CN108705659A - The concrete edge mold system and installation method of extended reinforcing bar - Google Patents

The concrete edge mold system and installation method of extended reinforcing bar Download PDF

Info

Publication number
CN108705659A
CN108705659A CN201810648634.6A CN201810648634A CN108705659A CN 108705659 A CN108705659 A CN 108705659A CN 201810648634 A CN201810648634 A CN 201810648634A CN 108705659 A CN108705659 A CN 108705659A
Authority
CN
China
Prior art keywords
mould holder
holder
side mould
reinforcing bar
mold system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810648634.6A
Other languages
Chinese (zh)
Other versions
CN108705659B (en
Inventor
王全良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongke Lijiu Jinan Construction Robot Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810648634.6A priority Critical patent/CN108705659B/en
Publication of CN108705659A publication Critical patent/CN108705659A/en
Application granted granted Critical
Publication of CN108705659B publication Critical patent/CN108705659B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0029Moulds or moulding surfaces not covered by B28B7/0058 - B28B7/36 and B28B7/40 - B28B7/465, e.g. moulds assembled from several parts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • B28B23/022Means for inserting reinforcing members into the mould or for supporting them in the mould
    • B28B23/024Supporting means
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps

Abstract

The problems such as the present invention provides a kind of concrete edge mold system of extended reinforcing bar and installation methods, solve the components peripheries such as precast floor slab, wallboard and stretch out reinforcing bar, and bar spacing is different, and the side mould used in component production process is different, caused a large amount of side mould waste.A kind of concrete edge mold system of extended reinforcing bar, while mould holder I, while mould holder II and reinforced mesh, side mould holder I is located above reinforced mesh, side mould holder II is located at below reinforced mesh, while mould holder I, while mould holder II and reinforced mesh be detachably connected as a whole by connection component, and be fixed in die station by magnetic fastening device.

Description

The concrete edge mold system and installation method of extended reinforcing bar
Technical field
The present invention relates to a kind of concrete edge mold systems, more particularly, to a kind of side mould of prefabricated components production that stretching out reinforcing bar System and installation method belong to building equipment field.
Background technology
On the flat-die or formwork erection production line of use, side mould need to be arranged, to pour into a mould coagulation in existing prefabricated components production plant Soil, but the components periphery such as most of floor, wallboard need to stretch out reinforcing bar, and processing slot, steel are needed on the side mould for stretching out reinforcement location Muscle spacing is different, and the side mould used is just different, causes a collection of component of prefabricated components production plant production just to discard a collection of side mould, leads A large amount of side mould is caused to waste.
It is had the following problems on prior art concrete component production line:
1. for the stretching of prefabricated components reinforcing bar, reserved notch is needed on the mould of side, the problem of concrete spillage occurs in incision site, Keep die station filthy, it is difficult to clear up;
2. often the prefabricated components quantity of set side mould production is few, scale can not be formed, production cost is high.The usage amount of side mould is huge, A large amount of side mould is caused to waste.
Invention content
Technical problem to be solved by the invention is to provide a kind of concrete edge mold system of extended reinforcing bar and installation method, It solves concrete pre-member in the prior art and needs a large amount of side moulds, wasting problem.
The invention is realized by the following technical scheme:
A kind of concrete edge mold system of extended reinforcing bar, including while mould holder I, while mould holder II and reinforced mesh, mould holder I, side Above reinforced mesh, side mould holder II is located at below reinforced mesh, while mould holder I, while mould holder II and reinforced mesh pass through Connection component is detachably connected as a whole, and is arranged in die station by magnetic fastening device.
The concrete edge mold system preferred embodiment of above-mentioned extended reinforcing bar, connection component include T-type component, nut with handle And elastomeric pad, T-type component head one end built-in edges mould holder II, the other end pass through reinforced mesh, after elastomeric pad with nut Connection, elastomeric pad one end are contacted with reinforced mesh in other end built-in edges mould holder I.
The concrete edge mold system preferred embodiment of above-mentioned extended reinforcing bar, die station is magnetic trolley, with multiple magnetic fastening devices By the side, mould is fixed in die station, and magnetic fastening device includes magnetic holder, and magnetic holder is equipped with magnetic control bar and connection pressing plate, connects pressing plate The other end is connect with the side upper surfaces mould holder I.
The concrete edge mold system preferred embodiment of above-mentioned extended reinforcing bar, side mould holder I are that multiple circular holes, side are reserved in C-type steel Mould holder II is that multiple strip type holes are reserved on C-type steel or U-steel, while the position of mould holder I circular holes with while mould holder II on Elongate holes center is corresponding.
A kind of installation method of the concrete edge mold system of extended reinforcing bar, which is characterized in that include the following steps:
(1)Mark the sideline for needing to produce component using pen machine as needed in die station;
(2)Side mould holder II is placed on the outside of sideline;
(3)Place reinforced mesh;
(4)Above the mould holder II when mould holder I is placed on;
(5)It is pressed downward handle, elastomeric pad is made to deform, by reinforced mesh environmental sealing, rotating handle makes T-bolt be rotated by 90 °, By while mould holder I and while mould holder II fix together.
(6)Repeat step 5, by while mould holder I components and while mould holder II fix together.
(7)The above-mentioned side mould being connected as one is fixed on by magnetic fastening device in die station.
The advantage of the invention is that:
(1)While mould holder I, while mould holder II and reinforced mesh be detachably connected as a whole by connection component, can produce not With the concrete component of bar spacing and quantity.
(2)Each component of the present invention can reuse, and service life is long.
(3)Which has a compact structure and a reasonable design, it is easy to use.
Description of the drawings
Attached drawing is used to provide further understanding of the present invention, and a part for constitution instruction, the reality with the present invention It applies example to be used to explain the present invention together, not be construed as limiting the invention.
Fig. 1 be while mould holder I, while mould holder II and reinforced mesh connection diagram.
Fig. 2 is T-type element structure schematic diagram.
Fig. 3 is nut structure diagram.
Fig. 4 is side mould holder I dimensional structure diagrams.
Fig. 5 is side mould holder I elevational schematic views.
Fig. 6 is elastomer gasket construction schematic diagram.
Fig. 7 is side mould holder II dimensional structure diagrams.
Fig. 8 is side mould holder II schematic top plan views.
Fig. 9 is side mould holder II another side dimensional structure diagrams.
Figure 10 is side mould holder II schematic front view.
Figure 11 is superimposed sheet bottom plate and concrete edge mold system connection diagram of the present invention.
Figure 12 is magnetic fastening device structural schematic diagram of the present invention.
Figure 13 is the selected example structure schematic diagram of the present invention.
Wherein, 1, handle 2, nut 3, while mould holder I 4, elastomeric pad 5, reinforced mesh 6, while mould holder II 7, T-type component 8, magnetic control bar 9, magnetic holder 10, connection pressing plate.
Specific implementation mode
Hereinafter, preferred embodiments of the present invention will be described with reference to the accompanying drawings, it should be understood that preferred reality described herein Apply example only for the purpose of illustrating and explaining the present invention and is not intended to limit the present invention.
A kind of concrete edge mold system of extended reinforcing bar, while mould holder I 3, while mould holder II6 and reinforced mesh 5, Bian Mozhi Frame I 3 is located at the top of reinforced mesh 5, and side mould holder II6 is located at below reinforced mesh 5, while mould holder I 3, while mould holder II6 and Reinforced mesh 5 is detachably connected as a whole by connection component, and is arranged in die station by magnetic fastening device.
In the present embodiment, connection component includes T-type component 7, nut 2 and elastomeric pad 4,7 head one of T-type component It is connect with nut 2 after holding built-in edges mould holder II6, the other end to pass through reinforced mesh 5, elastomeric pad 4, and end is connected with hand Handle 1,4 one end of elastomeric pad are contacted with reinforced mesh 5 in other end built-in edges mould holder I3.
In the present embodiment, die station is magnetic trolley, and magnetic fastening device includes magnetic holder 9, and magnetic holder 9 is equipped with 8 He of magnetic control bar Pressing plate 10 is connected, connection 10 other end of pressing plate is connect with 3 upper surfaces side mould holder I.
In the present embodiment, while mould holder I 3 and while mould holder II6 be C-type steel, side mould holder I3 is to be reserved in C-type steel Multiple circular holes, side mould holder II6 are that multiple strip type holes are reserved on C-type steel or U-steel, the position of side mould holder I3 circular holes with Elongate holes center on the mould holder II6 of side is corresponding, and the shape of C-type steel is for fixing elastomeric pad 4.
A kind of installation method of the concrete edge mold system of extended reinforcing bar, includes the following steps:
(1)The sideline for needing to produce component is marked using pen machine in die station;
(2)Side mould holder II6 is placed on the outside of sideline;
(3)Place reinforced mesh 5;
(4)It will be connected above the mould holder II6 when mould holder I 3 is placed on and by connection component;
(5)7 head of rotation T-type component makes in built-in edges mould holder II6;
(6)The above-mentioned all parts being connected as one are fixed on by magnetic fastening device in die station.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features. All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's Within protection domain.

Claims (6)

1. a kind of concrete edge mold system of extended reinforcing bar, it is characterised in that:While mould holder I (3), while mould holder II (6) and reinforcing bar Mesh sheet(5), side mould holder I (3) is located at reinforced mesh(5)Top, side mould holder II (6) are located at reinforced mesh(5)Lower section, side Mould holder I (3), side mould holder II (6) and reinforced mesh(5)It is detachably connected as a whole by connection component, and passes through magnetism Fixing device is fixed in die station.
2. the concrete edge mold system of extended reinforcing bar according to claim 1, it is characterised in that:Side mould holder II (6) is c-type Multiple strip type holes are reserved on steel or U-steel, the position in hole is corresponding with the hole on side mould holder I (3).
3. the concrete edge mold system of extended reinforcing bar according to claim 1, it is characterised in that:Side mould holder I (3) is C-type steel Upper to reserve multiple circular holes, circular hole position is corresponding with the elongate holes center on side mould holder II (6), and the shape of C-type steel is used for Fixed elastomeric pad(4).
4. the concrete edge mold system of extended reinforcing bar according to claim 1, it is characterised in that:Connection component includes with handle T-type component (7), nut (2) and handle(1), circular hole of the T-type component (7) on side mould holder I (3), nut (2) And handle(1);By side mould holder I (3), elastomeric pad(4)Side mould I components are collectively constituted with multiple connection components.
5. the concrete edge mold system of extended reinforcing bar according to claim 1, it is characterised in that:It will with multiple magnetic fastening devices The side mould is fixed in die station, and magnetic fastening device includes magnetic holder(8), magnetic holder(8)It is equipped with magnetic control bar(8)With connection pressing plate (10), connect pressing plate(10)The other end is connect with side mould holder I (3) upper surface.
6. a kind of installation method of the concrete edge mold system of Claims 2 or 3 or 4 extended reinforcing bars, which is characterized in that including following Step:
(1)Mark the sideline for needing to produce component using pen machine as needed in die station;
(2)Side mould holder II is placed on the outside of sideline;
(3)Place reinforced mesh;
(4)Above the mould holder II when mould holder I is placed on;
(5)It is pressed downward handle, elastomeric pad is made to deform, by reinforced mesh environmental sealing, rotating handle makes T-bolt be rotated by 90 °, By while mould holder I and while mould holder II fix together;
(6)Repeat step 5, by while mould holder I components and while mould holder II fix together;
(7)The above-mentioned side mould being connected as one is fixed on by magnetic fastening device in die station.
CN201810648634.6A 2018-06-22 2018-06-22 Concrete side form system capable of extending reinforced bar and installation method Active CN108705659B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810648634.6A CN108705659B (en) 2018-06-22 2018-06-22 Concrete side form system capable of extending reinforced bar and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810648634.6A CN108705659B (en) 2018-06-22 2018-06-22 Concrete side form system capable of extending reinforced bar and installation method

Publications (2)

Publication Number Publication Date
CN108705659A true CN108705659A (en) 2018-10-26
CN108705659B CN108705659B (en) 2024-04-05

Family

ID=63871954

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810648634.6A Active CN108705659B (en) 2018-06-22 2018-06-22 Concrete side form system capable of extending reinforced bar and installation method

Country Status (1)

Country Link
CN (1) CN108705659B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1044128A (en) * 1996-08-06 1998-02-17 Shimizu Corp Form for producing precast concrete plate
CN202655374U (en) * 2012-06-26 2013-01-09 昌利锻造有限公司 Upper forming die for separate blank forming die
CN204585500U (en) * 2015-02-11 2015-08-26 北京市燕通建筑构件有限公司 A kind of knockdown precast concrete laminated floor slab limit mode structure
CN206066661U (en) * 2016-09-28 2017-04-05 贵州省绿筑科建住宅产业化发展有限公司 A kind of side mould for exempting from out muscle hole and overlapping board mold
CN206405367U (en) * 2016-12-05 2017-08-15 宁夏天地奔牛实业集团有限公司 Adjustable die hammer trimming die holder
CN208497269U (en) * 2018-06-22 2019-02-15 王全良 The concrete edge mold system of extended reinforcing bar

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1044128A (en) * 1996-08-06 1998-02-17 Shimizu Corp Form for producing precast concrete plate
CN202655374U (en) * 2012-06-26 2013-01-09 昌利锻造有限公司 Upper forming die for separate blank forming die
CN204585500U (en) * 2015-02-11 2015-08-26 北京市燕通建筑构件有限公司 A kind of knockdown precast concrete laminated floor slab limit mode structure
CN206066661U (en) * 2016-09-28 2017-04-05 贵州省绿筑科建住宅产业化发展有限公司 A kind of side mould for exempting from out muscle hole and overlapping board mold
CN206405367U (en) * 2016-12-05 2017-08-15 宁夏天地奔牛实业集团有限公司 Adjustable die hammer trimming die holder
CN208497269U (en) * 2018-06-22 2019-02-15 王全良 The concrete edge mold system of extended reinforcing bar

Also Published As

Publication number Publication date
CN108705659B (en) 2024-04-05

Similar Documents

Publication Publication Date Title
CN207829306U (en) Assemble concrete structure prefabricated post reserved joint bar positioning sleeve board mold and vertical connection structure
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN208497269U (en) The concrete edge mold system of extended reinforcing bar
CN205043936U (en) High -speed railway ballastless track opens production line of track board with two -way elder generation
CN108705659A (en) The concrete edge mold system and installation method of extended reinforcing bar
CN204531154U (en) Steel bar girder gypsum plank and novel floor support plate
CN206796130U (en) A kind of concrete mold with reserving hole
CN206220499U (en) The integrated mould of water-heating preformed hole
CN1702252B (en) Method for processing concrete mesh-beam floor system
CN112709431A (en) Material conveying port device with embedded steel bars and method for presetting material conveying port
CN108086597A (en) A kind of bar reinforcement positioning device and its application method
CN210368677U (en) End template of continuous beam cast in situ of hanging basket
CN107313587A (en) The template fixed system and the construction method of waterproof construction of buildings waterproof structure
CN209384527U (en) A kind of positioning card for indulging muscle positioning applied to wall beam node annular
CN208619117U (en) A kind of constructing device of cable duct
CN203209591U (en) Standard processing device for big-diameter extra-long pile foundation full pre-assembly reinforcement cage
CN215052265U (en) Reinforced concrete thin wall body reinforced structure
CN210375928U (en) Self-vibration concrete test mould
CN113445732A (en) Civil engineering slope surface plate structure, erecting method and civil engineering slope surface laying method
CN209755642U (en) pretensioned prestressed concrete tensioning equipment
CN215714690U (en) Accurate positioning device for embedded hole of cushion stone
CN214447193U (en) Side mold for precast concrete superimposed sheet
CN201358582Y (en) Shear wall template internal stay used for construction
CN210737242U (en) Base plate expansion joint positioning device of track slab
CN214785287U (en) Wallboard for assembly type building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20191223

Address after: Room 601, block B, Olympic Tiantai Plaza, 5777 jingshidong Road, high tech Zone, Jinan City, Shandong Province, 250000

Applicant after: Shandong Lijiu Construction Robot Co.,Ltd.

Applicant after: SHANDONG LIANFANG INFORMATION TECHNOLOGY Co.,Ltd.

Address before: 250000 Jianshe Road century Jiayuan 15-2-1103, Shizhong District, Shandong City, Ji'nan Province

Applicant before: Wang Quanliang

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201223

Address after: Room 806, building 4, future venture Plaza, gangxingsan Road, Jinan District, China (Shandong) pilot Free Trade Zone, Jinan City, Shandong Province

Applicant after: Zhongke lijiu (Jinan) construction robot Co.,Ltd.

Applicant after: SHANDONG LIANFANG INFORMATION TECHNOLOGY Co.,Ltd.

Address before: Room 601, block B, Olympic Tiantai Plaza, 5777 Jingshi East Road, high tech Zone, Jinan City, Shandong Province

Applicant before: Shandong Lijiu Construction Robot Co.,Ltd.

Applicant before: SHANDONG LIANFANG INFORMATION TECHNOLOGY Co.,Ltd.

TA01 Transfer of patent application right
CB02 Change of applicant information

Address after: Room 606, Building 4, Future Entrepreneurship Plaza, High tech Zone, Jinan City, Shandong Province, 250098

Applicant after: Zhongke Lijiu (Jinan) Robotics Co.,Ltd.

Applicant after: SHANDONG LIANFANG INFORMATION TECHNOLOGY Co.,Ltd.

Address before: Room 806, building 4, future venture Plaza, gangxingsan Road, Jinan District, China (Shandong) pilot Free Trade Zone, Jinan City, Shandong Province

Applicant before: Zhongke lijiu (Jinan) construction robot Co.,Ltd.

Applicant before: SHANDONG LIANFANG INFORMATION TECHNOLOGY Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant