CN108711934A - The inspection method of one figure of monitoring, six table of system is dispatched based on SG-OSS intelligent grids - Google Patents
The inspection method of one figure of monitoring, six table of system is dispatched based on SG-OSS intelligent grids Download PDFInfo
- Publication number
- CN108711934A CN108711934A CN201810409910.3A CN201810409910A CN108711934A CN 108711934 A CN108711934 A CN 108711934A CN 201810409910 A CN201810409910 A CN 201810409910A CN 108711934 A CN108711934 A CN 108711934A
- Authority
- CN
- China
- Prior art keywords
- monitoring
- field
- tour
- board
- oss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J13/00—Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses the inspection methods for one figure of monitoring, six table that system is dispatched based on SG-OSS intelligent grids, are related to monitoring technical field on duty;It, which is included in the SCADA menus of monitored space, increases monitoring tour menu, and six table of a figure that monitoring tour is used, which is put into monitoring, to be maked an inspection tour in menu;All charts are fabricated separately according to associated monitoring area permission, are counted according to the different monitored space of login and are shown the data of relevant range;It realizes remote signalling, telemetering, remote regulating and the remote-control data that can cover D5000 systems when monitor makes an inspection tour comprehensively by technologies such as six table tour methods of a figure, ensure to find in time power grid and system there are the problem of, ensure the safe operation of power grid.
Description
Technical field
The present invention relates to monitor technical field on duty more particularly to a kind of prison for dispatching system based on SG-OSS intelligent grids
Control the inspection method of six table of a figure.
Background technology
In 2015, installation was electric company at county level of each city of Hebei South Power Network using the scheduling of SG-OSS intelligent grids comprehensively
System carries out Centralized Monitoring to all unattended substations in scheduling range, and current regulation and control center monitors on duty at different levels are without one
A unified inspection method makes an inspection tour work generally by monitoring is completed to the visual tour of bus arrangement figure.With power grid
Scale is increasingly huge, and structure is also increasingly complicated, and personnel labor intensity continues to increase.Electric network state amount information increases sharply in number, and is not easy
The entirety understanding to power grid is obtained from a large amount of data.After power grid is abnormal, monitoring information complexity is various, fault diagnosis and
Processing relies primarily on the operating experience of personnel, lacks the technological means prejudged to electric network failure diagnosis, tends not to find in time
Power grid abnormality.For Centralized Monitoring substation quantity increased at present, this inspection method has been unsatisfactory for reality
The demand of work.
The defect and deficiency of the prior art:First, since comprehensive tour needs multiple projects such as inspection telemetering, remote signalling, light word
And continuous image switching is needed to check information, operation is more and tour time is long, and having can cause to make an inspection tour operating interruptions when other work,
It cannot pinpoint the problems in time, make an inspection tour being easy to omit tour project after interruption again;Second is that inspection method is single, various data volumes are miserable
It is miscellaneous together, influence make an inspection tour effect;It third, exception information does not protrude, can not compare, should not find power grid and monitoring system defect.
Invention content
Technical problem to be solved by the invention is to provide a kind of monitoring one for dispatching system based on SG-OSS intelligent grids
The inspection method of six table of figure, by technologies such as six table tour methods of a figure, system can be covered comprehensively when monitor makes an inspection tour by realizing
Remote signalling, telemetering, remote regulating and remote-control data, ensure to find in time power grid and system there are the problem of, ensure the safety fortune of power grid
Row.
In order to solve the above technical problems, the technical solution used in the present invention is:Increase in the SCADA menus of monitored space
Menu is maked an inspection tour in monitoring, and six table of a figure that monitoring tour is used, which is put into monitoring, to be maked an inspection tour in menu;All charts are according to associated monitoring
Area's permission is fabricated separately, and is counted according to the different monitored space of login and is shown the data of relevant range;It is as follows,
S1 establishes a figure
A figure is established, a figure is wiring diagram, is the state diagram in normal display monitoring area channel, is used to monitor the power transformation of thing area
Channel status of standing centralized displaying;
S2 establishes table one
Table one is load factor table, is provided with the main transformer and respective load factor field of circuit in Table 1, temperature field and electric current is got over
Limit field and unprocessed information field;
S3 establishes table two
Table two includes that board information list and non-involution light word list are set in monitoring, and monitoring annotation board field, inspection are provided in table two
It repaiies annotation board field, No switching on annotation board field and scheduling annotation board field, the monitoring and sets board information list and non-involution
Light word list or so is distributed and corresponds, which is located in an interface and is ranked up according to one-to-one correspondence, supervises
The keyword for controlling board information list is corresponding with the label on corresponding equipment nameplate;
S4 establishes table three
Table three is dead tables of data, dead data field is provided in table three and doomed dead according to duration field;
S5 establishes table four
Table four is suspicious remote signalling list, and suspicious remote signalling field is provided in table four;
S6 establishes table five
Table five is active curve list;
S7 establishes table six
Table six is to inhibit information list, and inhibition information field is provided in table six.
Further technical solution is:In the step of S1 establishes a figure, made on each wiring diagram next
The tour button stood clicks the tour button of the next stop, then is maked an inspection tour into next wiring diagram, in manual or automated manner
It is maked an inspection tour.
Further technical solution is:The S2 was established in the step of table one, and the data in table one are arranged in a manual manner
Sequence.
Further technical solution is:The S3 was established in the step of table two, and monitoring sets board information list and notes monitoring
Releasing board, maintenance annotation board and No switching on annotation each field of board divides table to show.
Further technical solution is:The S4 was established in the step of table three, and dead data delay is shown, display is doomed dead
According to duration, be ranked up according to the duration of doomed dead evidence, show telemetry.
Further technical solution is:The S5 was established in the step of table four, and display switch, disconnecting link and telemetering amount be not right
Detail is answered, there is telemetering in a point position, and three-phase telemetry value is not corresponding with the position of the switch when closing position.
Further technical solution is:The S6 was established in the step of table five, is shown the active curve of all main transformers, is passed through
The variation of the active curve of main transformer is compared, the significant deficiency that substation's telecontrol communication machine crashes is found in time, finds system detectio not in time
The whole station for going out doomed dead evidence loses monitor event.
Further technical solution is:The S7 was established in the step of table six, showed all inhibition information, by with electricity
Net maintenance mode is checked, and finds the monitoring information of non-derepression in time.
Further technical solution is:The S3 was established in the step of table two, the letter in modification scheduling annotation board field
Breath makes it annotate the information in board field with monitoring to have any different, so as to monitor make an inspection tour in only filter out monitoring and set board information list.
Further technical solution is:Hyperlink is all supported in all charts, is clicked directly on data, is then opened wiring
Figure or chart spacing are checked in detail, and right button opening curves figure and Information Statistics is supported to retrieve table.
It is using advantageous effect caused by above-mentioned technical proposal:
First, comprehensive Project decomposition of making an inspection tour is maked an inspection tour at special chart, motivated, can note abnormalities data in time, single
Chart tour time shortens, and fast splicing after more people may be implemented while making an inspection tour and interrupting effectively shortens and loses the time.
Second, by sequence, comparison, association open the technological means such as figure and realize that the quick-searching to related data, subitem patrol
Inspection.
Third, single chart tour tour project is few, and data are easy lateral, longitudinal comparison, it can be found that hiding deeper
Defect.
4th, become passive processing and is monitored into active.Realization is timed the important parameter and warning information of monitoring system
Scanning finds potential exception and failure in time, reduces the response time of power equipment abnormality processing, the fortune of safeguards system equipment
The reliability of row rate and system.
5th, mitigate the work load of operation power operator on duty.Changed colour using big data screening and sequence, exception information
The prompt facilities such as display cooperation operator on duty makes an inspection tour entire electric power data and automated system, mitigates the work of operator on duty
Make burden and stress.
Description of the drawings
Fig. 1 is the flow chart of the present invention.
Specific implementation mode
With reference to the attached drawing in the embodiment of the present invention, technical solution in the embodiment of the present invention carries out clear, complete
Ground describes, it is clear that the described embodiments are merely a part of the embodiments of the present invention, instead of all the embodiments.Based on this
Embodiment in invention, every other reality obtained by those of ordinary skill in the art without making creative efforts
Example is applied, shall fall within the protection scope of the present invention.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still the present invention can be with
Implemented different from other manner described here using other, those skilled in the art can be without prejudice to intension of the present invention
In the case of do similar popularization, therefore the present invention is not limited by following public specific embodiment.
As shown in Figure 1, the invention discloses a kind of one figure of monitoring, six tables for dispatching system based on SG-OSS intelligent grids
Inspection method comprising following steps:
Increase monitoring in the SCADA menus of monitored space and make an inspection tour menu, six table of a figure that monitoring tour is used, which is put into monitoring, to patrol
Depending in menu;All charts are fabricated separately according to associated monitoring area permission, are counted according to the different monitored space of login and are shown phase
Close the data of range;It is as follows,
S1 establishes a figure
A figure is established, a figure is wiring diagram, is the state diagram in normal display monitoring area channel, is used to monitor the power transformation of thing area
Channel status of standing centralized displaying;The tour button that the next stop is made on each wiring diagram, clicks the tour button of the next stop,
It is then maked an inspection tour into next wiring diagram, is maked an inspection tour in manual or automated manner.
S2 establishes table one
Table one is load factor table, is provided with the main transformer and respective load factor field of circuit in Table 1, temperature field and electric current is got over
Limit field and unprocessed information field;Data in table one sort in a manual manner.
S3 establishes table two
Table two includes that board information list and non-involution light word list are set in monitoring, and monitoring annotation board field, inspection are provided in table two
It repaiies annotation board field, No switching on annotation board field and scheduling annotation board field, the monitoring and sets board information list and non-involution
Light word list or so is distributed and corresponds, which is located in an interface and is ranked up according to one-to-one correspondence, supervises
The keyword for controlling board information list is corresponding with the label on corresponding equipment nameplate;Monitoring sets board information list and notes monitoring
Releasing board, maintenance annotation board and No switching on annotation each field of board divides table to show.Information in modification scheduling annotation board field makes it
With monitoring the information in board field is annotated to have any different, so as to monitor make an inspection tour in only filter out monitoring and set board information list.
S4 establishes table three
Table three is dead tables of data, dead data field is provided in table three and doomed dead according to duration field;By dead data delay
Displaying, shows the duration of doomed dead evidence, is ranked up according to the duration of doomed dead evidence, shows telemetry.
S5 establishes table four
Table four is suspicious remote signalling list, and suspicious remote signalling field is provided in table four;Display switch, disconnecting link and telemetering amount be not corresponding
There are telemetering in detail, a point position, and three-phase telemetry value is not corresponding with the position of the switch when closing position.
S6 establishes table five
Table five is active curve list;Show the active curve of all main transformers, by comparing the variation of the active curve of main transformer, in time
It was found that the significant deficiency that substation's telecontrol communication machine crashes, the whole station that timely discovery system detectio does not go out doomed dead evidence loses monitor event.
S7 establishes table six
Table six is to inhibit information list, and inhibition information field is provided in table six.Show all inhibition information, by with power grid
Maintenance mode is checked, and finds the monitoring information of non-derepression in time.
Hyperlink is all supported in all charts, clicks directly on data, then opens wiring diagram or chart spacing carries out detailed core
It is right, support right button opening curves figure and Information Statistics to retrieve table.
Explanation:
S1 establishes a figure
It is disconnected that channel status figure substation icon becomes red then whole channels, and when tour finds channel whole interrupting information, clicks station
Name can carry out wiring diagram tour.I.e. button name is that " X points of tours finish when X, the next stop " realizes that quick switching substation patrols
Depending on reducing tour time;The time is clicked in the button solidification display clicked, for distinguishing tour vacuum phase.
Without special circumstances, light word figure is no longer checked when making an inspection tour wiring diagram, is no longer maked an inspection tour into interval.Wiring diagram makes an inspection tour main inspection
Telemetering, remote signalling location information are looked into, power grid mode is checked for monitor.
S3 establishes table two
Table two includes that board information list and non-involution light word list are set in monitoring, and board information list and non-involution light word are set in the monitoring
List or so is distributed and corresponds, which is located in an interface and is ranked up according to one-to-one correspondence, so as to right
Whether have non-involution light word no noting or involution light word do not extract annotation board, find untreated non-involution letter in time if should make an inspection tour
Breath.
S4 establishes table three
The displaying of dead data delay, such as continuous 1 hour doomed dead evidence are set, show dead data duration, can according to it is doomed dead according to when
Between be ranked up, have will showing for telemetry, threshold value can be set.Principle be it can be found that all operation datas it is dead
Data phenomenon, screens out outaged equipment.
S5 establishes table four
Remote signalling, telemetering error message are found when to make an inspection tour.
S7 establishes table six
It prevents because accidentally inhibiting to influence breakdown judge and disposition.
Advantage:
It is maked an inspection tour at special chart first, will integrate and make an inspection tour Project decomposition, motivated, can note abnormalities data in time, single figure
Table tour time shortens, and fast splicing after more people may be implemented while making an inspection tour and interrupting effectively shortens and loses the time.
Second is that by sequence, comparison, association open the technological means such as figure and realize that the quick-searching to related data, subitem patrol
Inspection.
Third, single chart is maked an inspection tour, tour project is few, and data are easy lateral, longitudinal comparison, it can be found that hiding deeper lack
It falls into.
It is monitored into active fourth, becoming passive processing.Realization, which is timed the important parameter and warning information of monitoring system, sweeps
It retouches, finds potential exception and failure in time, reduce the response time of power equipment abnormality processing, the operation of safeguards system equipment
The reliability of rate and system.
Fifth, mitigating the work load of operation power operator on duty.Changed colour using big data screening and sequence, exception information
The prompt facilities such as display cooperation operator on duty makes an inspection tour entire electric power data and automated system, mitigates the work of operator on duty
Make burden and stress.
Claims (10)
1. a kind of inspection method of one figure of monitoring, six table that dispatching system based on SG-OSS intelligent grids, it is characterised in that:It is supervising
It controls to increase to monitor in the SCADA menus in area and makes an inspection tour menu, six table of a figure used is maked an inspection tour in monitoring to be put into monitoring tour menu;
All charts are fabricated separately according to associated monitoring area permission, are counted according to the different monitored space of login and are shown the number of relevant range
According to;It is as follows,
S1 establishes a figure
A figure is established, a figure is wiring diagram, is the state diagram in normal display monitoring area channel, is used to monitor the power transformation of thing area
Channel status of standing centralized displaying;
S2 establishes table one
Table one is load factor table, is provided with the main transformer and respective load factor field of circuit in Table 1, temperature field and electric current is got over
Limit field and unprocessed information field;
S3 establishes table two
Table two includes that board information list and non-involution light word list are set in monitoring, and monitoring annotation board field, inspection are provided in table two
It repaiies annotation board field, No switching on annotation board field and scheduling annotation board field, the monitoring and sets board information list and non-involution
Light word list or so is distributed and corresponds, which is located in an interface and is ranked up according to one-to-one correspondence, supervises
The keyword for controlling board information list is corresponding with the label on corresponding equipment nameplate;
S4 establishes table three
Table three is dead tables of data, dead data field is provided in table three and doomed dead according to duration field;
S5 establishes table four
Table four is suspicious remote signalling list, and suspicious remote signalling field is provided in table four;
S6 establishes table five
Table five is active curve list;
S7 establishes table six
Table six is to inhibit information list, and inhibition information field is provided in table six.
2. the inspection method of one figure of monitoring, six table according to claim 1 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:In the step of S1 establishes a figure, the tour button of the next stop is made on each wiring diagram, under click
The tour button at one station, then maked an inspection tour into next wiring diagram, maked an inspection tour in manual or automated manner.
3. the inspection method of one figure of monitoring, six table according to claim 2 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:The S2 was established in the step of table one, and the data in table one sort in a manual manner.
4. the inspection method of one figure of monitoring, six table according to claim 3 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:The S3 was established in the step of table two, and monitoring sets board information list by monitoring annotation board, maintenance annotation board and taboo
Annotation each field of board of only closing a floodgate divides table to show.
5. the inspection method of one figure of monitoring, six table according to claim 4 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:The S4 was established in the step of table three, and dead data delay is shown, showed the duration of doomed dead evidence, according to
The duration of doomed dead evidence is ranked up, and shows telemetry.
6. the inspection method of one figure of monitoring, six table according to claim 5 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:The S5 was established in the step of table four, and display switch, disconnecting link are not corresponding detailed with telemetering amount, and there is telemetering in a point position,
Three-phase telemetry value is not corresponding with the position of the switch when closing position.
7. the inspection method of one figure of monitoring, six table according to claim 6 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:The S6 was established in the step of table five, showed the active curve of all main transformers, by comparing the active curve of main transformer
Change, finds that the significant deficiency that substation's telecontrol communication machine crashes, the whole station that the system detectio of discovery in time does not go out doomed dead evidence lose in time
Monitor event.
8. the inspection method of one figure of monitoring, six table according to claim 7 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:The S7 was established in the step of table six, showed all inhibition information, by being checked with grid maintenance mode, and
The monitoring information of the non-derepressions of Shi Faxian.
9. the inspection method of one figure of monitoring, six table according to claim 8 that system is dispatched based on SG-OSS intelligent grids,
It is characterized in that:The S3 was established in the step of table two, and the information in modification scheduling annotation board field makes it annotate board with monitoring
Information in field is had any different, so as to monitor make an inspection tour in only filter out monitoring and set board information list.
10. one figure six of monitoring for dispatching system based on SG-OSS intelligent grids according to any one of claim 1-9
The inspection method of table, it is characterised in that:All support hyperlink in all charts, click directly on data, then open wiring diagram or
Chart spacing is checked in detail, and right button opening curves figure and Information Statistics is supported to retrieve table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810409910.3A CN108711934A (en) | 2018-04-28 | 2018-04-28 | The inspection method of one figure of monitoring, six table of system is dispatched based on SG-OSS intelligent grids |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810409910.3A CN108711934A (en) | 2018-04-28 | 2018-04-28 | The inspection method of one figure of monitoring, six table of system is dispatched based on SG-OSS intelligent grids |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108711934A true CN108711934A (en) | 2018-10-26 |
Family
ID=63867619
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810409910.3A Pending CN108711934A (en) | 2018-04-28 | 2018-04-28 | The inspection method of one figure of monitoring, six table of system is dispatched based on SG-OSS intelligent grids |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108711934A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112487282A (en) * | 2020-11-04 | 2021-03-12 | 山东中创软件商用中间件股份有限公司 | Business processing condition monitoring method and device, electronic equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103441571A (en) * | 2013-06-18 | 2013-12-11 | 国家电网公司 | Integrated monitoring system information platform for transformer substation |
CN104977887A (en) * | 2015-07-02 | 2015-10-14 | 华润水泥技术研发有限公司 | SCADA system-based information monitoring system and monitoring method thereof |
CN106300661A (en) * | 2016-08-24 | 2017-01-04 | 安徽森度科技有限公司 | Power transformation is sent to transport check system |
CN107658985A (en) * | 2017-10-13 | 2018-02-02 | 国网新疆电力公司阿勒泰供电公司 | Transformer station's Centralized Monitoring visualization system and its application method |
CN107911347A (en) * | 2017-10-31 | 2018-04-13 | 国电南瑞科技股份有限公司 | A kind of monitoring system of distribution network and information transferring method based on across security partitioning |
-
2018
- 2018-04-28 CN CN201810409910.3A patent/CN108711934A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103441571A (en) * | 2013-06-18 | 2013-12-11 | 国家电网公司 | Integrated monitoring system information platform for transformer substation |
CN104977887A (en) * | 2015-07-02 | 2015-10-14 | 华润水泥技术研发有限公司 | SCADA system-based information monitoring system and monitoring method thereof |
CN106300661A (en) * | 2016-08-24 | 2017-01-04 | 安徽森度科技有限公司 | Power transformation is sent to transport check system |
CN107658985A (en) * | 2017-10-13 | 2018-02-02 | 国网新疆电力公司阿勒泰供电公司 | Transformer station's Centralized Monitoring visualization system and its application method |
CN107911347A (en) * | 2017-10-31 | 2018-04-13 | 国电南瑞科技股份有限公司 | A kind of monitoring system of distribution network and information transferring method based on across security partitioning |
Non-Patent Citations (1)
Title |
---|
李玉龙等: "基于智能调度平台的监控信息整合技术研究与应用", 《安徽电气工程职业技术学院学报》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112487282A (en) * | 2020-11-04 | 2021-03-12 | 山东中创软件商用中间件股份有限公司 | Business processing condition monitoring method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101958536B (en) | Distribution network failure isolation and quick power service restoration decision support system | |
CN209282929U (en) | A kind of electric power box intelligent monitoring protection management system | |
CN107834699A (en) | Dispatching of power netwoks based on the regulation and control integration of ground county integrates anti-error system | |
CN109634243A (en) | A kind of scheduler program operating system based on intelligent robot | |
CN106208372B (en) | Switch remote operation method based on comprehensive visualization and anti-error topological analysis | |
Chan et al. | The implementation and evolution of a SCADA system for a large distribution network | |
CN109245308A (en) | A kind of linkage alarm method based on substation's comprehensive monitoring system | |
CN110909444A (en) | High-speed rail traction power supply scheduling simulation training system | |
CN110224491A (en) | Monitoring device, monitoring method and the monitoring system of Distributed power net automatic switch | |
CN103809460A (en) | Monitoring center simulation method, device and system | |
CN102209231B (en) | Equipment information output method and system | |
CN108711934A (en) | The inspection method of one figure of monitoring, six table of system is dispatched based on SG-OSS intelligent grids | |
Nair et al. | IEC 61850 enabled automatic bus transfer scheme for primary distribution substations | |
CN111369020A (en) | Automatic control system and method for cascade hydropower station group control signals | |
CN105867270B (en) | A kind of power transmission and transformation equipment state anomalous identification and plan for emergency handling automatic push method | |
CN106059091A (en) | Transformer station remote maintenance system and method | |
CN109950883A (en) | Protection supervisory equipment and protection investigating method for distribution network automated switch | |
CN115912621A (en) | Rail transit substation inspection method and application | |
CN204992780U (en) | Distributing type electric power detecting system | |
CN107302267A (en) | A kind of transformer station's temporary ground wire supervising device and its operating method | |
CN204256508U (en) | A kind of supervisory system based on SCADA system | |
CN209608335U (en) | A kind of protection supervisory equipment for distribution network automated switch | |
CN202631616U (en) | Over-limit current monitoring system for underground high-voltage cable protective layer | |
CN112256922A (en) | Fault power failure rapid identification method and system | |
CN206180959U (en) | Photovoltaic power generation system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181026 |
|
RJ01 | Rejection of invention patent application after publication |