A kind of flange production converter Download PDFInfo
- Publication number
- CN108707719A CN108707719A CN201810580266.6A CN201810580266A CN108707719A CN 108707719 A CN108707719 A CN 108707719A CN 201810580266 A CN201810580266 A CN 201810580266A CN 108707719 A CN108707719 A CN 108707719A
- Authority
- CN
- China
- Prior art keywords
- bell
- furnace body
- steelframe
- welded
- flange production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21C—PROCESSING OF PIG-IRON, e.g. REFINING, MANUFACTURE OF WROUGHT-IRON OR STEEL; TREATMENT IN MOLTEN STATE OF FERROUS ALLOYS
- C21C5/00—Manufacture of carbon-steel, e.g. plain mild steel, medium carbon steel or cast steel or stainless steel
- C21C5/52—Manufacture of steel in electric furnaces
- C21C5/5241—Manufacture of steel in electric furnaces in an inductively heated furnace
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
The invention discloses a kind of flange production converters, including steelframe, furnace body and bell, both ends are welded with supporting rod inside the steelframe and supporting rod one end is separately connected furnace body both sides by shaft, the furnace interior fixes induced electricity polar circle by fixing piece and induced electricity polar circle is internally provided with graphite crucible, it is welded on crossbeam and crossbeam at the top of the steelframe and pulley is equipped with by fixing piece, the output shaft that the steelframe top side is fixed with No.1 motor and No.1 motor by fixed seat has been bolted No.1 wire spool, one end that steel wire rope and steel wire rope are wound on the No.1 wire spool is connected with bell across pulley, the bell is located at right over furnace body.Reasonable design of the present invention, melting range is wide, can carry out melting to metals such as cast iron, stainless steel, steel alloy, special steels, reach fusing point or boiling point, and floor space is small, energy consumption is low and speed of melting is fast.
Description
Technical field
The present invention relates to a kind of converter, more particularly to a kind of flange production converter.
Background technology
Converter is mainly used for cast iron, stainless steel, steel alloy, non-ferrous metal, precious metal carbon steel, steel alloy, special steel
Melting, reach fusing point or boiling point, processed again, existing converter heat dissipation effect is poor, takes up a large area, energy consumption
High smelting time is long.For this purpose, it is proposed that a kind of flange production converter.
Invention content
The main purpose of the present invention is to provide a kind of flange production converters, can effectively solve in background technology
Problem.
To achieve the above object, the technical solution that the present invention takes is:
A kind of flange production converter, including steelframe, furnace body and bell, steelframe inside both ends are welded with supporting rod
And supporting rod one end is separately connected furnace body both sides by shaft, the furnace interior fixes induced electricity polar circle and sense by fixing piece
It answers electrode collar to be internally provided with graphite crucible, is welded on crossbeam and crossbeam at the top of the steelframe and cunning is equipped with by fixing piece
Wheel, the output shaft that the steelframe top side is fixed with No.1 motor and No.1 motor by fixed seat have been bolted one
Number wire spool is wound with steel wire rope on the No.1 wire spool and one end of steel wire rope is connected with bell, the stove across pulley
Lid is located at right over furnace body, is equipped in graphite bush and graphite bush bottom position bell by mounting groove at the top of the bell
Portion, the graphite bush is internally provided with inside alumina tube and alumina tube is equipped with thermocouple, the heat by mounting base
It is provided with thermocouple connector at the top of galvanic couple and thermocouple connector and thermocouple are electrical connected, table in the furnace body and bell
Layer, which is both provided between alumina fiber layer and alumina fiber layer and furnace body and bell, is provided with hollow sandwich, the aluminium oxide
Fibrous layer extexine is provided with graphite protective layer.
Further, the furnace body and bell one end are welded with cooling water inlet pipe and one end of furnace body and bell is welded
It is connected to cooling water outlet pipe.
Further, one end is equipped with discharge port by mounting base at the top of the furnace body and furnace body side is welded with fixation
Ring.
Further, the steelframe top side be fixed with by fixed seat No. two motors and No. two motors output shaft it is logical
It crosses bolt and is fixed with No. two wire spools, be wound with steel wire rope on No. two wire spools and fixed ring is fixed in one end of steel wire rope
On.
Further, described crossbeam one end is equipped with digital display screen by mounting base and digital display screen and thermoelectricity are coupled
Device is connect to be electrical connected.
Further, bell top one end, which is equipped with by mounting groove inside peep hole and peep hole, passes through mounting groove
Quartz glass eyeglass is installed.
Further, it is provided with sealing cover on the outside of the thermocouple connector.
Compared with prior art, the present invention has the advantages that:This kind of flange production converter is felt by being arranged
Motor circle (Luoyang Wan Le power equipments factory product) is answered, it can be to the steel in graphite crucible (Luoyang Wan Le power equipments factory product)
Material is electrically heated, and heating speed is fast, production efficiency is high, saves material and cost, extension die life, passes through and cooling is arranged
Water outlet pipe and cooling water inlet pipe can connect recirculated cooling water by water pipe, cooling water made to be followed inside furnace body and bell
Ring has the function that cooling, can be effectively heat-insulated by the way that graphite protective layer and alumina fiber layer is arranged, and avoids furnace body and stove
Lid temperature is excessively high to damage staff, by the way that No.1 motor is arranged, the steel wire rope on No.1 wire spool can be driven logical
Pulley is crossed by bell pull-up or is put down, by No. two motors of setting, the steel wire rope on No. two wire spools can be driven to pull furnace body,
So that furnace body is tilted, have the function that topple over internal steel material, by the way that thermocouple (the limited public affairs of Shanghai Spectris instrument system are arranged
Take charge of Guangzhou Branch product), the temperature of furnace body when heated can be measured, and pass through thermocouple connector (Shanghai Spectris instrument
Device System Co., Ltd Guangzhou Branch product) digital display screen signal is given, digital display screen shows the temperature detected, just
It is checked in staff, by the way that graphite bush and alumina tube is arranged, thermocouple can be protected not burnt out by high temperature, by setting
Peep hole is set, furnace interior can be observed across quartz glass plate, facilitates and understands furnace body internal situation when heated.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of flange production converter of the present invention.
Fig. 2 is a kind of vertical view of flange production converter of the present invention.
Fig. 3 is a kind of furnace interior structure chart of flange production converter of the present invention.
Fig. 4 is a kind of bell internal structure chart of flange production converter of the present invention.
Fig. 5 is a kind of thermocouple schematic diagram of flange production converter of the present invention.
In figure:1, steelframe;2, furnace body;3, bell;4, supporting rod;5, induced electricity polar circle;6, graphite crucible;7, graphite protects
Layer;8, oxidized fibre layer;9, discharge port;10, shaft;11, cooling water outlet pipe;12, cooling water inlet pipe;13, steel wire rope;
14, fixed ring;15, No.1 wire spool;16, No. two wire spools;17, pulley;18, No.1 motor;19, No. two motors;20, graphite
Casing;21, alumina tube;22, thermocouple;23, thermocouple connector;24, sealing cover;25, digital display screen;26, crossbeam;
27, peep hole;28, quartz glass eyeglass;29, hollow sandwich.
Specific implementation mode
To make the technical means, the creative features, the aims and the efficiencies achieved by the present invention be easy to understand, with reference to
Specific implementation mode, the present invention is further explained.
As shown in Figs. 1-5, a kind of flange production converter, including steelframe 1, furnace body 2 and bell 3, inside the steelframe 1
Both ends are welded with supporting rod 4 and 4 one end of supporting rod is separately connected 2 both sides of furnace body by shaft 10, by solid inside the furnace body 2
Determine part fixation induced electricity polar circle 5 and induced electricity polar circle 5 is internally provided with graphite crucible 6,1 top of the steelframe is welded with crossbeam 26
And pulley 17 is equipped with by fixing piece on crossbeam 26,1 top side of the steelframe is fixed with No.1 motor 18 by fixed seat
And the output shaft of No.1 motor 18 has been bolted No.1 wire spool 15, and steel wire rope is wound on the No.1 wire spool 15
13 and one end of steel wire rope 13 be connected with bell 3 across pulley 17, the bell 3 is located at right over furnace body 2, and the bell 3 pushes up
Portion is equipped with by mounting groove inside graphite bush 20 and 20 bottom position bell 3 of graphite bush, is set inside the graphite bush 20
It is equipped with inside alumina tube 21 and alumina tube 21 and thermocouple 23, the top setting of the thermocouple 22 is equipped with by mounting base
There is thermocouple connector 23 and thermocouple connector 23 and thermocouple 22 are electrical connected, the furnace body 2 and 3 endosexine of bell are all provided with
It is equipped between alumina fiber layer 8 and alumina fiber layer 8 and furnace body 2 and bell 3 and is provided with hollow sandwich 29, the aluminium oxide
8 extexine of fibrous layer is provided with graphite protective layer 7.
Wherein, the furnace body 2 and 3 one end of bell are welded with cooling water inlet pipe 12 and one end of furnace body 2 and bell 3 is equal
It is welded with cooling water outlet pipe 11, is used for cooling water circulation, is cooled down to furnace body 2 and bell 3.
Wherein, 2 top one end of the furnace body is equipped with discharge port 9 by mounting base and 2 side of furnace body is welded with fixed ring
14, convenient for discharging.
Wherein, 1 top side of the steelframe is fixed with the output shaft of No. two motors 19 and No. two motors 19 by fixed seat
No. two wire spools 16 are bolted, one end that steel wire rope 13 and steel wire rope 13 are wound on No. two wire spools 16 is solid
Due in fixed ring 14, drives furnace body 2 to tilt by steel wire rope 13 when No. two motors 19 rotate, facilitate discharging.
Wherein, 26 one end of the crossbeam by mounting base is equipped with digital display screen 25 and digital display screen 25 and thermocouple
Connector 23 is electrical connected, for showing temperature when melting.
Wherein, 3 top one end of the bell, which is equipped with by mounting groove inside peep hole 27 and peep hole, passes through mounting groove
Quartz glass eyeglass 28 is installed, convenient for observation 1 inner case of furnace body.
Wherein, 23 outside of the thermocouple connector is provided with sealing cover 24.
It should be noted that the present invention is a kind of flange production converter, when work, by (the Luoyang ten thousand of induction machine circle 5
Happy power equipment factory product) both ends connected with switch board in external transformer, and be powered unlatching to the (Luoyang ten thousand of graphite crucible 6
Happy power equipment factory product) in steel material be electrically heated, heating speed is fast, production efficiency is high, save material and cost, prolong
Cooling water is connected cooling water outlet pipe 11 and cooling water inlet pipe 12 by pipeline, makes cooling water in furnace body 2 by long die life
With 3 inside cycle of bell, have the function that cooling, graphite protective layer 7 and alumina fiber layer 8 can be effectively heat-insulated, avoid stove
Body 2 and 3 temperature of bell is excessively high is damaged to staff starts No.1 motor 18 and drives steel wire rope on No.1 wire spool 15
13 by 3 pull-up of bell or are put down by pulley 17, start No. two motors 19 and the steel wire rope 13 on No. two wire spools 16 is driven to pull
Furnace body 2 allows furnace body 2 to tilt, and has the function that topple over internal steel material, (Shanghai Spectris instrument system is limited for thermocouple 22
Company's Guangzhou Branch product) temperature of furnace body 2 when heated is measured, and pass through (the Shanghai Spectris instrument of thermocouple connector 23
Device System Co., Ltd Guangzhou Branch product) give digital display screen 25 signal, digital display screen 25 shows the temperature detected
Degree, is checked convenient for staff, and graphite bush 20 and alumina tube 21, can be with for protecting thermocouple 22 not burnt out by high temperature
It is observed inside furnace body 2 through quartz glass plate 28 across peep hole 27, facilitates and understand the internal situation when heated of furnace body 2.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention.The technology of the industry
Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this
The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes
Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its
Equivalent thereof.
Claims (7)
1. a kind of flange production converter, including steelframe (1), furnace body (2) and bell (3), it is characterised in that:The steelframe
(1) internal both ends are welded with supporting rod (4) and supporting rod (4) one end is separately connected furnace body (2) both sides by shaft (10), described
Furnace body (2) is internal to be internally provided with graphite crucible (6), institute by fixing piece fixation induced electricity polar circle (5) and induced electricity polar circle (5)
It states to be welded on crossbeam (26) and crossbeam (26) at the top of steelframe (1) and pulley (17), steelframe (1) top is equipped with by fixing piece
Portion side be fixed with by fixed seat No.1 motor (18) and No.1 motor (18) output shaft be bolted No.1 around
Drum (15) is wound with one end of steel wire rope (13) and steel wire rope (13) on the No.1 wire spool (15) across pulley (17) even
It is connected to bell (3), the bell (3) is located at right over furnace body (2), and mounting groove is equipped with graphite bush on the bell (3)
(20) and graphite bush (20) bottom position bell (3) is internal, the graphite bush (20) be internally provided with alumina tube (21) and
Alumina tube (21) is internal to be equipped with thermocouple (23) by mounting base, and it is coupled to be provided with thermoelectricity at the top of the thermocouple (22)
It connects device (23) and thermocouple connector (23) and thermocouple (22) is electrical connected, the furnace body (2) and bell (3) endosexine are all provided with
It is equipped between alumina fiber layer (8) and alumina fiber layer (8) and furnace body (2) and bell (3) and is provided with hollow sandwich (29),
Alumina fiber layer (8) extexine is provided with graphite protective layer (7).
2. a kind of flange production converter according to claim 1, it is characterised in that:The furnace body (2) and bell (3)
One end is welded with cooling water inlet pipe (12) and one end of furnace body (2) and bell (3) is welded with cooling water outlet pipe (11).
3. a kind of flange production converter according to claim 1, it is characterised in that:One end at the top of the furnace body (2)
Discharge port (9) is installed by mounting base and furnace body (2) side is welded with fixed ring (14).
4. a kind of flange production converter according to claim 1, it is characterised in that:Steelframe (1) top side
The output shaft that No. two motors (19) and No. two motors (19) are fixed with by fixed seat has been bolted No. two wire spools
(16), it is wound with steel wire rope (13) on No. two wire spools (16) and fixed ring (14) is fixed in one end of steel wire rope (13)
On.
5. a kind of flange production converter according to claim 1, it is characterised in that:Described crossbeam (26) one end passes through
Mounting base is equipped with digital display screen (25) and digital display screen (25) and thermocouple connector (23) are electrical connected.
6. a kind of flange production converter according to claim 1, it is characterised in that:One end at the top of the bell (3)
It is equipped with inside peep hole (27) and peep hole by mounting groove and quartz glass eyeglass (28) is equipped with by mounting groove.
7. a kind of flange production converter according to claim 1, it is characterised in that:The thermocouple connector (23)
Outside is provided with sealing cover (24).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810580266.6A CN108707719A (en) | 2018-06-07 | 2018-06-07 | A kind of flange production converter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810580266.6A CN108707719A (en) | 2018-06-07 | 2018-06-07 | A kind of flange production converter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108707719A true CN108707719A (en) | 2018-10-26 |
Family
ID=63871386
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810580266.6A Pending CN108707719A (en) | 2018-06-07 | 2018-06-07 | A kind of flange production converter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108707719A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109737742A (en) * | 2018-12-21 | 2019-05-10 | 东华大学 | Rotatable Dumpage type electric crucible furnace |
CN112197582A (en) * | 2020-08-28 | 2021-01-08 | 芜湖良仕机械科技有限公司 | Integrated centralized dry boiler |
CN114264135A (en) * | 2022-01-11 | 2022-04-01 | 湖南优镒农业开发有限公司 | Tea-seed oil seed quick drying equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205403482U (en) * | 2016-01-21 | 2016-07-27 | 南阳师范学院 | But angle regulation's magnesium alloy smelting furnace |
CN205825703U (en) * | 2016-07-29 | 2016-12-21 | 湖州捷华机械制造有限公司 | A kind of Novel slag steel smelting electric furnace |
-
2018
- 2018-06-07 CN CN201810580266.6A patent/CN108707719A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205403482U (en) * | 2016-01-21 | 2016-07-27 | 南阳师范学院 | But angle regulation's magnesium alloy smelting furnace |
CN205825703U (en) * | 2016-07-29 | 2016-12-21 | 湖州捷华机械制造有限公司 | A kind of Novel slag steel smelting electric furnace |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109737742A (en) * | 2018-12-21 | 2019-05-10 | 东华大学 | Rotatable Dumpage type electric crucible furnace |
CN109737742B (en) * | 2018-12-21 | 2020-05-29 | 东华大学 | Rotatable dumping type electric crucible furnace |
CN112197582A (en) * | 2020-08-28 | 2021-01-08 | 芜湖良仕机械科技有限公司 | Integrated centralized dry boiler |
CN114264135A (en) * | 2022-01-11 | 2022-04-01 | 湖南优镒农业开发有限公司 | Tea-seed oil seed quick drying equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108707719A (en) | A kind of flange production converter | |
CN202452828U (en) | Super-audio frequency induction heating smelting furnace | |
CN104831083B (en) | electroslag smelting furnace device | |
CN210463966U (en) | Water-cooling protective sleeve for submerged arc furnace | |
CN218179608U (en) | High-power energy-saving environment-friendly zirconia smelting furnace | |
CN212833853U (en) | Online concurrent heating device of iron runner electromagnetic induction | |
CN107120965B (en) | A kind of high efficiency levels continuous casting induction furnace | |
CN208936749U (en) | A kind of bottomless electrode DC electric arc furnaces | |
CN211233948U (en) | Argon blowing type electric furnace cover | |
CN201813576U (en) | Power frequency induction furnace | |
CN209068981U (en) | A kind of device of heating and cooling heating container | |
CN201680704U (en) | Small center furnace cover of electric arc furnace | |
CN211090005U (en) | Embedded electromagnetic induction heating device and metal hot melting device | |
CN211823860U (en) | Novel intermediate frequency induction furnace | |
CN214792514U (en) | Electromagnetic stirring cold air circulating system at bottom of aluminum melting furnace | |
CN204625737U (en) | A kind of electric slag refusion and smelting stove | |
CN104831081B (en) | A kind of electroslag smelting method | |
CN207831918U (en) | A kind of core-type induction furnace | |
CN212042578U (en) | 1Cr17Ni2 or 5CrNiMoV molten steel casting system with movable airtight cover | |
CN219385212U (en) | Composite anode device for direct-current ladle furnace | |
CN215063763U (en) | Water cooling system of ferronickel submerged arc furnace | |
CN215379272U (en) | High-precision temperature-controlled energy-saving pipeline heat tracing device | |
CN210321177U (en) | High-strength metallurgical furnace | |
CN218884659U (en) | Water-cooling furnace cover convenient to overhaul | |
CN214120814U (en) | Intermediate frequency furnace inspection device with protective structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181026 |