CN1087051C - 人工复合地基桩基础的施工方法 - Google Patents
人工复合地基桩基础的施工方法 Download PDFInfo
- Publication number
- CN1087051C CN1087051C CN 98113954 CN98113954A CN1087051C CN 1087051 C CN1087051 C CN 1087051C CN 98113954 CN98113954 CN 98113954 CN 98113954 A CN98113954 A CN 98113954A CN 1087051 C CN1087051 C CN 1087051C
- Authority
- CN
- China
- Prior art keywords
- foundation
- artificially
- coarse aggregate
- grouting pipe
- composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
- Piles And Underground Anchors (AREA)
Abstract
人工复合地基桩基础的施工方法,它属于建筑业中灌注地基桩基础的施工方法。它由成孔、扩盘、下钢筋笼、下注浆管、下排淤管、投入粗骨料、灌注桩身砼、注水排淤、高压注浆,完成人工复合地基桩基础,其特点是在下钢筋笼的同时,加设排淤管;置换地基土层时,回填粗骨料;并在粗骨料的上面浇注桩身砼;通过注浆管给置换地基土层粗骨料注水,经排淤管排淤后封住排淤管,再经注浆管给置换地基土层高压注浆,形成人工复合地基桩基础。此地基提高了桩的端阻力和单方砼承载力。
Description
技术领域:本发明是属于建筑业中灌注地基桩基础的施工方法。
背景技术:目前,在建筑业中,灌注桩是现代建筑地基基础中已经普遍采用的设计形式之一。但是,在设计时由于地质条件的千差万别,较好的天然持力层埋置深度很深及厚度的不足,往往在选择端桩持力层时会给设计者、施工单位造成很大困难和不方便,同时也势必给建设单位资金投入上大为增加。
发明内容:本发明提出一种人工复合地基桩基础的施工方法,它解决了天然良好持力层埋置深度过大和厚度不足的问题,可以在适当深度设置一个人工复合地基持力层,使其满足桩的沉降计算要求,达到设计要求。本发明是在一般的施工方法的要求下,由成孔、扩盘、下注浆管与钢筋笼等工艺的同时,增设排淤管、投放粗骨料等施工方法,完成人工复合地基桩基础,其方法流程如图1所示,其特征在于:(1)在下钢筋笼的同时,加设注浆管a和排淤管b;(2)置换地基土层时,回填粗骨料,并在粗骨料的上面浇注桩身砼;(3)首先通过注浆管a给置换地基土层粗骨料注水经排淤管排淤,排淤后封住排淤管b,再经注浆管a给置换地基土层高压注浆,形成人工复合地基桩基础。本发明不同于高压注浆桩,在于受力机理的转变。高压注浆桩是通过注浆管在整个桩身部位进行1-2次注浆及补浆的办法来完成,使桩周土注入、渗入浆液后使桩周土的摩阻力得到提高,而增加桩的承载能力。本发明是在于提高桩端下桩端持力层端阻来提高桩的承载能力。通过建筑桩基规范给出的估算值可以看出,桩的端阻力在同样的地层要比摩阻力高出数倍至数拾倍,提高桩的端阻力是最有效、合理的途径。本发明与现有的技术相比有下述优点:本发明在于提高桩端下桩端持力层端阻来提高桩的承载能力。在注浆上部设有扩底的上覆封闭措施,可以保证注浆压力的实现,防止浆液的外溢,使有效的浆液都能注(渗)入在地基土中,不浪费原材料。注入的浆液在桩侧穿出时,能够把桩侧的土层得到加固,增加了桩侧摩阻力;同时也是克服施工缺陷,即灌注桩身时可能产生的振捣不实的有效方法。桩身采用扩底(或挤扩)时,可大幅度增加桩的断面积;更充分利用端阻力,达到受力机理以磨擦为主转为以端承为主的作用,是灌注桩的受力机理的重大改变。人工复合地基大大提高了桩的端阻力,从而使桩的受力由以磨擦为主变为端承为主,提高单方砼承载力的一倍以上。
附图说明:图1是本发明的施工方法流程图,图2是本发明工程具体实施方式的复合地基剖面示意图,图3是本发明工程具体实施方式复合地基基础平面示意图。
具体实施方式:人工复合地基桩基础的施工方法,它由成孔1、扩盘2、下注浆管、排淤管与钢筋笼3、投入粗骨料4、灌注桩身砼5、注水排淤6、高压注浆7施工方法,完成人工复合地基桩基础。其具体方法为:1、首先按设计要求成孔;2、扩盘:在自然土与复合地基相交接处扩盘;3、将钢筋笼下到扩盘后的孔内,钢筋笼下至到扩盘上端,将注浆管a和排淤管b同时设置在钢筋笼上,并下到孔内,注浆管a下到孔底,排淤管b下到复合地基上部;4、将粗骨料如碎石块投入扩盘孔以下孔内;5、灌注桩身砼;6、经注浆管a注水到粗骨料中,将下端部的淤泥由排淤管b排出;当干作业成孔时,不需要由注浆管a注水到粗骨料中,也不需要由排淤管b排淤;7、将排淤管b上端堵封后,经注浆管a高压注浆使浆不能向上排出而被迫进入地基层的周围土层内,完成人工复合地基桩基础。以哈尔滨市河苑大厦(层数为十八层,地下一层,建筑面积约一万四千平方米,现浇框剪结构,基础为柱下桩基)为例,设计单桩承载力标准值为1800KN。桩身直径为500mm,扩盘直径为960mm,桩身长为7000mm(见图2、图3)。复合地基厚度为3000mm。桩端持力层为粗砂厚为3m,其下为中砂与粉质粘土的混合交互层,并含地下水。原设计桩长为15米,桩径为600mm,并扩底,由于进入地下水位以内,必须采取水下钻进的成孔、成桩方法。改为按本发明方法后,桩长与复合地基均在地下水位以上创造了干作业施工条件,砼量大为降低,桩长缩短,钢筋量也随之大大降低,节工程造价50%,包括置换材料在内每立方米砼承载力达到750KN。
Claims (3)
1、人工复合地基桩基础的施工方法,它包括(1)、首先按设计要求成孔;(2)、在自然土与复合地基相交接处扩盘;(3)、将钢筋笼下到扩盘后的孔内,钢筋笼下至到扩盘上端,其特征在于将注浆管a和排淤管b同时设置在钢筋笼上,并下到孔内,注浆管a下到孔底,排淤管b下到复合地基上部;(4)、将粗骨料投入扩盘孔以下孔内;(5)、灌注桩身砼;(6)、经注浆管a注水到粗骨料中,将下端部的淤泥由排淤管b排出;(7)、将排淤管b上端堵封后,经注浆管a高压注浆使浆不能向上排出而被迫进入地基层的周围土层内,完成人工复合地基桩基础。
2、根据权利要求1所述的人工复合地基桩基础的施工方法,其特征在于当干作业成孔时,不需要由注浆管a注水到粗骨料中,也不需要由排淤管b排淤。
3、根据权利要求1、2所述的人工复合地基桩基础的施工方法,其特征在于向扩盘孔内投入的粗骨料为碎石块。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98113954 CN1087051C (zh) | 1998-04-28 | 1998-04-28 | 人工复合地基桩基础的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 98113954 CN1087051C (zh) | 1998-04-28 | 1998-04-28 | 人工复合地基桩基础的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1236851A CN1236851A (zh) | 1999-12-01 |
CN1087051C true CN1087051C (zh) | 2002-07-03 |
Family
ID=5223644
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 98113954 Expired - Fee Related CN1087051C (zh) | 1998-04-28 | 1998-04-28 | 人工复合地基桩基础的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1087051C (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100355991C (zh) * | 2005-04-18 | 2007-12-19 | 河海大学 | 一种桩土互动浆固散体材料桩复合地基施工工法 |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104234039B (zh) * | 2014-09-17 | 2016-06-29 | 中国一冶集团有限公司 | 一种钻孔灌注桩空孔部分填充物的置换装置及方法 |
CN104895086B (zh) * | 2015-05-04 | 2017-09-19 | 北京市勘察设计研究院有限公司 | 一种人工注浆层法桩端立体后压浆结构及浇筑方法 |
-
1998
- 1998-04-28 CN CN 98113954 patent/CN1087051C/zh not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100355991C (zh) * | 2005-04-18 | 2007-12-19 | 河海大学 | 一种桩土互动浆固散体材料桩复合地基施工工法 |
Also Published As
Publication number | Publication date |
---|---|
CN1236851A (zh) | 1999-12-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204059124U (zh) | 一种砂桩排水强夯后注浆地基加固结构 | |
CN110080254B (zh) | 用于斜边坡加固的排水抗滑桩-导水涵洞结构及施工方法 | |
CN103953008B (zh) | 一种适用于尾矿库的改进型混合坝 | |
CN104612134A (zh) | 一种用于浇筑施工的钻孔灌注桩后注浆施工方法 | |
CN109208545B (zh) | 一种具有消能效果的人工景观溢流坝施工方法 | |
CN103195060B (zh) | 软土地基预应力锚杆加固结构及其用途 | |
CN106638579A (zh) | 一种珊瑚砂地基膨胀水泥砂浆注浆桩的施工方法 | |
Wong | Methods of resisting hydrostatic uplift in substructures | |
KR100406874B1 (ko) | 흙 댐의 숭상 축조공법 | |
CN104164895A (zh) | 一种不产生水浮力的地下室 | |
CN109024621A (zh) | 路堤高边坡管桩复合挡土墙支护结构及其施工方法 | |
CN110805049B (zh) | 一种山体边坡超厚度喷锚永久支护结构的施工方法 | |
CN1087051C (zh) | 人工复合地基桩基础的施工方法 | |
CN218116337U (zh) | 一种用于已渗透土石坝加宽防渗结构 | |
CN203475486U (zh) | 一种不产生水浮力的地下室 | |
CN102828534A (zh) | 灾损病害深桩基础建筑物纠倾加固方法 | |
CN211143046U (zh) | 一种阻排水抗浮施工结构 | |
CN106939596A (zh) | 一种现浇竹节型泥浆护壁灌注桩 | |
CN116752554B (zh) | 基于控制性水泥注浆的高边坡支护系统和实施方法 | |
Wang et al. | Technology dealing with the soft soil foundation | |
CN219034746U (zh) | 穿越富水溶洞的隧洞通行结构 | |
CN212452500U (zh) | 一种坝体的加固结构体系 | |
CN215252983U (zh) | 一种综合管廊软弱地基的处理结构 | |
CN220266625U (zh) | 一种注浆片石挡墙墙身注浆加固结构 | |
CN203188198U (zh) | 软土地基预应力锚杆加固结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20020703 Termination date: 20150428 |
|
EXPY | Termination of patent right or utility model |