154434A (en) Closed trench tunnels
Clark et al. A novel approach to planetary regolith collection: the bucket drum soil excavator
CN215213500U (en) Control device for excavating and deslagging of vertical shaft at upper part of existing tunnel
EP2098642A1 (en) Screw equipment for digging to construct diaphragms
CN112901175A (en) Method for constructing underground laboratory spiral downward slope by applying TBM
CN210529799U (en) Can prevent excavator scraper bowl that inclines to leak

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181102