CN108722012A - 一种集成式冷冻过滤机组的工艺 - Google Patents

一种集成式冷冻过滤机组的工艺 Download PDF

Info

Publication number
CN108722012A
CN108722012A CN201810779523.9A CN201810779523A CN108722012A CN 108722012 A CN108722012 A CN 108722012A CN 201810779523 A CN201810779523 A CN 201810779523A CN 108722012 A CN108722012 A CN 108722012A
Authority
CN
China
Prior art keywords
valves
systems
filters
pumps
later
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810779523.9A
Other languages
English (en)
Inventor
高云芝
刘叶青
薛玉翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810779523.9A priority Critical patent/CN108722012A/zh
Publication of CN108722012A publication Critical patent/CN108722012A/zh
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D37/00Processes of filtration
    • B01D37/02Precoating the filter medium; Addition of filter aids to the liquid being filtered
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D35/00Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
    • B01D35/18Heating or cooling the filters
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D36/00Filter circuits or combinations of filters with other separating devices

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Separation Using Semi-Permeable Membranes (AREA)

Abstract

本发明是提供一种集成冷冻过滤机组的工艺,包括两组以上的冷冻过滤机组进行组合,通过变通阀门和管路来快速实现所述两组以上的冷冻过滤机组中的同型设备元件的通用性能。本发明结构科学合理,简单实用高效,功能多。

Description

一种集成式冷冻过滤机组的工艺
技术领域
本发明涉及一种多组过滤机组的多功能使用工艺,具体涉及一种集成式冷冻过滤机组的工艺。
背景技术
目前,在医药、化工、轻工、饮品等行业液体过滤中,市场上有很多的过滤机组都是单一用途,不能多用途,优质资源造成浪费,市场上的冷冻过滤机组功能就是单一功能冷冻与过滤连体实现被滤液体在低温下完成过滤,由于冷冻过滤机组设备是多元件组合,不是易损件的设备元件卖家与买家通常不备用,在生产过程中出现设备单一元件故障就会造成整套机组停机,必须等到故障排除后才能生产,有的设备元件需要维修或更换,但维修或采购周期都要1周~3个月,这样就耽误生产了,如提高效率发挥更多功能有待改进。
发明内容
为了解决上述问题,本发明的目的是提供操作简单、易用的一种集成式冷冻过滤机组的工艺,结构科学合理,简单实用高效,功能多、能耗低,实现了同型设备元件的通用性能。
所述一种集成式冷冻过滤机组的工艺,包括两组以上的冷冻过滤机组进行组合,通过变通阀门和管路来快速实现所述两组以上的冷冻过滤机组中的同型设备元件的通用性能。
附图说明
图1是本发明方法一的结构示意图;
图2是本发明方法二的结构示意图;
图3是本发明方法三的结构示意图。
具体实施方式
现结合附图和上述发明内容对本发明作进一步的详细说明。
方法一,参照图1,本发明的工艺提供一种集成式冷冻过滤机组,该机组提高了工作效率、降低生产成本,实现了冷冻过滤机组的双用,且部分同型元件可以替用,实现1+1大于2的价值。
所述一种集成式冷冻过滤机组,包括:Z8制冷系统、Z8Z制冷系统、A冷却水循环系统、AA冷却水循环系统、B冷却水循环系统、BB冷却水循环系统、C冷却水循环系统、CC冷却水循环系统、A冷媒循环系统、AA冷媒循环系统、B冷媒循环系统、BB冷媒循环系统、C冷媒循环系统、CC冷媒循环系统、D冷媒循环系统、DD冷媒循环系统、A冷进液系统、AA冷进液系统、B冷进液系统、BB冷进液系统、C冷进液系统、CC冷进液系统、A滤挂土系统、AA滤挂土系统、B滤挂土系统、BB滤挂土系统、C滤挂土系统、CC滤挂土系统、A大循环降温系统、AA大循环降温系统、B大循环降温系统、BB大循环降温系统、C大循环降温系统、CC大循环降温系统、A冷冻过滤系统、AA冷冻过滤系统、B冷冻过滤系统、BB冷冻过滤系统、C冷冻过滤系统、CC冷冻过滤系统、D常进液系统、DD常进液系统、E常进液系统、EE常进液系统、F常进液系统、FF常进液系统、G常进液系统、GG常进液系统、D常温过滤系统、DD常温过滤系统、E常温过滤系统、EE常温过滤系统、F常温过滤系统、FF常温过滤系统、G常温过滤系统、GG常温过滤系统、A添加系统、AA添加系统、B添加系统、BB添加系统、A正循环系统、A反循环系统、B正循环系统、B反循环系统、AA正循环系统、AA反循环系统、BB正循环系统、BB反循环系统、A固液分离系统、AA固液分离系统、B固液分离系统、BB固液分离系统、C固液分离系统、CC固液分离系统、D固液分离系统、DD固液分离系统、A冷液体抽出系统、AA冷液体抽出系统、B冷液体抽出系统、BB冷液体抽出系统、C冷液体抽出系统、CC冷液体抽出系统、D常液体抽出系统、DD常液体抽出系统、E常液体抽出系统、EE常液体抽出系统、F常液体抽出系统、FF常液体抽出系统、G常液体抽出系统、GG常液体抽出系统。
所述A冷却水循环系统包括:B2阀、B4阀、Z12冷却塔、B1阀、G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成A冷却水循环回路;
所述AA冷却水循环系统包括:B2B阀、B4B阀、Z12Z冷却塔、B1B阀、G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成AA冷却水循环回路;
所述B冷却水循环系统包括:B6阀、B3阀、Z11交换器、E6阀、所述B4阀、所述Z12冷却塔、所述B1阀、所述G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成B冷却水循环回路;
所述BB冷却水循环系统包括:B6B阀、B3B阀、Z11Z交换器、E6E阀、所述B4B阀、所述Z12Z冷却塔、所述B1B阀、所述G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成BB冷却水循环回路;
所述C冷却水循环系统包括:所述B6阀、B7阀、所述B3B阀、所述Z11Z交换器、所述E6E阀、B5阀、所述B4阀、所述Z12冷却塔、所述B1阀、所述G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成C冷却水循环回路;
所述CC冷却水循环系统包括:所述B6B阀、所述B7阀、所述B3阀、所述Z11交换器、所述E6阀、所述B5阀、所述B4B阀、所述Z12Z冷却塔、所述B1B阀、所述G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成CC冷却水循环回路;
所述A冷媒循环系统包括:A1阀、Z9冷媒罐、A2阀、G7冷媒泵、A3阀、Z3交换器、A4阀、A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成A冷媒循环回路;
所述AA冷媒循环系统包括:A1A阀、Z9Z冷媒罐、A2A阀、G7G冷媒泵、A3A阀、Z3Z交换器、A4A阀、A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成AA冷媒循环回路;
所述B冷媒循环系统包括:所述A1阀、所述Z9冷媒罐、所述A2阀、所述G7冷媒泵、A5阀、Z10交换器、A6阀、所述A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成B冷媒循环回路;
所述BB冷媒循环系统包括:所述A1A阀、所述Z9Z冷媒罐、所述A2A阀、所述G7G冷媒泵、A8阀、所述A5阀、所述Z10交换器、所述A6阀、B8阀、所述A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成BB冷媒循环回路;
所述C冷媒循环系统包括:所述A1阀、所述Z9冷媒罐、所述A2阀、所述G7冷媒泵、所述A8阀、所述A3A阀、所述Z3Z交换器、所述A4A阀、所述B8阀、所述A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成C冷媒循环回路;
所述CC冷媒循环系统包括:所述A1A阀、所述Z9Z冷媒罐、所述A2A阀、所述G7G冷媒泵、所述A8阀、所述A3阀、所述Z3交换器、所述A4阀、所述B8阀、所述A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成CC冷媒循环回路;
所述D冷媒循环系统包括:所述A1阀、所述Z9冷媒罐、所述A2阀、所述G7冷媒泵、所述A8阀、A5A阀、Z10Z交换器、所述A6A阀、所述B8阀、所述A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成D冷媒循环回路;
所述DD冷媒循环系统包括:所述A1A阀、所述Z9Z冷媒罐、所述A2A阀、所述G7G冷媒泵、所述A5A阀、所述Z10Z交换器、所述A6A阀、所述A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成DD冷媒循环回路;
所述A冷进液系统包括:Z1护滤器、C1阀、G1泵、Z2交换器、所述Z3交换器、C2阀、A9阀、G2泵、Z4过滤机、C3阀、E5阀、Z5搅拌罐、C4阀、G3泵、Z6过滤机通过管道连接形成A冷进液回路;
所述AA冷进液系统包括:Z1Z护滤器、C1C阀、G1G泵、Z2Z交换器、所述Z3Z交换器、C2C阀、A9A阀、G2G泵、Z4Z过滤机、C3C阀、E5E阀、Z5Z搅拌罐、C4C阀、G3G泵、Z6Z过滤机通过管道连接形成AA冷进液回路;
所述B冷进液系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐通过管道连接形成B冷进液回路;
所述BB冷进液系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成BB冷进液回路;
所述C冷进液系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、D2阀、M7阀、所述G3泵、所述Z6过滤机、D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成C冷进液回路;
所述CC冷进液系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、D2D阀、M7M阀、所述G3G泵、所述Z6Z过滤机、D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成CC冷进液回路;
所述A滤挂土系统包括:C8阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z4过滤机预涂助滤剂循环回路;
所述AA滤挂土系统包括:C8C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z4Z过滤机预涂助滤剂循环回路;
所述B滤挂土系统包括:D8阀、所述G3泵、所述Z6过滤机、所述D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z6过滤机预涂助滤剂循环回路;
所述BB滤挂土系统包括:D8D阀、所述G3G泵、所述Z6Z过滤机、所述D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z6Z过滤机预涂助滤剂循环回路;
所述C滤挂土系统包括:C7阀、G4泵、Z7过滤机、E4阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z7过滤机预涂助滤剂循环回路;
所述CC滤挂土系统包括:C7C阀、G4G泵、Z7Z过滤机、E4E阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z7Z过滤机预涂助滤剂循环回路;
所述A大循环降温系统包括:E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、C5阀、所述Z2交换器通过管道连接形成A大循环降温回路;
所述AA大循环降温系统包括:E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、C5C阀、所述Z2Z交换器通过管道连接形成AA大循环降温回路;
所述B大循环降温系统包括:所述E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、F1阀、所述Z2交换器通过管道连接形成B大循环降温回路;
所述BB大循环降温系统包括:所述E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、F1F阀、所述Z2Z交换器通过管道连接形成BB大循环降温回路;
所述C大循环降温系统包括:所述E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述D2阀、所述M7阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器通过管道连接形成C大循环降温回路;
所述CC大循环降温系统包括:所述E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述D2D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器通过管道连接形成CC大循环降温回路;
所述A冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器、所述G4泵、所述Z7过滤机、C6阀通过管道连接形成A冷冻过滤回路;
所述AA冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、C6C阀通过管道连接形成AA冷冻过滤回路;
所述B冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述F1阀、所述Z2交换器、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成B冷冻过滤回路;
所述BB冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述F1F阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成BB冷冻过滤回路;
所述C冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述D2阀、所述M7阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成C冷冻过滤回路;
所述CC冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述D2D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成CC冷冻过滤回路;
所述D常进液系统包括:所述Z1护滤器、D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐、所述C4阀、所述G3泵、所述Z6过滤机通过管道连接形成D常进液回路;
所述DD常进液系统包括:所述Z1Z护滤器、D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐、所述C4C阀、所述G3G泵、所述Z6Z过滤机通过管道连接形成DD常进液回路;
所述E常进液系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐过管道连接形成E常进液回路;
所述EE常进液系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐过管道连接形成EE常进液回路;
所述F常进液系统包括:所述Z1护滤器、所述D1阀、所述M7阀、所述G3泵、所述Z6过滤机、所述D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成F常进液回路;
所述FF常进液系统包括:所述Z1Z护滤器、所述D1D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成FF常进液回路;
所述G常进液系统包括:所述Z1护滤器、所述D1阀、F2阀、所述G4泵、所述Z7过滤机、所述E4阀、所述E5阀、所述Z5搅拌罐通过管道连接形成G常进液回路;
所述GG常进液系统包括:所述Z1Z护滤器、所述D1D阀、F2F阀、所述G4G泵、所述Z7Z过滤机、所述E4E阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成GG常进液回路;
所述D常温过滤系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、D4阀通过管道连接形成D常温过滤回路;
所述DD常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、D4D阀通过管道连接形成DD常温过滤回路;
所述E常温过滤系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、D3阀通过管道连接形成E常温过滤回路;
所述EE常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、D3D阀通过管道连接形成EE常温过滤回路;
所述F常温过滤系统包括:所述Z1护滤器、所述D1阀、所述M7阀、所述G3泵、所述Z6过滤机、所述D4阀通过管道连接形成F常温过滤回路;
所述FF常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述D4D阀通过管道连接形成FF常温过滤回路;
所述G常温过滤系统包括:所述Z1护滤器、所述D1阀、所述F2阀、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成G常温过滤回路;
所述GG常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述F2F阀、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成GG常温过滤回路;
所述A添加系统包括:所述Z5搅拌罐、G5添加泵、D6阀、所述Z4过滤机通过管道连接形成A添加回路;
所述AA添加系统包括:所述Z5Z搅拌罐、G5G添加泵、D6D阀、所述Z4Z过滤机通过管道连接形成AA添加回路;
所述B添加系统包括:所述Z5搅拌罐、所述G5添加泵、D7阀、所述Z6过滤机通过管道连接形成B添加回路;
所述BB添加系统包括:所述Z5Z搅拌罐、所述G5G添加泵、D7D阀、所述Z6Z过滤机通过管道连接形成BB添加回路;
所述A正循环系统包括:所述A9阀、所述G2泵、所述Z4过滤机、M1阀、M3阀、所述F2阀、Z13过滤机、E3阀、F6阀、F7阀、所述D2阀通过管道连接形成A正循环回路;
所述AA正循环系统包括:所述A9A阀、所述G2G泵、所述Z4Z过滤机、M1M阀、M3M阀、所述F2F阀、Z13Z过滤机、E3E阀、F6F阀、F7F阀、所述D2D阀通过管道连接形成AA正循环回路;
所述A反循环系统包括:所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述F2阀、所述Z13过滤机、F5阀、所述F6阀、所述F7阀、所述D2阀通过管道连接形成A反循环回路;
所述AA反循环系统包括:所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述F2阀、所述Z13过滤机、所述F5阀、所述F6阀、所述F7阀、所述D2阀通过管道连接形成AA反循环回路;
所述B正循环系统包括:所述M7阀、所述G3泵、所述Z6过滤机、M2阀、所述M3阀、所述F2阀、所述Z13过滤机、所述E3阀、所述F6阀、所述F7阀通过管道连接形成B正循环回路;
所述BB正循环系统包括:所述M7阀、所述G3泵、所述Z6过滤机、所述M2阀、所述M3阀、所述F2阀、所述Z13过滤机、所述E3阀、所述F6阀、所述F7阀通过管道连接形成BB正循环回路;
所述B反循环系统包括:所述M7阀、所述G3泵、所述Z6过滤机、所述D5阀、所述F2阀、所述Z13过滤机、所述F5阀、所述F6阀、所述F7阀通过管道连接形成B反循环回路;
所述BB反循环系统包括:所述M7阀、所述G3泵、所述Z6过滤机、所述D5阀、所述F2阀、所述Z13过滤机、所述F5阀、所述F6阀、所述F7阀通过管道连接形成BB反循环回路;
所述A固液分离系统包括:所述M1阀、K6阀、G11泵、Z14离心机、G12泵、M6阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机通过管道连接形成A固液分离循环回路;
所述AA固液分离系统包括:所述M1M阀、K6K阀、G11G泵、Z14Z离心机、G12G泵、M6M阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机通过管道连接形成AA固液分离循环回路;
所述B固液分离系统包括:所述M2阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M6阀、所述M7阀、所述G3泵、所述Z6过滤机通过管道连接形成B固液分离循环回路;
所述BB固液分离系统包括:M2M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M6M阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机通过管道连接形成BB固液分离循环回路;
所述C固液分离系统包括:F3阀、所述E4阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M6阀、所述F2阀、所述G4泵、所述Z7过滤机通过管道连接形成C固液分离循环回路;
所述CC固液分离系统包括:F3F阀、所述E4E阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M6M阀、所述F2F阀、所述G4G泵、所述Z7Z过滤机通过管道连接形成CC固液分离循环回路;
所述D固液分离系统包括:所述F5阀、所述E4阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、K7阀、所述M6阀、E2阀、所述Z13过滤机通过管道连接形成D固液分离循环回路;
所述DD固液分离系统包括:F5F阀、所述E4E阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、K7K阀、所述M6M阀、E2E阀、所述Z13Z过滤机通过管道连接形成DD固液分离循环回路;
所述A冷液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述D5阀、所述Z6过滤机、所述M2阀、所述C4阀、所述M7阀、所述D2阀、所述C2阀、所述A9阀、所述Z3交换器、所述Z2交换器、所述F2阀、所述E1阀、所述D1阀、所述C1阀、所述Z7过滤机、所述F3阀、F4阀、所述E4阀、所述F1阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成A冷液体抽出回路;
所述AA冷液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述D5D阀、所述Z6Z过滤机、所述M2M阀、所述C4C阀、所述M7M阀、所述D2D阀、所述C2C阀、所述A9A阀、所述Z3Z交换器、所述Z2Z交换器、所述F2F阀、所述E1E阀、所述D1D阀、所述C1C阀、所述Z7Z过滤机、所述F3F阀、F4F阀、所述E4E阀、所述F1F阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成AA冷液体抽出回路;
所述B冷液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述C4阀、所述M7阀、所述D2阀、所述C2阀、所述A9阀、所述Z3交换器、所述Z2交换器、所述F2阀、所述E1阀、所述D1阀、所述C1阀、所述F3阀、所述F4阀、所述E4阀、所述F1阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成B冷液体抽出回路;
所述BB冷液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述C4C阀、所述M7M阀、所述D2D阀、所述C2C阀、所述A9A阀、所述Z3Z交换器、所述Z2Z交换器、所述F2F阀、所述E1E阀、所述D1D阀、所述C1C阀、所述F3F阀、所述F4F阀、所述E4E阀、所述F1F阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成BB冷液体抽出回路;
所述C冷液体抽出系统包括:所述D5阀、所述Z6过滤机、所述M2阀、所述C4阀、所述M7阀、所述D2阀、所述C2阀、所述Z3交换器、所述Z2交换器、所述F2阀、所述E1阀、所述D1阀、所述C1阀、所述Z7过滤机、所述F3阀、所述F4阀、所述E4阀、所述F1阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、M5阀通过管道连接形成C冷液体抽出回路;
所述CC冷液体抽出系统包括:所述D5D阀、所述Z6Z过滤机、所述M2M阀、所述C4C阀、所述M7M阀、所述D2D阀、所述C2C阀、所述Z3Z交换器、所述Z2Z交换器、所述F2F阀、所述E1E阀、所述D1D阀、所述C1C阀、所述Z7Z过滤机、所述F3F阀、所述F4F阀、所述E4E阀、所述F1F阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、M5M阀通过管道连接形成CC冷液体抽出回路;
所述D常液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述C4阀、所述M7阀、所述D2阀、所述A9阀、所述D1阀、所述Z6过滤机、所述D5阀、所述M2阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成B冷液体抽出回路;
所述DD常液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述C4C阀、所述M7M阀、所述D2D阀、所述A9A阀、所述D1D阀、所述Z6Z过滤机、所述D5D阀、所述M2M阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成DD常液体抽出回路;
所述E常液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述C4阀、所述M7阀、所述D2阀、所述A9阀、所述D1阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成E常液体抽出回路;
所述EE常液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述C4C阀、所述M7M阀、所述D2D阀、所述A9A阀、所述D1D阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成EE常液体抽出回路;
所述F常液体抽出系统包括:所述Z6过滤机、所述M2阀、所述D5阀、所述C4阀、所述M7阀、所述D1阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成F常液体抽出回路;
所述FF液体抽出系统包括:所述Z6Z过滤机、所述M2M阀、所述D5D阀、所述C4C阀、所述M7M阀、所述D1D阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成FF常液体抽出回路;
所述G常液体抽出系统包括:所述Z7过滤机、所述F3阀、所述F4阀、所述E4阀、所述M3阀、所述C4阀、所述M7阀、所述D1阀、所述F2阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成G常液体抽出回路;
所述GG常液体抽出系统包括:所述Z7Z过滤机、所述F3F阀、所述F4F阀、所述E4E阀、所述M3M阀、所述C4C阀、所述M7M阀、所述D1D阀、所述F2F阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成GG常液体抽出回路;
所述H常液体抽出系统包括:所述Z13过滤机、所述F5阀、所述E3阀、所述E4阀、所述M3阀、所述K6阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成H液体抽出回路;
所述HH常液体抽出系统包括:所述Z13Z过滤机、所述F5F阀、所述E3E阀、所述E4E阀、所述M3M阀、所述K6K阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成HH液体抽出回路。
上述系统如有阀门未被列入,在实际制作和操作上根据需求添加,不能实现统一指令的阀门采用手动启闭配合实现。
本发明可分别用自动化和半自动化操作工艺实现,冷冻过滤、常温过滤、速冷交换、速热交换等工序使用是根据需求选择,下面介绍操作工艺,在执行每一项系统前、所有系统都是关闭状态均已达到待运行要求,执行系统中的泵元件启闭根据设计者设计需求(有的执行系统中个别泵属关闭状态成管道通路),所有元件不代表都有启闭功能如交换器、过滤机等。因设备操作程序较多,如有个别环节公知技术没有写入专利里,由设计者解释,如排气阀管道、甩土装置等。
执行所述Z11交换器速热交换操作:启动所述B冷却水循环系统、所述A冷媒循环系统(或所述B冷媒循环系统),之后启动所述Z8制冷系统,之后被交换的液体通过管道启动G10泵送入所述Z11交换器进行交换,实现所述Z11交换器速热交换工艺;或启动所述CC冷却水循环系统、所述AA冷媒循环系统,之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动所述G10泵送入所述Z11交换器进行交换,实现所述Z11交换器速热交换工艺。
执行所述Z11Z交换器速热交换操作:启动所述BB冷却水循环系统、所述AA冷媒循环系统(或所述BB冷媒循环系统、或所述CC冷媒循环系统),之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动G10G泵送入所述Z11Z交换器进行交换,实现所述Z11Z交换器速热交换工艺;或启动所述C冷却水循环系统、所述A冷媒循环系统(或所述B冷媒循环系统),之后启动所述Z8制冷系统,之后被交换的液体通过管道启动所述G10G泵送入所述Z11Z交换器进行交换,实现所述Z11Z交换器速热交换工艺。
执行所述Z10交换器速冷交换操作:启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述B冷媒循环系统,之后启动所述Z8制冷系统,之后被交换的液体通过管道启动G8泵送入所述Z10交换器进行交换,实现所述Z10交换器速冷交换工艺;或启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述BB冷媒循环系统,之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动所述G8泵送入所述Z10交换器进行交换,实现所述Z10交换器速冷交换工艺。
执行所述Z10Z交换器速冷交换操作:启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述DD冷媒循环系统,之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动G8G泵送入所述Z10Z交换器进行交换,实现所述Z10Z交换器速冷交换工艺;或启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述D冷媒循环系统,之后启动所述Z8制冷系统,之后被交换的液体通过管道启动所述G8G泵送入所述Z10Z交换器进行交换,实现所述Z10Z交换器速冷交换工艺。
执行所述A冷冻过滤系统操作:启动所述A冷进液系统完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述A大循环降温系统,之后当降温达到过滤要求时,关闭所述A大循环降温系统,之后启动所述A冷冻过滤系统和所述A添加系统进行正常过滤。
执行A二冷冻过滤系统操作:启动所述A冷进液系统完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述A大循环降温系统,之后当降温达到过滤要求时,关闭所述A大循环降温系统,之后启动所述A冷冻过滤系统和所述A添加系统进行正常过滤。
执行所述B冷冻过滤系统操作:启动所述B冷进液系统完成进液将其关闭,之后对所述A滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述B大循环降温系统,之后当降温达到过滤要求时,关闭所述B大循环降温系统,之后启动所述B冷冻过滤系统和所述A添加系统进行正常过滤。
执行B二冷冻过滤系统操作:启动所述B冷进液系统完成进液将其关闭,之后对所述A滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述B大循环降温系统,之后当降温达到过滤要求时,关闭所述B大循环降温系统,之后启动所述B冷冻过滤系统和所述A添加系统进行正常过滤。
执行所述C冷冻过滤系统操作:启动所述C冷进液系统完成进液将其关闭,之后对所述B滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述C大循环降温系统,之后当降温达到过滤要求时,关闭所述C大循环降温系统,之后启动所述C冷冻过滤系统和所述B添加系统进行正常过滤。
执行C二冷冻过滤系统操作:启动所述C冷进液系统完成进液将其关闭,之后对所述B滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述C大循环降温系统,之后当降温达到过滤要求时,关闭所述C大循环降温系统,之后启动所述C冷冻过滤系统和所述B添加系统进行正常过滤。
执行所述D常温过滤系统操作:启动所述D常进液系统、完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭,之后启动所述D常温过滤系统和所述A添加系统,进入正常过滤。
执行所述E常温过滤系统操作:启动所述E常进液系统、完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述E常温过滤系统和所述A添加系统,进入正常过滤。
执行所述F常温过滤系统操作:启动所述F常进液系统、完成进液将其关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭,之后启动所述F常温过滤系统和所述B添加系统,进入正常过滤。
执行所述G常温过滤系统操作:启动所述G常进液系统、完成进液将其关闭,之后启动所述C滤挂土系统对所述Z7过滤机进行预涂助滤介、完成并关闭,之后启动所述G常温过滤系统,进入正常过滤。
执行所述AA冷冻过滤系统操作:启动所述AA冷进液系统完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述AA大循环降温系统,之后当降温达到过滤要求时,关闭所述AA大循环降温系统,之后启动所述AA冷冻过滤系统和所述AA添加系统进行正常过滤。
执行AA二冷冻过滤系统操作:启动所述AA冷进液系统完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述AA大循环降温系统,之后当降温达到过滤要求时,关闭所述AA大循环降温系统,之后启动所述AA冷冻过滤系统和所述AA添加系统进行正常过滤。
执行所述BB冷冻过滤系统操作:启动所述BB冷进液系统完成进液将其关闭,之后对所述AA滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述BB大循环降温系统,之后当降温达到过滤要求时,关闭所述BB大循环降温系统,之后启动所述BB冷冻过滤系统和所述AA添加系统进行正常过滤。
执行BB二冷冻过滤系统操作:启动所述BB冷进液系统完成进液将其关闭,之后对所述AA滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述BB大循环降温系统,之后当降温达到过滤要求时,关闭所述BB大循环降温系统,之后启动所述BB冷冻过滤系统和所述AA添加系统进行正常过滤。
执行所述CC冷冻过滤系统操作:启动所述CC冷进液系统完成进液将其关闭,之后对所述BB滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述CC大循环降温系统,之后当降温达到过滤要求时,关闭所述CC大循环降温系统,之后启动所述CC冷冻过滤系统和所述BB添加系统进行正常过滤。
执行CC二冷冻过滤系统操作:启动所述CC冷进液系统完成进液将其关闭,之后对所述BB滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述CC大循环降温系统,之后当降温达到过滤要求时,关闭所述CC大循环降温系统,之后启动所述CC冷冻过滤系统和所述BB添加系统进行正常过滤。
执行所述DD常温过滤系统操作:启动所述DD常进液系统、完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭,之后启动所述DD常温过滤系统和所述AA添加系统,进入正常过滤。
执行所述EE常温过滤系统操作:启动所述EE常进液系统、完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述EE常温过滤系统和所述AA添加系统,进入正常过滤。
执行所述FF常温过滤系统操作:启动所述FF常进液系统、完成进液将其关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭,之后启动所述FF常温过滤系统和所述BB添加系统,进入正常过滤。
执行所述GG常温过滤系统操作:启动所述GG常进液系统、完成进液将其关闭,之后启动所述CC滤挂土系统对所述Z7Z过滤机进行预涂助滤介、完成并关闭,之后启动所述GG常温过滤系统,进入正常过滤。
当过滤结束后,根据需求选择,适配启动所述A固液分离系统、所述AA固液分离系统、所述B固液分离系统、所述BB固液分离系统、所述C固液分离系统、所述CC固液分离系统、A常液体抽出系统、AA常液体抽出系统、B常液体抽出系统、BB常液体抽出系统、C常液体抽出系统、CC常液体抽出系统等,完成固液分离和液体抽出等工艺。
方法二,参照图2,本发明的工艺提供一种双制冷双过滤设备,该设备提高了工作效率、降低生产成本,实现了冷冻过滤装置的一备一用,且部分同型元件可以替用,实现1+1大于2的价值。
所述一种双制冷双过滤设备,包括:Z8制冷系统、Z8Z制冷系统、A冷却水循环系统、AA冷却水循环系统、B冷却水循环系统、BB冷却水循环系统、C冷却水循环系统、CC冷却水循环系统、A冷媒循环系统、AA冷媒循环系统、B冷媒循环系统、BB冷媒循环系统、C冷媒循环系统、CC冷媒循环系统、A冷进液系统、AA冷进液系统、B冷进液系统、BB冷进液系统、C冷进液系统、CC冷进液系统、A滤挂土系统、AA滤挂土系统、B滤挂土系统、BB滤挂土系统、C滤挂土系统、CC滤挂土系统、A大循环降温系统、AA大循环降温系统、B大循环降温系统、BB大循环降温系统、C大循环降温系统、CC大循环降温系统、A冷冻过滤系统、AA冷冻过滤系统、B冷冻过滤系统、BB冷冻过滤系统、C冷冻过滤系统、CC冷冻过滤系统、D常进液系统、DD常进液系统、E常进液系统、EE常进液系统、F常进液系统、FF常进液系统、G常进液系统、GG常进液系统、D常温过滤系统、DD常温过滤系统、E常温过滤系统、EE常温过滤系统、F常温过滤系统、FF常温过滤系统、G常温过滤系统、GG常温过滤系统、A添加系统、AA添加系统、B添加系统、BB添加系统、A固液分离系统、AA固液分离系统、B固液分离系统、BB固液分离系统、C固液分离系统、CC固液分离系统、A冷液体抽出系统、AA冷液体抽出系统、B冷液体抽出系统、BB冷液体抽出系统、C冷液体抽出系统、CC冷液体抽出系统、D常液体抽出系统、DD常液体抽出系统、E常液体抽出系统、EE常液体抽出系统、F常液体抽出系统、FF常液体抽出系统、G常液体抽出系统、GG常液体抽出系统。
所述A冷却水循环系统包括:B2阀、B4阀、Z12冷却塔、B1阀、G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成A冷却水循环回路;
所述AA冷却水循环系统包括:B2B阀、B4B阀、Z12Z冷却塔、B1B阀、G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成AA冷却水循环回路;
所述B冷却水循环系统包括:B6阀、B3阀、Z11交换器、E6阀、所述B4阀、所述Z12冷却塔、所述B1阀、所述G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成B冷却水循环回路;
所述BB冷却水循环系统包括:B6B阀、B3B阀、Z11Z交换器、E6E阀、所述B4B阀、所述Z12Z冷却塔、所述B1B阀、所述G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成BB冷却水循环回路;
所述C冷却水循环系统包括:所述B6阀、B7阀、所述B3B阀、所述Z11Z交换器、所述E6E阀、B5阀、所述B4阀、所述Z12冷却塔、所述B1阀、所述G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成C冷却水循环回路;
所述CC冷却水循环系统包括:所述B6B阀、所述B7阀、所述B3阀、所述Z11交换器、所述E6阀、所述B5阀、所述B4B阀、所述Z12Z冷却塔、所述B1B阀、所述G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成CC冷却水循环回路;
所述A冷媒循环系统包括:A1阀、Z9冷媒罐、A2阀、G7冷媒泵、A3阀、Z3交换器、A4阀、A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成A冷媒循环回路;
所述AA冷媒循环系统包括:A1A阀、Z9Z冷媒罐、A2A阀、G7G冷媒泵、Z3Z交换器、A4A阀、A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成AA冷媒循环回路;
所述B冷媒循环系统包括:所述A1阀、所述Z9冷媒罐、所述A2阀、所述G7冷媒泵、A5阀、Z10交换器、A6阀、所述A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成B冷媒循环回路;
所述BB冷媒循环系统包括:所述A1A阀、所述Z9Z冷媒罐、所述A2A阀、所述G7G冷媒泵、A8阀、所述A5阀、所述Z10交换器、所述A6阀、B8阀、所述A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成BB冷媒循环回路;
所述C冷媒循环系统包括:所述A1阀、所述Z9冷媒罐、所述A2阀、所述G7冷媒泵、所述A8阀、所述Z3Z交换器、所述A4A阀、所述B8阀、所述A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成C冷媒循环回路;
所述CC冷媒循环系统包括:所述A1A阀、所述Z9Z冷媒罐、所述A2A阀、所述G7G冷媒泵、所述A8阀、所述A3阀、所述Z3交换器、所述A4阀、所述B8阀、所述A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成CC冷媒循环回路;
所述A冷进液系统包括:Z1护滤器、C1阀、G1泵、Z2交换器、所述Z3交换器、C2阀、A9阀、G2泵、Z4过滤机、C3阀、E5阀、Z5搅拌罐、C4阀、G3泵、Z6过滤机通过管道连接形成A冷进液回路;
所述AA冷进液系统包括:Z1Z护滤器、C1C阀、G1G泵、Z2Z交换器、所述Z3Z交换器、C2C阀、A9A阀、G2G泵、Z4Z过滤机、C3C阀、E5E阀、Z5Z搅拌罐、C4C阀、G3G泵、Z6Z过滤机通过管道连接形成AA冷进液回路;
所述B冷进液系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐通过管道连接形成B冷进液回路;
所述BB冷进液系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成BB冷进液回路;
所述C冷进液系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、D2阀、M7阀、所述G3泵、所述Z6过滤机、D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成C冷进液回路;
所述CC冷进液系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、D2D阀、M7M阀、所述G3G泵、所述Z6Z过滤机、D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成CC冷进液回路;
所述A滤挂土系统包括:C8阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z4过滤机预涂助滤剂循环回路;
所述AA滤挂土系统包括:C8C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z4Z过滤机预涂助滤剂循环回路;
所述B滤挂土系统包括:D8阀、所述G3泵、所述Z6过滤机、所述D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z6过滤机预涂助滤剂循环回路;
所述BB滤挂土系统包括:D8D阀、所述G3G泵、所述Z6Z过滤机、所述D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z6Z过滤机预涂助滤剂循环回路;
所述C滤挂土系统包括:C7阀、G4泵、Z7过滤机、E4阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z7过滤机预涂助滤剂循环回路;
所述CC滤挂土系统包括:C7C阀、G4G泵、Z7Z过滤机、E4E阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z7Z过滤机预涂助滤剂循环回路;
所述A大循环降温系统包括:E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、C5阀、所述Z2交换器通过管道连接形成A大循环降温回路;
所述AA大循环降温系统包括:E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、C5C阀、所述Z2Z交换器通过管道连接形成AA大循环降温回路;
所述B大循环降温系统包括:所述E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、F1阀、所述Z2交换器通过管道连接形成B大循环降温回路;
所述BB大循环降温系统包括:所述E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、F1F阀、所述Z2Z交换器通过管道连接形成BB大循环降温回路;
所述C大循环降温系统包括:所述E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述D2阀、所述M7阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器通过管道连接形成C大循环降温回路;
所述CC大循环降温系统包括:所述E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述D2D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器通过管道连接形成CC大循环降温回路;
所述A冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器、所述G4泵、所述Z7过滤机、C6阀通过管道连接形成A冷冻过滤回路;
所述AA冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、C6C阀通过管道连接形成AA冷冻过滤回路;
所述B冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述F1阀、所述Z2交换器、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成B冷冻过滤回路;
所述BB冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述F1F阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成BB冷冻过滤回路;
所述C冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述D2阀、所述M7阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成C冷冻过滤回路;
所述CC冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述D2D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成CC冷冻过滤回路;
所述D常进液系统包括:所述Z1护滤器、D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐、所述C4阀、所述G3泵、所述Z6过滤机通过管道连接形成D常进液回路;
所述DD常进液系统包括:所述Z1Z护滤器、D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐、所述C4C阀、所述G3G泵、所述Z6Z过滤机通过管道连接形成DD常进液回路;
所述E常进液系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐过管道连接形成E常进液回路;
所述EE常进液系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐过管道连接形成EE常进液回路;
所述F常进液系统包括:所述Z1护滤器、所述D1阀、所述M7阀、所述G3泵、所述Z6过滤机、所述D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成F常进液回路;
所述FF常进液系统包括:所述Z1Z护滤器、所述D1D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成FF常进液回路;
所述G常进液系统包括:所述Z1护滤器、所述D1阀、F2阀、所述G4泵、所述Z7过滤机、所述E4阀、所述E5阀、所述Z5搅拌罐通过管道连接形成G常进液回路;
所述GG常进液系统包括:所述Z1Z护滤器、所述D1D阀、F2F阀、所述G4G泵、所述Z7Z过滤机、所述E4E阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成GG常进液回路;
所述D常温过滤系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、D4阀通过管道连接形成D常温过滤回路;
所述DD常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、D4D阀通过管道连接形成DD常温过滤回路;
所述E常温过滤系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、D3阀通过管道连接形成E常温过滤回路;
所述EE常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、D3D阀通过管道连接形成EE常温过滤回路;
所述F常温过滤系统包括:所述Z1护滤器、所述D1阀、所述M7阀、所述G3泵、所述Z6过滤机、所述D4阀通过管道连接形成F常温过滤回路;
所述FF常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述D4D阀通过管道连接形成FF常温过滤回路;
所述G常温过滤系统包括:所述Z1护滤器、所述D1阀、所述F2阀、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成G常温过滤回路;
所述GG常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述F2F阀、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成GG常温过滤回路;
所述A添加系统包括:所述Z5搅拌罐、G5添加泵、D6阀、所述Z4过滤机通过管道连接形成A添加回路;
所述AA添加系统包括:所述Z5Z搅拌罐、G5G添加泵、D6D阀、所述Z4Z过滤机通过管道连接形成AA添加回路;
所述B添加系统包括:所述Z5搅拌罐、所述G5添加泵、D7阀、所述Z6过滤机通过管道连接形成B添加回路。
所述BB添加系统包括:所述Z5Z搅拌罐、所述G5G添加泵、D7D阀、所述Z6Z过滤机通过管道连接形成BB添加回路;
所述A固液分离系统包括:M1阀、G11泵、Z14离心机、G12泵、M6阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机通过管道连接形成A固液分离循环回路;
所述AA固液分离系统包括:M1M阀、G11G泵、Z14Z离心机、G12G泵、M6M阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机通过管道连接形成AA固液分离循环回路;
所述B固液分离系统包括:M2阀、所述G11泵、所述Z14离心机、所述G12泵、所述M6阀、所述M7阀、所述G3泵、所述Z6过滤机通过管道连接形成B固液分离循环回路;
所述BB固液分离系统包括:M2M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M6M阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机通过管道连接形成BB固液分离循环回路;
所述C固液分离系统包括:F3阀、所述E4阀、M3阀、所述G11泵、所述Z14离心机、所述G12泵、所述M6阀、所述F2阀、所述G4泵、所述Z7过滤机通过管道连接形成C固液分离循环回路。
所述CC固液分离系统包括:F3F阀、所述E4E阀、M3M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M6M阀、所述F2F阀、所述G4G泵、所述Z7Z过滤机通过管道连接形成CC固液分离循环回路;
所述A冷液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述D5阀、所述Z6过滤机、所述M2阀、所述C4阀、所述M7阀、所述D2阀、所述C2阀、所述A9阀、所述Z3交换器、所述Z2交换器、所述F2阀、所述E1阀、所述D1阀、所述C1阀、所述Z7过滤机、所述F3阀、F4阀、所述E4阀、所述F1阀、所述M3阀、所述G11泵、所述Z14离心机、所述G12泵、M5阀通过管道连接形成A冷液体抽出回路;
所述AA冷液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述D5D阀、所述Z6Z过滤机、所述M2M阀、所述C4C阀、所述M7M阀、所述D2D阀、所述C2C阀、所述A9A阀、所述Z3Z交换器、所述Z2Z交换器、所述F2F阀、所述E1E阀、所述D1D阀、所述C1C阀、所述Z7Z过滤机、所述F3F阀、F4F阀、所述E4E阀、所述F1F阀、所述M3M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、M5M阀通过管道连接形成AA冷液体抽出回路;
所述B冷液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述C4阀、所述M7阀、所述D2阀、所述C2阀、所述A9阀、所述Z3交换器、所述Z2交换器、所述F2阀、所述E1阀、所述D1阀、所述C1阀、所述F3阀、所述F4阀、所述E4阀、所述F1阀、所述M3阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成B冷液体抽出回路;
所述BB冷液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述C4C阀、所述M7M阀、所述D2D阀、所述C2C阀、所述A9A阀、所述Z3Z交换器、所述Z2Z交换器、所述F2F阀、所述E1E阀、所述D1D阀、所述C1C阀、所述F3F阀、所述F4F阀、所述E4E阀、所述F1F阀、所述M3M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成BB冷液体抽出回路;
所述C冷液体抽出系统包括:所述D5阀、所述Z6过滤机、所述M2阀、所述C4阀、所述M7阀、所述D2阀、所述C2阀、所述Z3交换器、所述Z2交换器、所述F2阀、所述E1阀、所述D1阀、所述C1阀、所述Z7过滤机、所述F3阀、所述F4阀、所述E4阀、所述F1阀、所述M3阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成C冷液体抽出回路;
所述CC冷液体抽出系统包括:所述D5D阀、所述Z6Z过滤机、所述M2M阀、所述C4C阀、所述M7M阀、所述D2D阀、所述C2C阀、所述Z3Z交换器、所述Z2Z交换器、所述F2F阀、所述E1E阀、所述D1D阀、所述C1C阀、所述Z7Z过滤机、所述F3F阀、所述F4F阀、所述E4E阀、所述F1F阀、所述M3M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成CC冷液体抽出回路;
所述D常液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述C4阀、所述M7阀、所述D2阀、所述A9阀、所述D1阀、所述Z6过滤机、所述D5阀、所述M2阀、所述M3阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成B冷液体抽出回路;
所述DD常液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述C4C阀、所述M7M阀、所述D2D阀、所述A9A阀、所述D1D阀、所述Z6Z过滤机、所述D5D阀、所述M2M阀、所述M3M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成DD常液体抽出回路;
所述E常液体抽出系统包括:所述Z4过滤机、所述M1阀、所述C3阀、所述C4阀、所述M7阀、所述D2阀、所述A9阀、所述D1阀、所述M3阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成E常液体抽出回路;
所述EE常液体抽出系统包括:所述Z4Z过滤机、所述M1M阀、所述C3C阀、所述C4C阀、所述M7M阀、所述D2D阀、所述A9A阀、所述D1D阀、所述M3M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成EE常液体抽出回路;
所述F常液体抽出系统包括:所述Z6过滤机、所述M2阀、所述D5阀、所述C4阀、所述M7阀、所述D1阀、所述M3阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成F常液体抽出回路;
所述FF液体抽出系统包括:所述Z6Z过滤机、所述M2M阀、所述D5D阀、所述C4C阀、所述M7M阀、所述D1D阀、所述M3M阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成FF常液体抽出回路;
所述G常液体抽出系统包括:所述Z7过滤机、所述F3阀、所述F4阀、所述E4阀、所述M3阀、所述C4阀、所述M7阀、所述D1阀、所述F2阀、所述G11泵、所述Z14离心机、所述G12泵、所述M5阀通过管道连接形成G常液体抽出回路;
所述GG常液体抽出系统包括:所述Z7Z过滤机、所述F3F阀、所述F4F阀、所述E4E阀、所述M3M阀、所述C4C阀、所述M7M阀、所述D1D阀、所述F2F阀、所述G11G泵、所述Z14Z离心机、所述G12G泵、所述M5M阀通过管道连接形成GG常液体抽出回路;
上述系统如有阀门未被列入,在实际制作和操作上根据需求添加,不能实现统一指令的阀门采用手动启闭配合实现。
本发明可分别用自动化和半自动化操作工艺实现,冷冻过滤、常温过滤、速冷交换、速热交换等工序使用是根据需求选择,下面介绍操作工艺,在执行每一项系统前、所有系统都是关闭状态均已达到待运行要求,执行系统中的泵元件启闭根据设计者设计需求(有的执行系统中个别泵属关闭状态成管道通路),所有元件不代表都有启闭功能如交换器、过滤机等。因设备操作程序较多,如有个别环节公知技术没有写入专利里,由设计者解释,如排气阀管道、甩土装置等。
执行所述Z11交换器速热交换操作:启动所述B冷却水循环系统、所述A冷媒循环系统(或所述B冷媒循环系统),之后启动所述Z8制冷系统,之后被交换的液体通过管道启动G10泵送入所述Z11交换器进行交换,实现所述Z11交换器速热交换工艺;或启动所述CC冷却水循环系统、所述AA冷媒循环系统,之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动所述G10泵送入所述Z11交换器进行交换,实现所述Z11交换器速热交换工艺。
执行所述Z11Z交换器速热交换操作:启动所述BB冷却水循环系统、所述AA冷媒循环系统(或所述BB冷媒循环系统、或所述CC冷媒循环系统),之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动G10G泵送入所述Z11Z交换器进行交换,实现所述Z11Z交换器速热交换工艺;或启动所述C冷却水循环系统、所述A冷媒循环系统(或所述B冷媒循环系统),之后启动所述Z8制冷系统,之后被交换的液体通过管道启动所述G10G泵送入所述Z11Z交换器进行交换,实现所述Z11Z交换器速热交换工艺。
执行所述Z10交换器速冷交换操作:启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述B冷媒循环系统,之后启动所述Z8制冷系统,之后被交换的液体通过管道启动G8泵送入所述Z10交换器进行交换,实现所述Z10交换器速冷交换工艺;或启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述BB冷媒循环系统,之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动所述G8泵送入所述Z10交换器进行交换,实现所述Z10交换器速冷交换工艺。
执行所述A冷冻过滤系统操作:启动所述A冷进液系统完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述A大循环降温系统,之后当降温达到过滤要求时,关闭所述A大循环降温系统,之后启动所述A冷冻过滤系统和所述A添加系统进行正常过滤。
执行A二冷冻过滤系统操作:启动所述A冷进液系统完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述A大循环降温系统,之后当降温达到过滤要求时,关闭所述A大循环降温系统,之后启动所述A冷冻过滤系统和所述A添加系统进行正常过滤。
执行所述B冷冻过滤系统操作:启动所述B冷进液系统完成进液将其关闭,之后对所述A滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述B大循环降温系统,之后当降温达到过滤要求时,关闭所述B大循环降温系统,之后启动所述B冷冻过滤系统和所述A添加系统进行正常过滤。
执行B二冷冻过滤系统操作:启动所述B冷进液系统完成进液将其关闭,之后对所述A滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述B大循环降温系统,之后当降温达到过滤要求时,关闭所述B大循环降温系统,之后启动所述B冷冻过滤系统和所述A添加系统进行正常过滤。
执行所述C冷冻过滤系统操作:启动所述C冷进液系统完成进液将其关闭,之后对所述B滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述C大循环降温系统,之后当降温达到过滤要求时,关闭所述C大循环降温系统,之后启动所述C冷冻过滤系统和所述B添加系统进行正常过滤。
执行C二冷冻过滤系统操作:启动所述C冷进液系统完成进液将其关闭,之后对所述B滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述C大循环降温系统,之后当降温达到过滤要求时,关闭所述C大循环降温系统,之后启动所述C冷冻过滤系统和所述B添加系统进行正常过滤。
执行所述D常温过滤系统操作:启动所述D常进液系统、完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭,之后启动所述D常温过滤系统和所述A添加系统,进入正常过滤。
执行所述E常温过滤系统操作:启动所述E常进液系统、完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述E常温过滤系统和所述A添加系统,进入正常过滤。
执行所述F常温过滤系统操作:启动所述F常进液系统、完成进液将其关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭,之后启动所述F常温过滤系统和所述B添加系统,进入正常过滤。
执行所述G常温过滤系统操作:启动所述G常进液系统、完成进液将其关闭,之后启动所述C滤挂土系统对所述Z7过滤机进行预涂助滤介、完成并关闭,之后启动所述G常温过滤系统,进入正常过滤。
执行所述AA冷冻过滤系统操作:启动所述AA冷进液系统完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述AA大循环降温系统,之后当降温达到过滤要求时,关闭所述AA大循环降温系统,之后启动所述AA冷冻过滤系统和所述AA添加系统进行正常过滤。
执行AA二冷冻过滤系统操作:启动所述AA冷进液系统完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述AA大循环降温系统,之后当降温达到过滤要求时,关闭所述AA大循环降温系统,之后启动所述AA冷冻过滤系统和所述AA添加系统进行正常过滤。
执行所述BB冷冻过滤系统操作:启动所述BB冷进液系统完成进液将其关闭,之后对所述AA滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述BB大循环降温系统,之后当降温达到过滤要求时,关闭所述BB大循环降温系统,之后启动所述BB冷冻过滤系统和所述AA添加系统进行正常过滤。
执行BB二冷冻过滤系统操作:启动所述BB冷进液系统完成进液将其关闭,之后对所述AA滤挂土系统进行预涂助滤介、完成并关闭;同时所述启动A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述BB大循环降温系统,之后当降温达到过滤要求时,关闭所述BB大循环降温系统,之后启动所述BB冷冻过滤系统和所述AA添加系统进行正常过滤。
执行所述CC冷冻过滤系统操作:启动所述CC冷进液系统完成进液将其关闭,之后对所述BB滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述CC大循环降温系统,之后当降温达到过滤要求时,关闭所述CC大循环降温系统,之后启动所述CC冷冻过滤系统和所述BB添加系统进行正常过滤。
执行CC二冷冻过滤系统操作:启动所述CC冷进液系统完成进液将其关闭,之后对所述BB滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述CC大循环降温系统,之后当降温达到过滤要求时,关闭所述CC大循环降温系统,之后启动所述CC冷冻过滤系统和所述BB添加系统进行正常过滤。
执行所述DD常温过滤系统操作:启动所述DD常进液系统、完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭,之后启动所述DD常温过滤系统和所述AA添加系统,进入正常过滤。
执行所述EE常温过滤系统操作:启动所述EE常进液系统、完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述EE常温过滤系统和所述AA添加系统,进入正常过滤。
执行所述FF常温过滤系统操作:启动所述FF常进液系统、完成进液将其关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭,之后启动所述FF常温过滤系统和所述BB添加系统,进入正常过滤。
执行所述GG常温过滤系统操作:启动所述GG常进液系统、完成进液将其关闭,之后启动所述CC滤挂土系统对所述Z7Z过滤机进行预涂助滤介、完成并关闭,之后启动所述GG常温过滤系统,进入正常过滤。
当过滤结束后,根据需求选择,适配启动所述A固液分离系统、所述AA固液分离系统、所述B固液分离系统、所述BB固液分离系统、所述C固液分离系统、所述CC固液分离系统、所述A冷液体抽出系统、所述AA冷液体抽出系统、所述B冷液体抽出系统、所述BB冷液体抽出系统、所述C冷液体抽出系统、所述CC冷液体抽出系统、所述D常液体抽出系统、所述DD常液体抽出系统、所述E常液体抽出系统、所述EE常液体抽出系统、所述F常液体抽出系统、所述FF常液体抽出系统、所述G常液体抽出系统、所述GG常液体抽出系统等,完成固液分离和液体抽出等工艺。
方法三,参照图1,本发明的工艺提供一种双制冷双过滤装置,该装置提高了工作效率、降低生产成本,实现了冷冻过滤装置的一备一用,且部分同型元件可以替用,实现1+1大于2的价值。
所述一种双制冷双过滤装置,包括:Z8制冷系统、Z8Z制冷系统、A冷却水循环系统、AA冷却水循环系统、B冷却水循环系统、BB冷却水循环系统、C冷却水循环系统、CC冷却水循环系统、A冷媒循环系统、AA冷媒循环系统、B冷媒循环系统、BB冷媒循环系统、C冷媒循环系统、CC冷媒循环系统、A冷进液系统、AA冷进液系统、B冷进液系统、BB冷进液系统、C冷进液系统、CC冷进液系统、A滤挂土系统、AA滤挂土系统、B滤挂土系统、BB滤挂土系统、C滤挂土系统、CC滤挂土系统、A大循环降温系统、AA大循环降温系统、B大循环降温系统、BB大循环降温系统、C大循环降温系统、CC大循环降温系统、A冷冻过滤系统、AA冷冻过滤系统、B冷冻过滤系统、BB冷冻过滤系统、C冷冻过滤系统、CC冷冻过滤系统、D常进液系统、DD常进液系统、E常进液系统、EE常进液系统、F常进液系统、FF常进液系统、G常进液系统、GG常进液系统、D常温过滤系统、DD常温过滤系统、E常温过滤系统、EE常温过滤系统、F常温过滤系统、FF常温过滤系统、G常温过滤系统、GG常温过滤系统、A添加系统、AA添加系统、B添加系统、BB添加系统。
所述A冷却水循环系统包括:B2阀、B4阀、Z12冷却塔、B1阀、G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成A冷却水循环回路;
所述AA冷却水循环系统包括:B2B阀、B4B阀、Z12Z冷却塔、B1B阀、G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成AA冷却水循环回路;
所述B冷却水循环系统包括:B6阀、B3阀、Z11交换器、E6阀、所述B4阀、所述Z12冷却塔、所述B1阀、所述G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成B冷却水循环回路;
所述BB冷却水循环系统包括:B6B阀、B3B阀、Z11Z交换器、E6E阀、所述B4B阀、所述Z12Z冷却塔、所述B1B阀、所述G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成BB冷却水循环回路;
所述C冷却水循环系统包括:所述B6阀、B7阀、所述B3B阀、所述Z11Z交换器、所述E6E阀、B5阀、所述B4阀、所述Z12冷却塔、所述B1阀、所述G6冷却泵通过管道与所述Z8制冷系统的冷凝器进出口连接形成C冷却水循环回路;
所述CC冷却水循环系统包括:所述B6B阀、所述B7阀、所述B3阀、所述Z11交换器、所述E6阀、所述B5阀、所述B4B阀、所述Z12Z冷却塔、所述B1B阀、所述G6G冷却泵通过管道与所述Z8Z制冷系统的冷凝器进出口连接形成CC冷却水循环回路;
所述A冷媒循环系统包括:A1阀、Z9冷媒罐、A2阀、G7冷媒泵、A3阀、Z3交换器、A4阀、A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成A冷媒循环回路;
所述AA冷媒循环系统包括:A1A阀、Z9Z冷媒罐、A2A阀、G7G冷媒泵、A3A阀、Z3Z交换器、A4A阀、A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成AA冷媒循环回路;
所述B冷媒循环系统包括:所述A1阀、所述Z9冷媒罐、所述A2阀、所述G7冷媒泵、A5阀、Z10交换器、A6阀、所述A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成B冷媒循环回路;
所述BB冷媒循环系统包括:所述A1A阀、所述Z9Z冷媒罐、所述A2A阀、所述G7G冷媒泵、A8阀、所述A5阀、所述Z10交换器、所述A6阀、B8阀、所述A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成BB冷媒循环回路;
所述C冷媒循环系统包括:所述A1阀、所述Z9冷媒罐、所述A2阀、所述G7冷媒泵、所述A8阀、所述A3A阀、所述Z3Z交换器、所述A4A阀、所述B8阀、所述A7阀通过管道与所述Z8制冷系统的蒸发器进出口连接形成C冷媒循环回路;
所述CC冷媒循环系统包括:所述A1A阀、所述Z9Z冷媒罐、所述A2A阀、所述G7G冷媒泵、所述A8阀、所述A3阀、所述Z3交换器、所述A4阀、所述B8阀、所述A7A阀通过管道与所述Z8Z制冷系统的蒸发器进出口连接形成CC冷媒循环回路;
所述A冷进液系统包括:Z1护滤器、C1阀、G1泵、Z2交换器、所述Z3交换器、C2阀、A9阀、G2泵、Z4过滤机、C3阀、E5阀、Z5搅拌罐、C4阀、G3泵、Z6过滤机通过管道连接形成A冷进液回路;
所述AA冷进液系统包括:Z1Z护滤器、C1C阀、G1G泵、Z2Z交换器、所述Z3Z交换器、C2C阀、A9A阀、G2G泵、Z4Z过滤机、C3C阀、E5E阀、Z5Z搅拌罐、C4C阀、G3G泵、Z6Z过滤机通过管道连接形成AA冷进液回路;
所述B冷进液系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐通过管道连接形成B冷进液回路;
所述BB冷进液系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成BB冷进液回路;
所述C冷进液系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、D2阀、M7阀、所述G3泵、所述Z6过滤机、D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成C冷进液回路;
所述CC冷进液系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、D2D阀、M7M阀、所述G3G泵、所述Z6Z过滤机、D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成CC冷进液回路;
所述A滤挂土系统包括:C8阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z4过滤机预涂助滤剂循环回路;
所述AA滤挂土系统包括:C8C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z4Z过滤机预涂助滤剂循环回路;
所述B滤挂土系统包括:D8阀、所述G3泵、所述Z6过滤机、所述D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z6过滤机预涂助滤剂循环回路;
所述BB滤挂土系统包括:D8D阀、所述G3G泵、所述Z6Z过滤机、所述D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z6Z过滤机预涂助滤剂循环回路;
所述C滤挂土系统包括:C7阀、G4泵、Z7过滤机、E4阀、所述E5阀、所述Z5搅拌罐通过管道连接形成所述Z7过滤机预涂助滤剂循环回路;
所述CC滤挂土系统包括:C7C阀、G4G泵、Z7Z过滤机、E4E阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成所述Z7Z过滤机预涂助滤剂循环回路;
所述A大循环降温系统包括:E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、C5阀、所述Z2交换器通过管道连接形成A大循环降温回路;
所述AA大循环降温系统包括:E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、C5C阀、所述Z2Z交换器通过管道连接形成AA大循环降温回路;
所述B大循环降温系统包括:所述E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、F1阀、所述Z2交换器通过管道连接形成B大循环降温回路;
所述BB大循环降温系统包括:所述E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、F1F阀、所述Z2Z交换器通过管道连接形成BB大循环降温回路;
所述C大循环降温系统包括:所述E1阀、所述Z2交换器、所述Z3交换器、所述C2阀、所述D2阀、所述M7阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器通过管道连接形成C大循环降温回路;
所述CC大循环降温系统包括:所述E1E阀、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述D2D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器通过管道连接形成CC大循环降温回路;
所述A冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器、所述G4泵、所述Z7过滤机、C6阀通过管道连接形成A冷冻过滤回路;
所述AA冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、C6C阀通过管道连接形成AA冷冻过滤回路;
所述B冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述F1阀、所述Z2交换器、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成B冷冻过滤回路;
所述BB冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述F1F阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成BB冷冻过滤回路;
所述C冷冻过滤系统包括:所述Z1护滤器、所述C1阀、所述G1泵、所述Z2交换器、所述Z3交换器、所述C2阀、所述D2阀、所述M7阀、所述G3泵、所述Z6过滤机、所述C5阀、所述Z2交换器、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成C冷冻过滤回路;
所述CC冷冻过滤系统包括:所述Z1Z护滤器、所述C1C阀、所述G1G泵、所述Z2Z交换器、所述Z3Z交换器、所述C2C阀、所述D2D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述C5C阀、所述Z2Z交换器、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成CC冷冻过滤回路;
所述D常进液系统包括:所述Z1护滤器、D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐、所述C4阀、所述G3泵、所述Z6过滤机通过管道连接形成D常进液回路;
所述DD常进液系统包括:所述Z1Z护滤器、D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐、所述C4C阀、所述G3G泵、所述Z6Z过滤机通过管道连接形成DD常进液回路;
所述E常进液系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述E5阀、所述Z5搅拌罐过管道连接形成E常进液回路;
所述EE常进液系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述E5E阀、所述Z5Z搅拌罐过管道连接形成EE常进液回路;
所述F常进液系统包括:所述Z1护滤器、所述D1阀、所述M7阀、所述G3泵、所述Z6过滤机、所述D5阀、所述E5阀、所述Z5搅拌罐通过管道连接形成F常进液回路;
所述FF常进液系统包括:所述Z1Z护滤器、所述D1D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述D5D阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成FF常进液回路;
所述G常进液系统包括:所述Z1护滤器、所述D1阀、F2阀、所述G4泵、所述Z7过滤机、所述E4阀、所述E5阀、所述Z5搅拌罐通过管道连接形成G常进液回路;
所述GG常进液系统包括:所述Z1Z护滤器、所述D1D阀、F2F阀、所述G4G泵、所述Z7Z过滤机、所述E4E阀、所述E5E阀、所述Z5Z搅拌罐通过管道连接形成GG常进液回路;
所述D常温过滤系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、所述C3阀、所述C4阀、所述G3泵、所述Z6过滤机、D4阀通过管道连接形成D常温过滤回路;
所述DD常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、所述C3C阀、所述C4C阀、所述G3G泵、所述Z6Z过滤机、D4D阀通过管道连接形成DD常温过滤回路;
所述E常温过滤系统包括:所述Z1护滤器、所述D1阀、所述D2阀、所述A9阀、所述G2泵、所述Z4过滤机、D3阀通过管道连接形成E常温过滤回路;
所述EE常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述D2D阀、所述A9A阀、所述G2G泵、所述Z4Z过滤机、D3D阀通过管道连接形成EE常温过滤回路;
所述F常温过滤系统包括:所述Z1护滤器、所述D1阀、所述M7阀、所述G3泵、所述Z6过滤机、所述D4阀通过管道连接形成F常温过滤回路;
所述FF常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述M7M阀、所述G3G泵、所述Z6Z过滤机、所述D4D阀通过管道连接形成FF常温过滤回路;
所述G常温过滤系统包括:所述Z1护滤器、所述D1阀、所述F2阀、所述G4泵、所述Z7过滤机、所述C6阀通过管道连接形成G常温过滤回路;
所述GG常温过滤系统包括:所述Z1Z护滤器、所述D1D阀、所述F2F阀、所述G4G泵、所述Z7Z过滤机、所述C6C阀通过管道连接形成GG常温过滤回路;
所述A添加系统包括:所述Z5搅拌罐、G5添加泵、D6阀、所述Z4过滤机通过管道连接形成A添加回路;
所述AA添加系统包括:所述Z5Z搅拌罐、G5G添加泵、D6D阀、所述Z4Z过滤机通过管道连接形成AA添加回路;
所述B添加系统包括:所述Z5搅拌罐、所述G5添加泵、D7阀、所述Z6过滤机通过管道连接形成B添加回路。
所述BB添加系统包括:所述Z5Z搅拌罐、所述G5G添加泵、D7D阀、所述Z6Z过滤机通过管道连接形成BB添加回路。
本发明可分别用自动化和半自动化操作工艺实现,冷冻过滤、常温过滤、速冷交换、速热交换等工序使用是根据需求选择,下面介绍操作工艺,在执行每一项系统前、所有系统都是关闭状态均已达到待运行要求,执行系统中的泵元件启闭根据设计者设计需求(有的执行系统中个别泵属关闭状态成管道通路),所有元件不代表都有启闭功能如交换器、过滤机等。因设备操作程序较多,如有个别环节公知技术没有写入专利里,由设计者解释,如排气阀管道、甩土装置等。
执行所述Z11交换器速热交换操作:启动所述B冷却水循环系统、所述A冷媒循环系统(或所述B冷媒循环系统),之后启动所述Z8制冷系统,之后被交换的液体通过管道启动G10泵送入所述Z11交换器进行交换,实现所述Z11交换器速热交换工艺;或启动所述CC冷却水循环系统、所述AA冷媒循环系统,之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动所述G10泵送入所述Z11交换器进行交换,实现所述Z11交换器速热交换工艺。
执行所述Z11Z交换器速热交换操作:启动所述BB冷却水循环系统、所述AA冷媒循环系统(或所述BB冷媒循环系统、或所述CC冷媒循环系统),之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动G10G泵送入所述Z11Z交换器进行交换,实现所述Z11Z交换器速热交换工艺;或启动所述C冷却水循环系统、所述A冷媒循环系统(或所述B冷媒循环系统),之后启动所述Z8制冷系统,之后被交换的液体通过管道启动所述G10G泵送入所述Z11Z交换器进行交换,实现所述Z11Z交换器速热交换工艺。
执行所述Z10交换器速冷交换操作:启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述B冷媒循环系统,之后启动所述Z8制冷系统,之后被交换的液体通过管道启动G8泵送入所述Z10交换器进行交换,实现所述Z10交换器速冷交换工艺;或启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述BB冷媒循环系统,之后启动所述Z8Z制冷系统,之后被交换的液体通过管道启动所述G8泵送入所述Z10交换器进行交换,实现所述Z10交换器速冷交换工艺。
执行所述A冷冻过滤系统操作:启动所述A冷进液系统完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述A大循环降温系统,之后当降温达到过滤要求时,关闭所述A大循环降温系统,之后启动所述A冷冻过滤系统和所述A添加系统进行正常过滤。
执行A二冷冻过滤系统操作:启动所述A冷进液系统完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述A大循环降温系统,之后当降温达到过滤要求时,关闭所述A大循环降温系统,之后启动所述A冷冻过滤系统和所述A添加系统进行正常过滤。
执行所述B冷冻过滤系统操作:启动所述B冷进液系统完成进液将其关闭,之后对所述A滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述B大循环降温系统,之后当降温达到过滤要求时,关闭所述B大循环降温系统,之后启动所述B冷冻过滤系统和所述A添加系统进行正常过滤。
执行B二冷冻过滤系统操作:启动所述B冷进液系统完成进液将其关闭,之后对所述A滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述B大循环降温系统,之后当降温达到过滤要求时,关闭所述B大循环降温系统,之后启动所述B冷冻过滤系统和所述A添加系统进行正常过滤。
执行所述C冷冻过滤系统操作:启动所述C冷进液系统完成进液将其关闭,之后对所述B滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统和所述A冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述C大循环降温系统,之后当降温达到过滤要求时,关闭所述C大循环降温系统,之后启动所述C冷冻过滤系统和所述B添加系统进行正常过滤。
执行C二冷冻过滤系统操作:启动所述C冷进液系统完成进液将其关闭,之后对所述B滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述CC冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述C大循环降温系统,之后当降温达到过滤要求时,关闭所述C大循环降温系统,之后启动所述C冷冻过滤系统和所述B添加系统进行正常过滤。
执行所述D常温过滤系统操作:启动所述D常进液系统、完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭,之后启动所述D常温过滤系统和所述A添加系统,进入正常过滤。
执行所述E常温过滤系统操作:启动所述E常进液系统、完成进液将其关闭,之后启动所述A滤挂土系统对所述Z4过滤机进行预涂助滤介、完成并关闭,之后启动所述E常温过滤系统和所述A添加系统,进入正常过滤。
执行所述F常温过滤系统操作:启动所述F常进液系统、完成进液将其关闭,之后启动所述B滤挂土系统对所述Z6过滤机进行预涂助滤介、完成并关闭,之后启动所述F常温过滤系统和所述B添加系统,进入正常过滤。
执行所述G常温过滤系统操作:启动所述G常进液系统、完成进液将其关闭,之后启动所述C滤挂土系统对所述Z7过滤机进行预涂助滤介、完成并关闭,之后启动所述G常温过滤系统,进入正常过滤。
执行所述AA冷冻过滤系统操作:启动所述AA冷进液系统完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述AA大循环降温系统,之后当降温达到过滤要求时,关闭所述AA大循环降温系统,之后启动所述AA冷冻过滤系统和所述AA添加系统进行正常过滤。
执行AA二冷冻过滤系统操作:启动所述AA冷进液系统完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述AA大循环降温系统,之后当降温达到过滤要求时,关闭所述AA大循环降温系统,之后启动所述AA冷冻过滤系统和所述AA添加系统进行正常过滤。
执行所述BB冷冻过滤系统操作:启动所述BB冷进液系统完成进液将其关闭,之后对所述AA滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述BB大循环降温系统,之后当降温达到过滤要求时,关闭所述BB大循环降温系统,之后启动所述BB冷冻过滤系统和所述AA添加系统进行正常过滤。
执行BB二冷冻过滤系统操作:启动所述BB冷进液系统完成进液将其关闭,之后对所述AA滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述BB大循环降温系统,之后当降温达到过滤要求时,关闭所述BB大循环降温系统,之后启动所述BB冷冻过滤系统和所述AA添加系统进行正常过滤。
执行所述CC冷冻过滤系统操作:启动所述CC冷进液系统完成进液将其关闭,之后对所述BB滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述AA冷却水循环系统(或所述BB冷却水循环系统)和所述AA冷媒循环系统,之后启动所述Z8Z制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述CC大循环降温系统,之后当降温达到过滤要求时,关闭所述CC大循环降温系统,之后启动所述CC冷冻过滤系统和所述BB添加系统进行正常过滤。
执行CC二冷冻过滤系统操作:启动所述CC冷进液系统完成进液将其关闭,之后对所述BB滤挂土系统进行预涂助滤介、完成并关闭;同时启动所述A冷却水循环系统(或所述B冷却水循环系统)和所述C冷媒循环系统,之后启动所述Z8制冷系统进行冷能储能;之后当冷能储能达到要求时启动所述CC大循环降温系统,之后当降温达到过滤要求时,关闭所述CC大循环降温系统,之后启动所述CC冷冻过滤系统和所述BB添加系统进行正常过滤。
执行所述DD常温过滤系统操作:启动所述DD常进液系统、完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭,之后启动所述DD常温过滤系统和所述AA添加系统,进入正常过滤。
执行所述EE常温过滤系统操作:启动所述EE常进液系统、完成进液将其关闭,之后启动所述AA滤挂土系统对所述Z4Z过滤机进行预涂助滤介、完成并关闭,之后启动所述EE常温过滤系统和所述AA添加系统,进入正常过滤。
执行所述FF常温过滤系统操作:启动所述FF常进液系统、完成进液将其关闭,之后启动所述BB滤挂土系统对所述Z6Z过滤机进行预涂助滤介、完成并关闭,之后启动所述FF常温过滤系统和所述BB添加系统,进入正常过滤。
执行所述GG常温过滤系统操作:启动所述GG常进液系统、完成进液将其关闭,之后启动所述CC滤挂土系统对所述Z7Z过滤机进行预涂助滤介、完成并关闭,之后启动所述GG常温过滤系统,进入正常过滤。
配合人工操作二合一系统,对操作繁琐且能统一指令的设计了模块化但需要配合人员采集数据来配合操作、因为流体过滤的压差和流量在持续变化及硅藻土添加量变化都有要求、对冷冻过滤还需要温差等要求,对不能完全统一指令需要人工检测数据的实行半自动化或手动化配合,所述冷却塔可设计利用循环水温可调范围内自行控制自动化开启和关闭,所述冷却塔在所述储水罐之上,其显示触摸屏、控制配电柜、模块等没有在视图里标出;对所用阀门部分采用电控和部分电控加手动二合一控制,实行安全阀定压自动保护装置、对泵动力源出口与安全阀的高压端口连接,以防止电控阀门的故障及其违反操作带来的大压差给部分装置带来损毁的可能,安全阀的排压端口连接可储液容器、以防止排压液体流失及其飞溅带来的隐患!在进液和出液处均可设计多管道向阀门控制、来满足多种液体的变换过滤清洗;根据客户需求采用助滤介质系统或不用助滤介质系统均可等。同时还采用了本人已有的几项专利技术:发明专利名称:一种自动化冷冻过滤装置及其操作方法、发明专利号:201110433647.X ,发明专利名称:一种模块化低温过滤装置及其操作方法、发明专利号:201110433715.2 来确保该发明的科技含量及其市场、实用价值。

Claims (1)

1.一种集成式冷冻过滤机组的工艺,其特征在于,两组以上的冷冻过滤机组进行组合,通过变通阀门和管路来快速实现所述两组以上的冷冻过滤机组中的同型设备元件的通用。
CN201810779523.9A 2018-07-16 2018-07-16 一种集成式冷冻过滤机组的工艺 Pending CN108722012A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810779523.9A CN108722012A (zh) 2018-07-16 2018-07-16 一种集成式冷冻过滤机组的工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810779523.9A CN108722012A (zh) 2018-07-16 2018-07-16 一种集成式冷冻过滤机组的工艺

Publications (1)

Publication Number Publication Date
CN108722012A true CN108722012A (zh) 2018-11-02

Family

ID=63926981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810779523.9A Pending CN108722012A (zh) 2018-07-16 2018-07-16 一种集成式冷冻过滤机组的工艺

Country Status (1)

Country Link
CN (1) CN108722012A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109876523A (zh) * 2019-02-22 2019-06-14 高云芝 一种冷热过滤机组

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1020637A1 (fr) * 1999-01-14 2000-07-19 Snecma Moteurs Circuit de carburant à filtre principal protégé
CN102492598A (zh) * 2011-12-22 2012-06-13 高云芝 一种自动化冷冻过滤装置及其操作方法
CN206793137U (zh) * 2017-05-16 2017-12-26 淄博鲁工造粒装备科技有限公司 一种双联过滤器

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1020637A1 (fr) * 1999-01-14 2000-07-19 Snecma Moteurs Circuit de carburant à filtre principal protégé
CN102492598A (zh) * 2011-12-22 2012-06-13 高云芝 一种自动化冷冻过滤装置及其操作方法
CN206793137U (zh) * 2017-05-16 2017-12-26 淄博鲁工造粒装备科技有限公司 一种双联过滤器

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109876523A (zh) * 2019-02-22 2019-06-14 高云芝 一种冷热过滤机组
CN109876523B (zh) * 2019-02-22 2021-11-05 高云芝 一种冷热过滤机组

Similar Documents

Publication Publication Date Title
CN108654197A (zh) 一种低温过滤装置
CN108654206A (zh) 一种冷冻过滤装置
CN108759201A (zh) 一种双制冷系统的冷冻过滤装置
CN108854239A (zh) 一种冷冻双过滤装置
CN108619784A (zh) 一种冷冻过滤设备
CN108889022A (zh) 一种冷冻双过滤设备
CN108771910A (zh) 一种双制冷双过滤装置
CN108722012A (zh) 一种集成式冷冻过滤机组的工艺
CN108993024A (zh) 一种冷冻过滤机组中的速冷工艺
CN108722010A (zh) 一种集成式冷冻过滤机组
CN115067744A (zh) 速成式恒温恒流校园用温热饮水机
CN109331540A (zh) 一种冷冻过滤机组的余液处理工艺
CN108124409A (zh) 一种服务器液冷系统
CN108722011A (zh) 一种低温过滤设备
CN108827053A (zh) 一种冷冻过滤机组的热能再利用工艺
CN108889026A (zh) 一种冷冻过滤机组的过滤工艺
CN108744712A (zh) 一种双制冷系统的冷冻过滤设备
CN108939660A (zh) 一种冷冻过滤机组的双系统制冷工艺
CN212067983U (zh) 一种双制冷双过滤设备
CN212068011U (zh) 一种双制冷双过滤装置
CN212091271U (zh) 一种双制冷系统的冷冻过滤设备
CN212091270U (zh) 一种冷冻过滤装置
CN108686421A (zh) 一种双制冷双过滤设备
CN212091216U (zh) 一种冷冻双过滤装置
CN212091232U (zh) 一种低温过滤装置

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181102