CN108708310A - Steel framework pin-connected panel rockfall is blocked construction - Google Patents
Steel framework pin-connected panel rockfall is blocked construction Download PDFInfo
- Publication number
- CN108708310A CN108708310A CN201810434594.5A CN201810434594A CN108708310A CN 108708310 A CN108708310 A CN 108708310A CN 201810434594 A CN201810434594 A CN 201810434594A CN 108708310 A CN108708310 A CN 108708310A
- Authority
- CN
- China
- Prior art keywords
- steel framework
- construction
- barricade
- rockfall
- stone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 37
- 239000010959 steel Substances 0.000 title claims abstract description 37
- 238000010276 construction Methods 0.000 title claims abstract description 30
- 239000004575 stone Substances 0.000 claims abstract description 25
- 239000011435 rock Substances 0.000 claims abstract description 9
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 7
- 230000000903 blocking effect Effects 0.000 claims abstract description 6
- 230000001681 protective effect Effects 0.000 claims abstract description 6
- 238000007596 consolidation process Methods 0.000 claims abstract description 5
- 238000012549 training Methods 0.000 abstract description 5
- 230000007613 environmental effect Effects 0.000 abstract description 4
- 238000005516 engineering process Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000007123 defense Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000003139 buffering effect Effects 0.000 description 1
- 238000013016 damping Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005246 galvanizing Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000003755 preservative agent Substances 0.000 description 1
- 230000002335 preservative effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F7/00—Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
- E01F7/04—Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
- E01F7/045—Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Steel framework pin-connected panel rockfall is blocked construction, to effectively improve the reliability and durability of safeguard structure, and convenient, environmental suitability of constructing, especially suitable for obstructed water power and can not use the regional rockfall training works of complexity hardships and dangers of construction machinery.Including:Steel framework barricade, steel framework barricade are formed by steel framework unit on-site consolidation, and internal chock stone forms barricade;Energy-dissipating and shock-absorbing drainage blanket, the covering of energy-dissipating and shock-absorbing drainage blanket are layed on the versant surface of steel framework side, form one of outer buffer layer, and ejectment surface charge for remittance;Mortar flag stone stone falling channel is set to after wall at slope foot, and both lateral sides meet stoneledge face drop-over with falling rocks slope surface and construction of blocking;Rigid protective net is fixedly installed on the top of barricade.
Description
Technical field
The present invention relates to civil engineering, more particularly to a kind of steel framework pin-connected panel rockfall is blocked construction, is suitable for
The complicated regional rockfall training works of hardships and dangers.
Background technology
Rockfall Prevention Technique is broadly divided into active defense technology and passive protection technology.Active defense technology is by metal
Flexible net is covered on the slope with potential falling rocks, realizes that one kind that crag is reinforced or constrains in falling rocks near its original position is soft
Property guard technology.Passive protection technology is broadly divided into rigid protection and flexible protection systems.Conventional rigid guard technology includes falling
Stone cistern, bricklaying stone cut off wall block the bank of stone, hangar tunnel or open-cut tunnel structure etc., its advantage is that technically reliable, durability is good, the disadvantage is that cost
Height, construction are more complex.Flexiblesystem includes passive protection net, curtain net, flexible frame etc., has an easy construction, cost is relatively low,
Flexible arrangement, terrain adaptability is good, takes up an area the features such as few, but structural reliability, durability are still to be improved.
Invention content
It blocks construction technical problem to be solved by the invention is to provide a kind of steel framework pin-connected panel rockfall, to have
Effect improves the reliability and durability of safeguard structure, and convenient, environmental suitability of constructing, especially suitable for obstructed water power and nothing
Method uses the regional rockfall training works of complexity hardships and dangers of construction machinery.
The technical solution adopted by the present invention to solve the technical problems is as follows:
The steel framework pin-connected panel rockfall of the present invention is blocked construction, it is characterized in that including:Steel framework barricade, steel
Frame barricade is formed by steel framework unit on-site consolidation, and internal chock stone forms barricade;Energy-dissipating and shock-absorbing drainage blanket, energy dissipating
The covering of damping drainage blanket is layed on the versant surface of steel framework side, forms one of outer buffer layer, and ejectment surface charge for remittance;Slurry
Slabstone stone falling channel is built, is set to after wall at slope foot, both lateral sides meet stoneledge face drop-over with falling rocks slope surface and construction of blocking;Rigidity
Protection network is fixedly installed on the top of barricade.
The energy-dissipating and shock-absorbing drainage blanket is by internal ring spring pipeloop and the solid netted knot of resilient three-dimensional for hollow-core construction
The permeable gauze pad of structure is combined, and ring spring pipeloop is arranged at intervals in permeable gauze pad.
The invention has the advantages that for obstructed water power, the hard and dangerous regional rockfall of the complexity of construction machinery can not be used
Training works provide the gear protection structure that a kind of construction is convenient, structure is reliable, cheap, environmental suitability is strong;It is rigid with tradition
Property, semi-rigid safeguard structure compare, cost is lower, speed of application faster, environmental suitability is more preferable, and drainage is efficient, right
Foundation bearing capacity requires low, flexible arrangement, environment terrain adaptable;Compared with flexible protective structure, reliability, durability
Higher;Construction investment is advantageously reduced, later maintenance cost is saved, there are excellent economic results in society.
Description of the drawings
This specification includes such as next width attached drawing:
Fig. 1 is that steel framework pin-connected panel rockfall of the present invention is blocked the cross-section diagram of construction;
Fig. 2 is the cross-section diagram of energy-dissipating and shock-absorbing drainage blanket;
Component and corresponding label are shown in figure:Steel framework barricade 10, block stone 11, energy-dissipating and shock-absorbing drainage blanket 20, annular
Spring pipeloop 21, permeable gauze pad 22, mortar flag stone stone falling channel 30, filling body 31, rigid protective net 40.
Specific implementation mode
Present invention will be further explained below with reference to the attached drawings and examples.
Referring to Fig.1, steel framework pin-connected panel rockfall of the invention construction of blocking includes:Steel framework barricade 10, steel
Frame barricade 10 processed is formed by steel framework unit on-site consolidation, and internal chock stone 11 forms barricade;Energy-dissipating and shock-absorbing drains
Layer 20, the covering of energy-dissipating and shock-absorbing drainage blanket 20 are layed on 10 side versant surface of steel framework barricade, form one of outer buffer layer,
And ejectment surface charge for remittance;Mortar flag stone stone falling channel 30 is set to after wall at slope foot, both lateral sides and falling rocks slope surface and structure of blocking
It makes and meets stoneledge face drop-over drop-over;Rigid protective net 40 is fixedly installed on the top of barricade.
Steel framework barricade 10 is formed by steel framework unit on-site consolidation, barricade steel framework unit by prefabrication simultaneously
Galvanizing by dipping preservative treatment is carried out, production efficiency is high, quality controllable, while artificial carry can be used and assemble, especially suitable for not
Water flowing electricity can not use the regional rockfall training works of complexity hardships and dangers of construction machinery.
With reference to Fig. 2, the energy-dissipating and shock-absorbing drainage blanket 20 is by the internal ring spring pipeloop 21 for hollow-core construction and elasticity three
The permeable gauze pad 22 of dimension space network is combined, and ring spring pipeloop 21 is arranged at intervals in permeable gauze pad 22.It is described
The thickness of permeable gauze pad 24 is 30cm, elasticity modulus 0.05-0.5MPa, porosity of=60%.Energy-dissipating and shock-absorbing drainage blanket 20 is not only
Construct internal water accumulation is discharged rapidly with good buffering energy-absorbing performance, and using its high-voidage, high hydraulic conductivity characteristic, avoids
Water damage significantly improves the durability for construction of blocking.
Referring to Fig.1, rigid protective net 40 intercepts fritter slungshot, increases the effective height of interception of system.Mortar flag stone stone falling channel
30 play draining and collect falling rocks.Compared to conventional flex safeguard structure, maintainable, reliability and durability are more preferable.
Compared to conventional rigid, semi-rigid safeguard structure, cost is lower, easy for construction, flexible arrangement, drainage efficiency higher, and environment is suitable
Answering property is stronger, has significant economic technique superiority.
Referring to Fig.1, the steel framework barricade 10 is in step-like by versant, and energy-dissipating and shock-absorbing drainage blanket 20 is completely laid on steel
10 surface of frame barricade.Backfill stone shape in gap between 30 bottom surface of mortar flag stone stone falling channel and falling rocks slope surface, barricade
At filling body 31.
The above steel framework pin-connected panel rockfall of the present invention that only explains through diagrams is blocked some principles of construction,
Be not intended to by the present invention be confined to shown in and the concrete structure and the scope of application in, therefore every be possible to be utilized
Corresponding modification and equivalent belong to the apllied the scope of the claims of the present invention.
Claims (5)
- The construction 1. steel framework pin-connected panel rockfall is blocked, it is characterized in that including:Steel framework barricade (10), steel framework gear Wall (10) is formed by steel framework unit on-site consolidation, and internal chock stone (11) forms barricade;Energy-dissipating and shock-absorbing drainage blanket (20), energy-dissipating and shock-absorbing drainage blanket (20) covering is layed on steel framework barricade (10) side versant surface, is formed external slow together Rush layer, and ejectment surface charge for remittance;Mortar flag stone stone falling channel (30) is set to after wall at slope foot, both lateral sides and falling rocks slope surface Stoneledge face drop-over drop-over is met with construction of blocking;Rigid protective net (40), is fixedly installed on the top of barricade.
- The construction 2. steel framework pin-connected panel rockfall as described in claim 1 is blocked, it is characterized in that:The energy-dissipating and shock-absorbing row Water layer (20) is the permeable gauze pad of the ring spring pipeloop (21) and resilient three-dimensional space network of hollow-core construction by inside (22) it is combined, ring spring pipeloop (21) is arranged at intervals in permeable gauze pad (22).
- The construction 3. steel framework pin-connected panel rockfall as claimed in claim 2 is blocked, it is characterized in that:The permeable gauze pad (24) thickness is 30cm, elasticity modulus 0.05-0.5MPa, porosity of=60%.
- The construction 4. steel framework pin-connected panel rockfall as described in claim 1 is blocked, it is characterized in that:The shelves wall steel frame The side versant of frame (10) is in step-like.
- The construction 5. steel framework pin-connected panel rockfall as described in claim 1 is blocked, it is characterized in that:The mortar flag stone is fallen Backfill stone forms filling body (31) in gap between stone cistern (30) bottom surface and falling rocks slope surface, barricade.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810434594.5A CN108708310A (en) | 2018-05-09 | 2018-05-09 | Steel framework pin-connected panel rockfall is blocked construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810434594.5A CN108708310A (en) | 2018-05-09 | 2018-05-09 | Steel framework pin-connected panel rockfall is blocked construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108708310A true CN108708310A (en) | 2018-10-26 |
Family
ID=63867836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810434594.5A Pending CN108708310A (en) | 2018-05-09 | 2018-05-09 | Steel framework pin-connected panel rockfall is blocked construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108708310A (en) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20015651U1 (en) * | 2000-09-08 | 2000-11-30 | Weber Rainer | Stone basket |
AT502680A4 (en) * | 2006-07-31 | 2007-05-15 | Cordt Gerhard Dipl Ing Dr | DEVICE FOR THE PROTECTION OF MASSES EXCEPT FROM A HIGHER PLACE, ESPECIALLY BEFORE LAWINEN OR MUREN |
CN101487237A (en) * | 2009-02-26 | 2009-07-22 | 中国科学院地质与地球物理研究所 | Production method of vertical stone blocking net |
CN101736707A (en) * | 2009-12-15 | 2010-06-16 | 中国科学院水利部成都山地灾害与环境研究所 | Novel energy consumption damping stone blocking structure |
RU2432430C1 (en) * | 2010-02-25 | 2011-10-27 | Федеральное государственное образовательное учреждение высшего профессионального образования Кабардино-Балкарская государственная сельскохозяйственная академия им.В.М.Кокова (ФГОУ ВПО КБГСХА) | Method for erection of avalanche-breakers of biopositive design |
CN102383400A (en) * | 2010-09-28 | 2012-03-21 | 单发成 | Debris flow resisting wall |
CN202849958U (en) * | 2012-09-02 | 2013-04-03 | 中铁二院工程集团有限责任公司 | Dangerous-rock-falling-preventing mechanism of high-steep slope bridge tunnel |
CN103243665A (en) * | 2013-05-27 | 2013-08-14 | 中铁工程设计咨询集团有限公司 | Protection method and protection device for blocking deep cutting falling rocks |
CN103882874A (en) * | 2012-12-22 | 2014-06-25 | 王化平 | Method for expressway landslide prevention with porous plastic plates |
CN204000652U (en) * | 2014-06-30 | 2014-12-10 | 成都新途科技有限公司 | Semi-rigid protective screening for Falling Rocks protection |
CN204530521U (en) * | 2015-02-15 | 2015-08-05 | 中国铁路总公司 | A kind of flexible compound blocks stone wall-retaining structure |
CN207031946U (en) * | 2017-08-01 | 2018-02-23 | 四川睿铁科技有限责任公司 | A kind of earthquake territory subgrade support retainer shock-damping structure |
CN208309410U (en) * | 2018-05-09 | 2019-01-01 | 中铁二院工程集团有限责任公司 | Steel framework pin-connected panel rockfall is blocked construction |
-
2018
- 2018-05-09 CN CN201810434594.5A patent/CN108708310A/en active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20015651U1 (en) * | 2000-09-08 | 2000-11-30 | Weber Rainer | Stone basket |
AT502680A4 (en) * | 2006-07-31 | 2007-05-15 | Cordt Gerhard Dipl Ing Dr | DEVICE FOR THE PROTECTION OF MASSES EXCEPT FROM A HIGHER PLACE, ESPECIALLY BEFORE LAWINEN OR MUREN |
CN101487237A (en) * | 2009-02-26 | 2009-07-22 | 中国科学院地质与地球物理研究所 | Production method of vertical stone blocking net |
CN101736707A (en) * | 2009-12-15 | 2010-06-16 | 中国科学院水利部成都山地灾害与环境研究所 | Novel energy consumption damping stone blocking structure |
RU2432430C1 (en) * | 2010-02-25 | 2011-10-27 | Федеральное государственное образовательное учреждение высшего профессионального образования Кабардино-Балкарская государственная сельскохозяйственная академия им.В.М.Кокова (ФГОУ ВПО КБГСХА) | Method for erection of avalanche-breakers of biopositive design |
CN102383400A (en) * | 2010-09-28 | 2012-03-21 | 单发成 | Debris flow resisting wall |
CN202849958U (en) * | 2012-09-02 | 2013-04-03 | 中铁二院工程集团有限责任公司 | Dangerous-rock-falling-preventing mechanism of high-steep slope bridge tunnel |
CN103882874A (en) * | 2012-12-22 | 2014-06-25 | 王化平 | Method for expressway landslide prevention with porous plastic plates |
CN103243665A (en) * | 2013-05-27 | 2013-08-14 | 中铁工程设计咨询集团有限公司 | Protection method and protection device for blocking deep cutting falling rocks |
CN204000652U (en) * | 2014-06-30 | 2014-12-10 | 成都新途科技有限公司 | Semi-rigid protective screening for Falling Rocks protection |
CN204530521U (en) * | 2015-02-15 | 2015-08-05 | 中国铁路总公司 | A kind of flexible compound blocks stone wall-retaining structure |
CN207031946U (en) * | 2017-08-01 | 2018-02-23 | 四川睿铁科技有限责任公司 | A kind of earthquake territory subgrade support retainer shock-damping structure |
CN208309410U (en) * | 2018-05-09 | 2019-01-01 | 中铁二院工程集团有限责任公司 | Steel framework pin-connected panel rockfall is blocked construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106522270B (en) | A kind of the pile foundation barricade antidetonation retaining structure and construction method of the buffer layer containing EPS | |
CN108374358A (en) | A kind of rockfall is passively blocked construction | |
CN208219457U (en) | A kind of rockfall is passively blocked construction | |
CN204080737U (en) | A kind of coast defence dike type structure adopting staged concrete slab revetment | |
CN109183640A (en) | The shed hole structure and its construction method of a kind of antidetonation and anti-mud-rock flow and falling rocks | |
CN204754939U (en) | Underground structure high damping subtracting shock insulation structure | |
CN106906808A (en) | A kind of domatic medicining wave structure of waterfront and its construction method | |
CN208309410U (en) | Steel framework pin-connected panel rockfall is blocked construction | |
CN202024695U (en) | Shock-absorbing protective device of soft composite air curtain with underwater demolition | |
CN202116993U (en) | Slope collapse rock prevention open-cut tunnel structure for multi-line unequal-altitude railways | |
CN102042787A (en) | Flexible composite air-curtain shock absorption protective device for underwater explosion | |
CN201502019U (en) | Permeable ground structure | |
CN108708310A (en) | Steel framework pin-connected panel rockfall is blocked construction | |
CN210482099U (en) | Light rockfall interception structure for high and steep slope | |
CN211421192U (en) | Earthquake isolation device for foundation construction for building | |
CN206616421U (en) | A kind of interim bedding structure across Metro station excavation | |
CN108560490A (en) | A kind of sandwich type mud-rock flow blocking dam and its construction method | |
CN205049057U (en) | High slope blasting rolling stone blocks protector | |
CN210636318U (en) | Column net type rolling stone blocking device | |
CN204212105U (en) | Flexible fabricated protective slope structure | |
CN208996057U (en) | Gear protection structure for soft base side slope near water | |
CN203808025U (en) | Intercepting ditch structure for steeper terrain | |
CN209636661U (en) | A kind of band buffer system is huge-truss bars concrete protection hangar tunnel | |
CN202577344U (en) | L-shaped retaining wall structure | |
CN208762946U (en) | A kind of safeguard structure of inverted siphon |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181026 |