CN108716732A - New wind turbine - Google Patents
New wind turbine Download PDFInfo
- Publication number
- CN108716732A CN108716732A CN201810551122.8A CN201810551122A CN108716732A CN 108716732 A CN108716732 A CN 108716732A CN 201810551122 A CN201810551122 A CN 201810551122A CN 108716732 A CN108716732 A CN 108716732A
- Authority
- CN
- China
- Prior art keywords
- air inlet
- filtering area
- gas outlet
- wind turbine
- new wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F1/00—Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
- F24F1/02—Self-contained room units for air-conditioning, i.e. with all apparatus for treatment installed in a common casing
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/02—Ducting arrangements
- F24F13/0218—Flexible soft ducts, e.g. ducts made of permeable textiles
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F8/00—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying
- F24F8/10—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering
- F24F8/108—Treatment, e.g. purification, of air supplied to human living or working spaces otherwise than by heating, cooling, humidifying or drying by separation, e.g. by filtering using dry filter elements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2221/00—Details or features not otherwise provided for
- F24F2221/34—Heater, e.g. gas burner, electric air heater
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Textile Engineering (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
Abstract
The present invention relates to air cleaning facility technical fields, and in particular to new wind turbine;Including new Blower Housing, new Blower Housing is sealing cavity body, sealing cavity body inner route clapboard is separated into the first filtering area and the second filtering area, partition board bottom offers the first gas outlet, first filtering area top side wall offers air inlet, air inlet pipe is provided on air inlet, second filtering area top side wall offers the second gas outlet, first filtering area is provided with the first filter plate in air inlet lower part, second filtering area is provided with the second filter plate in the second gas outlet lower part, and partition board is provided with exhaust fan against air inlet side;Interior is introduced after outdoor air capable of being filtered, and enhances the pure and fresh degree of room air.
Description
Technical field
The present invention relates to air cleaning facility technical fields, and in particular to new wind turbine.
Background technology
Currently, outdoor air is introduced interior by new wind turbine due to having, the advantage of the pure and fresh degree of room air is kept, it is more next
More by the concern in market and welcome.In general, new wind turbine is mostly base station or air conditioner in machine room.It only simply draws outdoor air
Enter interior, to keep the pure and fresh degree of room air.But when outdoor air cleannes are not high, by new wind turbine by room
Outer air is introduced directly into interior, it is easy to cause the cleannes of room air to reduce, to influence the cleaning effect of new wind turbine.
Invention content
The purpose of the present invention is to provide new wind turbines, and introducing is indoor after capable of being filtered outdoor air, in enhanced room
The pure and fresh degree of air.
In order to solve the above technical problems, the present invention uses following technical scheme:
New wind turbine, including new Blower Housing, new Blower Housing are sealing cavity body, and sealing cavity body inner route clapboard is separated into first
Filtering area and the second filtering area, partition board bottom offer the first gas outlet, and the first filtering area top side wall offers air inlet, into
Air inlet pipe is provided on gas port, the second filtering area top side wall offers the second gas outlet, and the first filtering area is in air inlet lower part
It is provided with the first filter plate, the second filtering area is provided with the second filter plate in the second gas outlet lower part, and partition board is against air inlet one
Side is provided with exhaust fan.
Further, setting having heaters and cooler at the top of the first filtering area, the electricity of heater and cooler with outside
Source connects.
Further, air inlet pipe is at least provided with two.
Further, the second gas outlet is at least provided with three, and uniformly offers on new Fan casing body sidewall.
Further, the first filter plate includes the first filter layer for being layered on top of each other setting, the second filter layer and is set to described
Active carbon layer between first filter layer and second filter layer, the active carbon layer are composed of active carbon particle.
Further, the first filter layer and second filter layer all have filter hole, wherein the mistake of second filter layer
Filter opening diameter is less than the active carbon particle diameter.
Further, air inlet pipe end outer wall is circumferentially provided with external screw thread.
Further, escape pipe has been connected through a screw thread on the second gas outlet, escape pipe is soft gooseneck.
Compared with prior art, the present invention one of at least has the advantages that:
1. in the use of the present invention, opening exhaust fan, then outdoor gas enters from air inlet pipe, then pass through the first filter plate and
Interior is exited into from the second gas outlet after second filter plate, enhances the pure and fresh degree of room air.
2. having heaters and cooler are arranged in the first filtering area, in use, if outdoor air and interior
There are temperature differences for air, then heater or cooler, reduce the temperature difference of indoor and outdoor air.
3. being provided with soft gooseneck on the second gas outlet, the position for capableing of fresh air as needed adjusts soft gooseneck
Export direction, increase practicability.
Description of the drawings
Fig. 1 is schematic structural view of the invention.
Fig. 2 is that the present invention first filters plate structure schematic diagram.
In figure, the new Blower Housings of 1-, 2- partition boards, the first filtering areas of 3-, the second filtering areas of 4-, the first gas outlets 5-, 6- into
Gas port, 7- air inlet pipe, the second gas outlets 8-, the first filter plates of 9-, the second filter plates of 10-, 11- exhaust fans, 12- heaters, 13-
Cooler, the first filter layers of 14-, the second filter layers of 15-, 16- active carbon layers, 17- escape pipes.
Specific implementation mode
As shown in Figure 1, in order to make the purpose , technical scheme and advantage of the present invention be clearer, below in conjunction with attached drawing
And embodiment, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used to solve
The present invention is released, is not intended to limit the present invention.
Embodiment 1
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11 against 6 side of air inlet, when in use, open exhaust fan 11, then outdoor gas from
Air inlet pipe 7 enters, and then exits into room from the second gas outlet 8 after the first filter plate 9 and the filtering of the second filter plate 10
It is interior, enhance the pure and fresh degree of room air.
Embodiment 2
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11,3 top setting having heaters 12 of the first filtering area and cooler against 6 side of air inlet
13, heater 12 and cooler 13 are connect with external power supply, in use, if outdoor air and room air are deposited
In temperature difference, then heater 12 or cooler 13, reduce the temperature difference of indoor and outdoor air.
Embodiment 3
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11,3 top setting having heaters 12 of the first filtering area and cooler against 6 side of air inlet
13, heater 12 and cooler 13 are connect with external power supply, and air inlet pipe 7 can increase air inlet at least provided with two
Amount increases indoor air freshness.
Embodiment 4
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11 against 6 side of air inlet, and the second gas outlet 8 is and uniform at least provided with three
It offers on 1 side wall of new Blower Housing, is provided with multiple second gas outlets 8, intake velocity can be slowed down, it is comfortable to increase air inlet
Degree.
Embodiment 5
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11 against 6 side of air inlet, and the first filter plate 9 includes the first filtering for being layered on top of each other setting
The 14, second filter layer 15 of layer and the active carbon layer 16 being set between first filter layer 14 and second filter layer 15,
The active carbon layer 16 is composed of active carbon particle, and the gas by filtering enters interior, increases cleaning gas degree.
Embodiment 6
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11 against 6 side of air inlet, and the first filter plate 9 includes the first filtering for being layered on top of each other setting
The 14, second filter layer 15 of layer and the active carbon layer 16 being set between first filter layer 14 and second filter layer 15,
The active carbon layer 16 is composed of active carbon particle, and the first filter layer 14 and second filter layer 15 all have filtering
Hole, wherein the filtering bore dia of second filter layer 15 is less than the active carbon particle diameter, increases filter effect.
Embodiment 7
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11 against 6 side of air inlet, and 7 end outer wall of air inlet pipe is circumferentially provided with external screw thread, makes
Used time, admission line are threadedly attached in air inlet pipe 7, and disassembly and installation is more convenient.
Embodiment 8
New wind turbine, including new Blower Housing 1, new Blower Housing 1 are sealing cavity body, and sealing cavity body inner route clapboard 2 is separated into
First filtering area 3 and the second filtering area 4,2 bottom of partition board offer the first gas outlet 5, and 3 top side wall of the first filtering area offers
Air inlet 6, air inlet pipe 7 is provided on air inlet 6, and 4 top side wall of the second filtering area offers the second gas outlet 8, the first filtering
Area 3 is provided with the first filter plate 9 in 6 lower part of air inlet, and the second filtering area 4 is provided with the second filtering in 8 lower part of the second gas outlet
Plate 10, partition board 2 are provided with exhaust fan 11 against 6 side of air inlet, escape pipe 17 have been connected through a screw thread on the second gas outlet 8,
Escape pipe 17 is soft gooseneck, and the position for capableing of fresh air as needed adjusts the export direction of soft gooseneck, increases practical
Property.
Although reference be made herein to invention has been described for multiple explanatory embodiments of the invention, however, it is to be understood that
Those skilled in the art can be designed that a lot of other modification and implementations, these modifications and implementations will be fallen in this Shen
It please be within disclosed scope and spirit.More specifically, disclose in the application, drawings and claims in the range of, can
With the building block and/or a variety of variations and modifications of layout progress to theme combination layout.In addition to building block and/or layout
Outside the modification and improvement of progress, to those skilled in the art, other purposes also will be apparent.
Claims (8)
1. new wind turbine, it is characterised in that:Including new Blower Housing(1), new Blower Housing(1)For sealing cavity body, sealing cavity
Body inner route clapboard(2)It is separated into the first filtering area(3)With the second filtering area(4), partition board(2)Bottom offers the first gas outlet
(5), the first filtering area(3)Top side wall offers air inlet(6), air inlet(6)On be provided with air inlet pipe(7), the second filtering
Area(4)Top side wall offers the second gas outlet(8), the first filtering area(3)In air inlet(6)Lower part is provided with the first filter plate
(9), the second filtering area(4)In the second gas outlet(8)Lower part is provided with the second filter plate(10), partition board(2)Against air inlet(6)
Side is provided with exhaust fan(11).
2. new wind turbine according to claim 1, it is characterised in that:First filtering area(3)Having heaters is arranged in top(12)
And cooler(13), heater(12)And cooler(13)It is connect with external power supply.
3. new wind turbine according to claim 1, it is characterised in that:Air inlet pipe(7)At least provided with two.
4. new wind turbine according to claim 1, it is characterised in that:Second gas outlet(8)At least provided with three, and
Even offers in new Blower Housing(1)On side wall.
5. new wind turbine according to claim 1, it is characterised in that:First filter plate(9)Including being layered on top of each other setting
One filter layer(14), the second filter layer(15)Be set to first filter layer(14)With second filter layer(15)Between
Active carbon layer(16), the active carbon layer(16)It is composed of active carbon particle.
6. new wind turbine according to claim 5, it is characterised in that:First filter layer(14)With second filter layer(15)
All have filter hole, wherein second filter layer(15)Filtering bore dia be less than the active carbon particle diameter.
7. new wind turbine according to claim 1, it is characterised in that:Air inlet pipe(7)End outer wall is circumferentially provided with external screw thread.
8. new wind turbine according to claim 1, it is characterised in that:Second gas outlet(8)On be connected through a screw thread outlet
Pipe(17), escape pipe(17)For soft gooseneck.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810551122.8A CN108716732A (en) | 2018-05-31 | 2018-05-31 | New wind turbine |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810551122.8A CN108716732A (en) | 2018-05-31 | 2018-05-31 | New wind turbine |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108716732A true CN108716732A (en) | 2018-10-30 |
Family
ID=63912709
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810551122.8A Pending CN108716732A (en) | 2018-05-31 | 2018-05-31 | New wind turbine |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108716732A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110469936A (en) * | 2019-08-20 | 2019-11-19 | 李�诚 | A kind of new blower of hanging-on-window type |
CN113834147A (en) * | 2021-09-08 | 2021-12-24 | 深圳市英维克科技股份有限公司 | Temperature control device |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2873576B1 (en) * | 1998-01-05 | 1999-03-24 | 日本エアーテック株式会社 | Air purifier installed between outside air and room |
CN204006363U (en) * | 2014-03-25 | 2014-12-10 | 北京中标新亚节能工程股份有限公司 | Fresh air processor |
CN204678462U (en) * | 2015-04-07 | 2015-09-30 | 江苏友奥电器有限公司 | A kind of Multifunctional warm air blower |
CN205137719U (en) * | 2015-10-30 | 2016-04-06 | 青岛海尔空调器有限总公司 | Movable type air conditioner |
CN205174586U (en) * | 2015-10-27 | 2016-04-20 | 上海清清家科技有限公司 | New fan of adjustable amount of wind size |
CN205536342U (en) * | 2016-01-20 | 2016-08-31 | 珠海格力电器股份有限公司 | New fan |
CN206037276U (en) * | 2016-08-24 | 2017-03-22 | 赵全礼 | Air purifier |
KR20180007206A (en) * | 2016-07-12 | 2018-01-22 | 주식회사 쎄번 | Wall penetration type selectively clean air supply system |
CN207262579U (en) * | 2017-04-27 | 2018-04-20 | 马立新 | Environment-friendly novel air purifier and the door and window with environment-friendly novel air purifier |
CN208282277U (en) * | 2018-05-31 | 2018-12-25 | 四川建源节能科技有限公司 | New blower |
-
2018
- 2018-05-31 CN CN201810551122.8A patent/CN108716732A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2873576B1 (en) * | 1998-01-05 | 1999-03-24 | 日本エアーテック株式会社 | Air purifier installed between outside air and room |
CN204006363U (en) * | 2014-03-25 | 2014-12-10 | 北京中标新亚节能工程股份有限公司 | Fresh air processor |
CN204678462U (en) * | 2015-04-07 | 2015-09-30 | 江苏友奥电器有限公司 | A kind of Multifunctional warm air blower |
CN205174586U (en) * | 2015-10-27 | 2016-04-20 | 上海清清家科技有限公司 | New fan of adjustable amount of wind size |
CN205137719U (en) * | 2015-10-30 | 2016-04-06 | 青岛海尔空调器有限总公司 | Movable type air conditioner |
CN205536342U (en) * | 2016-01-20 | 2016-08-31 | 珠海格力电器股份有限公司 | New fan |
KR20180007206A (en) * | 2016-07-12 | 2018-01-22 | 주식회사 쎄번 | Wall penetration type selectively clean air supply system |
CN206037276U (en) * | 2016-08-24 | 2017-03-22 | 赵全礼 | Air purifier |
CN207262579U (en) * | 2017-04-27 | 2018-04-20 | 马立新 | Environment-friendly novel air purifier and the door and window with environment-friendly novel air purifier |
CN208282277U (en) * | 2018-05-31 | 2018-12-25 | 四川建源节能科技有限公司 | New blower |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110469936A (en) * | 2019-08-20 | 2019-11-19 | 李�诚 | A kind of new blower of hanging-on-window type |
CN113834147A (en) * | 2021-09-08 | 2021-12-24 | 深圳市英维克科技股份有限公司 | Temperature control device |
WO2023035393A1 (en) * | 2021-09-08 | 2023-03-16 | 深圳市英维克科技股份有限公司 | Temperature control apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207797321U (en) | A kind of new wind turbine of air conditioner with air purification | |
CN208282277U (en) | New blower | |
CN108716732A (en) | New wind turbine | |
CN206145892U (en) | Indoor air purification equipment | |
CN108344093A (en) | A kind of engineering industry energy-saving ventilation system | |
CN107192081A (en) | A kind of fresh air-changing device and fully-automatic intelligent air regenerating device | |
CN106762853A (en) | A kind of denoising device for industrial fan | |
CN106288053A (en) | A kind of air quality processes unit | |
CN205245406U (en) | Unit device of modularization toilet | |
CN206191750U (en) | Air conditioning system | |
CN206514435U (en) | A kind of air quality handles unit | |
CN205227526U (en) | Energy -concerving and environment -protective type central air conditioning's fan coil equipment | |
CN212691996U (en) | Household constant temperature, humidity, oxygen, clean and clean equipment | |
CN211829820U (en) | Low-voltage distribution cabinet aeration cooling structure | |
CN103604188B (en) | Domestic indoor/outdoor air circulation system | |
CN106352410A (en) | Air conditioning system | |
CN207351156U (en) | A kind of traditional energy saving zinc-plated drying integrated device | |
CN203586479U (en) | Domestic indoor and outdoor air circulation system | |
CN206957952U (en) | A kind of outer rotor Double Speed Fan | |
CN207486841U (en) | A kind of spirally inlet air device in biomass combustion equipment | |
CN206274198U (en) | Purification air-conditioning and ventilated linked energy conserving system | |
CN206959252U (en) | Integral ceiling air circulation structure | |
CN206695327U (en) | Electrostatic precipitation total-heat exchanger | |
CN206556191U (en) | A kind of moveable VMC | |
CN206371037U (en) | One kind accelerates computer room air flow arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |