CN107100223A - A kind of quick collecting device in rare earth mining site land used face cubic metre of earth - Google Patents
A kind of quick collecting device in rare earth mining site land used face cubic metre of earth Download PDFInfo
- Publication number
- CN107100223A CN107100223A CN201710229845.1A CN201710229845A CN107100223A CN 107100223 A CN107100223 A CN 107100223A CN 201710229845 A CN201710229845 A CN 201710229845A CN 107100223 A CN107100223 A CN 107100223A
- Authority
- CN
- China
- Prior art keywords
- plate
- rotating shaft
- runner
- welding
- way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910052761 rare earth metal Inorganic materials 0.000 title claims abstract description 36
- 150000002910 rare earth metals Chemical class 0.000 title claims abstract description 32
- 238000005065 mining Methods 0.000 title claims abstract description 31
- 238000003466 welding Methods 0.000 claims abstract description 112
- 230000005540 biological transmission Effects 0.000 claims description 39
- 230000005611 electricity Effects 0.000 claims description 6
- 238000000034 method Methods 0.000 abstract description 7
- 230000009286 beneficial effect Effects 0.000 abstract description 6
- 238000004140 cleaning Methods 0.000 abstract description 5
- 230000000694 effects Effects 0.000 abstract description 2
- 229910052500 inorganic mineral Inorganic materials 0.000 description 14
- 239000011707 mineral Substances 0.000 description 14
- 238000010586 diagram Methods 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 2
- 239000000126 substance Substances 0.000 description 2
- 229910052586 apatite Inorganic materials 0.000 description 1
- WUKWITHWXAAZEY-UHFFFAOYSA-L calcium difluoride Chemical compound [F-].[F-].[Ca+2] WUKWITHWXAAZEY-UHFFFAOYSA-L 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- IKNAJTLCCWPIQD-UHFFFAOYSA-K cerium(3+);lanthanum(3+);neodymium(3+);oxygen(2-);phosphate Chemical compound [O-2].[La+3].[Ce+3].[Nd+3].[O-]P([O-])([O-])=O IKNAJTLCCWPIQD-UHFFFAOYSA-K 0.000 description 1
- 239000002734 clay mineral Substances 0.000 description 1
- 239000010436 fluorite Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000012535 impurity Substances 0.000 description 1
- 150000008040 ionic compounds Chemical group 0.000 description 1
- 229910000311 lanthanide oxide Inorganic materials 0.000 description 1
- 229910052747 lanthanoid Inorganic materials 0.000 description 1
- 150000002602 lanthanoids Chemical class 0.000 description 1
- 230000005389 magnetism Effects 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000005272 metallurgy Methods 0.000 description 1
- 150000002739 metals Chemical class 0.000 description 1
- 239000010445 mica Substances 0.000 description 1
- 229910052618 mica group Inorganic materials 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 229910052590 monazite Inorganic materials 0.000 description 1
- 239000002245 particle Substances 0.000 description 1
- VSIIXMUUUJUKCM-UHFFFAOYSA-D pentacalcium;fluoride;triphosphate Chemical compound [F-].[Ca+2].[Ca+2].[Ca+2].[Ca+2].[Ca+2].[O-]P([O-])([O-])=O.[O-]P([O-])([O-])=O.[O-]P([O-])([O-])=O VSIIXMUUUJUKCM-UHFFFAOYSA-D 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 229910001404 rare earth metal oxide Inorganic materials 0.000 description 1
- 229910052706 scandium Inorganic materials 0.000 description 1
- SIXSYDAISGFNSX-UHFFFAOYSA-N scandium atom Chemical compound [Sc] SIXSYDAISGFNSX-UHFFFAOYSA-N 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 229940088594 vitamin Drugs 0.000 description 1
- 229930003231 vitamin Natural products 0.000 description 1
- 235000013343 vitamin Nutrition 0.000 description 1
- 239000011782 vitamin Substances 0.000 description 1
- 150000003722 vitamin derivatives Chemical class 0.000 description 1
- 238000009941 weaving Methods 0.000 description 1
- 229910052727 yttrium Inorganic materials 0.000 description 1
- VWQVUPCCIRVNHF-UHFFFAOYSA-N yttrium atom Chemical compound [Y] VWQVUPCCIRVNHF-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F7/00—Equipment for conveying or separating excavated material
- E02F7/02—Conveying equipment mounted on a dredger
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/18—Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/18—Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
- E02F3/181—Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels including a conveyor
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/18—Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
- E02F3/188—Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels with the axis being horizontal and transverse to the direction of travel
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F3/00—Dredgers; Soil-shifting machines
- E02F3/04—Dredgers; Soil-shifting machines mechanically-driven
- E02F3/18—Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
- E02F3/22—Component parts
- E02F3/24—Digging wheels; Digging elements of wheels; Drives for wheels
- E02F3/241—Digging wheels; Digging elements of wheels; Drives for wheels digging wheels
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02F—DREDGING; SOIL-SHIFTING
- E02F7/00—Equipment for conveying or separating excavated material
- E02F7/02—Conveying equipment mounted on a dredger
- E02F7/026—Conveying equipment mounted on a dredger mounted on machines equipped with dipper- or bucket-arms
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Soil Working Implements (AREA)
Abstract
The present invention relates to a kind of rare earth lease equipment, more particularly to a kind of quick collecting device in rare earth mining site land used face cubic metre of earth.The technical problem to be solved in the present invention is to provide a kind of quick collecting device in rare earth mining site land used face that scale removal process is time saving and energy saving, novel device cleaning is both economically and environmentally beneficial cubic metre of earth.In order to solve the above-mentioned technical problem, the invention provides the quick collecting device in such a rare earth mining site land used face cubic metre of earth, include installing plate, the first support base, first rotating shaft, the first runner, crawler belt bar, the first collecting box, the second support base, the first fixed plate, second rotating shaft etc.;The left and right sides is provided with to be connected with first rotating shaft, first rotating shaft on the downside of the first support base, the first support base by way of welding on the downside of installing plate is connected with the first runner, and crawler belt bar is connected between the first runner.Invention achieves the effect that scale removal process is time saving and energy saving, novel device cleaning is both economically and environmentally beneficial.
Description
Technical field
Set the present invention relates to a kind of rare earth lease equipment, more particularly to a kind of quick collect in rare earth mining site land used face cubic metre of earth
It is standby.
Background technology
Rare Earth Mine mainly exists in the earth's crust with mineral forms, and it mainly has three kinds:As the basic component of mineral,
Rare earth in mineral lattice, constitutes the essential composition of mineral with ionic compound form preservation.This kind of mineral are commonly referred to as
For rare-earth mineral, such as monazite, bastnaesite.As the impurity element of mineral, in the form of isomorphous replacement, it is scattered in
In rock-forming mineral and the mineral of rare metals, this kind of mineral can be described as the mineral containing rare earth element, and such as apatite, fluorite are in
Ionic condition is adsorbed between the surface of some mineral or particle.This kind of mineral are mainly various clay minerals, mica mineral.
The rare earth element of this kind of state is easy to extract.
Rare earth has the laudatory title of " industrial vitamin ".Nowadays extremely important strategic resource is turned into.Rare earth element is aoxidized
Thing refer to period of element atom ordinal number be 57 to 71 15 kinds of lanthanide oxides, and with lanthanide series chemical property
The oxide of similar scandium and yttrium totally 17 kinds of elements.Rare earth element is in oil, chemical industry, metallurgy, weaving, ceramics, glass, permanent magnetism material
The fields such as material, which are obtained for, to be widely applied, with the progress and the continuous breakthrough of application technology of science and technology, the valency of rare earth oxide
Value will be increasing.
At present when rare earth mining site carries out digging ore deposit, some earthwork can be all remained in mining site, and traditional large scale equipment pair
These earthwork are cleared up very uneconomical, and not environmentally friendly enough, and if not clearing up these earthwork, again can be to ring
Border is damaged.
Therefore the rare earth mining site use for researching and developing that a kind of scale removal process is time saving and energy saving, novel device cleaning is both economically and environmentally beneficial is needed badly
There is the time-consuming expense of scale removal process when the earthwork of rare earth mining site being carried out and cleared up at present to overcome in the quick collecting device in ground cubic metre of earth
Power, legacy equipment clear up uneconomical environmentally friendly shortcoming.
The content of the invention
(1)The technical problem to be solved
In order to exist when overcoming the current earthwork to rare earth mining site to carry out and clearing up, scale removal process is wasted time and energy the present invention, tradition is set
Standby to clear up uneconomical environmentally friendly shortcoming, the technical problem to be solved in the present invention is to provide scale removal process is time saving and energy saving, novel device
A kind of quick collecting device in cleaning both economically and environmentally beneficial rare earth mining site land used face cubic metre of earth.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides the quick collecting device in such a rare earth mining site land used face cubic metre of earth,
Include installing plate, the first support base, first rotating shaft, the first runner, crawler belt bar, the first collecting box, the second support base, first consolidate
It is fixed board, the second rotating shaft, the second runner, the first conveyer belt, the first motor, the 3rd runner, the first transmission article, supporting plate, first oblique
The left and right sides is provided with by way of welding on the downside of the first support base, the first support base on the downside of plate and the second swash plate, installing plate
It is connected with first rotating shaft, first rotating shaft and is connected with the first runner, is connected between the first runner right on the upside of crawler belt bar, installing plate
The mode that side is bolted is provided with middle part right side on the first collecting box, installing plate and second is provided with by way of welding
Support base, the second support base upper end is provided with the first fixed plate, the first fixed plate upper right side and lower left by way of welding
It is connected with the second rotating shaft, the second rotating shaft and is connected with the second runner, is connected between the second runner on the first conveyer belt, installing plate
Pass on left the of the first motor output shaft that bolted mode is provided with front side of the first motor, the first motor and lower left
It is connected with front side of two rotating shafts between the 3rd runner, the 3rd runner and is connected with the first transmission article, installing plate upper left side passes through welding
Mode is provided with supporting plate, and supporting plate is located at the first motor left, and it is oblique that supporting plate upper end is provided with first by way of welding
Plate, the first swash plate upper left side is provided with the second swash plate by way of welding.
Preferably, the first connecting plate, the first slide rail, the first sliding block, the first screw rod and the first nut, installing plate are also included
The left and right sides of both sides is provided with what is be bolted in the first connecting plate, the first connecting plate by way of welding behind front side
Mode is provided with the first slide rail, and the first slide rail inner sliding type is connected with the downside of the first sliding block, the first sliding block by way of welding
On the upside of the first support base, a word hole is provided with the left of the first connecting plate, the mode that the first sliding block passes on left welding is installed
There is the first screw rod, the first screw rod is reached by a word hole and the first nut, the first spiral shell are rotary with the first connecting plate left, the first screw rod
It is female to coordinate with the first screw rod.
Preferably, conveying arrangement is also included, conveying arrangement includes contiguous block, the second fixed plate, the 3rd fixed plate,
Three rotating shafts, the 4th runner, the 4th rotating shaft, the 5th runner, fixed pulley, the second conveyer belt, the second motor, the 6th runner and second pass
Right side company of being provided with by way of welding on conveying arrangement, the second swash plate is provided with above dynamic bar, the first swash plate and the second swash plate
Block is connect, contiguous block upper end is provided with the second fixed plate by way of welding, and the second fixed plate upper right side is by way of welding
3rd fixed plate is installed, the mode being bolted on the upside of the junction of the 3rd fixed plate and the second fixed plate is provided with fixed
Pulley, the second fixed plate lower left, which is connected with the 3rd rotating shaft, the 3rd rotating shaft, is connected with the 4th runner, the 3rd fixed plate lower right
It is connected with the 4th rotating shaft, the 4th rotating shaft and is connected with the 5th runner, the second transport is connected between the 4th runner and the 5th runner
It is connected on the upside of band, the second conveyer belt on the upside of fixed pulley, the mode being bolted on front side of the second fixed plate lower left is installed
Have on front side of the second motor output shaft and the 3rd rotating shaft on front side of the second motor, the second motor by being connected with the 6th runner, the 6th
The second transmission bar is connected between runner.
Preferably, also include and the first hook shovel is evenly equipped with the first hook shovel, the second conveyer belt.
Preferably, remaining earthwork collection device is also included, remaining earthwork collection device includes L-shaped and places plate, second
Collecting box, the second connecting plate, the 5th rotating shaft, rotating disk, second hook shovel, the 3rd motor, the 7th runner and the 3rd transmission article, installing plate
Right side is provided with right on the downside of remaining earthwork collection device, installing plate and L-shaped placement plate is provided with by way of welding, and L-shaped is placed
It is placed with plate on the right side of the second collecting box, installing plate and the second connecting plate is installed by way of welding, on the right side of the second connecting plate
It is connected with the 5th rotating shaft, the 5th rotating shaft and is connected with rotating disk, front on the left of the second hook shovel, the second connecting plate is evenly equipped with the outside of rotating disk
The mode being bolted, which is provided with front side of the 3rd motor output shaft on front side of the 3rd motor, the 3rd motor and the 5th rotating shaft, to be connected
It is connected between the 7th runner, the 7th runner and is connected with the 3rd transmission article.
Preferably, the 3rd connecting plate, the second slide rail, the second sliding block, arm-tie and the second screw rod are also included, installing plate is upper right
Side is provided with the mode being bolted in the 3rd connecting plate, the 3rd connecting plate by way of welding and is provided with the second cunning
Rail, the second slide rail inner sliding type is connected with the downside of the second sliding block, the second sliding block and is provided with by way of welding under arm-tie, arm-tie
End is provided with to be provided with screwed hole, screwed hole on the upside of the second connecting plate, the 3rd connecting plate by way of welding is placed with second
Screw rod, the second screw rod lower end is rotatably connected on the upside of the second sliding block.
Preferably, lowering or hoisting gear is also included, lowering or hoisting gear includes the 3rd slide rail, the 3rd sliding block, the 6th rotating shaft, coiling
In wheel, bracing wire, first gear, the 4th connecting plate, the 7th rotating shaft, second gear and crank, the 3rd fixed plate and the second fixed plate
Side is provided with the mode being bolted in lowering or hoisting gear, supporting plate and is provided with the 3rd slide rail, the connection of the 3rd slide rail inner sliding type
Have and be provided with front side of the 3rd sliding block, the 3rd sliding block by way of welding on the upside of the second fixed plate and the 3rd fixed plate, supporting plate
Front, which is connected with the 6th rotating shaft, the 6th rotating shaft, is connected with reel, is wound with bracing wire on the left of reel, and bracing wire lower end is connected to the
On the upside of three sliding blocks, the mode being bolted on front side of the 6th rotating shaft is provided with top on the right side of first gear, supporting plate and passes through weldering
The mode connect, which is provided with middle part on front side of the 4th connecting plate, the 4th connecting plate and is connected with front side of the 7th rotating shaft, the 7th rotating shaft, passes through spiral shell
Tether the mode connect and second gear is installed, second gear is engaged with first gear, rotary be connected with is shaken on front side of second gear
.
Preferably, also include and pacified on the upside of the second nut, the 3rd screw rod and rack, the 4th connecting plate by way of welding
Equipped with the second nut, the 3rd screw rod is rotary with the second nut, the 3rd screw rod and the second nut coordinate, and the 3rd screw rod lower end is rotary
Rack is connected with, rack is engaged with second gear.
Operation principle:When user needs the earthwork to rare earth mining site to be collected, user can open the first motor, the
One motor drives the 3rd runner of left side to turn clockwise, and the rotation of the runner of left side the 3rd drives the 3rd turn of right side by the first transmission article
Wheel turns clockwise, and the rotation of the runner of right side the 3rd drives the second rotating shaft of lower left to turn clockwise, the second rotating shaft of lower left
Rotation drives the second runner of lower left to turn clockwise, and the second runner rotation of lower left drives upper right side by the first transport
The second runner turn clockwise, so as to drive the first conveyer belt to turn clockwise, now user promotes installing plate to be moved to the left,
Installing plate drives the first runner of both sides to rotate and move by Athey wheel, when being moved to the position of the earthwork, and the second swash plate will
The earthwork sliding trackle higher than the second swash plate, so that the earthwork is fallen on the second swash plate and the first swash plate, the first swash plate is now fallen on
On the earthwork will be slipped to the first conveyer belt, transported by the first conveyer belt into the first collecting box.
Because also including before the first connecting plate, the first slide rail, the first sliding block, the first screw rod and the first nut, installing plate
The left and right sides of both sides is provided with the side being bolted in the first connecting plate, the first connecting plate by way of welding behind side
Formula is provided with the first slide rail, and the first slide rail inner sliding type is connected with the downside of the first sliding block, the first sliding block is pacified by way of welding
On the upside of the first support base, a word hole is provided with the left of the first connecting plate, the mode that the first sliding block passes on left welding is provided with
First screw rod, the first screw rod is reached by a word hole and the first nut, the first nut is rotary with the first connecting plate left, the first screw rod
Coordinate with the first screw rod, when user needs to carry out the collection of the earthwork to the mining site ground of different terrain, user will can install
Plate is lifted, and then moves up and down the first sliding block, and the first sliding block is moved up and down in the first slide rail, and the first sliding block drives first to support
Seat is moved up and down, so as to drive crawler belt bar to move up and down, when being moved on desired position, user rotates the first nut, the
One nut is rotated into the right by the cooperation with the first screw rod, and the first nut touches the first connecting plate, so that first be slided
It is no longer moved on this position that block is fixed in the first slide rail, then put down installing plate.
Because also including conveying arrangement, conveying arrangement includes contiguous block, the second fixed plate, the 3rd fixed plate, the 3rd
Rotating shaft, the 4th runner, the 4th rotating shaft, the 5th runner, fixed pulley, the second conveyer belt, the second motor, the 6th runner and the second transmission
Right side on conveying arrangement, the second swash plate is provided with above bar, the first swash plate and the second swash plate connection is installed by way of welding
Block, contiguous block upper end is provided with the second fixed plate by way of welding, and the second fixed plate upper right side is pacified by way of welding
Equipped with the 3rd fixed plate, the mode being bolted on the upside of the junction of the 3rd fixed plate and the second fixed plate, which is provided with, determines cunning
Wheel, the second fixed plate lower left, which is connected with the 3rd rotating shaft, the 3rd rotating shaft, is connected with the 4th runner, and the 3rd fixed plate lower right connects
It is connected in the 4th rotating shaft, the 4th rotating shaft and is connected with the 5th runner, the second conveyer belt is connected between the 4th runner and the 5th runner,
It is connected on the upside of second conveyer belt on the upside of fixed pulley, the mode being bolted on front side of the second fixed plate lower left is provided with the
By being connected with the 6th runner, the 6th runner on front side of the second motor output shaft and the 3rd rotating shaft on front side of two motors, the second motor
Between be connected with the second transmission bar, when user needs the earthwork on transport ground quickly and efficiently, user can open the
Two motors, the second motor drives the 6th runner in upper right side to turn clockwise, and the 6th runner in upper right side, which turns clockwise, to be passed through
Second transmission article drives the 6th runner of lower left to turn clockwise, and the 6th runner rotation of lower left drives the 3rd rotating shaft up time
Pin rotates, and the 3rd rotating shaft turns clockwise, and the 3rd rotating shaft rotation drives the 4th runner to turn clockwise, and the rotation of the 4th runner passes through
Second conveyer belt bypasses fixed pulley and drives the 5th runner to be turned clockwise in the 4th rotating shaft, so as to drive the second conveyer belt
Turn clockwise, directly can just be transported when then the earthwork of the user on to ground is collected transport by the second conveyer belt
It is defeated on the first conveyer belt.
Because also including and the first hook shovel being evenly equipped with the first hook shovel, the second conveyer belt, first hooks shovel can be by ground
The earthwork is further to carry out more complete collect.
Because also including remaining earthwork collection device, remaining earthwork collection device includes L-shaped and places plate, the second collection
Case, the second connecting plate, the 5th rotating shaft, rotating disk, second are hooked on the right side of shovel, the 3rd motor, the 7th runner and the 3rd transmission article, installing plate
Provided with remaining earthwork collection device, right is provided with L-shaped by way of welding and places plate on the downside of installing plate, and L-shaped is placed on plate
It is placed with the right side of the second collecting box, installing plate and the second connecting plate is installed by way of welding, is connected on the right side of the second connecting plate
Have and rotating disk is connected with the 5th rotating shaft, the 5th rotating shaft, front on the left of the second hook shovel, the second connecting plate is evenly equipped with the outside of rotating disk and is passed through
Bolted mode is provided with front side of the 3rd motor output shaft on front side of the 3rd motor, the 3rd motor and the 5th rotating shaft and is connected with
The 3rd transmission article is connected between 7th runner, the 7th runner, when user needs to receive the remaining earthwork on the right side of installing plate
When collection, user can open the 3rd motor, and the 3rd motor drives the 7th runner rotate counterclockwise of left side, the runner of left side the 7th
Rotation drives the 7th runner rotate counterclockwise of right side by the 3rd transmission article, and the rotation of the runner of right side the 7th drove for the 5th rotating shaft inverse time
Pin rotates, and the 5th rotating shaft rotate counterclockwise drives rotating disk rotate counterclockwise, and turntable rotation drives second to hook shovel rotate counterclockwise, from
And the earthwork on the right side of installing plate is collected, it will be transported to above the second connecting plate then as the second rotation for hooking shovel,
Then the earthwork second hooked in shovel will be dropped the next second dorsal part for hooking shovel, and continuing rotary turnplate will make to hook second
The earthwork of back-off side is low to be slipped in the second collecting box.
Because also including right side on the 3rd connecting plate, the second slide rail, the second sliding block, arm-tie and the second screw rod, installing plate
The mode being bolted in 3rd connecting plate, the 3rd connecting plate is installed by way of welding the second slide rail is installed,
Second slide rail inner sliding type is connected with the downside of the second sliding block, the second sliding block and arm-tie, arm-tie lower end is provided with by way of welding
It is provided with to be provided with screwed hole, screwed hole on the upside of the second connecting plate, the 3rd connecting plate by way of welding and is placed with the second spiral shell
Bar, the second screw rod lower end is rotatably connected on the upside of the second sliding block, and the earthwork on the right side of installing plate is carried out when user needs to change
During the height of collection, user can pass through precession above and below the cooperation with screwed hole, with the screw rod of forward or reverse second, the second screw rod
Two screw rods will drive the second sliding block to be moved up and down in the second slide rail, and the second sliding block, which is moved up and down, will drive arm-tie to move up and down,
So as to drive the second connecting plate to move up and down, so as to drive rotating disk and the second hook shovel to move up and down.
Because also including lowering or hoisting gear, lowering or hoisting gear include the 3rd slide rail, the 3rd sliding block, the 6th rotating shaft, reel,
Set above bracing wire, first gear, the 4th connecting plate, the 7th rotating shaft, second gear and crank, the 3rd fixed plate and the second fixed plate
There is the mode being bolted in lowering or hoisting gear, supporting plate that the 3rd slide rail is installed, the 3rd slide rail inner sliding type is connected with
Front on the upside of second fixed plate and the 3rd fixed plate, supporting plate is installed on front side of three sliding blocks, the 3rd sliding block by way of welding
It is connected with the 6th rotating shaft, the 6th rotating shaft and is connected with reel, is wound with bracing wire on the left of reel, bracing wire lower end is connected to the 3rd cunning
On the upside of block, the mode being bolted on front side of the 6th rotating shaft is provided with top on the right side of first gear, supporting plate and passes through welding
Mode is provided with middle part on front side of the 4th connecting plate, the 4th connecting plate and is connected with front side of the 7th rotating shaft, the 7th rotating shaft to be connected by bolt
The mode connect is provided with second gear, and second gear is engaged with first gear, and rotatably crank is connected with front side of second gear, when
When user needs to change the height being collected to the earthwork on the left of installing plate, that is to say, that when needing the ore deposit to different terrain
During the height that the earthwork of Ground is collected, user can turn clockwise crank, and crank rotation drives second gear up time
Pin rotates, and second gear, which turns clockwise, will drive the first gear rotate counterclockwise being engaged with, and first gear rotation drives
6th rotating shaft rotate counterclockwise, the 6th rotating shaft rotation drives reel rotate counterclockwise, and reel rotate counterclockwise will be released and drawn
Line, so that the 3rd sliding block is moved down in the 3rd slide rail, so that drive the second fixed plate and the 3rd fixed plate to move down,
So as to driving the second conveyer belt to move down, if desired move up the second conveyer belt, then rotate counterclockwise crank just can be with
.
Because also including the second nut, the 3rd screw rod and rack, installed on the upside of the 4th connecting plate by way of welding
Have and the 3rd screw rod is rotary with the second nut, the second nut, the 3rd screw rod and the second nut coordinate, and the 3rd screw rod lower end rotatably connects
Rack is connected to, rack is engaged with second gear, when the shipping height of the second conveyer belt needed for user chooses, user can be with
The 3rd screw rod is rotated, the 3rd screw rod is moved down, made by the downward precession of cooperation with the second nut, the 3rd screw rod band carry-over bar
Rack is engaged with second gear, second gear is no longer rotated, and is no longer moved so as to fix the second conveyer belt.
(3)Beneficial effect
Invention achieves the effect that scale removal process is time saving and energy saving, novel device cleaning is both economically and environmentally beneficial, by using second
Conveyer belt is collected and transported to the earthwork on the left of installing plate hooks shovel to the surplus earth progress on the right side of installing plate plus second
The mode collected and transported, is not only able to more thoroughly be collected the earthwork on mining site, moreover it is possible to received to saving large scale equipment
The economy and the energy wasted during the collection earthwork.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention.
Fig. 2 is the main structure diagram of the first connecting plate of the invention.
Fig. 3 is the main structure diagram of conveying arrangement of the present invention.
Fig. 4 hooks the main structure diagram of shovel for the present invention second.
Fig. 5 is the first main structure diagram of the remaining earthwork collection device of the present invention.
Fig. 6 is second of main structure diagram of the remaining earthwork collection device of the present invention.
Fig. 7 is the first main structure diagram of lowering or hoisting gear of the present invention.
Fig. 8 is second of main structure diagram of lowering or hoisting gear of the present invention.
Mark in accompanying drawing for:1- installing plates, the support bases of 2- first, 3- first rotating shafts, the runners of 4- first, 5- crawler belt bars,
The collecting boxs of 6- first, the support bases of 7- second, the fixed plates of 8- first, the rotating shafts of 9- second, the runners of 10- second, the conveyer belts of 101- first,
The motors of 11- first, the runners of 12- the 3rd, the transmission bars of 13- first, 14- supporting plates, the swash plates of 15- first, the swash plates of 16- second, 21- the
One connecting plate, the slide rails of 22- first, the sliding blocks of 23- first, the word holes of 24- mono-, the screw rods of 25- first, the nuts of 26- first, 17- transport dresses
Put, 171- contiguous blocks, the fixed plates of 172- second, the fixed plates of 173- the 3rd, the rotating shafts of 1731- the 3rd, the runners of 174- the 4th, 175-
Four rotating shafts, the runners of 176- the 5th, 177- fixed pulleys, the conveyer belts of 178- second, the motors of 179- second, the runners of 1710- the 6th,
1711- second is driven bar, and 1781- first hooks shovel, and 18- remnants earthwork collection devices, 181-L shapes place plate, and 182- second is collected
Case, the connecting plates of 183- second, the rotating shafts of 184- the 5th, 185- rotating disks, 186- second hooks shovel, the motors of 187- the 3rd, the 7th turn of 188-
Wheel, the transmissions article of 189- the 3rd, the connecting plates of 1831- the 3rd, the slide rails of 1832- second, the sliding blocks of 1833- second, 1834- arm-ties, 1835-
Screwed hole, the screw rods of 1836- second, 19- lowering or hoisting gears, the slide rails of 191- the 3rd, the sliding blocks of 192- the 3rd, the rotating shafts of 193- the 6th, 194-
Reel, 195- bracing wires, 196- first gears, the connecting plates of 197- the 4th, the rotating shafts of 198- the 7th, 199- second gears, 1910- shakes
The nuts of 1991- second, the screw rods of 1992- the 3rd, 1993- racks.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of quick collecting device in rare earth mining site land used face cubic metre of earth, as shown in figures 1-8, include installing plate 1, the first support base 2,
First rotating shaft 3, the first runner 4, crawler belt article 5, the first collecting box 6, the second support base 7, the first fixed plate 8, the second rotating shaft 9,
Two runners 10, the first conveyer belt 101, the first motor 11, the 3rd runner 12, first transmission article 13, supporting plate 14, the first swash plate 15
With the second swash plate 16, the downside left and right sides of installing plate 1 is provided with by way of welding under the first support base 2, the first support base 2
Side, which is connected with first rotating shaft 3, first rotating shaft 3, is connected with the first runner 4, and crawler belt bar 5 is connected between the first runner 4, installs
The mode that the upside right of plate 1 is bolted is provided with the side that middle part right side passes through welding on the first collecting box 6, installing plate 1
Formula is provided with the second support base 7, and the upper end of the second support base 7 is provided with the first fixed plate 8, the first fixed plate by way of welding
8 upper right side and lower left, which are connected with the second rotating shaft 9, the second rotating shaft 9, is connected with the second runner 10, is connected between the second runner 10
There is the first conveyer belt 101, the mode that the upper left side of installing plate 1 is bolted is provided with before the first motor 11, the first motor 11
The output shaft of the first motor 11 of side and the front side of the second rotating shaft 9 of lower left are connected between the 3rd runner 12, the 3rd runner 12 and connected
The first transmission bar 13 is connected to, the upper left side of installing plate 1 is provided with supporting plate 14 by way of welding, and supporting plate 14 is located at the first electricity
The left of machine 11, the upper end of supporting plate 14 is provided with the first swash plate 15 by way of welding, and the upper left side of the first swash plate 15 passes through welding
Mode the second swash plate 16 is installed.
Embodiment 2
A kind of quick collecting device in rare earth mining site land used face cubic metre of earth, as shown in figures 1-8, include installing plate 1, the first support base 2,
First rotating shaft 3, the first runner 4, crawler belt article 5, the first collecting box 6, the second support base 7, the first fixed plate 8, the second rotating shaft 9,
Two runners 10, the first conveyer belt 101, the first motor 11, the 3rd runner 12, first transmission article 13, supporting plate 14, the first swash plate 15
With the second swash plate 16, the downside left and right sides of installing plate 1 is provided with by way of welding under the first support base 2, the first support base 2
Side, which is connected with first rotating shaft 3, first rotating shaft 3, is connected with the first runner 4, and crawler belt bar 5 is connected between the first runner 4, installs
The mode that the upside right of plate 1 is bolted is provided with the side that middle part right side passes through welding on the first collecting box 6, installing plate 1
Formula is provided with the second support base 7, and the upper end of the second support base 7 is provided with the first fixed plate 8, the first fixed plate by way of welding
8 upper right side and lower left, which are connected with the second rotating shaft 9, the second rotating shaft 9, is connected with the second runner 10, is connected between the second runner 10
There is the first conveyer belt 101, the mode that the upper left side of installing plate 1 is bolted is provided with before the first motor 11, the first motor 11
The output shaft of the first motor 11 of side and the front side of the second rotating shaft 9 of lower left are connected between the 3rd runner 12, the 3rd runner 12 and connected
The first transmission bar 13 is connected to, the upper left side of installing plate 1 is provided with supporting plate 14 by way of welding, and supporting plate 14 is located at the first electricity
The left of machine 11, the upper end of supporting plate 14 is provided with the first swash plate 15 by way of welding, and the upper left side of the first swash plate 15 passes through welding
Mode the second swash plate 16 is installed.
Also include the first connecting plate 21, the first slide rail 22, the first sliding block 23, the first screw rod 25 and the first nut 26, pacify
The left and right sides of both sides, which is provided with by way of welding in the first connecting plate 21, the first connecting plate 21, behind the front side of dress plate 1 passes through
Bolted mode is provided with the first slide rail 22, and the inner sliding type of the first slide rail 22 is connected with the first sliding block 23, the first sliding block 23
Downside is arranged on the upside of the first support base 2 by way of welding, and the left side of the first connecting plate 21 is provided with a word hole 24, the first sliding block
23 modes for passing on left welding are provided with the first screw rod 25, and it is left that the first screw rod 25 reaches the first connecting plate 21 by a word hole 24
The first nut 26 is rotary with side, the first screw rod 25, the first nut 26 coordinates with the first screw rod 25.
Embodiment 3
A kind of quick collecting device in rare earth mining site land used face cubic metre of earth, as shown in figures 1-8, include installing plate 1, the first support base 2,
First rotating shaft 3, the first runner 4, crawler belt article 5, the first collecting box 6, the second support base 7, the first fixed plate 8, the second rotating shaft 9,
Two runners 10, the first conveyer belt 101, the first motor 11, the 3rd runner 12, first transmission article 13, supporting plate 14, the first swash plate 15
With the second swash plate 16, the downside left and right sides of installing plate 1 is provided with by way of welding under the first support base 2, the first support base 2
Side, which is connected with first rotating shaft 3, first rotating shaft 3, is connected with the first runner 4, and crawler belt bar 5 is connected between the first runner 4, installs
The mode that the upside right of plate 1 is bolted is provided with the side that middle part right side passes through welding on the first collecting box 6, installing plate 1
Formula is provided with the second support base 7, and the upper end of the second support base 7 is provided with the first fixed plate 8, the first fixed plate by way of welding
8 upper right side and lower left, which are connected with the second rotating shaft 9, the second rotating shaft 9, is connected with the second runner 10, is connected between the second runner 10
There is the first conveyer belt 101, the mode that the upper left side of installing plate 1 is bolted is provided with before the first motor 11, the first motor 11
The output shaft of the first motor 11 of side and the front side of the second rotating shaft 9 of lower left are connected between the 3rd runner 12, the 3rd runner 12 and connected
The first transmission bar 13 is connected to, the upper left side of installing plate 1 is provided with supporting plate 14 by way of welding, and supporting plate 14 is located at the first electricity
The left of machine 11, the upper end of supporting plate 14 is provided with the first swash plate 15 by way of welding, and the upper left side of the first swash plate 15 passes through welding
Mode the second swash plate 16 is installed.
Also include the first connecting plate 21, the first slide rail 22, the first sliding block 23, the first screw rod 25 and the first nut 26, pacify
The left and right sides of both sides, which is provided with by way of welding in the first connecting plate 21, the first connecting plate 21, behind the front side of dress plate 1 passes through
Bolted mode is provided with the first slide rail 22, and the inner sliding type of the first slide rail 22 is connected with the first sliding block 23, the first sliding block 23
Downside is arranged on the upside of the first support base 2 by way of welding, and the left side of the first connecting plate 21 is provided with a word hole 24, the first sliding block
23 modes for passing on left welding are provided with the first screw rod 25, and it is left that the first screw rod 25 reaches the first connecting plate 21 by a word hole 24
The first nut 26 is rotary with side, the first screw rod 25, the first nut 26 coordinates with the first screw rod 25.
Also include conveying arrangement 17, conveying arrangement 17 includes contiguous block 171, the second fixed plate 172, the 3rd fixed plate
173rd, the 3rd rotating shaft 1731, the 4th runner 174, the 4th rotating shaft 175, the 5th runner 176, fixed pulley 177, the second conveyer belt 178,
Second motor 179, the 6th runner 1710 and the second transmission article 1711, the first swash plate 15 and the top of the second swash plate 16 are provided with transport dress
Put right side on 17, the second swash plate 16 and contiguous block 171, the side that the upper end of contiguous block 171 passes through welding are installed by way of welding
Formula is provided with the second fixed plate 172, and the upper right side of the second fixed plate 172 is provided with the 3rd fixed plate 173 by way of welding, the
The mode being bolted on the upside of the junction of three fixed plates 173 and the second fixed plate 172 is provided with fixed pulley 177, second
The lower left of fixed plate 172, which is connected with the 3rd rotating shaft 1731, the 3rd rotating shaft 1731, is connected with the 4th runner 174, the 3rd fixed plate
173 lower rights, which are connected with the 4th rotating shaft 175, the 4th rotating shaft 175, is connected with the 5th runner 176, the 4th runner 174 and the 5th turn
The second conveyer belt 178 is connected between wheel 176, the upside of the second conveyer belt 178 is connected to the upside of fixed pulley 177, the second fixed plate
The mode being bolted on front side of 172 lower lefts is provided with the second motor 179, the second motor 179 of the front side of the second motor 179
Output shaft and the front side of the 3rd rotating shaft 1731 are connected with the second transmission by being connected between the 6th runner 1710, the 6th runner 1710
Bar 1711.
Embodiment 4
A kind of quick collecting device in rare earth mining site land used face cubic metre of earth, as shown in figures 1-8, include installing plate 1, the first support base 2,
First rotating shaft 3, the first runner 4, crawler belt article 5, the first collecting box 6, the second support base 7, the first fixed plate 8, the second rotating shaft 9,
Two runners 10, the first conveyer belt 101, the first motor 11, the 3rd runner 12, first transmission article 13, supporting plate 14, the first swash plate 15
With the second swash plate 16, the downside left and right sides of installing plate 1 is provided with by way of welding under the first support base 2, the first support base 2
Side, which is connected with first rotating shaft 3, first rotating shaft 3, is connected with the first runner 4, and crawler belt bar 5 is connected between the first runner 4, installs
The mode that the upside right of plate 1 is bolted is provided with the side that middle part right side passes through welding on the first collecting box 6, installing plate 1
Formula is provided with the second support base 7, and the upper end of the second support base 7 is provided with the first fixed plate 8, the first fixed plate by way of welding
8 upper right side and lower left, which are connected with the second rotating shaft 9, the second rotating shaft 9, is connected with the second runner 10, is connected between the second runner 10
There is the first conveyer belt 101, the mode that the upper left side of installing plate 1 is bolted is provided with before the first motor 11, the first motor 11
The output shaft of the first motor 11 of side and the front side of the second rotating shaft 9 of lower left are connected between the 3rd runner 12, the 3rd runner 12 and connected
The first transmission bar 13 is connected to, the upper left side of installing plate 1 is provided with supporting plate 14 by way of welding, and supporting plate 14 is located at the first electricity
The left of machine 11, the upper end of supporting plate 14 is provided with the first swash plate 15 by way of welding, and the upper left side of the first swash plate 15 passes through welding
Mode the second swash plate 16 is installed.
Also include the first connecting plate 21, the first slide rail 22, the first sliding block 23, the first screw rod 25 and the first nut 26, pacify
The left and right sides of both sides, which is provided with by way of welding in the first connecting plate 21, the first connecting plate 21, behind the front side of dress plate 1 passes through
Bolted mode is provided with the first slide rail 22, and the inner sliding type of the first slide rail 22 is connected with the first sliding block 23, the first sliding block 23
Downside is arranged on the upside of the first support base 2 by way of welding, and the left side of the first connecting plate 21 is provided with a word hole 24, the first sliding block
23 modes for passing on left welding are provided with the first screw rod 25, and it is left that the first screw rod 25 reaches the first connecting plate 21 by a word hole 24
The first nut 26 is rotary with side, the first screw rod 25, the first nut 26 coordinates with the first screw rod 25.
Also include conveying arrangement 17, conveying arrangement 17 includes contiguous block 171, the second fixed plate 172, the 3rd fixed plate
173rd, the 3rd rotating shaft 1731, the 4th runner 174, the 4th rotating shaft 175, the 5th runner 176, fixed pulley 177, the second conveyer belt 178,
Second motor 179, the 6th runner 1710 and the second transmission article 1711, the first swash plate 15 and the top of the second swash plate 16 are provided with transport dress
Put right side on 17, the second swash plate 16 and contiguous block 171, the side that the upper end of contiguous block 171 passes through welding are installed by way of welding
Formula is provided with the second fixed plate 172, and the upper right side of the second fixed plate 172 is provided with the 3rd fixed plate 173 by way of welding, the
The mode being bolted on the upside of the junction of three fixed plates 173 and the second fixed plate 172 is provided with fixed pulley 177, second
The lower left of fixed plate 172, which is connected with the 3rd rotating shaft 1731, the 3rd rotating shaft 1731, is connected with the 4th runner 174, the 3rd fixed plate
173 lower rights, which are connected with the 4th rotating shaft 175, the 4th rotating shaft 175, is connected with the 5th runner 176, the 4th runner 174 and the 5th turn
The second conveyer belt 178 is connected between wheel 176, the upside of the second conveyer belt 178 is connected to the upside of fixed pulley 177, the second fixed plate
The mode being bolted on front side of 172 lower lefts is provided with the second motor 179, the second motor 179 of the front side of the second motor 179
Output shaft and the front side of the 3rd rotating shaft 1731 are connected with the second transmission by being connected between the 6th runner 1710, the 6th runner 1710
Bar 1711.
Also include and the first hook shovel 1781 is evenly equipped with the first hook shovel 1781, the second conveyer belt 178.
Also include remaining earthwork collection device 18, remaining earthwork collection device 18 includes L-shaped and places plate 181, second
Collecting box 182, the second connecting plate 183, the 5th rotating shaft 184, rotating disk 185, second hook the 186, the 3rd motor 187 of shovel, the 7th runner
188 and the 3rd transmission articles 189, the right side of installing plate 1 is provided with remaining earthwork collection device 18, and the downside right of installing plate 1 passes through welding
Mode L-shaped be installed place plate 181, L-shaped is placed and is placed with the second collecting box 182 on plate 181, and the right side of installing plate 1 passes through weldering
The mode connect is provided with the second connecting plate 183, and the right side of the second connecting plate 183 is connected with the 5th rotating shaft 184, the 5th rotating shaft 184
Rotating disk 185 is connected with, the outside of rotating disk 185 is evenly equipped with the second hook shovel 186, and the left side of the second connecting plate 183 front is bolted
Mode the 3rd motor 187 is installed, the output shaft of the 3rd motor 187 of the front side of the 3rd motor 187 and the front side of the 5th rotating shaft 184 connect
It is connected between the 7th runner 188, the 7th runner 188 and is connected with the 3rd transmission article 189.
Also include the 3rd connecting plate 1831, the second slide rail 1832, the second sliding block 1833, the screw rod of arm-tie 1834 and second
1836, right side, which is provided with by way of welding in the 3rd connecting plate 1831, the 3rd connecting plate 1831, on installing plate 1 passes through bolt
The mode of connection is provided with the second slide rail 1832, and the inner sliding type of the second slide rail 1832 is connected with the second sliding block 1833, the second sliding block
1833 downsides are provided with arm-tie 1834 by way of welding, and the lower end of arm-tie 1834 is provided with the second connection by way of welding
Plate 183, the upside of the 3rd connecting plate 1831, which is provided with screwed hole 1835, screwed hole 1835, is placed with the second screw rod 1836, the second spiral shell
The lower end of bar 1836 is rotatably connected to the upside of the second sliding block 1833.
Also include lowering or hoisting gear 19, lowering or hoisting gear 19 includes the 3rd slide rail 191, the 3rd sliding block 192, the 6th rotating shaft
193rd, reel 194, bracing wire 195, first gear 196, the 4th connecting plate 197, the 7th rotating shaft 198, second gear 199 and crank
1910, the 3rd fixed plate 173 and the top of the second fixed plate 172 are provided with what is be bolted in lowering or hoisting gear 19, supporting plate 14
Mode is provided with the 3rd slide rail 191, and the inner sliding type of the 3rd slide rail 191 is connected with the 3rd sliding block 192, and the front side of the 3rd sliding block 192 is logical
The mode for crossing welding is provided with the second fixed plate 172 and the 3rd fixed plate 173, and the upside of supporting plate 14 front is connected with the 6th rotating shaft
193, it is connected with reel 194 in the 6th rotating shaft 193, the left side of reel 194 is wound with bracing wire 195, the lower end of bracing wire 195 is connected to the
The upside of three sliding block 192, the mode that the front side of the 6th rotating shaft 193 is bolted is provided with first gear 196, the right side of supporting plate 14
Top is provided with the 4th connecting plate 197 by way of welding, and the front side of the 4th connecting plate 197 middle part is connected with the 7th rotating shaft 198,
The mode that the front side of 7th rotating shaft 198 is bolted is provided with second gear 199, and second gear 199 is nibbled with first gear 196
Close, the front side of second gear 199 is rotatably connected with crank 1910.
Also include the second nut 1991, the 3rd screw rod 1992 and rack 1993, the upside of the 4th connecting plate 197 passes through welding
Mode be provided with the second nut 1991, the second nut 1991 and be rotary with the 3rd screw rod 1992, the 3rd screw rod 1992 and the second spiral shell
Mother 1991 coordinates, and the lower end of the 3rd screw rod 1992 is rotatably connected with rack 1993, and rack 1993 is engaged with second gear 199.
Operation principle:When user needs the earthwork to rare earth mining site to be collected, user can open the first motor 11,
First motor 11 drives the 3rd runner 12 of left side to turn clockwise, and the rotation of the runner 12 of left side the 3rd is driven by the first transmission article 13
The runner 12 of right side the 3rd turns clockwise, and the rotation of the runner 12 of right side the 3rd drives the second rotating shaft 9 of lower left to turn clockwise, left
The second rotating shaft 9 rotation of lower section drives the second runner 10 of lower left to turn clockwise, and the second runner 10 rotation of lower left is logical
Cross the first conveyer belt 101 and move second runner 10 in upper right side and turn clockwise, so as to drive the dextrorotation of the first conveyer belt 101
Turn, now user promotes installing plate 1 to be moved to the left, installing plate 1 drives the first runner 4 of both sides to rotate and move by Athey wheel
Dynamic, when being moved to the position of the earthwork, the second swash plate 16 is by the earthwork sliding trackle higher than the second swash plate 16, so that the earthwork is fallen on
On second swash plate 16 and the first swash plate 15, the earthwork now fallen on the first swash plate 15 will be slipped to the first conveyer belt 101, pass through
First conveyer belt 101 is transported into the first collecting box 6.
Because also including the first connecting plate 21, the first slide rail 22, the first sliding block 23, the first screw rod 25 and the first nut
26, the left and right sides of both sides is provided with by way of welding in the first connecting plate 21, the first connecting plate 21 behind the front side of installing plate 1
The mode being bolted is provided with the first slide rail 22, and the inner sliding type of the first slide rail 22 is connected with the first sliding block 23, and first slides
The downside of block 23 is arranged on the upside of the first support base 2 by way of welding, and the left side of the first connecting plate 21 is provided with a word hole 24, first
The mode that sliding block 23 passes on left welding is provided with the first screw rod 25, and the first screw rod 25 reaches the first connecting plate by a word hole 24
The first nut 26 is rotary with 21 lefts, the first screw rod 25, the first nut 26 coordinates with the first screw rod 25, when user is needed to difference
When the mining site ground of landform carries out the collection of the earthwork, user can lift installing plate 1, then move up and down the first sliding block 23,
First sliding block 23 is moved up and down in the first slide rail 22, and the first sliding block 23 drives the first support base 2 to move up and down, so as to drive shoe
Tape 5 is moved up and down, when being moved on desired position, and user rotates the first nut 26, and the first nut 26 is by with first
The cooperation of screw rod 25 is rotated into the right, and the first nut 26 touches the first connecting plate 21, so that the first sliding block 23 be fixed on
It is no longer moved on this position in first slide rail 22, then put down installing plate 1.
Because also including conveying arrangement 17, conveying arrangement 17 includes contiguous block 171, the second fixed plate the 172, the 3rd and consolidated
Fixed board 173, the 3rd rotating shaft 1731, the 4th runner 174, the 4th rotating shaft 175, the 5th runner 176, fixed pulley 177, the second conveyer belt
178th, the second motor 179, the 6th runner 1710 and the second transmission article 1711, the first swash plate 15 and the top of the second swash plate 16 are provided with fortune
Right side is provided with contiguous block 171 by way of welding on defeated device 17, the second swash plate 16, and the upper end of contiguous block 171 passes through welding
Mode the second fixed plate 172 is installed, the upper right side of the second fixed plate 172 is provided with the 3rd fixed plate by way of welding
173, the mode being bolted on the upside of the junction of the 3rd fixed plate 173 and the second fixed plate 172 is provided with fixed pulley
177, the lower left of the second fixed plate 172 is connected with the 3rd rotating shaft 1731, the 3rd rotating shaft 1731 and is connected with the 4th runner 174, the
The lower right of three fixed plate 173, which is connected with the 4th rotating shaft 175, the 4th rotating shaft 175, is connected with the 5th runner 176, the 4th runner 174
And the 5th be connected with the second conveyer belt 178 between runner 176, the upside of the second conveyer belt 178 is connected to the upside of fixed pulley 177, the
The mode being bolted on front side of the lower left of two fixed plate 172 is provided with the second motor 179, and the of the front side of the second motor 179
The output shaft of two motor 179 and the front side of the 3rd rotating shaft 1731 are connected by being connected between the 6th runner 1710, the 6th runner 1710
There is the second transmission bar 1711, when user needs the earthwork on transport ground quickly and efficiently, user can open the second electricity
Machine 179, the second motor 179 drives the 6th runner 1710 in upper right side to turn clockwise, the up time of the 6th runner 1710 in upper right side
Pin rotation is turned clockwise by the 6th runner 1710 of the drive lower left of the second transmission article 1711, the 6th runner of lower left
1710 rotations drive the 3rd rotating shaft 1731 to turn clockwise, and the 3rd rotating shaft 1731 turns clockwise, the rotating band of the 3rd rotating shaft 1731
Dynamic 4th runner 174 turns clockwise, and the rotation of the 4th runner 174 bypasses the drive of fixed pulley 177 by the second conveyer belt 178
5th runner 176 turns clockwise in the 4th rotating shaft 175, so as to drive the second conveyer belt 178 to turn clockwise, then user
The earthwork on to ground just can be transported directly to the first conveyer belt when being collected transport by the second conveyer belt 178
On 101.
The first hook shovel 1781 is evenly equipped with the first hook shovel 1781, the second conveyer belt 178 because also including, first hooks shovel
1781 can further carry out the earthwork on ground more complete collect.
Because also including remaining earthwork collection device 18, remaining earthwork collection device 18 include L-shaped place plate 181,
Second collecting box 182, the second connecting plate 183, the 5th rotating shaft 184, rotating disk 185, second hook the 186, the 3rd motor the 187, the 7th of shovel
The transmission article of runner 188 and the 3rd 189, the right side of installing plate 1 is provided with remaining earthwork collection device 18, and the downside right of installing plate 1 passes through
The mode of welding is provided with L-shaped and places plate 181, and L-shaped is placed and the second collecting box 182 is placed with plate 181, and the right side of installing plate 1 is logical
The mode for crossing welding is provided with the second connecting plate 183, and the right side of the second connecting plate 183 is connected with the 5th rotating shaft 184, the 5th rotating shaft
Rotating disk 185 is connected with 184, the outside of rotating disk 185 is evenly equipped with the second hook shovel 186, and the left side of the second connecting plate 183 front passes through bolt
The mode of connection is provided with before the 3rd motor 187, the output shaft of the 3rd motor 187 of the front side of the 3rd motor 187 and the 5th rotating shaft 184
Side, which is connected between the 7th runner 188, the 7th runner 188, is connected with the 3rd transmission article 189, when user is needed to the right side of installing plate 1
When the remaining earthwork of side is collected, user can open the 3rd motor 187, and the 3rd motor 187 drives the 7th turn of left side
188 rotate counterclockwises are taken turns, the rotation of the runner 188 of left side the 7th drives the 7th runner 188 of right side counterclockwise by the 3rd transmission article 189
Rotation, the runner 188 of right side the 7th rotation drives the rotate counterclockwise of the 5th rotating shaft 184, and the rotate counterclockwise of the 5th rotating shaft 184, which drives, to be turned
The rotate counterclockwise of disk 185, the rotation of rotating disk 185 drives second to hook 186 rotate counterclockwises of shovel, so that the earthwork to the right side of installing plate 1
It is collected, the top of the second connecting plate 183 will be transported to then as the second rotation for hooking shovel 186, then hooks and shovel by second
The earthwork in 186 will be dropped the next second dorsal part for hooking shovel 186, and continuing rotary turnplate 185 will make to hook shovel 186 second
The earthwork of dorsal part is low to be slipped in the second collecting box 182.
Because also including the 3rd connecting plate 1831, the second slide rail 1832, the second sliding block 1833, the spiral shell of arm-tie 1834 and second
Right side, which is provided with by way of welding in the 3rd connecting plate 1831, the 3rd connecting plate 1831, on bar 1836, installing plate 1 passes through spiral shell
Tether the mode connect and the second slide rail 1832 is installed, the inner sliding type of the second slide rail 1832 is connected with the second sliding block 1833, and second slides
The downside of block 1833 is provided with arm-tie 1834 by way of welding, and the lower end of arm-tie 1834 is provided with the second company by way of welding
Fishplate bar 183, the upside of the 3rd connecting plate 1831, which is provided with screwed hole 1835, screwed hole 1835, is placed with the second screw rod 1836, and second
The lower end of screw rod 1836 is rotatably connected to the upside of the second sliding block 1833, and the earthwork on the right side of installing plate 1 is entered when user needs to change
During the height that row is collected, user can with the second screw rod of forward or reverse 1836, the second screw rod 1836 by with screwed hole 1835
Precession above and below cooperation, the second screw rod 1836 will drive the second sliding block 1833 to be moved up and down in the second slide rail 1832, the second sliding block
1833 move up and down by drive arm-tie 1834 move up and down, so as to drive the second connecting plate 183 to move up and down, so as to drive rotating disk
185 and second hook shovel and 186 move up and down.
Because also including lowering or hoisting gear 19, lowering or hoisting gear 19 include the 3rd slide rail 191, the 3rd sliding block 192, the 6th turn
Axle 193, reel 194, bracing wire 195, first gear 196, the 4th connecting plate 197, the 7th rotating shaft 198, second gear 199 and shake
1910, the 3rd fixed plates 173 and the top of the second fixed plate 172 are provided with lowering or hoisting gear 19, supporting plate 14 and are bolted
Mode the 3rd slide rail 191 is installed, the inner sliding type of the 3rd slide rail 191 is connected with the 3rd sliding block 192, the front side of the 3rd sliding block 192
Second fixed plate 172 and the 3rd fixed plate 173 are installed by way of welding, the upside of supporting plate 14 front is connected with the 6th turn
Reel 194 is connected with axle 193, the 6th rotating shaft 193, the left side of reel 194 is wound with bracing wire 195, and the lower end of bracing wire 195 is connected to
The upside of 3rd sliding block 192, the mode that the front side of the 6th rotating shaft 193 is bolted is provided with first gear 196, and supporting plate 14 is right
4th connecting plate 197 is installed by way of welding, the front side of the 4th connecting plate 197 middle part is connected with the 7th rotating shaft above side
198, the mode that the front side of the 7th rotating shaft 198 is bolted is provided with second gear 199, second gear 199 and first gear
196 engagements, the front side of second gear 199 is rotatably connected with crank 1910, when user needs to change the earthwork to the left side of installing plate 1
During the height being collected, that is to say, that when needing height that the earthwork to the mining site ground of different terrain is collected, use
Family can turn clockwise crank 1910, and the rotation of crank 1910 drives second gear 199 to turn clockwise, and second gear 199 is suitable
Hour hands rotation will drive the rotate counterclockwise of first gear 196 being engaged with, and the rotation of first gear 196 drives the 6th rotating shaft 193
Rotate counterclockwise, the 6th rotating shaft 193 rotation drives the rotate counterclockwise of reel 194, and the rotate counterclockwise of reel 194 will be released and drawn
Line 195, so that the 3rd sliding block 192 is moved down in the 3rd slide rail 191, so as to drive the second fixed plate 172 and the 3rd solid
Fixed board 173 is moved down, so as to drive the second conveyer belt 178 to move down, if desired moves up the second conveyer belt 178,
Then rotate counterclockwise crank 1910 just can be with.
Because also including the second nut 1991, the 3rd screw rod 1992 and rack 1993, the upside of the 4th connecting plate 197 passes through
The mode of welding, which is provided with the second nut 1991, the second nut 1991, is rotary with the 3rd screw rod 1992, the 3rd screw rod 1992 and
Two nuts 1991 coordinate, and the lower end of the 3rd screw rod 1992 is rotatably connected with rack 1993, and rack 1993 is nibbled with second gear 199
Close, when the shipping height of the second conveyer belt 178 needed for user chooses, user can rotate the 3rd screw rod 1992, the 3rd
Screw rod 1992 is moved down with carry-over bar 1993, made by the downward precession of cooperation with the second nut 1991, the 3rd screw rod 1992
Rack 1993 is engaged with second gear 199, second gear 199 is no longer rotated, so as to fix the second conveyer belt 178 not
Move again.
Embodiment described above only expresses the preferred embodiment of the present invention, and it describes more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of quick collecting device in rare earth mining site land used face cubic metre of earth, it is characterised in that include installing plate(1), first support
Seat(2), first rotating shaft(3), the first runner(4), crawler belt bar(5), the first collecting box(6), the second support base(7), first fix
Plate(8), the second rotating shaft(9), the second runner(10), the first conveyer belt(101), the first motor(11), the 3rd runner(12), first
It is driven bar(13), supporting plate(14), the first swash plate(15)With the second swash plate(16), installing plate(1)The downside left and right sides passes through weldering
The mode connect is provided with the first support base(2), the first support base(2)Downside is connected with first rotating shaft(3), first rotating shaft(3)On
It is connected with the first runner(4), the first runner(4)Between be connected with crawler belt bar(5), installing plate(1)Upside right is connected by bolt
The mode connect is provided with the first collecting box(6), installing plate(1)The second support base is installed by way of welding on the right side of upper middle part
(7), the second support base(7)Upper end is provided with the first fixed plate by way of welding(8), the first fixed plate(8)Upper right side and
Lower left is connected with the second rotating shaft(9), the second rotating shaft(9)On be connected with the second runner(10), the second runner(10)Between connect
There is the first conveyer belt(101), installing plate(1)The mode that upper left side is bolted is provided with the first motor(11), the first electricity
Machine(11)First motor of front side(11)Output shaft and the second rotating shaft of lower left(9)Front side is connected with the 3rd runner(12), the
Three runners(12)Between be connected with the first transmission bar(13), installing plate(1)Upper left side is provided with supporting plate by way of welding
(14), supporting plate(14)Positioned at the first motor(11)Left, supporting plate(14)It is oblique that upper end is provided with first by way of welding
Plate(15), the first swash plate(15)Upper left side is provided with the second swash plate by way of welding(16).
2. the quick collecting device in a kind of rare earth mining site land used face cubic metre of earth according to claim 1, it is characterised in that also include
There is the first connecting plate(21), the first slide rail(22), the first sliding block(23), the first screw rod(25)With the first nut(26), installing plate
(1)The left and right sides of both sides is provided with the first connecting plate by way of welding behind front side(21), the first connecting plate(21)It is interior logical
Cross bolted mode and the first slide rail is installed(22), the first slide rail(22)Inner sliding type is connected with the first sliding block(23), the
One sliding block(23)Downside is arranged on the first support base by way of welding(2)Upside, the first connecting plate(21)Left side is provided with one
Word hole(24), the first sliding block(23)The mode for passing on left welding is provided with the first screw rod(25), the first screw rod(25)Pass through one
Word hole(24)Reach the first connecting plate(21)Left, the first screw rod(25)On be rotary with the first nut(26), the first nut(26)With
First screw rod(25)Coordinate.
3. the quick collecting device in a kind of rare earth mining site land used face cubic metre of earth according to claim 2, it is characterised in that also include
There is conveying arrangement(17), conveying arrangement(17)Include contiguous block(171), the second fixed plate(172), the 3rd fixed plate(173)、
3rd rotating shaft(1731), the 4th runner(174), the 4th rotating shaft(175), the 5th runner(176), fixed pulley(177), second transport
Band(178), the second motor(179), the 6th runner(1710)With the second transmission bar(1711), the first swash plate(15)With the second swash plate
(16)Top is provided with conveying arrangement(17), the second swash plate(16)Upper right side is provided with contiguous block by way of welding(171), even
Connect block(171)Upper end is provided with the second fixed plate by way of welding(172), the second fixed plate(172)Upper right side passes through weldering
The mode connect is provided with the 3rd fixed plate(173), the 3rd fixed plate(173)With the second fixed plate(172)Junction on the upside of it is logical
Cross bolted mode and fixed pulley is installed(177), the second fixed plate(172)Lower left is connected with the 3rd rotating shaft(1731),
3rd rotating shaft(1731)On be connected with the 4th runner(174), the 3rd fixed plate(173)Lower right is connected with the 4th rotating shaft(175),
4th rotating shaft(175)On be connected with the 5th runner(176), the 4th runner(174)With the 5th runner(176)Between be connected with second
Conveyer belt(178), the second conveyer belt(178)Upside is connected to fixed pulley(177)Upside, the second fixed plate(172)Before lower left
The mode that side is bolted is provided with the second motor(179), the second motor(179)Second motor of front side(179)Output
Axle and the 3rd rotating shaft(1731)Front side is by being connected with the 6th runner(1710), the 6th runner(1710)Between be connected with the second biography
Dynamic bar(1711).
4. the quick collecting device in a kind of rare earth mining site land used face cubic metre of earth according to claim 3, it is characterised in that also include
There is the first hook shovel(1781), the second conveyer belt(178)On be evenly equipped with the first hook shovel(1781).
5. the quick collecting device in a kind of rare earth mining site land used face cubic metre of earth according to claim 4, it is characterised in that also include
There is remaining earthwork collection device(18), remaining earthwork collection device(18)Include L-shaped and place plate(181), the second collecting box
(182), the second connecting plate(183), the 5th rotating shaft(184), rotating disk(185), second hook shovel(186), the 3rd motor(187),
Seven runners(188)With the 3rd transmission article(189), installing plate(1)Right side is provided with remaining earthwork collection device(18), installing plate(1)
Downside right is provided with L-shaped by way of welding and places plate(181), L-shaped placement plate(181)On be placed with the second collecting box
(182), installing plate(1)Right side is provided with the second connecting plate by way of welding(183), the second connecting plate(183)Right side connects
It is connected to the 5th rotating shaft(184), the 5th rotating shaft(184)On be connected with rotating disk(185), rotating disk(185)Outside is evenly equipped with the second hook shovel
(186), the second connecting plate(183)The mode being bolted in front of left side is provided with the 3rd motor(187), the 3rd motor
(187)3rd motor of front side(187)Output shaft and the 5th rotating shaft(184)Front side is connected with the 7th runner(188), the 7th runner
(188)Between be connected with the 3rd transmission article(189).
6. the quick collecting device in a kind of rare earth mining site land used face cubic metre of earth according to claim 5, it is characterised in that also include
There is the 3rd connecting plate(1831), the second slide rail(1832), the second sliding block(1833), arm-tie(1834)With the second screw rod(1836),
Installing plate(1)Upper right side is provided with the 3rd connecting plate by way of welding(1831), the 3rd connecting plate(1831)It is interior to pass through spiral shell
Tether the mode connect and the second slide rail is installed(1832), the second slide rail(1832)Inner sliding type is connected with the second sliding block(1833),
Second sliding block(1833)Downside is provided with arm-tie by way of welding(1834), arm-tie(1834)Lower end is by way of welding
Second connecting plate is installed(183), the 3rd connecting plate(1831)Upside is provided with screwed hole(1835), screwed hole(1835)It is interior to place
There is the second screw rod(1836), the second screw rod(1836)Lower end is rotatably connected to the second sliding block(1833)Upside.
7. the quick collecting device in a kind of rare earth mining site land used face cubic metre of earth according to claim 6, it is characterised in that also include
There is lowering or hoisting gear(19), lowering or hoisting gear(19)Include the 3rd slide rail(191), the 3rd sliding block(192), the 6th rotating shaft(193), around
Line wheel(194), bracing wire(195), first gear(196), the 4th connecting plate(197), the 7th rotating shaft(198), second gear(199)
And crank(1910), the 3rd fixed plate(173)With the second fixed plate(172)Top is provided with lowering or hoisting gear(19), supporting plate(14)
The mode being inside bolted is provided with the 3rd slide rail(191), the 3rd slide rail(191)Inner sliding type is connected with the 3rd sliding block
(192), the 3rd sliding block(192)Front side is provided with the second fixed plate by way of welding(172)With the 3rd fixed plate(173),
Supporting plate(14)The 6th rotating shaft is connected with front of upside(193), the 6th rotating shaft(193)On be connected with reel(194), reel
(194)Left side is wound with bracing wire(195), bracing wire(195)Lower end is connected to the 3rd sliding block(192)Upside, the 6th rotating shaft(193)Front side
The mode being bolted is provided with first gear(196), supporting plate(14)It is provided with above right side by way of welding
4th connecting plate(197), the 4th connecting plate(197)The 7th rotating shaft is connected with the middle part of front side(198), the 7th rotating shaft(198)Front side
The mode being bolted is provided with second gear(199), second gear(199)With first gear(196)Engagement, the second tooth
Wheel(199)Front side is rotatably connected with crank(1910).
8. the quick collecting device in a kind of rare earth mining site land used face cubic metre of earth according to claim 7, it is characterised in that also include
There is the second nut(1991), the 3rd screw rod(1992)And rack(1993), the 4th connecting plate(197)Upside is by way of welding
Second nut is installed(1991), the second nut(1991)Inside it is rotary with the 3rd screw rod(1992), the 3rd screw rod(1992)With second
Nut(1991)Coordinate, the 3rd screw rod(1992)Lower end is rotatably connected with rack(1993), rack(1993)With second gear
(199)Engagement.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710229845.1A CN107100223A (en) | 2017-04-10 | 2017-04-10 | A kind of quick collecting device in rare earth mining site land used face cubic metre of earth |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710229845.1A CN107100223A (en) | 2017-04-10 | 2017-04-10 | A kind of quick collecting device in rare earth mining site land used face cubic metre of earth |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107100223A true CN107100223A (en) | 2017-08-29 |
Family
ID=59674855
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710229845.1A Pending CN107100223A (en) | 2017-04-10 | 2017-04-10 | A kind of quick collecting device in rare earth mining site land used face cubic metre of earth |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107100223A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108729449A (en) * | 2018-05-22 | 2018-11-02 | 四川城凯特建设工程有限公司 | A kind of construction method and deep basal pit soil transport device of deep basal pit |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000356100A (en) * | 1999-06-16 | 2000-12-26 | Kumagai Gumi Co Ltd | Self-traveling muck loading device |
| JP2001221597A (en) * | 2000-02-10 | 2001-08-17 | Murata Mfg Co Ltd | Method and machine for disposing of mine |
| CN2488958Y (en) * | 2001-03-11 | 2002-05-01 | 李成祥 | Pick-spade impact ice-snow remover |
| CN102337894A (en) * | 2011-11-01 | 2012-02-01 | 中联重科物料输送设备有限公司 | Ore loading machine |
| CN106245697A (en) * | 2016-08-08 | 2016-12-21 | 中国华冶科工集团有限公司 | Groove descaling machine |
| CN205894140U (en) * | 2016-07-29 | 2017-01-18 | 北京昊华能源股份有限公司 | Colliery material loading forklift |
-
2017
- 2017-04-10 CN CN201710229845.1A patent/CN107100223A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000356100A (en) * | 1999-06-16 | 2000-12-26 | Kumagai Gumi Co Ltd | Self-traveling muck loading device |
| JP2001221597A (en) * | 2000-02-10 | 2001-08-17 | Murata Mfg Co Ltd | Method and machine for disposing of mine |
| CN2488958Y (en) * | 2001-03-11 | 2002-05-01 | 李成祥 | Pick-spade impact ice-snow remover |
| CN102337894A (en) * | 2011-11-01 | 2012-02-01 | 中联重科物料输送设备有限公司 | Ore loading machine |
| CN205894140U (en) * | 2016-07-29 | 2017-01-18 | 北京昊华能源股份有限公司 | Colliery material loading forklift |
| CN106245697A (en) * | 2016-08-08 | 2016-12-21 | 中国华冶科工集团有限公司 | Groove descaling machine |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108729449A (en) * | 2018-05-22 | 2018-11-02 | 四川城凯特建设工程有限公司 | A kind of construction method and deep basal pit soil transport device of deep basal pit |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106925420B (en) | The concentration equipment of impurity in a kind of rare-earth separating permanent-magnet material | |
| CN107051632B (en) | A kind of rare earth processing quickly smashes equipment with building stones | |
| CN106944209B (en) | A kind of rare earth processing rare earth ore disintegrating apparatus | |
| CN102797272B (en) | Automatic moving universal adjustable type placer exploiting selecting and loading device | |
| CN109894258A (en) | A kind of magnetic iron ore pretreatment unit | |
| HRP20171561T1 (en) | Push and turn dryer | |
| CN107100223A (en) | A kind of quick collecting device in rare earth mining site land used face cubic metre of earth | |
| CN106988371B (en) | A kind of rare earth mining site land used face cubic metre of earth collecting device | |
| CN217450463U (en) | Integrated crushing system for backfilling soil | |
| CN114832930B (en) | An integrated crushing system for backfill soil | |
| CN107187898A (en) | A kind of efficient discharging collecting device of mining electric locomotive wagon box | |
| CN202718149U (en) | Automatic moving multidirectional adjustable type placer deposit mining, selecting and loading device | |
| CN218282634U (en) | Circulating grit aggregate is with multistage screening plant | |
| CN207169998U (en) | A kind of polycrystalline cast ingot seed crystal deironing apparatus | |
| CN205851071U (en) | A kind of breaker for rare earth processing | |
| CN117123310A (en) | Ore dressing device and ore dressing method | |
| CN209393344U (en) | A sand and stone magnetic separation sub-mesh device | |
| CN206240171U (en) | A kind of waste water filtering system | |
| CN106861859A (en) | A kind of coal ore crushing and screening device | |
| CN108726099B (en) | A high-efficiency conveying mechanism for fireproof coating | |
| CN207592402U (en) | A kind of feeding device of steel ball cleaning equipment | |
| CN207025780U (en) | A kind of mining industry high-efficiency coal separator | |
| CN2609877Y (en) | Sand material loading and unload conveyer | |
| CN215844180U (en) | Broken stone filter screen for mine mining | |
| CN207618659U (en) | A kind of electromagnetism production sand device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20181113 Address after: 100038 Beijing Haidian District Beihoneycomb No.8 Zhongya Building, Block C, Room 106 Applicant after: Xie Congzhong Address before: 330038 Red Valley Road 1568, Red Valley, Nanchang, Jiangxi, China. The Red Valley triumph commercial office complex and commercial six 301-15 room (third floors) Applicant before: Nanchang first leaf Technology Co., Ltd. |
|
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170829 |