CN1087051C CN 98113954 CN98113954A CN1087051C CN 1087051 C CN1087051 C CN 1087051C CN 98113954 CN98113954 CN 98113954 CN 98113954 A CN98113954 A CN 98113954A CN 1087051 C CN1087051 C CN 1087051C
Authority
CN
China
Prior art keywords
foundation
artificially
coarse aggregate
grouting pipe
composite
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 98113954
Other languages
English (en)
Other versions
CN1236851A (zh
Inventor
徐松
徐国光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 98113954 priority Critical patent/CN1087051C/zh
Publication of CN1236851A publication Critical patent/CN1236851A/zh
Application granted granted Critical
Publication of CN1087051C publication Critical patent/CN1087051C/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

人工复合地基桩基础的施工方法,它属于建筑业中灌注地基桩基础的施工方法。它由成孔、扩盘、下钢筋笼、下注浆管、下排淤管、投入粗骨料、灌注桩身砼、注水排淤、高压注浆,完成人工复合地基桩基础,其特点是在下钢筋笼的同时,加设排淤管;置换地基土层时,回填粗骨料;并在粗骨料的上面浇注桩身砼;通过注浆管给置换地基土层粗骨料注水,经排淤管排淤后封住排淤管,再经注浆管给置换地基土层高压注浆,形成人工复合地基桩基础。此地基提高了桩的端阻力和单方砼承载力。

Description

人工复合地基桩基础的施工方法
技术领域:本发明是属于建筑业中灌注地基桩基础的施工方法。
背景技术:目前,在建筑业中,灌注桩是现代建筑地基基础中已经普遍采用的设计形式之一。但是,在设计时由于地质条件的千差万别,较好的天然持力层埋置深度很深及厚度的不足,往往在选择端桩持力层时会给设计者、施工单位造成很大困难和不方便,同时也势必给建设单位资金投入上大为增加。
发明内容:本发明提出一种人工复合地基桩基础的施工方法,它解决了天然良好持力层埋置深度过大和厚度不足的问题,可以在适当深度设置一个人工复合地基持力层,使其满足桩的沉降计算要求,达到设计要求。本发明是在一般的施工方法的要求下,由成孔、扩盘、下注浆管与钢筋笼等工艺的同时,增设排淤管、投放粗骨料等施工方法,完成人工复合地基桩基础,其方法流程如图1所示,其特征在于:(1)在下钢筋笼的同时,加设注浆管a和排淤管b;(2)置换地基土层时,回填粗骨料,并在粗骨料的上面浇注桩身砼;(3)首先通过注浆管a给置换地基土层粗骨料注水经排淤管排淤,排淤后封住排淤管b,再经注浆管a给置换地基土层高压注浆,形成人工复合地基桩基础。本发明不同于高压注浆桩,在于受力机理的转变。高压注浆桩是通过注浆管在整个桩身部位进行1-2次注浆及补浆的办法来完成,使桩周土注入、渗入浆液后使桩周土的摩阻力得到提高,而增加桩的承载能力。本发明是在于提高桩端下桩端持力层端阻来提高桩的承载能力。通过建筑桩基规范给出的估算值可以看出,桩的端阻力在同样的地层要比摩阻力高出数倍至数拾倍,提高桩的端阻力是最有效、合理的途径。本发明与现有的技术相比有下述优点:本发明在于提高桩端下桩端持力层端阻来提高桩的承载能力。在注浆上部设有扩底的上覆封闭措施,可以保证注浆压力的实现,防止浆液的外溢,使有效的浆液都能注(渗)入在地基土中,不浪费原材料。注入的浆液在桩侧穿出时,能够把桩侧的土层得到加固,增加了桩侧摩阻力;同时也是克服施工缺陷,即灌注桩身时可能产生的振捣不实的有效方法。桩身采用扩底(或挤扩)时,可大幅度增加桩的断面积;更充分利用端阻力,达到受力机理以磨擦为主转为以端承为主的作用,是灌注桩的受力机理的重大改变。人工复合地基大大提高了桩的端阻力,从而使桩的受力由以磨擦为主变为端承为主,提高单方砼承载力的一倍以上。
附图说明:图1是本发明的施工方法流程图,图2是本发明工程具体实施方式的复合地基剖面示意图,图3是本发明工程具体实施方式复合地基基础平面示意图。
具体实施方式:人工复合地基桩基础的施工方法,它由成孔1、扩盘2、下注浆管、排淤管与钢筋笼3、投入粗骨料4、灌注桩身砼5、注水排淤6、高压注浆7施工方法,完成人工复合地基桩基础。其具体方法为:1、首先按设计要求成孔;2、扩盘:在自然土与复合地基相交接处扩盘;3、将钢筋笼下到扩盘后的孔内,钢筋笼下至到扩盘上端,将注浆管a和排淤管b同时设置在钢筋笼上,并下到孔内,注浆管a下到孔底,排淤管b下到复合地基上部;4、将粗骨料如碎石块投入扩盘孔以下孔内;5、灌注桩身砼;6、经注浆管a注水到粗骨料中,将下端部的淤泥由排淤管b排出;当干作业成孔时,不需要由注浆管a注水到粗骨料中,也不需要由排淤管b排淤;7、将排淤管b上端堵封后,经注浆管a高压注浆使浆不能向上排出而被迫进入地基层的周围土层内,完成人工复合地基桩基础。以哈尔滨市河苑大厦(层数为十八层,地下一层,建筑面积约一万四千平方米,现浇框剪结构,基础为柱下桩基)为例,设计单桩承载力标准值为1800KN。桩身直径为500mm,扩盘直径为960mm,桩身长为7000mm(见图2、图3)。复合地基厚度为3000mm。桩端持力层为粗砂厚为3m,其下为中砂与粉质粘土的混合交互层,并含地下水。原设计桩长为15米,桩径为600mm,并扩底,由于进入地下水位以内,必须采取水下钻进的成孔、成桩方法。改为按本发明方法后,桩长与复合地基均在地下水位以上创造了干作业施工条件,砼量大为降低,桩长缩短,钢筋量也随之大大降低,节工程造价50%,包括置换材料在内每立方米砼承载力达到750KN。

Claims (3)

1、人工复合地基桩基础的施工方法,它包括(1)、首先按设计要求成孔;(2)、在自然土与复合地基相交接处扩盘;(3)、将钢筋笼下到扩盘后的孔内,钢筋笼下至到扩盘上端,其特征在于将注浆管a和排淤管b同时设置在钢筋笼上,并下到孔内,注浆管a下到孔底,排淤管b下到复合地基上部;(4)、将粗骨料投入扩盘孔以下孔内;(5)、灌注桩身砼;(6)、经注浆管a注水到粗骨料中,将下端部的淤泥由排淤管b排出;(7)、将排淤管b上端堵封后,经注浆管a高压注浆使浆不能向上排出而被迫进入地基层的周围土层内,完成人工复合地基桩基础。
2、根据权利要求1所述的人工复合地基桩基础的施工方法,其特征在于当干作业成孔时,不需要由注浆管a注水到粗骨料中,也不需要由排淤管b排淤。
3、根据权利要求1、2所述的人工复合地基桩基础的施工方法,其特征在于向扩盘孔内投入的粗骨料为碎石块。
CN 98113954 1998-04-28 1998-04-28 人工复合地基桩基础的施工方法 Expired - Fee Related CN1087051C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 98113954 CN1087051C (zh) 1998-04-28 1998-04-28 人工复合地基桩基础的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 98113954 CN1087051C (zh) 1998-04-28 1998-04-28 人工复合地基桩基础的施工方法

Publications (2)

Publication Number Publication Date
CN1236851A CN1236851A (zh) 1999-12-01
CN1087051C true CN1087051C (zh) 2002-07-03

Family

ID=5223644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 98113954 Expired - Fee Related CN1087051C (zh) 1998-04-28 1998-04-28 人工复合地基桩基础的施工方法

Country Status (1)

Country Link
CN (1) CN1087051C (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100355991C (zh) * 2005-04-18 2007-12-19 河海大学 一种桩土互动浆固散体材料桩复合地基施工工法

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234039B (zh) * 2014-09-17 2016-06-29 中国一冶集团有限公司 一种钻孔灌注桩空孔部分填充物的置换装置及方法
CN104895086B (zh) * 2015-05-04 2017-09-19 北京市勘察设计研究院有限公司 一种人工注浆层法桩端立体后压浆结构及浇筑方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100355991C (zh) * 2005-04-18 2007-12-19 河海大学 一种桩土互动浆固散体材料桩复合地基施工工法

Also Published As

Publication number Publication date
CN1236851A (zh) 1999-12-01

Similar Documents

Publication Publication Date Title
CN204059124U (zh) 一种砂桩排水强夯后注浆地基加固结构
CN110080254B (zh) 用于斜边坡加固的排水抗滑桩-导水涵洞结构及施工方法
CN103953008B (zh) 一种适用于尾矿库的改进型混合坝
CN104612134A (zh) 一种用于浇筑施工的钻孔灌注桩后注浆施工方法
CN109208545B (zh) 一种具有消能效果的人工景观溢流坝施工方法
CN103195060B (zh) 软土地基预应力锚杆加固结构及其用途
CN106638579A (zh) 一种珊瑚砂地基膨胀水泥砂浆注浆桩的施工方法
Wong Methods of resisting hydrostatic uplift in substructures
KR100406874B1 (ko) 흙 댐의 숭상 축조공법
CN104164895A (zh) 一种不产生水浮力的地下室
CN109024621A (zh) 路堤高边坡管桩复合挡土墙支护结构及其施工方法
CN110805049B (zh) 一种山体边坡超厚度喷锚永久支护结构的施工方法
CN1087051C (zh) 人工复合地基桩基础的施工方法
CN218116337U (zh) 一种用于已渗透土石坝加宽防渗结构
CN203475486U (zh) 一种不产生水浮力的地下室
CN102828534A (zh) 灾损病害深桩基础建筑物纠倾加固方法
CN211143046U (zh) 一种阻排水抗浮施工结构
CN106939596A (zh) 一种现浇竹节型泥浆护壁灌注桩
CN116752554B (zh) 基于控制性水泥注浆的高边坡支护系统和实施方法
Wang et al. Technology dealing with the soft soil foundation
CN219034746U (zh) 穿越富水溶洞的隧洞通行结构
CN212452500U (zh) 一种坝体的加固结构体系
CN215252983U (zh) 一种综合管廊软弱地基的处理结构
CN220266625U (zh) 一种注浆片石挡墙墙身注浆加固结构
CN203188198U (zh) 软土地基预应力锚杆加固结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20020703

Termination date: 20150428

EXPY Termination of patent right or utility model